Housing Urban and Rular Development Local Bodies Closing in 0 days TDR #21327326

Thanjavur District Nabard - Ridf - Xxv ( 2019-2020 ) Orathanadu Block - Package No . 2 ( 02 Works ) Thanjavur District - Package No . 2- Reconstruction Of 2 Nos Of Minor Bridge Works In Package No . 02 Orathanadu Block Of Thanjavur District Under Na

Issued by Local Bodies · Orathanadu, Tamil Nadu
Tender Value
1.80 Crore
Estimated cost
Bid Submission
04 Sep 2019
0 days left
EMD
1.80 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Orathanadu → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Thanjavur District Nabard - Ridf - Xxv ( 2019-2020 ) Orathanadu Block - Package No . 2 ( 02 Works ) Thanjavur District - Package No . 2- Reconstruction Of 2 Nos Of Minor Bridge Works In Package No . 02 Orathanadu Block Of Thanjavur District Under Nabard - Ridf - Xxv 2019-20

BOQ

Name of Work: THANJAVUR DISTRICT - NABARD - RIDF - XXV (2019 - 2020). Part.1. Reconstruction of Minor Bridge in Chinnakumulai Road across Vadakadu Channel in Avidanallavijayapuram Panchayat.Part.2. Reconstruction of Minor Bridge across Singaneri Vaikkal Kakkarai Panchayat.
Sl.No.Item DescriptionItem Code / MakeQuantityUnits
11Part.1. Reconstruction of Minor Bridge in Chinnakumulai Road across Vadakadu Channel in Avidanallavijayapuram Panchayat.
22Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION (OPEN FOUNDATION, RAFT FOUNDATION, CUT OFF WALL, FLEXIBLE & RIGID APRON) UNDER ABUTMENTS & PIERS BELOW SILL LEVEL.595.95Cu.m
33Filling below the open foundation concrete with clean coarse sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Raft.69.35Cu.m
44Vibrated Cement Concrete of grade M10 Nominal Mix 1:3:6 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for LEVELING COURSE UNDER FOOTING -1 Cum (Below Sill level).13.87Cu.m
55Vibrated Cement Concrete of grade M20 (Design mix) using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing,transporting,laying & curing concrete working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds cofferdams, horing, strutting etc., complete as per relevant standard specification for FOOTINGS OF ABUTMENT, PIERS AND WINGS (BELOW SILL LEVEL).324.74Cu.m
66Vibrated Cement Concrete of grade M20 (Design mix) 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour chargesfor mixing, transporting, laying and curing concrete working at depths,Tools & Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc.,complete as per relevant standardspecification for SUB - STRUCTURE OF ABUTMENT, WINGS AND PIERS (Above sill level).99.2Cu.m
77Vibrated Reinforced Cement Concrete of grade M25 design mix using 20mm & 12 mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS.5.07Cu.m
88Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND WINGS.52Nos
99Providing and fixing Kraft Paper for full width of seating of deck slab and including including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complete.13.2Sq.m
1010Vibrated reinforced cement concrete M 30, 1:1.44:2.88 Grade, Design Mix using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for DECK SLAB.59.22Cu.m
1111Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MORT's (Roads Wing) specifications for Roads and Bridges \" Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.35.57Cu.m
1212Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the abutment and wings.55.81Cum
1313Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutments andpiers as shown in the drawing including cost and conveyance of expeansion joints oncluding shallimar pad and joimt sealent etc., complete-1 set.22.5R.M
1414Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.7.12M.T
1515Vibrated Cement Concrete of grade M 15 (Nominal Mix 1:2:4) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for BASE COURSE BELOW APPROACH SLAB.65.22Cu.m
1616Vibrated reinforced cement concrete M 30 Grade, Design Mix using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for APPROACH SLAB.15.82Cum
1717Vibrated Cement Concrete M20 grade, Design Mix using 20mm & 12mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for PARAPET WALL OVER WINGS.6.3Cum
1818Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for Wearing coat of 75mm uniform thickness over deck slab and approach slab.143.88Sq.m
1919Vibrated Reinforced Cement Concrete M-25, Grade, Design Mix, using 20 mm & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC HAND RAILS.29.6R.M
2020Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.4Nos.
2121Approach road.
2222Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 2km for formation of Approach Road.
232398% COMPACTION3585Cu.m
2424100% COMPACTION618.75Cu.m
2525Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method).GSB Grade III194.06Cu.m
2626Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)85.78Cu.m
2727Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method) Rate for 10sqm74.53Cu.m
2828Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification993.75Sq.m
2929Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type \"A\" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete993.75Sq.m
3030Supply of NP 3 class RCC 900 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete for culvert.22.5R.M
3131Construction of Retaining wall.
3232Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.71.28Cu.m
3333Filling inside the Foundation with clean coarse sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Foundation.8.91Cu.m
3434Vibrated Cement Concrete of Grade M 15 Nominal Mix (1:2:4) using 20 mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION BELOW.8.91Cu.m
3535Vibrated Cement Concrete Grade M 20 Design Mix (1:1.5:3) using 20 & 12 mm ISS size HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per standard specifications for RETAINING WALL FOUNDATION.17.82Cu.m
3636Vibrated Cement Concrete of Grade M 20 Design Mix (1:1.5:3) using 20 mm & 12 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF RETAINING WALL ABOVE SILL LEVEL -76.68Cu.m
3737Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Retaining Wall including cost and conveyance of all materials to work site and labour charges for fixing, complete72Nos
3838Dismantling of Existing Structure.
3939Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m - Foundation.7.68Cu.m
4040Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m - Substructure.25.92Cu.m
4141Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as - Superstructure.13Cu.m
4242Part.2. Reconstruction of Minor Bridge across Singaneri Vaikkal Kakkarai Panchayat.
4343Earthwork excavation in all classes of soil except hardrock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as Bailing out water, providing and maintaining necessary coffferdams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION (OPEN FOUNDATION, RAFT FOUNDATION, CUT OFF WALL, FLEXIBLE & RIGID APRON) UNDER ABUTMENTS & PIERS BELOW SILL LEVEL.757.57Cu.m
4444Filling below the open foundation concrete with clean coarse sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Raft.36.03Cu.m
4545Vibrated Cement Concrete of grade M10 Nominal Mix 1:3:6 using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for LEVELING COURSE UNDER FOOTING -1 Cum (Below Sill level).18.01Cu.m
4646Vibrated Cement Concrete of grade M20 (Design mix) using 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour charges for mixing,transporting,laying & curing concrete working at depths,Tools and Plants and incidental charges such as maintaining of protective bunds cofferdams, horing, strutting etc., complete as per relevant standard specification for FOOTINGS OF ABUTMENT, PIERS AND WINGS (BELOW SILL LEVEL).458.84Cu.m
4747Vibrated Cement Concrete of grade M20 (Design mix) 20mm & 12mm ISS size HBG metal including cost and conveyance of all materials to site and cement at site including cost of formwork, soft water, labour chargesfor mixing, transporting, laying and curing concrete working at depths,Tools & Plants and incidental charges such as maintaining of protective bunds, cofferdams, shoring, struttingetc.,complete as per relevant standardspecification for SUB - STRUCTURE OF ABUTMENT, WINGS AND PIERS (Above sill level).148.99Cu.m
4848Vibrated Reinforced Cement Concrete of grade M25 design mix using 20mm & 12 mm ISS size HBG graded metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants including all other incidental charges etc; complete as per relevant standard specifications, for DIRT WALL CUM BED BLOCK OVER ABUTMENTS AND BED BLOCK OVER PIERS.6.85Cu.m
4949Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for abutments and wings including cost and conveyance of all materials to work site, cost and labour for 900 mm. Dia. Semi spherical back fill arrangements with 100 mm. size broken granite chips at the periphery and labour charges for fixing, etc., to drain of the backfill IN BETWEEN THE ABUTMENTS AND WINGS.78Nos
5050Providing and fixing Kraft Paper for full width of seating of deck slab and including including cost and conveyance to work site Labour for fixing the same in correct position and all other incidental charges etc., complete.19.73Sq.m
5151Vibrated reinforced cement concrete M 30, 1:1.44:2.88 Grade, Design Mix using 20 & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for DECK SLAB.88.83Cu.m
5252Providing filter media behind the abutments and wings with clean III graded material 53mm to 5.6mm to 600mm thick and well compacted in layers with smaller sized towards the soil and bigger size towards the wall including cost and conveyance to work site including all labours and other incidental charges including hire charges for tools and plants employed etc., for filter media as per MORT's (Roads Wing) specifications for Roads and Bridges \" Fourth Revision Cl. 309-3-2-13 and 305 -4-4 etc., complete.41.84Cu.m
5353Filling behind Abutments and wings with clean gritty gravel including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling behind the abutment and wings.67.23Cum
5454Providing and fixing PVC EXPANSION JOINT in between deck slabs over abutments andpiers as shown in the drawing including cost and conveyance of expeansion joints oncluding shallimar pad and joimt sealent etc., complete-1 set.30R.M
5555Supply and fabrication of High Yield Strength Deformed Bar with Grade Designation Fe.500, conforming to IS:1786 1985, steel required for all RCC items of works involved in the schedule cost of steel at site fabrication labour charges for cleaning, bending tying grills, including overlapping to the required length whenever necessary and placing the reinforcement in position as specified in the drawings, including cost of binding wire, provision of spacer bars, cover blocks and all other incidental charges etc., complete, Fe.500 grade.9.92M.T
5656Vibrated Cement Concrete of grade M 15 (Nominal Mix 1:2:4) using 40mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for BASE COURSE BELOW APPROACH SLAB.59.36Cu.m
5757Vibrated reinforced cement concrete M 30 Grade, Design Mix using 20mm & 12mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire chargs for tools and plants, including all other incidental charges etc., complete as per standard specifications for APPROACH SLAB.15.82Cum
5858Vibrated Cement Concrete M20 grade, Design Mix using 20mm & 12mm ISS size hard granite broken metal including cost and conveyance of all materials to site and cement at sitel including labour charges for mixing,transporting, laying, and curing concrete, working at heights, hire charges for tools and plants, including all other incidental charges,etc.,complete as per standard specification for PARAPET WALL OVER WINGS.6.3Cum
5959Vibrated cement Concrete M30 design mix using ISS size HBG graded metal including cost and conveyance of all materials to worksite and cement at site including all labour charges for fixing concrete, laying, vibrating, hire charges for tools and plants, compacting, curing with all leads for soft water, including all other incidental charges,formwork,cost of premoulded expansion joints and fixing the same in position etc., complete for Wearing coat of 75mm uniform thickness over deck slab and approach slab.192.72Sq.m
6060Vibrated Reinforced Cement Concrete M-25, Grade, Design Mix, using 20 mm & 12 mm ISS size hard granite broken graded metal including cost and conveyance of all materials to site including cement at site but excluding cost and fabrication of steel, including labour charges for mixing, transporting, laying, and curing concrete,working at heights,hire charges for tools and plants,including all other incidental charges,etc, complete for RCC HAND RAILS.44.4R.M
6161Providing and fixing of cast iron drainage spouts 100mm dia as per MOST drawing SD/205 with grating arrangements at top as shown in the drawing using 12mm x 25mm flats for grating arrangements, and 100mm dia drainage spout projecting beyond the bottom of deck slab as shown in the drawing including cost and conveyance of cast iron pipes and flats and fixing them in position etc,complete.6Nos.
6262Approach road.
6363Excavation including removal and satisfactory disposal of all materials necessary for the construction of road way and side drains in accordance with specifications and the lines , grades and cross sections shown in the drawings or as indicated by the Engineer for Carted Eath with a lead of 2km for formation of Approach Road.
646498% COMPACTION1188Cu.m
6565100% COMPACTION148.5Cu.m
6666Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method).GSB Grade III73.16Cu.m
6767Providing and laying Water Bound Macadam Grading - II ( 75mm to 22.40mm) IRC HBGmetal consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively)and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method)31.33Cu.m
6868Providing and laying Water Bound Macadam Grading - III (63mm to11.20mm) IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I (Mix -in - place method) Rate for 10sqm20.08Cu.m
6969Providing & Laying Tack Coat over the WBM surface using 4.00 kg of rapid setting bituminous emulsion for 10 sqm. Including cost of bituminous emulsion which will be supplied by the department at section stores and the cost will be recovered as per special condition appended including labour charges for preparing the surface for laying tack coat and for applying required quantity of bituminous emulsion for mechanical sprayer including hire and fuel charges for all tools and plants employed etc., complete ad per clause 503 of MORT & H specification267.75Sq.m
7070Providing and laying pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying separately Seal coat type \"A\" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete267.75Sq.m
7171Supply of NP 3 class RCC 900 mm dia. pipes supplied by the Contractor at his own cost specified below confirming to IS 458 / 1989 cost of pipe as a finished work including all other incidental charges, testing charges including loading and unloading transport and delivery in good condition at work site as directed by the departmental officers etc., complete for culvert.22.5R.M
7272Construction of Retaining wall.
7373Earthwork excavation in all classes of soil except hard rock requiring blasting and depositing on bank with all leads and lifts as per SS20B, including cost of all labour, equipments and all incidental charges such as baling out water, providing and maintaining necessary cofffer dams, sheeting, shoring, bracing and their subsequent removal, removal of all logs, stumps, grubs and other deleterious matter and obstructions, trimming bottom of excavation, backfilling, and clearing the site and disposal of all surplus materials etc., complete as per relevant standard specifications for FOUNDATION UNDER RETAING WALL.79.2Cu.m
7474Filling inside the Foundation with clean coarse sand including cost and conveyance of gravel to worksite, laying, handling charges and filling in layers, tamping under optimum moisture content to get the maximum density including watering with all leads for water and all other incidental charges etc., complete for filling inside the Foundation.9.9Cu.m
7575Vibrated Cement Concrete of Grade M 15 Nominal Mix (1:2:4) using 40 mm size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths, tools and plants and maintaining of protective bunds, cofferdams, shoring, strutting etc., complete as per relevant standard specifications for FOUNDATION BELOW.9.9Cu.m
7676Vibrated Cement Concrete Grade M 20 Design Mix (1:1.5:3) using 20 & 12 mm ISS size HBG graded metal including cost and conveyance of all materials to site and cement at site but excluding cost and fabrication of steel but including form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete working at heights, hire charges for tools and plants, including all other incidental charges etc., complete as per standard specifications for RETAINING WALL FOUNDATION.19.8Cu.m
7777Vibrated Cement Concrete of Grade M 20 Design Mix (1:1.5:3) using 20 mm & 12 mm ISS size HBG metal including cost and conveyance of all materials to site including cost of cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete , working at depths , tools and plants and including all other incidental charges etc; complete as per relevant standard specifications, for SUBSTRUCTURE OF RETAINING WALL ABOVE SILL LEVEL -98Cu.m
7878Providing and fixing seepage pipes of 100 mm dia. PVC pipes of required lengths for Retaining Wall including cost and conveyance of all materials to work site and labour charges for fixing, complete80Nos
7979Dismantling of Existing Structure.
8080Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m - Foundation.18.36Cu.m
8181Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m - Substructure.70.2Cu.m
8282Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as - Superstructure.23.4Cu.m
8383GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \"BB\" for all works in this package}\n1GST Amount (in Rupees)

AI Tender Summary

OUR REF NO 21327326
AUTHORITY Local Bodies
TENDER VALUE 1.80 Crore
LAST DATE 04-09-2019
Authority
Authority Name Rural Development And Panchayats Department
Work Description Thanjavur District Nabard - Ridf - Xxv ( 2019-2020 ) Orathanadu Block - Package No . 2 ( 02 Works ) Thanjavur District - Package No . 2- Reconstruction Of 2 Nos Of Minor Bridge Works In Package No . 02 Orathanadu Block Of Thanjavur District Under Nabard - Ridf - Xxv 2019-20
Basic Detail
Tender No DIPR/2601/TENDER/2019 dated 29.07.2019
Bidding Type Tender
Location
City Orathanadu
State Tamil Nadu
Key Dates
Publish Date 08 Aug 2019
Submission Date 04 Sep 2019
Open Date 05 Sep 2019
Finance
Tender Value 1.80 Crore
Tender Fee Ref. Documents
EMD 1.80 Lakhs
Exemption Not Available
Document List
packg.2.orathanadu.technicalbid.pdf
Tendernotice_1.pdf
pkg.2.orathanadu.pricebid.pdf
BOQ_162024.xls
9A5ECA0E-836A-403F-AB48-A9A4CE4D3CC9.html

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Jan 01, 1900
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 04, 2019
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Sep 05, 2019

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
2

packg.2.orathanadu.technicalbid.pdf

pdf

Tendernotice_1.pdf

2

pkg.2.orathanadu.pricebid.pdf

xls

BOQ_162024.xls

html

9A5ECA0E-836A-403F-AB48-A9A4CE4D3CC9.html

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders