Tender For Providing And Fixing The Ipe ( Tabebuia ) Decking On Steps Of Amphitheatre In Vasant Udyan At Vasant Vihar ( Specialized Work )., EE/SD-3/DDA NEHRU PLACE-Delhi

Delhi Development Authority-DDA has published Tender For Providing And Fixing The Ipe ( Tabebuia ) Decking On Steps Of Amphitheatre In Vasant Udyan At Vasant Vihar ( Specialized Work ).. Submission Date for this Tender is 13-08-2019. Civil Work Tenders in EE/SD-3/DDA NEHRU PLACE Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

21310140
Tender For Providing And Fixing The Ipe ( Tabebuia ) Decking On Steps Of Amphitheatre In Vasant Udyan At Vasant Vihar ( Specialized Work ).
Open Tender
Indian
Delhi
EE/SD-3/DDA NEHRU PLACE
13-08-2019

Tender Details

Tender For Providing And Fixing The Ipe ( Tabebuia ) Decking On Steps Of Amphitheatre In Vasant Udyan At Vasant Vihar ( Specialized Work ) .

Key Value

Document Fees
Refer document
EMD
INR 53624.0 /-
Tender Value
INR 26.81 Lakhs /-

BOQ Items

Name of Work: M/o works pertaining to completed scheme in South Zone under Nazul A/c -II. Sub Head : Providing and fixing the IPE (Tabebuia) Decking on steps of Amphitheatre in Vasant Udyan at Vasant Vihar (Specialized work).
Sl. No. Item Description Item Code / Make Quantity Units
1 1 Schedule - 'A' Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge :\n(a) In cement mortar. 20.37 cum
2 2 Deduct for lifting/taking away dismentle hard stone of from Vasant Udyan park complete as per direction of Engineer in charge. 16.3 cum
3 3 Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. 4.07 cum
4 4 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :\n(a) 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) . 14.93 cum
5 5 Centering and shuttering including strutting, propping etc. and removal of form work for :\n(a) Foundations, footings, bases for columns. 50.16 sqm
6 6 Providing and fixing of Ipe (Tabebuia) Decking of size 19(+/-1)mm x 90(+/-2)mm sourced from brazilian rain forest, providing certificate of origin and phytosanitary Certificate. Fixing should be done using 16 gauge hollow aluminium channel of 25x50 mm (filled with hardwood) at an interval of 450 mm as specified and approved by Engineer-in-charge. It should be fastened on the floor on which deckwood is screwed from the top. 2 coats of sleekbase should be applied after installation. The rates are inclusive of initial one year of maintenance to be carried out by the agency at his own cost. 171.09 sqm
7 7 Schedule - 'B' Regular maintenance of IPE (Tabebuia) Decking for five year, applying sleek base every six month with repairs of wooden surface wherever required i/c cost of material, labour and miscellenious expancies like screws, adhesive, IPE plank, aluminium channel etc. (i) Maintenance of Decking for the second year after initial one year of maintenance carried out by the agency at his own cost. 171.09 sqm
8 8 (ii) Maintenance of Decking for the third year. 171.09 sqm
9 9 (iii) Maintenance of Decking for the fourth year. 171.09 sqm
10 10 (iv) Maintenance of Decking for the fifth year. NOTE :- (i) The maintenance of IPE (Tabebuia) decking for initial one year after actual date of completion of work shall be carried out by the agency at his own cost. The Second year maintenance period as per the schedule shall be reckoned after expiry of one year of maintenance period. (ii) The maintenance include applying sleekbase every six month or whenever require as per direction of Engineer in charge with repairs to the wooden surface whever required. (iii) The maintenance include replacement of wooden planks & rectified of any others defects observed as per direction of Engineer in charge except. a) Due to force majeure or. b) Serious loss or damage by fire or c) damage due to Act of God or d) any other cause which is the absolute discretion to the Engineer-in-Charge is beyond the contractors as theft of any parts. (iv) It will be the responsibility of the agency to bring the decking in proper working condition if agency fails to bring the wooden deck in proper working condition within 7 working days after receiving the complaints, the agency shall pay Rs. 100/- per day to the department as a compensation or will be deducted from the agencies bill. (v) Completion of the work for schedule 'A' shall be recorded after its actual completion at site and proportionate security deposit shall be released after completion of one year maintenance period. (vi) Supplementry agreement shall be framed for period the maintenance work of five years. 171.09 sqm
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail