Annual Rate Contract For Maintenance Jobs At Instrument Section Of Tdp At Rcf , Trombay Unit . As Per Nit
Tender Overview
Project Description
Annual Rate Contract For Maintenance Jobs At Instrument Section Of Tdp At Rcf , Trombay Unit . As Per Nit , Pg-Calibration Of Faulty Pressure Gauges . , Pg-Fixing Of Diaphragm Type Pressure Gauge With Isolation Valve . , Pg-Fixing Of Diaphragm & Capillary Type Pressure Gauge . , Pg-Replacement Of Defective Pressure Gauge & Defective Pg With Isolation Valve . Pg Removal And Shifting To Workshop . , Pg-Rectification Of Leakage For Pg Having Leakage From Pg Bottom Chamber Or From Gasket . , Pg-Rectification Of Leakage From Pg 1 / 2 Inch Process Connection . , Lg- Replacement / Rectification Defective Drain Valve Of Level Gauge & Fixing New Level Gauge Drain Valve & Removal , Cleaning And Fixing Back Of Level Gauge Scale . , Lg-Shifting Of Level Gauge From Stores To Site . , Lg-Flushing , De-Chocking And Cleaning Of Magnetic Level Gauge & Fixing Of Level Gauge After Rectification . , Lg-Removal , Cleaning And Replacement Of Deformed Float & Rectification Of Leakage Problem From Isolation Valve . , Lg-Fixing Of Plug At Lg Drain And Vent . , Lg-Replacement Of Guide Wire & Defective Float Of Float And Board Lgs , Lg-Pointer Relocation Of Float And Board Lgs , Magnetic Flow Meter- Fixing Of Mag Flow Meter At New Location . , Magnetic Flow Meter - Removal , Cleaning And Fixing Back Of Flow Tube . , Magnetic Flow Meter - Replacement Of Defective Converter & Checking And Programming Of Converter . , Magnetic Flow Meter -Cabling , Glanding And Termination Of Mag Flow Meter & Checking Of Flow Tube & Checking Calibration Of Mag Flow Using Simulator . , Magnetic Flow Meter -Rectification / Replacement Of Defective Earthing & Rectification Of Leakage Problem Of Mag Flow . , Magnetic Flow Meter - Replacement Of Defective Float Of Float And Board Lgs And Checking Of Flow Tube Using Simulator & Relocation , Modification And New Installation Of Mag Flow Meter , Control Valve- Overhauling Of Control Valve , Control Valve - Removal And Shifting Of Control Valve To Workshop For Maintenance & Rectification Of Butterfly Valve Body Leakage From The Shaft End Leakage . , Control Valve - Removal And Rectification Of Gland , Flange & Seat Leakage . , Control Valve - Replacement Of Defective Afr Of Control Valve . , Control Valve - Control Valve Fixing Calibration And Taking In Line Control Valve Removal , Cleaning And Shifting To Store . , Control Valve - Control Valve Cable Laying , Dressing , Glanding And Termination . , Control Valve - Relocation , Modification And New Installation Of Control Valve , Ult- Tank Manhole Cover Removal And Shifting To Mechanical Workshop For Providing Nozzle For Ult & Preparing Canopy For Ult And Fixing . . , Ult-Fixing , Cabling And Termination Of Ult , Ult Removal , Cleaning And Mounted Back , Cable Laying Dressing For Ult . Fixing , Cabling And Termination Of Local Indicator For Ult . , Ult-Mounting Of Ult With Still Well On The Tank . , Ult-Calibration Of Ult To Match Lg And Lt & Providing Extended Nozzle For Ult . Replacement Of Dplt With Ult . , Ult-Mounting Of Ult After Maintenance . , Ult-Relocation , Modification And New Installation Of Ult , Level Switch- Removal Cleaning And Replacement Of Deform Float & Cleaning And Rectification Of Sump Level Switch . , Level Switch- Dechoking Of Isolation Valve And Level Switch & Rectification Of Leakage From Drain Valve . , Level Switch - Replacement Of Defective Drain Valve . , Level Switch - Providing Plug At Drain And Vent . , Level Switch - Rectification Of Leakage From Drain Valve & Leakage From Level Switch Flange Joint . , Level Switch - Relocation , Modification And New Installation Of Level Switch , Dpft- Calibration Of Dpft & Isolating , Cleaning Of Ft Flange And Taking In Line . , Dpft- Impulse Line Cleaning . , Dpft- Power Resetting Of Ft And Taken In Line . & Adjusting Zero Shift . , Dplt- Calibration Of Dplt & Isolating , Cleaning Of Lt Flange And Taking In Line . , Dplt- Dechoking Of Isolation , Cleaning Of Lt Flange And Taking In Line . , Dplt- Cleaning Of Lt Cable And Reterminating & Power Resetting Of Lt And Taken In Line . , Dplt- Adjusting Zero Shift . , Radar Lt- Lt Removal , Cleaning And Shifting To Store & Checking Calibration Of Radar Lt . , Radar Lt- Lt Fixing , Glanding & Termination & Programming Of Radar Level Transmitter . , Radar Lt- Checking Calibration Of Radar Lt , Dcs- Replacement Of Defective Fan & Loop Checking Of Motor Control Loop . , Dcs- Updating Of Panel And Jb Wiring . , Dcs- Fixing Cable Ducts Cover After Cable Dressing & Replacement Of Defective Glass Fuse . , Dcs- Cleaning Of All The Panels And Consoles . , Dcs- Terminals Tightened In All Panels , Mounting Of Fuse Tb And Normal Tb & Wiring Job For Panel . , Dcs- Fixing Of Relay Panel , Diode Array Block & Mounting Of Isolators . , Pressure Switch- Replacement Of Defective Pressure Switch . , Pressure Switch- Pressure Switch Removal , Calibration And Fixing Back . , Telephone- Replacement Of Defective Telephone Set & Defective Hand Set Cable For Telephone . , Telephone- Repairing Of Defective Telephone Set . , Telephone- One New Telephone Connection Given With Telephone Set , Telephone Line Loop Checking & Shifting Of Telephone From Different Location . , Rotameter- Removal Of Rotameter , Cleaning And Fixing Back . , Rotameter - Rectification Of Flange Leakage Problem & Replacement Of Defective Rotameter . , Rotameter - Installation / Fixing , Glanding , Termination Of Rotameter . , Rotameter - Loop Checking Of Rotament For Control Room Indication . , Rotameter - Cabling , Dressing , Glanding And Termination For Rotameter . , Rotameter - Covering Rotameter With Polyethene & Removal , Cleaning And Shifting Of Rotameter To Store . , Ph- Checking Calibration Of Ph Transmitters , Ph- Rtd And Ph Meter Cabling To Converter . , Pc- Routine Checking Cleaning And Up Keeping Of Pc & Providing Printer And Installing In Pc . , Pc- Replacing Defective Monitor & Defective Mouse Of Computer . , Pc- Relocating Pc With Table From One Location To Another Location . , Others- Shifting Of Material And Instrument From One Location To Another & Material Shifting From Main Store To Plant . , Others - Shifting Of Cable Drums . , Others - Covering With Polyethene Sheet On Field Instrument For Rainy Season Protection . , Others - Pa System Arrangement In Meeting Hall . , Others - 6Mm & 12Mm Ss Tubing . , Others - Rectification , Fixing Of Air Filter Regulator & Rectification Of Push Button Problem Of Plant Pa System . , Others - Fixing Of Magnet Of Plant Pa System . , Others - Power Resetting Of Pa System & Maintenance Of Attendance System . , Others - Cleaning Jb & Field Instrument . , Others - Rectification , Programming And Resetting Of Fire Alarm System . , Others - Preparing And Fixing Aluminum Canopy For Field Instrument And Jb . , Others - Replacement Of Defective Solenoid Valve . , Others - Multi Core Cable , Drop Cable , Power Cable Laying Glanding And Termination , Others - Housekeeping Job For Instruments In Different Units .
BOQ
| Name of Work: ARC FOR MAINTENANCE JOBS AT INSTRUMENT SECTION OF TDP AT RCF, TROMBAY UNIT. | |||||
|---|---|---|---|---|---|
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
| 1 | 1 | PG-Calibration of faulty pressure gauges. | a1 | 58 | Nos |
| 2 | 2 | PG-Fixing of diaphragm type pressure gauge with isolation valve. | a2 | 43 | Nos |
| 3 | 3 | PG-Fixing of diaphragm & capillary type pressure gauge. | a3 | 173 | Nos |
| 4 | 4 | PG-Replacement of defective pressure gauge & defective PG with isolation valve. PG removal and shifting to workshop. | a4 | 86 | Nos |
| 5 | 5 | PG-Rectification of leakage for PG having leakage from PG bottom chamber or from gasket. | a5 | 60 | Nos |
| 6 | 6 | PG-Rectification of leakage from PG 1/2 inch process connection. | a6 | 43 | Nos |
| 7 | 7 | LG- Replacement/rectification defective Drain valve of level gauge & Fixing new level gauge Drain valve & Removal, cleaning and fixing back of level gauge scale. | a7 | 115 | Nos |
| 8 | 8 | LG-Shifting of level gauge from stores to site. | a8 | 43 | Nos |
| 9 | 9 | LG-Flushing, de-chocking and cleaning of magnetic level gauge & Fixing of level gauge after rectification. | a9 | 86 | Nos |
| 10 | 10 | LG-Removal, cleaning and replacement of deformed float & Rectification of leakage problem from isolation valve. | a10 | 72 | Nos |
| 11 | 11 | LG-Fixing of plug at LG drain and vent. | a11 | 60 | Nos |
| 12 | 12 | LG-Replacement of guide wire & defective float of float and board LGs | a12 | 19 | Nos |
| 13 | 13 | LG-Pointer relocation of float and board LGs | a13 | 7 | Nos |
| 14 | 14 | Magnetic Flow Meter- Fixing of mag flow meter at new location. | a14 | 14 | Nos |
| 15 | 15 | Magnetic Flow Meter - Removal, cleaning and fixing back of flow tube. | a15 | 14 | Nos |
| 16 | 16 | Magnetic Flow Meter - Replacement of defective converter & Checking and programming of converter. | a16 | 22 | Nos |
| 17 | 17 | Magnetic Flow Meter -Cabling, glanding and termination of mag flow meter & checking of flow tube & Checking calibration of mag flow using simulator. | a17 | 50 | Nos |
| 18 | 18 | Magnetic Flow Meter -Rectification/replacement of defective earthing & rectification of leakage problem of mag flow. | a18 | 36 | Nos |
| 19 | 19 | Magnetic Flow Meter - Replacement of defective float of float and board LGs and checking of flow tube using simulator & Relocation, modification and new installation of mag flow meter | a19 | 86 | Nos |
| 20 | 20 | Control Valve- Overhauling of control valve | a20 | 12 | Nos |
| 21 | 21 | Control Valve - Removal and shifting of control valve to workshop for maintenance & Rectification of butterfly valve body leakage from the shaft end leakage. | a21 | 29 | Nos |
| 22 | 22 | Control Valve - Removal and rectification of gland, flange & seat leakage. | a22 | 50 | Nos |
| 23 | 23 | Control Valve - Replacement of defective AFR of control valve. | a23 | 14 | Nos |
| 24 | 24 | Control Valve - Control valve fixing calibration and taking in line Control valve removal, cleaning and shifting to store. | a24 | 29 | Nos |
| 25 | 25 | Control Valve - Control valve cable laying, dressing, glanding and termination. | a25 | 22 | Nos |
| 26 | 26 | Control Valve - Relocation, modification and new installation of control valve | a26 | 48 | Nos |
| 27 | 27 | ULT- Tank manhole cover removal and shifting to mechanical workshop for providing nozzle for ULT & Preparing Canopy for ULT and fixing. . | a27 | 7 | Nos |
| 28 | 28 | ULT-Fixing, cabling and termination of ULT, ULT removal, cleaning and mounted back, Cable laying dressing for ULT. Fixing, cabling and termination of local indicator for ULT. | a28 | 36 | Nos |
| 29 | 29 | ULT-Mounting of ULT with still well on the tank. | a29 | 29 | Nos |
| 30 | 30 | ULT-Calibration of ULT to match LG and LT & Providing extended nozzle for ULT. Replacement of DPLT with ULT. | a30 | 29 | Nos |
| 31 | 31 | ULT-Mounting of ULT after maintenance. | a31 | 14 | Nos |
| 32 | 32 | ULT-Relocation, modification and new installation of ULT | a32 | 24 | Nos |
| 33 | 33 | LEVEL SWITCH- Removal cleaning and replacement of deform float & Cleaning and rectification of sump level switch. | a33 | 22 | Nos |
| 34 | 34 | Level Switch- Dechoking of isolation valve and Level switch & Rectification of leakage from drain valve. | a34 | 22 | Nos |
| 35 | 35 | Level Switch - Replacement of defective drain valve. | a35 | 12 | Nos |
| 36 | 36 | Level Switch - Providing plug at drain and vent. | a36 | 36 | Nos |
| 37 | 37 | Level Switch - Rectification of leakage from drain valve & leakage from Level switch flange joint. | a37 | 12 | Nos |
| 38 | 38 | Level Switch - Relocation, modification and new installation of Level Switch | a38 | 10 | Nos |
| 39 | 39 | DPFT- Calibration of DPFT & Isolating, cleaning of FT flange and taking in line. | a39 | 10 | Nos |
| 40 | 40 | DPFT- Impulse line cleaning. | a40 | 10 | Nos |
| 41 | 41 | DPFT- Power resetting of FT and taken in line. & Adjusting Zero shift. | a41 | 10 | Nos |
| 42 | 42 | DPLT- Calibration of DPLT & Isolating, cleaning of LT flange and taking in line. | a42 | 22 | Nos |
| 43 | 43 | DPLT- Dechoking of isolation, cleaning of LT flange and taking in line. | a43 | 12 | Nos |
| 44 | 44 | DPLT- Cleaning of LT cable and reterminating & Power resetting of LT and taken in line. | a44 | 14 | Nos |
| 45 | 45 | DPLT- Adjusting Zero shift. | a45 | 14 | Nos |
| 46 | 46 | RADAR LT- LT removal, cleaning and shifting to store & Checking calibration of Radar LT. | a46 | 36 | Nos |
| 47 | 47 | RADAR LT- LT fixing, glanding & termination & Programming of Radar level transmitter. | a47 | 36 | Nos |
| 48 | 48 | RADAR LT- Checking calibration of Radar LT | a48 | 42 | Nos |
| 49 | 49 | DCS- Replacement of defective fan & Loop checking of motor control loop. | a49 | 36 | Nos |
| 50 | 50 | DCS- Updating of Panel and JB Wiring. | a50 | 29 | Nos |
| 51 | 51 | DCS- Fixing cable ducts cover after cable dressing & Replacement of defective glass fuse. | a51 | 288 | Nos |
| 52 | 52 | DCS- Cleaning of all the panels and consoles. | a52 | 43 | Nos |
| 53 | 53 | DCS- Terminals tightened in all panels, Mounting of fuse TB and normal TB & Wiring job for panel. | a53 | 360 | Nos |
| 54 | 54 | DCS- Fixing of relay panel, diode array block & Mounting of isolators. | a54 | 36 | Nos |
| 55 | 55 | PRESSURE SWITCH- Replacement of defective pressure switch. | a55 | 7 | Nos |
| 56 | 56 | PRESSURE SWITCH- Pressure switch removal, calibration and fixing back. | a56 | 7 | Nos |
| 57 | 57 | TELEPHONE- Replacement of defective telephone set & defective hand set cable for telephone. | a57 | 36 | Nos |
| 58 | 58 | TELEPHONE- Repairing of defective telephone set. | a58 | 12 | Nos |
| 59 | 59 | TELEPHONE- One new Telephone connection given with telephone set, Telephone line loop checking & Shifting of telephone from different location. | a59 | 36 | Nos |
| 60 | 60 | Rotameter- Removal of rotameter, cleaning and fixing back. | a60 | 43 | Nos |
| 61 | 61 | Rotameter - Rectification of Flange leakage problem & Replacement of defective Rotameter. | a61 | 26 | Nos |
| 62 | 62 | Rotameter - Installation/Fixing, glanding, termination of Rotameter. | a62 | 42 | Nos |
| 63 | 63 | Rotameter - Loop checking of rotament for control room indication. | a63 | 7 | Nos |
| 64 | 64 | Rotameter - Cabling, Dressing, Glanding and termination for Rotameter. | a64 | 14 | Nos |
| 65 | 65 | Rotameter - Covering rotameter with polyethene & Removal, cleaning and shifting of Rotameter to store. | a65 | 84 | Nos |
| 66 | 66 | PH- Checking calibration of PH transmitters | a66 | 5 | Nos |
| 67 | 67 | PH- RTD and PH meter cabling to converter. | a67 | 5 | Nos |
| 68 | 68 | PC- Routine checking cleaning and up keeping of PC & Providing printer and installing in PC. | a68 | 22 | Nos |
| 69 | 69 | PC- Replacing defective monitor & defective mouse of computer. | a69 | 29 | Nos |
| 70 | 70 | PC- Relocating PC with table from one location to another location. | a70 | 7 | Nos |
| 71 | 71 | Others- Shifting of material and instrument from one location to another & Material shifting from main store to plant. | a71 | 144 | Nos |
| 72 | 72 | Others - Shifting of cable drums. | a72 | 14 | Nos |
| 73 | 73 | Others - Covering with polyethene sheet on field instrument for rainy season protection. | a73 | 58 | Nos |
| 74 | 74 | Others - PA system arrangement in meeting hall. | a74 | 22 | Nos |
| 75 | 75 | Others - 6mm & 12mm SS tubing. | a75 | 480 | Nos |
| 76 | 76 | Others - Rectification, Fixing of Air filter Regulator & Rectification of push button problem of plant PA system. | a76 | 115 | Nos |
| 77 | 77 | Others - Fixing of magnet of plant PA system. | a77 | 14 | Nos |
| 78 | 78 | Others - Power resetting of PA system & Maintenance of attendance system. | a78 | 29 | Nos |
| 79 | 79 | Others - Cleaning JB & field instrument. | a79 | 259 | Nos |
| 80 | 80 | Others - Rectification, programming and resetting of fire alarm system. | a80 | 14 | Nos |
| 81 | 81 | Others - Preparing and fixing aluminum canopy for field instrument and JB. | a81 | 29 | Nos |
| 82 | 82 | Others - Replacement of defective solenoid valve. | a82 | 7 | Nos |
| 83 | 83 | Others - Multi core cable, Drop cable , Power cable laying glanding and termination | a83 | 3000 | Nos |
| 84 | 84 | Others - Housekeeping job for instrument's in different units. | a84 | 144 | Nos |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed