Cooperative Sugar Mills Societies has published Tender For Fabrication Job Work Year 2019-20. Submission Date for this Tender is 12-08-2019. Fabrication Work Tenders in Sugar Mill Palwal Haryana. Bidders can get complete Tender details and download the document.
Name of Work: Tender for Fabrication work for the year 2019-20 | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | M.S Pipe Line | item1 | 1 | Per.in.dia/ ft.length |
2 | 2 | Dismantling of pipe lines 1” to 3’’ | item2 | 1 | Per.in.dia/ ft.length |
3 | 3 | do- 4’’to 11’’ | item3 | 1 | Per.in.dia/ ft.length |
4 | 4 | do- 12” to 20” | item4 | 1 | Per.in.dia/ ft.length |
5 | 5 | do- 21’’to48’’ | item5 | 1 | Per.in.dia/ ft.length |
6 | 6 | M.S Pipe Line | item6 | 1 | Per.in.dia/ ft.length |
7 | 7 | Erection of pipe line from 1” to 3” dia | item7 | 1 | Per.in.dia/ ft.length |
8 | 8 | do- 4” to 11” | item8 | 1 | Per.in.dia/ ft.length |
9 | 9 | do- 12 to 20 | item9 | 1 | Per.in.dia/ ft.length |
10 | 10 | do- 21 to 48 | item10 | 1 | Per.in.dia/ ft.length |
11 | 11 | Fabrication of pipe line from 12”above | item11 | 1 | Per.in.dia/ ft.length |
12 | 12 | Flanges and blind up to 48” | item12 | 1 | Per inch dia/pc |
13 | 13 | dismantling of flanges/blind | item13 | 1 | Per inch dia/pc |
14 | 14 | refitting of old/new flanges/blind | item14 | 1 | Per inch dia/pc |
15 | 15 | fabrication of flanges blind from M.S. plate | item15 | 1 | Per inch dia/pc |
16 | 16 | Bends, reducers and nipples (up to 1’’ to 12’’) | item16 | 1 | Per inch dia/pc |
17 | 17 | Dismantling | item17 | 1 | Per inch dia/pc |
18 | 18 | fabrication | item18 | 1 | Per inch dia/pc |
19 | 19 | fitting | item19 | 1 | Per inch dia/pc |
20 | 20 | Bends, reducers and nipples (above 12’’) | item20 | 1 | Per inch dia/pc |
21 | 21 | Dismantling | item21 | 1 | Per inch dia/pc |
22 | 22 | fabrication | item22 | 1 | Per inch dia/pc |
23 | 23 | fitting | item23 | 1 | Per inch dia/pc |
24 | 24 | Dismantling , fab. and erection of M.S. / G.l pipe \nAccessories ( Tee, cross ,distance piece up to 12’’) | item24 | 1 | Per inch dia/pc |
25 | 25 | Dismantling | item25 | 1 | Per inch dia/pc |
26 | 26 | Fabrication | item26 | 1 | Per inch dia/pc |
27 | 27 | Erection | item27 | 1 | Per inch dia/pc |
28 | 28 | Dismantling , fab. and erection of M.S. / G.l pipe Accessories \n( Tee,cross, distance piece above 12’’) \n | item28 | 1 | Per inch dia/pc |
29 | 29 | Dismantling | item29 | 1 | Per inch dia/pc |
30 | 30 | Fabrication | item30 | 1 | Per inch dia/pc |
31 | 31 | Erection | item31 | 1 | Per inch dia/pc |
32 | 32 | Dismantling, Fab. and Erection of M.S.tanks,/Vassals \nfrom M.S plates,angle M.S channel ‘I’ section etc \n( up to 6 mm plate ) \n | item32 | 1 | P MT |
33 | 33 | Dismantling | item33 | 1 | P MT |
34 | 34 | Fabrication | item34 | 1 | P MT |
35 | 35 | Erection | item35 | 1 | P MT |
36 | 36 | Dismantling, Fab. and Erection of M.S. plate jobs \n boiler ducting boiler casing etc.) above 6 mm plate\n | item36 | 1 | P MT |
37 | 37 | Dismantling | item37 | 1 | P MT |
38 | 38 | Fabrication | item38 | 1 | P MT |
39 | 39 | Erection | item39 | 1 | P MT |
40 | 40 | Dismantling and Erection of railing \nDismantling | item40 | 1 | Per.in.dia/ ft.lth |
41 | 41 | Fabrication | item41 | 1 | Per.in.dia/ ft.lth |
42 | 42 | Erection | item42 | 1 | Per.in.dia/ ft.lth |
43 | 43 | Valves | item43 | 1 | Per inch dia/pc |
44 | 44 | Dismantling 1’’ to 6’’ | item44 | 1 | Per inch dia/pc |
45 | 45 | Dismantling 7’’ to 12’’ | item45 | 1 | Per inch dia/pc |
46 | 46 | Dismantling above 12’’ size | item46 | 1 | Per inch dia/pc |
47 | 47 | fitting 1’’ to 6’’ | item47 | 1 | Per inch dia/pc |
48 | 48 | fitting 7’’ to 12’’ | item48 | 1 | Per inch dia/pc |
49 | 49 | fitting above 12’’ size | item49 | 1 | Per inch dia/pc |
50 | 50 | S.S Pipe Line | item50 | 1 | Per inch dia / feet length |
51 | 51 | Dismantling of all size | item51 | 1 | Per inch dia /feet length |
52 | 52 | Erection all size | item52 | 1 | Per inch dia /feet length |
53 | 53 | Dismantling,fab., and erection of S.S.pipe Accessories\n(tee,cross,distance piece,nipples reducer and bend) up to 12” \nDismantling | item53 | 1 | Per inch dia/pc |
54 | 54 | Fabrication | item54 | 1 | Per inch dia/pc |
55 | 55 | Erection | item55 | 1 | Per inch dia/pc |
56 | 56 | Patch Work on tank and pipe \n(M S plate cutting, fitting and welding, 02 round welding) \n | item56 | 1 | Per ftsq |
57 | 57 | Dismantling , Fabrication and Erection of cone of bigger size will be treated\nDismantling | item57 | 1 | Per inch dia /feet length |
58 | 58 | Fabrication | item58 | 1 | Per inch dia / feet length |
59 | 59 | Erection | item59 | 1 | Per inch dia / feet length |
60 | 60 | Fabrication and Erection of gutter of any size by \nRequired thickness (bigger size will be treat as dia) \n | item60 | 1 | per cross sectional area \n(ft2) ft running length\n |
61 | 61 | Dismantling , fabrication and erection of 3 Nos. hood \nof cutter ,chopper and leveler by 8/6 mm M.S. plate\n | item61 | 1 | L.S. per hood |
62 | 62 | Dismantling , Fabrication and erection of old feed pipe line \nFeed pump to boiler\n | item62 | 1 | Per in. dia./Ft.length |
63 | 63 | Dismantling of old and erection of new I D Fan taper cone. | item63 | 1 | L.S. / Unit |
64 | 64 | Dismantling , Fabrication and erection of old ducting from \nI.D. fan inlet damper to I D Fan .\n | item64 | 1 | L.S. / Unit |
65 | 65 | Dismantling , Fabrication and erection of flue gas \nducting size 5’ x 5’ | item65 | 1 | L.S./Unit |
66 | 66 | Dismantling , fabrication and erection of I.D.. fan casing \nform 8 to 10mm M.S plate .\n | item66 | 1 | L.S. / Unit |
67 | 67 | Dismantling , fabrication and erection of I.D. Fan outlet damper | item67 | 1 | L.S. /Unit |
68 | 68 | Dismantling , fabrication and erection of I.D. Fan inlet damper | item68 | 1 | L.S. /Unit |
69 | 69 | Dismantling ,fabrication and Erection of Bagasse elevator, \nbagasse carrier and RBC bottom and side plate worn out portion \n | item69 | 1 | Per sqft |
70 | 70 | Dismantling , fabrication and erection of Boiler bagasse feeding \nChute by 8/6 mm M.S. plate. \n | item70 | 1 | L.S. /Unit |
71 | 71 | Dismantling , erection and fabrication of umbrella of pan.\n | item71 | 1 | L.S./Per pc. |
72 | 72 | Dismantling , fabrication and erection of save all of Quad body. \nDismantling | item72 | 1 | L.S. Unit |
73 | 73 | Fabrication | item73 | 1 | L.S. Unit |
74 | 74 | Erection | item74 | 1 | L.S. Unit |
75 | 75 | Dismantling , Fabrication and Erection of save all of pan. \nDismantling | item75 | 1 | L.S. Unit |
76 | 76 | Fabrication | item76 | 1 | L.S. Unit |
77 | 77 | Erection | item77 | 1 | L.S. Unit |
78 | 78 | Stair case( fab. with chaquered plate /old plate and pipe line) \nDismantling | item78 | 1 | Per ft width |
79 | 79 | Fabrication | item79 | 1 | Per ft width |
80 | 80 | Erection | item80 | 1 | Per ft width |
81 | 81 | Dismantling and erection of pump up to 4’’ and 15 hp motor\nShifting of pump / motor more than 20 mtr distance | item81 | 1 | per inch section/hp |
82 | 82 | Dismantling | item82 | 1 | per inch section/hp |
83 | 83 | Erection | item83 | 1 | per inch section/hp |
84 | 84 | Dismantling and erection of pump more than 4” and 15 H.P motor \nShifting of pump / motor more than 20 mtr distance | item84 | 1 | per inch section/hp |
85 | 85 | Dismantling | item85 | 1 | per inch section/hp |
86 | 86 | Erection ( pump / motor) | item86 | 1 | per inch section/hp |
87 | 87 | Ammonia and gas coils ( Dismantling , fab. and erection) | item87 | 1 | Per inch dia /feet length |
88 | 88 | Dismantling | item88 | 1 | Per inch dia /feet |
89 | 89 | Fabrication | item89 | 1 | Per inch dia /feet |
90 | 90 | Erection | item90 | 1 | Per inch dia /feet |
91 | 91 | Dismantling , fabrication and erection of new plate form as \n Per requirement from old M S plate 6mm to 8 mm thickness.\n up to 2 sqm \nDismantling | item91 | 1 | per sqft |
92 | 92 | Fabrication | item92 | 1 | per sqft |
93 | 93 | Erection | item93 | 1 | per sqft |
94 | 94 | Dismantling , fabrication, and erection of new \n Plate from by M S/ chequared plate more than 2 sqmtr\nDismantling | item94 | 1 | P M T |
95 | 95 | Fabrication | item95 | 1 | P M T |
96 | 96 | Erection | item96 | 1 | P M T |
97 | 97 | Crystallizer Coils \nDismantling | item97 | 1 | Per inch dia /feet lth |
98 | 98 | Fabrication | item98 | 1 | Per inch dia /feet lth |
99 | 99 | Erection | item99 | 1 | Per inch dia /feet lth |
100 | 100 | Old and worn out staging , plate farm tank, vassals. \nDismantling | item100 | 1 | P M T |
101 | 101 | Fabrication | item101 | 1 | P M T |
102 | 102 | Erection | item102 | 1 | P M T |
103 | 103 | Repairing of rubber seated exhaust /vapor valve above 16 “ | item103 | 1 | Per in. dia.Per pc |
104 | 104 | Dismantling , fabrication and erection of side plate of cane \nkicker cutter, leveler, and chopper by 8/6 mm M.S. plate\n\n | item104 | 1 | Per.sq.ft |
105 | 105 | Dismantling , fabrication and erection of mill juice tray by \n8 mm/10 mm M.S plate \n | item105 | 1 | L.S.per mill tray |
106 | 106 | Dismantling of existing cane carrier chute and fabrication and erection of 8 to 10 mm M.S plate | item106 | 1 | L.S. Unit |
107 | 107 | Repairing of steam jacket for sulpher furnace | item107 | 1 | Per pc |
108 | 108 | Replacement of steam jacket of evaporator bodies | item108 | 1 | L.S. per body |
109 | 109 | Strengthening of vapour line above 16” by inner and outer side \n /ring of angle/pipes \n | item109 | 1 | Per pc |
110 | 110 | Dismantling , fabrication and erection of support angle, pipe, \nchannel at any equipment \n | item110 | 1 | per running\nft length\n |
111 | 111 | Hopper centre piece by 12 mm plate | item111 | 1 | L.S./Pc |
112 | 112 | Dismantling | item112 | 1 | L.S./pc |
113 | 113 | Fabrication | item113 | 1 | L.S./pc |
114 | 114 | Erection | item114 | 1 | L.S./pc |
115 | 115 | Hopper tray \nDismantling | item115 | 1 | Per. Sq. mtr. |
116 | 116 | Fabrication | item116 | 1 | Per. Sq. mtr. |
117 | 117 | Erection | item117 | 1 | Per. Sq. mtr. |
118 | 118 | Sulpher Furnace cooler dismantling ,fab. and erection work | item118 | 1 | L.S/pc |
119 | 119 | Sulpher Furnace scrubber dismantling , fabrication\n and erection work | item119 | 1 | L.S/pc |
120 | 120 | ‘B’ Vacuum crystallizer shell to be changed from\n 10 MM M.S. plate | item120 | 1 | L.S. |
121 | 121 | ‘C, Vacuum crystallizer shell to be changed from 10 MM M.S. plate | item121 | 1 | L.S. |
122 | 122 | Dismantling of RCC plate form of Sulpher Furnace \nwith shifting of waste \nmaterial complete in all respects and strengthening the same with all column and M.S. beams\n | item122 | 1 | L.S |
123 | 123 | Strengthening of factory columns of various size by 10 mm M.S.Plate \nangle channels etc\n | item123 | 1 | per running ft |
124 | 124 | Strengthening of factory beams of any size by M.S.plate angle channel \n I. Section etc\n | item124 | 1 | per running ft |
125 | 125 | Chipping ,cleaning and painting of columns and beams \nor staging of factory machinery.\n | item125 | 1 | per ft |
126 | 126 | Painting one coat with ready mixed paint in factory buildingM.S. column ( 25 mtr approx. height. and 15-5 mtr height approx) And M.S trusses including rubbing down old ( if required at site.All the bracing and purlins are included with this work. | item126 | 1 | PMT |
127 | 127 | Dismantling, Fabrication and erection of any size factory/Building,columns beams and trusses | item127 | 1 | L.S |
128 | 128 | Dismantling ,Fabrication and erection of worn out Water pipes, nozzles, drain box etc. | item128 | 1 | L.S |
129 | 129 | Dismantling ,Fabrication and erection of worn out shell\n of both wet Scrubber | item129 | 1 | L.S |
130 | 130 | Dismantling, Fabrication and erection of worn out internal of both wet Scrubber | item130 | 1 | per sqft or sqm |
131 | 131 | Dismantling, Fabrication and erection of worn flue gas ducting \nSize 5’ x5’of both Wet Scrubber from damper to chimney \n | item131 | 1 | Per running ft length |
132 | 132 | Replacement of worn out portion of supports of molasses tank roof. | item132 | 1 | per sqft |
133 | 133 | Replacement of worn out portion of roof of molasses tank | item133 | 1 | L.S |
134 | 134 | Dismantling of Boiler exit flue gas damper | item134 | 1 | L.S |
135 | 135 | Dismantling, and erection of Boiler I.D., F.D. Fan impeller | item135 | 1 | L.S |
136 | 136 | Fabrication and erection of 06 Nos. M.S. column below sulpher furnace \nplate form and raising of same up to required height.\n | item136 | 1 | per sqft |
137 | 137 | Replacement of weak portion of molasses tank up to a height of 10 mtr \nby 6 mm,8 mm,10 mm plate etc.\n \n | item137 | 1 | per sqft |
138 | 138 | Providing roof above molasses khacha pit by M.S./CGI sheets with \nProper columns, staging and tresses \n | item138 | 1 | L.S/unit |
139 | 139 | Dismantling and assembling of air heater outlet ducting | item139 | 1 | Per tube |
140 | 140 | Dismantling of worn out Air Heater tubes | item140 | 1 | Per tube |
141 | 141 | Replacement of worn out Air Heater tubes. | item141 | 1 | Per in.dia/ft |
142 | 142 | Dismantling , fabrication, erection of worn out both\nboiler blow down line boiler to drain pit.\n | item142 | 1 | L.S/unit |
143 | 143 | Dismantling, fabrication, erection of worn out of 2 nos.\n5” long bend of feed water line header\n | item143 | 1 | L.S/unit |
144 | 144 | Removal of hanging old lagging and fixing of new glass wool,\n plastered by P.O.P or hasean cloth and covered wire netting\n (murga jali) \nwithout material Up to 75 mm thickness | item144 | 1 | per sqft |
145 | 145 | Up to 50 mm thickness | item145 | 1 | per sqft |
146 | 146 | Replacement of juice heater partition plate in all respects | item146 | 1 | per juice heater |
147 | 147 | Shifting of Vibro Screen from Mill house to Boiling \nHouse Complete unit in all respects | item147 | 1 | L.S |
148 | 148 | Reconditioning of worn out 02 Nos. J.H. ( 04 Nos covers)Juice \nHeater grooves with respect to its top/bottom mating at outside cover | item148 | 1 | per juice heater |
149 | 149 | Dismantling of worn out body shell quad body no. 5 ( spare body) | item149 | 1 | L.S |
150 | 150 | Fabrication and erection of body shell quad body no. 5 | item150 | 1 | L.S |
151 | 151 | Dismantling , fabrication, erection of 10' x 20 ' vacum filter mud tray | item151 | 1 | L.S |
152 | 152 | Dismantling of worn out body shell of pan no. 6 | item152 | 1 | L.S |
153 | 153 | Fabrication and erection of body shell pan no. 6 | item153 | 1 | L.S |
154 | 154 | Dismantling , fabrication, erection of 8' x 16 ' vacum filter mud tray | item154 | 1 | L.S |
155 | 155 | Pan No. 3 Retubing work | item155 | 1 | L.S |
156 | 156 | Dismantling of worn out bottom and fabrication and erection of new bottom of \nCrystlizer no. 3,4,9 10 and 11 | item156 | 1 | L.S/unit |
157 | 157 | Dismantling of calanderia of pan | item157 | 1 | L.S |
158 | 158 | Fabrication, erection of calanderia of pan | item158 | 1 | L.S |
159 | 159 | Dismantling of calanderia of quad (evaporator) | item159 | 1 | L.S |
160 | 160 | Fabrication, erection of calanderia of evaporator( quad) | item160 | 1 | L.S |
161 | 161 | Increasing the length of hydraulic grab fingers | item161 | 1 | L.S/unit |
162 | 162 | Dismantling , fabrication, erection of kicker drum \nwith holder assembly | item162 | 1 | L.S |
163 | 163 | Dismantling , erection commission of pan discharge valve \nof pan no 5 and 6 | item163 | 1 | L.S |
164 | 164 | Modification of mill Kush Kush Conveyor | item164 | 1 | L.S |
165 | 165 | Fabrication of staging of C/F machine NK 1100 and erection and commission of \nC/F machine NK 1100 2 Nos | item165 | 1 | L.S |
166 | 166 | Fabrication, erection of new juice door filtration system | item166 | 1 | L.S |
167 | 167 | Dismantling , fabrication, erection of flocculating chamber top\n and bottom plate of door | item167 | 1 | L.S |
168 | 168 | Crystallizer spiral ribbon strip has to dismantle and Again set right fitting. \nWorn out arms and other related Work also to be done | item168 | 1 | L.S/unit |
169 | 169 | Dismantling , fabrication, erection of worn out runner of cane carrier/bagasse elevator/ RBC/MBC\n | item169 | 1 | Per running mtr. |
170 | 170 | Dismantling the kush-kush conveyor and hole to be increased | item170 | 1 | L.S |
171 | 171 | Dismantling , fabrication, erection of worn out portion \nof D.S.M. screen | item171 | 1 | L.S |
172 | 172 | Fabrication, erection of I.D fan cone ring with flange | item172 | 1 | L.S |
173 | 173 | Erection and commissioning of B- messcutte C/F machine including machine \nstructure ,leveling of machine and related work to be done in all respect of M/C | item173 | 1 | L.S/unit |
174 | 174 | Dismantling of old worn out and fabrication, erection of \nnew juice sulphitor internal drum | item174 | 1 | L.S |
175 | 175 | Juice ring fabrication by 6mm plate for mill rollers | item175 | 1 | L.S |
176 | 176 | Hinge type cover fabrication at copper, leveler and cutter | item176 | 1 | L.S/per-cutter/kicker/leveler |
177 | 177 | Railway line changing of cane unloader | item177 | 1 | Per mtr running length |
178 | 178 | Labour supply ( per day 8 hr. basis)\nTurner/Mechinist | item178 | 1 | Per day |
179 | 179 | Fitter | item179 | 1 | Per day |
180 | 180 | Welder | item180 | 1 | Per day |
181 | 181 | Helper | item181 | 1 | Per day |
182 | 182 | Khalasi | item182 | 1 | Per day |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail