Indian Oil Corporation Limited-IOCL has published Carrying Out 2Nd Phase Of Bio-Remediation Process For 55Mt Of Oil Sludge And 225Mt Of Oil Contaminated Sand At M/S . Kamarajar Port Ltd . . Submission Date for this Tender is 14-08-2019. Mechanical engineering Service Tenders in Kamarajar Port Limited, Ennore Tamil Nadu. Bidders can get complete Tender details and download the document.
Name of Work: CARRYING OUT 2ND PHASE OF BIO-REMEDIATION PROCESS FOR 55MT OF OIL SLUDGE AND 225MT OF OIL CONTAMINATED SAND AT M/S.KAMARAJAR PORT LTD. Note: The below mentioned rates are inclusive of all material, labour, transportation charges on materials & machinery, all leads & lifts, hire charges etc wherever applicable for carrying out the work. GST will be paid seperately. | |||||
---|---|---|---|---|---|
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
1 | 1 | PREPARATION OF BIO-REMEDIATION PIT AND PROCESS | BI01010001010000000000000515BI0100001112 | ||
2 | 1.01 | Providing samiyana for 15 days | BI01010001010000000000000515BI0100001113 | 1 | LS |
3 | 1.02 | Earth work excavation for Bio Remediation Pit (13724 SqFt.) | BI01010001010000000000000515BI0100001114 | 27016 | CFT |
4 | 1.03 | Supplying and Laying impermeable HDPE sheet | BI01010001010000000000000515BI0100001115 | 15031 | SFT |
5 | 1.04 | Back filling 9" earth above the impermeable HDPE sheets laid in the Bio Remediation Pit | BI01010001010000000000000515BI0100001116 | 10131 | CFT |
6 | 1.05 | Moving the sludge stored in the container by using fork lift and spreading above the 9" layer of earth in the Bio Remediation Pit | BI01010001010000000000000515BI0100001117 | 55 | KL |
7 | 1.06 | Moving & Spreading the stored oil soaked earth above the sludge spread in the Bio Remediation Pit | BI01010001010000000000000515BI0100001118 | 250 | MT |
8 | 1.07 | Back filling 8" earth above the sludge spread in the Bio Remediation Pit | BI01010001010000000000000515BI0100001119 | 9005 | CFT |
9 | 1.08 | Mixing the earth and salvaged oil to a depth of 12" with the help of Tractor/JCP | BI01010001010000000000000515BI0100001120 | 1 | LS |
10 | 1.09 | Sowing the Bacteria and nutrients in the Bio Remediation Pit and watering, as advised | BI01010001010000000000000515BI0100001121 | 400 | KG |
11 | 2 | MAINTENANCE AND MONITORING OF BIO REMEDIATION PIT | |||
12 | 2.01 | Tilling with the Tractor/JCP and positioning two manpower including taking pass from KPL | BI01010001010000000000000515BI0100001125 | 120 | Days |
13 | 2.02 | Sampling from Peizo wells (8 nos) and Bio-remediated soil (8 Nos) once in 30 days in your own glass sample containers as per instructions and sending the same to R&D Centre, Faridabad, through courier and submitting the acknolwedged courier slip including courier charges, cost of sample bottles and transportation. The same process has to be done for 8 months. | BI01010001010000000000000515BI0100001126 | 8 | Nos |
14 | 2.03 | Watering with the available water at the site and supplied 5 HP pump hoses and safeguarding the growth of vegitation from cow, buffallo etc by providing two people per day (one in the day time and one in the night time) | BI01010001010000000000000515BI0100001127 | 120 | Days |