Bharat Coking Coal Limited-BCCL has published Repairing/ Overhauling Of Idler Wheel Assembly Of Pock Lain 90 Ck Mc . Sl . No . A1339 Of Sudamdih Coal Washery . . Submission Date for this Tender is 24-08-2019. Industrial Wheels Tenders in Sudamdih Coal Washery, Sudamdih,Dhanbad,Jharkhand. Jharkhand. Bidders can get complete Tender details and download the document.
Name of Work: Repairing/ overhauling of Idler wheel assembly of Pock lain 90 CK Mc. Sl. No. A1339 of Sudamdih Coal Washery. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | Item Description/ Heading | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Material Cost for Idler wheel assembly:\n1. Changing of Idler wheel seal kit - 01 Set @ Rs. 3200.00 = Rs. 3200.00\n2. Changing of gun metal bush - 01 Set @ Rs. 5300.00 = Rs. 5300.00\n3. Cost of Idler shaft seal cap - 02 Nos. @ Rs. 1100.00 = Rs. 2200.00\n4. Cost of Idler shaft "O" ring - 01 No @ Rs. 1200.00 = Rs. 1200.00\n5. Cost of Idler cap bolt - 12 Nos. @ Rs. 25.00 = Rs. 300.00\n6. Cost of cutting electrodes - 05 Kg @ Rs. 320.00 = Rs. 1600.00\n7. Cost of grinding stone - 02 Nos. @ Rs. 25.00 = Rs. 50.00\n8. Cost of cutting tools - 02 Nos. @ Rs. 200.00 = Rs. 400.00\n--------------------------------------------------------------------\n Total Cost of Materials = Rs. 14250.00\n-------------------------------------------------------------------- | BI01010001010000000000000515BI0100001113 | 2 | Set |
3 | 1.02 | Labour Cost:\n1. Charges of welder - 08 Shift @ Rs. 591.00 = Rs. 4728.00\n2. Charges of welder/ helper - 08 Shift @ Rs. 550.00 = Rs. 4400.00\n3. Charges of lathe man - 04 Shift @ Rs. 591.00 = Rs. 2364.00\n4. Charges of lathe man/ helper - 04 Shift @ Rs. 550.00 = Rs. 2200.00\n5. Charges of tyndel for lifting of the idler on the lathe machine - 03 Shift @ Rs. 591.00 = Rs. 1773.00\n--------------------------------------------------------------------\n Total Labour Cost = Rs. 15465.00\n-------------------------------------------------------------------- | BI01010001010000000000000515BI0100001114 | 2 | Set |
4 | 1.03 | Infrastructure Cost:\n1. Hire charges of lathe machine - 06 Shift @ Rs. 400.00 = Rs. 2400.00\n2. Hire charges of press machine for bush pressing - 02 Shift @ Rs. 700.00 = Rs. 1400.00\n--------------------------------------------------------------------\n Total Infrastructure Cost = Rs. 3800.00\n-------------------------------------------------------------------- | BI01010001010000000000000515BI0100001118 | 2 | Set |
5 | 2 | Total impact of GST for the purpose of CTC | BI01010001010000000000000515BI0100001129 | 1 | Nos |