Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #21349815

Thanjavur District Nabard - Ridf - Xxv ( 2019-2020 ) Orathanadu Block - Package No . 4 ( 03 Works ) Thanjavur District - Package No . 4- Reconstruction Of 3 Nos Of Minor Bridge Works In Orathanadu Block Of Thanjavur District Under Nabard - Ridf - Xx

Issued by Local Bodies · Orathanadu, Tamil Nadu
Tender Value
1.78 Crore
Estimated cost
Bid Submission
04 Sep 2019
0 days left
EMD
1.78 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Orathanadu → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Thanjavur District Nabard - Ridf - Xxv ( 2019-2020 ) Orathanadu Block - Package No . 4 ( 03 Works ) Thanjavur District - Package No . 4- Reconstruction Of 3 Nos Of Minor Bridge Works In Orathanadu Block Of Thanjavur District Under Nabard - Ridf - Xxv 2019-20

BOQ

Name of Work: THANJAVUR DISTRICT - NABARD - RIDF - XXV (2019 - 2020). Part.1. Reconstruction of Minor Bridge to Keela Theru Road across Vadaseri Vaikkal in Neivasal South Panchayat.Part.2. Reconstruction of Minor Bridge across Vallamvari Vaikkal in Ponnapur to Palayaneri Vayal Road in Chinnaponnapur Panchayat.Part.3. Reconstruction of Minor Bridge to Sunnambukara Theru Road across Vadaseri Vaikkal in Moorthiyambalpuram Panchayat.
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Part.1. Reconstruction of Minor Bridge to Keela Theru Road across Vadaseri Vaikkal in Neivasal South Panchayat.
22Excavation including removal and satisfactory disposal in accordance with the requirements of the specifications. The material shall be laid in one or more layers as sub-base or lower sub-base and upper sub-base as necessary according to lines,grades and cross sections shown in the drawings or as directed by the Engineer using Carted Earth having CBR value not lessthan 10, obtained from 9 km lead including cost and conveyance and compactino by power roller including all labour and incidental charges etc., complete. For Formation Diversion Road using Carted Earth. (98% Compaction)137.5Cu.m
33Providing, laying and compacting well graded material on prepared sub-grade in accordance with the requirements of the specifications. The material shall be laid in one or more layers as sub-base or lower sub-base and upper sub-base as necessary according to lines,grades and cross sections shown in the drawings or as directed by the Engineer using Gravel with power Roller Rolling for Sub Grade for Gravel Diversion Road Gravel Filling55Cu.m
44Supply of RCC NP3 ISI class pipes and collars of 1000 mm dia of standard length and cut lengths including cost and conveyance to the worksite and all other incidental charges etc., complete.22.5R.M
55Dismantling and cleaning a way Brick / Stone Masonry in Cement Mortar walls under 3 M height including dismantling and stacking the serviceable materials etc complete (S.No.14 Page 31 of PWD schedule of rates for (2017-2018)18.86Cu.m
66Dismantling the existing cement concrete and cleaning away from work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc,complete. (S.No.38 Page 27 of PWD schedule of rates for (2017-2018)32Cu.m
77Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling our water, providing and maintaining necessary cofferdams, sheeting, shoring bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specification for DRESSING THE BED UP TO SILL LEVEL.55.57Cu.m
88Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION OF ABUTMENTS , WINGS & PIERS.229.32Cu.m
99Vibrated Cement Concrete of grade M10 Nominal Mix 1:3:6 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for LEVELLING COURSE BELOW ABUTMENT , WINGS AND PIERS (BELOW SILL LEVEL)23.13Cu.m
1010Vibrated Cement Concrete of grade M20 (Design mix) using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying & curing concrete working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds cofferdams, horing, strutting etc., complete as per relevent standard specification for FOUNDATION OF ABUTMENT, WING WALLS AND PIERS (BELOW SILL LEVEL)176.8Cu.m
1111Vibrated Cement Concrete of grade M 15 Nominal Mix 1:2:4 using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. For Bed protection39.36Cu.m
1212Vibrated Cement Concrete of grade M20 (Design mix) 20mm & 12mm ISS size HBG metal including cost andconveyance of all materials to site and cement at site including cost of formwork, soft water, labour chargesfor mixing, transporting, laying and curing concrete working at depths,Tools & Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc.,complete as per relevent standardspecification. for SUB - STRUCTURE OF ABUTMENT AND WINGS (Above sill level).54.01Cu.m
1313Reinforced cement concrete M25 (design mix) using 20mm & 12mm ISS size HBG metal including cost and conveyanceof all materials to site and cement at site excluding cost and fabrication of steel but including formwork and centering, softwater,labour charges for mixing,transporting and placing in position, vibrating and compacting, finishing and curing, all other incidental charges etc.,completeas per specification for BED BLOCK CUM DIRTWALL OVER ABUTMENT.4.84Cu.m
1414Providing and fixing PVC seepage pipes of 100mm dia of required lengths for abutments wings including cost and conveyance of all materials to worksite and labour charges for fixing, etc., complete to drain the backfill as per standard specifications.22Nos
1515Providing and fixing KRAFT paper for full width of seating of deck slab and including cost and conveyance to worksite , labour for fixing the same incorrect position and all other incidental charges etc., complete.13.2Sq.m
1616Vibrated reinforced cement concrete M30 (Design mix) using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site & cement at site excluding cost and fabrication of steel but including formwork and centering softwater labour charges for mixing, transporting, placing in, position vibrating andcompacting finishing & curing concrete, working at heights, hire charges fortools and plants, including all otherincidental charges etc., complete as per standard specification. for RCC DECK SLAB35.73Cu.m
1717Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm and well compacted in layerswith smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work siteincluding all labours and other incidentalcharges including hire charges forfor tools and plants employed etc.,for filter media as per MOST's (Roads Wing)specifications for Roads and Bridges Fourth Revision Cl. 309-3-2-13 and 305-4-4 etc.,complete.25.17Cu.m
1818Filling behind Abutments and wings with clean gritty gravel to I ncluding cost and conveyance of gravel to worksite,laying, handling, charges & filling in layers, tamping under optimum moisture content to get the maximum density including watering, with all leads for water and all other incidental charges etc.,complete. FOR FILLING BEHIND ABUTMENT AND WINGWALL36.37Cu.m
1919Providing and fixing 200mm thick PVC EXPANSION JOINT in between deckslabs over abutment and pier as shown in the drawing including cost and conveyance of expansion joints including shalimarpad and joint sealent etc., complete22.5R.M
2020Vibrated Cement Concrete of grade M 15 Nominal Mix 1:2:4 using 20mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. for BASECOURSE BELOW APPROACH SLAB6.15Cu.m
2121Vibrated reinforced cement concreteM30 (Design mix) using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials site & cement at site excluding cost and fabrication ofsteel but including formwork & centering softwater labour charges for mixing, transporting,placing in, position vibrating and compacting finishing &curing concrete, working at heights, hire charges for tools & plants,including all other incidental charges etc complete as .per standard specification for APPROACH SLAB16.03Cu.m
2222Vibrated Cement Concrete of grade M30 (Design mix) using 20mm & 12mm ISS size HBG metal including cost & conveyance of all materials to site and cement at site including all labour charges for mixing concrete laying, vibrating Hirecharges for Tools and Plants, compacting, curing with all leads of soft water,including and all other incidental charges form work cost of premoulded expansion joints and fixing the same in position etc.,complete for wearing coat of 75mm uniform .thickness over Deck slab117.48Sq.m
2323Vibrated reinforced Cement Concrete of grade M 25 (Design Mix) 1:1.5:3.0 using 20 & 12mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications. for RCC Handrail21.6R.M
2424Vibrated Cement Concrete of grade M20 using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, lead for soft water,labour charges for mixing, transporting,laying and curing concrete working at heights hire charges for Tools and Plants including all other incidental charges etc. complete as per standard specification for CRASH BARRIER TYPE PARAPET.6.3Cu.m
2525Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawings SD/205 with grating arrangements at top as shown in thedrawing using 12mmx25mm flats for grating arrangements,and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in thedrawing including cost & conveyance of cast iron pipes and flats and fixing them in position etc., complete.4Nos
2626Supply and fabrication of Fe-500 steel required for all RCC items of works involved in the schedule and cost of HCRM steel confirming to IS 1786 at site including fabrication, labour charges for cleaning the rods straightening cutting bending tying grills, including overlapping to the required length wherever necessery and placing the reinforced in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete as per standard specifications. Fe-500 Grade 1 MT.5.5M.T
2727Construction of Retaining wall.
2828Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAINING WALL.38.4Cu.m
2929Filling inside the Foundation with clean coarse sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Foundation.9.6Cu.m
3030Vibrated Cement Concrete of Grade M 15 Nominal Mix (1:2:4) using 20 mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION BELOW.9.6Cu.m
3131Vibrated Cement Concrete Grade M 20 Design Mix (1:1.5:3) using 20 & 12 mm ISS size HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per standard specifications for RETAINING WALL FOUNDATION.24.48Cu.m
3232Vibrated Cement Concrete of Grade M 20 Design Mix (1:1.5:3) using 20 mm & 12 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF RETAINING WALL ABOVE SILL LEVEL -76.96Cu.m
3333Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Retaining Wall including cost and conveyance of all materials to work site and labour charges for fixing, complete32Nos
3434Part.2. Reconstruction of Minor Bridge across Vallamvari Vaikkal in Ponnapur to Palayaneri Vayal Road in Chinnaponnapur Panchayat.
3535Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION (OPEN FOUNDATION, RAFT FOUNDATION, CUT OFF WALL, FLEXIBLE & RIGID APRON) UNDER ABUTMENTS & PIERS BELOW SILL LEVEL.497.93Cu.m
3636Filling below the open foundation concrete with clean coarse sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Raft.80.31Cu.m
3737Vibrated Cement Concrete of grade M10 Nominal Mix 1:3:6 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for LEVELING COURSE UNDER FOOTING -1 Cum (Below Sill level).16.06Cu.m
3838Vibrated Cement Concrete of grade M20 (Design mix) using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying & curing concrete working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds cofferdams, horing, strutting etc., complete as per relevant standard specification for FOOTINGS OF ABUTMENT, PIERS AND WINGS (BELOW SILL LEVEL).281.51Cu.m
3939Vibrated Cement Concrete of grade M20 (Design mix) 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour chargesfor mixing, transporting, laying and curing concrete working at depths,Tools & Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc.,complete as per relevant standardspecification for SUB - STRUCTURE OF ABUTMENT, WINGS AND PIERS (Above sill level).106.68Cu.m
4040Vibrated Reinforced Cement Concrete of grade M25 design mix using 20mm & 12 mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS.5.86Cu.m
4141Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND WINGS.52Nos
4242Providing and fixing Kraft Paper for full width of seating of deck slab and including including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complete.16.83Sq.m
4343Vibrated reinforced cement concrete M 30, 1:1.44:2.88 Grade, Design Mix using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for DECK SLAB.69.48Cu.m
4444Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MORT's (Roads Wing) specifications for Roads and Bridges \" Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.31.73Cu.m
4545Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the abutment and wings.42.73Cum
4646Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutments andpiers as shown in the drawing including cost and conveyance of expeansion joints oncluding shallimar pad and joimt sealent etc., complete-1 set.25.6R.M
4747Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.7.95M.T
4848Vibrated Cement Concrete of grade M 15 (Nominal Mix 1:2:4) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for BASE COURSE BELOW APPROACH SLAB.5.28Cu.m
4949Vibrated reinforced cement concrete M 30 Grade, Design Mix using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for APPROACH SLAB.12.88Cum
5050Vibrated Cement Concrete M20 grade, Design Mix using 20mm & 12mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for PARAPET WALL OVER WINGS.6.3Cum
5151Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for Wearing coat of 75mm uniform thickness over deck slab and approach slab.150.7Sq.m
5252Vibrated Reinforced Cement Concrete M-25, Grade, Design Mix, using 20 mm & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC HAND RAILS.40.8R.M
5353Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.6Nos.
5454Approach road.
5555Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 2km for formation of Approach Road.
565698% COMPACTION1362Cu.m
5757100% COMPACTION148.5Cu.m
5858Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method).GSB Grade III85.16Cu.m
5959Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)31.33Cu.m
6060Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method) Rate for 10sqm20.08Cu.m
6161Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification267.75Sq.m
6262Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type \"A\" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete267.75Sq.m
6363Supply of NP 3 class RCC 900 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete for culvert.22.5R.M
6464Construction of Retaining wall.
6565Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.115.5Cu.m
6666Filling inside the Foundation with clean coarse sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Foundation.14.44Cu.m
6767Vibrated Cement Concrete of Grade M 15 Nominal Mix (1:2:4) using 40 mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION BELOW.14.44Cu.m
6868Vibrated Cement Concrete Grade M 20 Design Mix (1:1.5:3) using 20 & 12 mm ISS size HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per standard specifications for RETAINING WALL FOUNDATION.28.88Cu.m
6969Vibrated Cement Concrete of Grade M 20 Design Mix (1:1.5:3) using 20 mm & 12 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF RETAINING WALL ABOVE SILL LEVEL -118.25Cu.m
7070Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Retaining Wall including cost and conveyance of all materials to work site and labour charges for fixing, complete110Nos
7171Dismantling of Existing Structure.
7272Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m - Foundation.8.28Cu.m
7373Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m - Substructure.22.4Cu.m
7474Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as - Superstructure.12.6Cu.m
7575Part.3. Reconstruction of Minor Bridge to Sunnambukara Theru Road across Vadaseri Vaikkal in Moorthiyambalpuram Panchayat.
7676Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION (OPEN FOUNDATION, RAFT FOUNDATION, CUT OFF WALL, FLEXIBLE & RIGID APRON) UNDER ABUTMENTS & PIERS BELOW SILL LEVEL.464.02Cu.m
7777Filling below the open foundation concrete with clean coarse sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Raft.19.43Cu.m
7878Vibrated Cement Concrete of grade M10 Nominal Mix 1:3:6 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for LEVELING COURSE UNDER FOOTING -1 Cum (Below Sill level).12.95Cu.m
7979Vibrated Cement Concrete of grade M20 (Design mix) using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing,transporting,laying & curing concrete working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds cofferdams, horing, strutting etc., complete as per relevant standard specification for FOOTINGS OF ABUTMENT, PIERS AND WINGS (BELOW SILL LEVEL).300.08Cu.m
8080Vibrated Cement Concrete of grade M20 (Design mix) 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour chargesfor mixing, transporting, laying and curing concrete working at depths,Tools & Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc.,complete as per relevant standardspecification for SUB - STRUCTURE OF ABUTMENT, WINGS AND PIERS (Above sill level).56.79Cu.m
8181Vibrated Reinforced Cement Concrete of grade M25 design mix using 20mm & 12 mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS.5.07Cu.m
8282Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND WINGS.26Nos
8383Providing and fixing Kraft Paper for full width of seating of deck slab and including including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complete.13.2Sq.m
8484Vibrated reinforced cement concrete M 30, 1:1.44:2.88 Grade, Design Mix using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for DECK SLAB.54.42Cu.m
8585Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MORT's (Roads Wing) specifications for Roads and Bridges \" Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.24.23Cu.m
8686Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the abutment and wings.39.49Cum
8787Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutments andpiers as shown in the drawing including cost and conveyance of expeansion joints oncluding shallimar pad and joimt sealent etc., complete-1 set.22.5R.M
8888Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.6.56M.T
8989Vibrated Cement Concrete of grade M 15 (Nominal Mix 1:2:4) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for BASE COURSE BELOW APPROACH SLAB.33.15Cu.m
9090Vibrated reinforced cement concrete M 30 Grade, Design Mix using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for APPROACH SLAB.15.82Cum
9191Vibrated Cement Concrete M20 grade, Design Mix using 20mm & 12mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for PARAPET WALL OVER WINGS.6.3Cum
9292Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for Wearing coat of 75mm uniform thickness over deck slab and approach slab.135.96Sq.m
9393Vibrated Reinforced Cement Concrete M-25, Grade, Design Mix, using 20 mm & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC HAND RAILS.27.2R.M
9494Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.4Nos.
9595Approach road.
9696Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 2km for formation of Approach Road.
979798% COMPACTION931.5Cu.m
9898100% COMPACTION111.38Cu.m
9999Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method).GSB Grade III56.48Cu.m
100100Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)24.3Cu.m
101101Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method) Rate for 10sqm15.86Cu.m
102102Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification211.5Sq.m
103103Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type \"A\" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete211.5Sq.m
104104Supply of NP 3 class RCC 900 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete for culvert.22.5R.M
105105Construction of Retaining wall.
106106Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.74.4Cu.m
107107Filling inside the Foundation with clean coarse sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Foundation.9.3Cu.m
108108Vibrated Cement Concrete of Grade M 15 Nominal Mix (1:2:4) using 40 mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION BELOW.9.3Cu.m
109109Vibrated Cement Concrete Grade M 20 Design Mix (1:1.5:3) using 20 & 12 mm ISS size HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per standard specifications for RETAINING WALL FOUNDATION.18.6Cu.m
110110Vibrated Cement Concrete of Grade M 20 Design Mix (1:1.5:3) using 20 mm & 12 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF RETAINING WALL ABOVE SILL LEVEL -58.2Cu.m
111111Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Retaining Wall including cost and conveyance of all materials to work site and labour charges for fixing, complete80Nos
112112Dismantling of Existing Structure.
113113Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m - Foundation.29.58Cu.m
114114Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m - Substructure.11.88Cu.m
115115Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as - Superstructure.18.7Cu.m
116116Removal of hume pipe 900mm dia the existing piped causeway and clearing away from the work site and carefully stacking the useful materials for reuse on the road side as directed by the departmental officers including all labour and incidental charges etc., complete. for Super structure.35R.M
117117GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}\n1GST Amount (in Rupees)

AI Tender Summary

OUR REF NO 21349815
AUTHORITY Local Bodies
TENDER VALUE 1.78 Crore
LAST DATE 04-09-2019
Authority
Authority Name Rural Development And Panchayats Department
Work Description Thanjavur District Nabard - Ridf - Xxv ( 2019-2020 ) Orathanadu Block - Package No . 4 ( 03 Works ) Thanjavur District - Package No . 4- Reconstruction Of 3 Nos Of Minor Bridge Works In Orathanadu Block Of Thanjavur District Under Nabard - Ridf - Xxv 2019-20
Basic Detail
Tender No DIPR/2601/TENDER/2019 dated 29.07.2019
Bidding Type Tender
Location
City Orathanadu
State Tamil Nadu
Key Dates
Publish Date 09 Aug 2019
Submission Date 04 Sep 2019
Open Date 05 Sep 2019
Finance
Tender Value 1.78 Crore
Tender Fee Ref. Documents
EMD 1.78 Lakhs
Exemption Not Available
Document List
BOQ_162148.xls
Tendernotice_1.pdf
packg.4.orathanadu.technicalbid.pdf
pkg.4.orathanadu.pricebid.pdf
DC733F79-EB91-4493-9358-DFC6815E96FB.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 09, 2019
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 04, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 05, 2019

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
xls

BOQ_162148.xls

pdf

Tendernotice_1.pdf

4

packg.4.orathanadu.technicalbid.pdf

4

pkg.4.orathanadu.pricebid.pdf

html

DC733F79-EB91-4493-9358-DFC6815E96FB.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders