Tender Details

Tender For Fabrication And Erection Work-1 Juice Heater 2 Replacement Of Worn-Out Partition Plates Of Juice Heater Compartment, After Fabrication Of New Partition Plates Identical To Existing One And Giving Leak Proof Trial. 3 Lime Station 4 Replacement Of Worn Out Grit Conveyor Scroll With Shaft- The Scope Of Work Includes Dismantling Of Worn Out Conveyor And Fabrication Of New Conveyor Identical To The Existing One And Fitting Thereof. Full 5 Replacement Of Worn Out Grit Conveyor Scroll With Shaft- The Scope Of Work Includes Dismantling Of Worn Out Conveyor And Fabrication Of New Conveyor Identical To The Existing One And Fitting Thereof. Half 6 Juice Sulphitor 7 ( A ) Replacement Of Worn-Out Cylindrical Portion Of Recovery Tower :- The Job Includes Dismantling Of Existing Worn-Out Cylindrical Portion Of Recovery Tower And Connected Pipe Lines, Fabrication Of New One, Identical To Existing One & Fitting Thereof. 8 ( B ) Replacement Of Worn-Out Half Cylindrical Portion Of Recovery Tower :- The Job Includes Dismantling Of Existing Worn-Out Cylindrical Portion Of Recovery Tower And Connected Pipe Lines, Fabrication Of New One, Identical To Existing One & Fitting Thereof. 9 Replacement Of Worn-Out Perforated Baffle Plate Inside Recovery Tower Of Juice Sulphiter :-The Job Includes Dismantling Of Existing Worn-Out Perforated Plate And Fabrication Of New Identical To Existing One And Fitting Thereof. 10 Replacement Of Worn-Out Perforated Plate Of Juice / Syrup Sulphiter :- A .Dismantling Of Worn-Out Perforated Plates Of Juice / Syrup Sulphiter. B:-B.Fabrication Of New Perforated Plate Identical To Existing One And Fitting Thereof In Position. 11 C.Repairing Of Worn-Out Top Cover Of Juice Sulphiter, :- The Job Includes Dismantling Of Existing Worn-Out Portion Of Cover, Fabrication Of New Portion Identical Cover & Fitting Of The Same In Position With Proper Supports As Required. 12 Replacement Of Worn Out Bottom Cone Of Correction Tank:- The Scop Of Work Include Dismantling Of Worn Out Bottom Of Correction Tank & Febrication Of New Bottom Identical To Exstiong One & Fitting Thereof With Related Connection Etc. 13 The Scope Of Work Includes Dismantling, Fabrication And Erection Of Worn Out Shell Above The Bottom Cone Of Correction Tank Of Juice Sulphitor. -- A:- Half Portion Of Shell 14 B:-    Full Portion Of Shell 15 Sulphur Furnace 16 A.The Job Includes Dismantling Of Worn-Out Sulphur Melters And Fabrication Of New Sulphur Melter, Identical To The Exiting One And Fitting Thereof In Position And Giving Satisfactory Testing At 300 Psig. 17 Sulpher Melter:- Replacement Of Weak / Worn-Out Steam Coil Melter-The Job Includes Dismantling Of Existing Wornout Stem Coil , Fabrication Of New Steam Coil Identical To The Existing, Fitting Thereof In Position After Testing The Same At 300 Psig. 18 Replacement Of Worn-Out S.S. / M.S. Pipe Of Gas Cooler- Replacement Of Worn-Out S.S. Pipe In So2 Gas Cooler. ( 4¢ ) , After Fabrication Of The Same With M.S. / S.S. Pipe, Identical To The Existing. 19 Complete Replacement Of So2 Gas Cooler –Dismantling Of Worn-Out Gas Cooler And Shifted At Scrap Yard. Fabrication & Erection Of New Gas Cooler By 10Mm M.S. Plate As Existing Cooler.Fitting Of 4 Dia S.S. / M.S. Pipe And Water Pipeline As In Existing Cooler, Leak Proof Trail Of Compete Unit. 20 Replacement Of Existing Worn-Out Scrubber :-The Job Includes Dismantling Of Existing Worn-Out Scrubber, Fabrication Of New Scrubber For So 2 Gas Identical To The Existing One And Erection Thereof. 21 Replacement Of Worn-Out Top Cover Of So 2 Gas Scrubber :- The Scope Of Work Includes Dismantling Of Existing Worn-Out Top Cover Of Scrubber, Fabrication Of New Top Cover / Flange Identical To The Existing One From 12 / 16 Mm Thick Ms Plate And Fitting / Erection Thereof. 22 Juice Clarifier 23 Dismantling Of Worn-Out Juice Withdrawal Coils Of Juice Clarifier, Fabrication Of Coil Identical To The Existing In Size With Nipple Etc. From Ms Pipe & Fitting Thereof. 24 Vacuum Filters 25 Replacement Of Worn-Out Heavy / Light Filtrate Juice Receiving Tanks.The Scope Of Work Includes Dismantling Of Worn-Out Heavy / Light Filtrate Juice Tank, Fabrication Of New Tank, Flange From 8 Mm Thick Ms Plate And Fitting Thereof. 26 Replacement Of Common Filtrate Juice Receiving Tank :-The Scope Of Work Include Dismantling Of Worn-Out Filtrate Juice Tank, Fabrication Of New One From 10 Mm Thick Ms Plate Identical To The Existing And Fitting Thereof. 27 Replacement Of Mud Trough Of Vacuum Filters :-A:- The Scope Of Work Includes Dismantling Of Existing Worn-Out Mud Trough ; Fabrication Of New Mud Trough Identical To Existing One From 8 Mm Thick Ms Plate And Erection Thereof. 28 ( B ) Replacement Of Half Portion Mud Trough Of Vacuum Filters :-The Scope Of Work Includes Dismantling Of Existing Worn-Out Mud Trough ; Fabrication Of New Mud Trough Identical To Existing One From 8 Mm Thick Ms Plate And Erection Thereof. 29 Replacement Of Worn-Out External Catcher Of Vacuum Filter Condenser, :-The Job Includes Dismantling Of Existing Worn-Out External Catcher; Fabrication Of The Catcher Identical To Existing One And Fitting Thereof. 30 Fabrication & Fitting Of Vacuum Filter Mud Agitator Identical To Existing, Including Dismantling Of Existing Worn-Out. 31 Replacement Of Worn-Out Side Plates Behind Vacuum Filter From M.S. Plate ( 3 Mm Thick ) Or G .I. Sheet With Proper Revitting. 32 Fabrication And Erection Of Bagacillo Cyclone Identical To The Existing One, After Dismantling The Existing Worn-Out. 33 Replacement Of Trough Of Mud Mixer :-The Scope Of Work Includes Dismantling Of Worn-Out Mud Trough Of Mixer And Fabrication Of Trough Identical To The Existing One And Fitting With Leak Proof Trial. 34 Replacement Of Worn-Out Conveyor Of Mud Mixer :-The Scope Of Work Includes Dismantling Of Worn-Out Conveyor And Fabrication Of New Conveyer Identical To Existing One And Fitting Thereof. 35 Replacement Of Bagacillo Screen At Bagasse Carrier, In Place Of Old / Worn-Out Piece Of Screen. 36 Job Includes Dismantling Of Agitator There Of Replacenent Of Worned Out Portion Of Angles / Plat / Channel Of Agilator And Fiting After Repair With Proper Trial. 37 Replacement Of Wornout Top Cover With Flange Of Light / Heavy Filtrate Receiving Tank 38 Evaporator Station 39 ( A ) Replacement Of Worn-Out Down –Take Funnels Of Evaporator :-The Scope Of Work Includes Dismantling Of Worn-Out Down - Take Funnels With Pipes And Clamps Etc., Fabrication Of New Funnel Identical To The Existing One & Fitting Thereof With Proper Clamping & Brackets, Welding Etc. And Giving Leak Proof Trials. 40 ( B ) Repair Of Worn-Out Down –Take Funnels Of Evaporator :-The Scope Of Work Includes Leaky / Worn-Out Portion Is To Be Welded / Patched And Leak Proof Trial Is To Be Done. 41 ( C ) Partial Replacement Of Worn-Out / Weak Portion Of Vapour Jacket Of Evaporator Calandria With 8 / 10 Mm / 12 Mm M.S.Plate. 42 Pan 43 Replacement Of Worn-Out Washing Arrangement For Sight Glass Of Pans :-The Job Includes Dismantling Of Worn-Out Sight Glass Washing Pipes Of Pan With Nozzle, Fabrication Of Identical Washing System And Fitting Thereof With Nozzles. 44 Replacement Of Worn-Out Til-Tale Bottle Of Pans :-The Scope Of Work Includes Dismantling Of Worn-Out Catcher Bottles, Fabrication Of New Bottles Identical To The Existing One, Fitting Of Flanges And Pipe Connection Thereof, Including Fitting Of Bottles Etc. In Position. The Job Also Includes Giving Leak-Proof Testing Of Catcher. 45 Replacement Of Top Umbrella Of Pans / Evap.The Job Includes Fabrication Of New Umbrella Of Pan / Evap. With 10 / 12Mm Ms Plate And Fitting Thereof With Proper Supports. 46 Fitting Of Sight Glasses With Flanges :-The Scope Of Work Includes Fabrication Of Flanges And Their Fitting In Position With Sight Glasses. 47 Providing Supports Inside / Outside Of Syrup Tanks / Molasses Tanks At Pan Floor ( Minimum 8 Supports Are To Be Provided ) . 48 Replacement Of Worn-Out Steam Coils Of Molasses Storage Tanks ( Behind Pans ) :-The Job Includes Dismantling Of Existing Weak And Worn-Out Steam Coils, Fabrication Of New Coils Identical To Existing Size And Fitting Thereof, Drilling Job Is Also Included, Including Giving Satisfactory Trials. 49 Replacement Of Condensate Box Of Calandria Of Pans / Evaporator Bodies :-The Scope Of Work Includes Dismantling Of Worn-Out Condensate Box, Fabrication And Fitting Of New Condensate Box Identical To The Existing One, Fitting Thereof And Giving Satisfactory Leak Proof Trials. 50 Replacement Of Worn-Out Shell Of Molasses Conditioner Including Pipe Connections & Valves Etc.-The Job Includes Dismantling Of Existing Worn-Out Shell Of Molasses Conditioner Including Pipe Connection & Valves Etc., Fabrication Of New Shell Identical To Existing On And Fitting The Same In Position, Including Providing Pipe Connections And Fitting Of Valves Etc. 51 Replacement Of Worn-Out Bottom Cone Of Molasses Conditioner.-The Job Includes Dismantling Of Existing Worn-Out Bottom Cone Of Molasses Conditioner; Fabrication Of New Bottom Cone Identical To Existing One And Fitting Thereof. 52 Replacement Of Worn-Out M.S. / S.S. Sheet Inner Of Discharge Valve Of Pan, As Per The Existing; The Job Includes Dismantling & Fitting Of All The Parts Of Discharge Valve, The M.S. / S.S. Sheet Is To Be Include After Machining. The Job Also Includes Giving Satisfactory Leak Proof Trials Of The Unit. 53 Replacement Of Worn-Out Bottom Plate Of Syrup / Molasses Tanks At Pan Station :-The Job Includes Dismantling Of Existing Supports, Replacement Of Bottom Plate With Required Inside / Outside Supports, As Per Existing And Giving Satisfactory Leak Proof Water Trials . 54 Replacement Of Worn-Out Side Plate Up To 1 Mtr. Height Approximately Of Molasses / Syrup Tanks :-The Job Includes Dismantling Of Worn-Out Side Plate With Supports, Replacement Of Side Plate With One Mtr. Ht. ( Approx. ) , With Required Supports, Inside & Outside, As Per Existing. The Job Also Includes Giving Satisfactory Leak Proof Water Trials Of Unit. 55 Vertical & Horizontal Crystallizer 56 ( A ) Replacement Of Worn-Out Scrolls Of Crystallizers: - The Job Includes Dismantling Of Existing Worn-Out Scrolls Of Crystallizer: Fabrication Of New Scroll By 8 / 10 Mm Size Old / New Ms Flat / Strips. 57 ( B ) Repair Of Worn-Out Scrolls Of Crystallizers :-The Job Includes Dismantling Of Existing Worn-Out / Weak Scrolls Of Crystallizer; Repair Of Weak Scroll By 8 / 10 Mm Size Old / New Ms Flat / Strips; The Job Also Include Strengthening Of Bent Scrolls. 58 Replacement Of Worn-Out Cooling Coil Of Vertical Crystallizer -The Job Includes Dismantling Of Worn Out Coil Of Vertical Crystallizer, Fabrication Of New Coil Identical To The Existing Coil At Site And Fitting Thereof . The Scope Of Work Also Include Giving Hydraulic Testing At 80 Psig And Satisfactory Trial Of The Coil 59 ( A ) Replacement Of Existing Worn-Out Water Coil Of Molasses Storage Storage Tanks :-The Job Includes Dismantling Of Existing Worn-Out Water Coil, Fabrication Of New Coil By Using 2 Dia. Pipe And Drilling Of Holes For Water Spray, Including Fitting Of Coil In Position, With Proper Supports. 60 ( B ) Repair Of Existing Worn-Out Water Coil Of Molasses Steel Storage Tanks :-The Job Includes Dismantling Of Existing Worn-Out Water Coil, Fabrication Of New Coil By Using 2 Dia. Pipe And Drilling Of Holes For Water Spray, Including Fitting Of Coil In Position, With Proper Supports. 61 Centrifugal Station 62 Replacement Of Worn-Out Discharge Chutes Of S / D Centrifugal Machines :-The Job Includes Dismantling Of Existing Worn-Out Sugar Discharge Chute Of S / D Cont. Machine And Fabrication Of New Chutes Identical To The Existing And Fitting Thereof. 63 Replacement Of Worn-Out Discharge Chutes Of Continuous Centrifugal Machine :-The Job Includes Dismantling Of Existing Worn-Out Discharge Chutes Of Cont. Centrifugal Machine And Fabrication Of New Chutes Identical To Existing And Fitting Thereof. 64 Replacement Of Top Cover Of Monitor Casing Of S / D Centrifugal Machine :-The Job Includes Fabrication Of Top Cover Of Monitor Casing Of S / D Machine Identical To Existing, Dismantling Of Existing Worn-Out Cover & Fitting New Fabricated Cover. 65 Monitor Casing Of S / D Centrifugal Machine Are To Be Made New, Complete In All Respects :- The Job Includes Dismantling Of Worn-Out Existing Monitor Casing, Fabrication Of New Casing Identical To The Existing One And Fitting Thereof. 66 Replacement Of Worn-Out Steam Coil Of The Sugar Melter :-The Job Includes Dismantling Of Steam Coil Of Sugar Melter, Fabrication Of New Circular Coil With 3 Dia. Pipe Identical To The Existing And Fitting Thereof In Position. 67 Replacement Of Steam Coil Of Hot / Cold Air Blower ( For Sugar Drying ) :-The Job Includes Dismantling Of Worn-Out Steam Coil Of Hot Air Blower, Fabrication Of New Coil Identical To Existing From New Pipe And Fitting Thereof In Position And Giving Hydraulic Testing At 100 Lbs. / Sq. Inch. 68 Replacement Of Worn-Out Molasses Chamber Of Nk-1100 Centrifugal Machine :-The Job Includes Dismantling Of Worn-Out Semi-Circular Chamber With Bottom Plate And Air Vent Pipe, Fabrication Of Molasses Outlet Chamber Identical To The Existing Chamber With Bottom Plate By 6 / 8 Mm M.S. Plate And Fitting At Site With Vent Pipe Etc. 69 Replacement Of Worn-Out Chutes Of Sugar Elevator :-The Scope Of Work Includes Dismantling Of The Existing Worn-Out Chutes, Fabrication Of New Chutes From 3 Mm M.S. Plate Identical To Existing And Fitting Thereof. 70 Replacement Of Worn-Out Portion Of Side Plates Of Sugar Elevator :- The Job Includes Dismantling Of Existing Worn-Out Portion Of Side Plates Of Sugar Elevator, Fabrication Of New Side Plates Of Required Size From 5 / 6 Mm Thick M.S. Plate And Fitting Thereof. 71 Replacement Of Worn-Out Sugar Discharge Chute Of Sugar Graders :-The Scope Of Work Includes Dismantling Of Existing Worn-Out Chute, Fabrication Of New Chutes From 3 Mm Thick M.S. Plate And Fitting Thereof Identically. 72 ( A ) Replacement Of Worn-Out Molasses Separator Circular Ring Of S.D. Machine:-The Job Includes Dismantling Of Worn-Out Molasses Separator Ring, Fabrication Of New Rings Identical Of Existing Ring & Fitting At Site With Leak Proof Trial. 73 ( B ) Replacement Of ( Worn-Out Internal ) Stationary Cylinder Of Sugar Melter:-The Job Includes Dismantling Of Worn-Out Cylinder ( Stationary ) Of Sugar Melter, Fabrication Of New Cylinder & Fitting Of The Same With Supporting Angles Identical To The Existing. 74 ( C ) Replacement Of Worn-Out Staging For Bearing Housing And Motor Of S.D. Machines :-The Job Includes Dismantling Of Worn-Out Staging Of S.D. Centrifugal Machines, Fabrication And Erection Of New Staging By 8 Side Channel Identical To The Existing One. 75 Replacement Of Worn-Out Molasses Outlet Pipe Of Nk-1100 M / Cs :-The Job Includes Dismantling Of Worn-Out Molasses Outlet Pipe With Reducer And Fabrication Of New Outlets Identical To The Existing One And Fitting Thereof. 76 Replacement Of Top Cover ( Portable ) Of Monitor Casing Of S.D. Centrifugal Machine :-The Job Includes Dismantling Of Existing Worn-Out Top Cover, Fabrication Of New Top Cover ( Portable ) Of Monitor Casing Of S.D. Centrifugal Machine, Identical To The Existing And Fitting Thereof. 77 Mills & Boilers 78 Replacement Of 50% Portion Of Juice Whirller Tanks ( Lower Half ) Of Mill House By New / Old M.S. Material By Welding From Both The Sides And Completing All The Connections And Removal Of Worn-Out Material To The Scrap Yard. 79 Replacement Of Juice Trays Below ‘Trpf’ Roller :-The Job Includes Dismantling Of Existing Worn-Out Juice Trays Below ‘Trpf’ Rollers, Fabrication Of New Juice Tray By 5 / 6 / 8 Mm Thick M.S. Plate And 30X30x6 Mm Size Angle To The Scrap Yard. 80 Replacement Of Bath Maceration Boots With Side Juice Box Of Rake Elevators Of Mill House :-Dismantling Of Existing Worn-Out Bath Maceration Boots With Side Juice Box, Fabrication Of New From 12 Mm Thick M.S. Plate Identical To The Existing The Erection Thereof; The Job Also Include Giving Satisfactory Water Trials; The Welding Is Required To Be Done From Both The Sides. 81 Replacement Of Worn-Out Sprocket Drum Of Rake Carrier Chain Drive:-The Work Includes Dismantling Of Worn-Out Drum & Fabrication Of New Drum Identical To Existing One From 8 / 10 Mm M.S. Plate & Fitting Of The Same. 82 Repair Of Worn-Out Pusher Roller. 83 Replacement Of Weak & Worn-Out I / D Fan Bottom And Upper Half Casing :-The Scope Of Work Includes Dismantling Of Worn-Out Portion Of Bottom & Upper Half Casing Of Boiler No. 1, 2, 3 And No. 4; Fabrication Of New Casing Including Fitting Thereof And Giving Satisfactory Trials. 84 Replacement Of I / D Fan Suction Side Ducting Cone And Damper:-The Scope Of Work Includes Worn-Out Suction Side Ducting Cone & Damper Of I / D Fan, Fabrication Of New Suction Side Ducting Cone & Damper And Fitting Thereof. 85 Fabrication & Erection Of Expansion Joint Of Boiler Ducting :-The Scope Of Work Includes Dismantling Of Existing Worn-Out Expansion Joints; Fabrication Of New Expansion Joint Similar To The Existing One From 3 / 5 Mm Thick M.S. Plate And Erection Thereof. 86 Fabrication Of New I.D. Fan Identical To Our Existing I.D. Fans. 87 Fabrication Of New F.D. Fan Identical To Our Existing F.D. Fans. 88 Repair Of Our Existing I / D Fans Of The Boiler No. 1, 2, 3 And No. 4;-The Job Involves Replacement Of Worn-Out Vane Plate, Side Plate Etc; Dismantling Of Old Vane Plate And Side Plate Etc , Fabricating The New Vane Plate And Side Plate Etc. And Fitting Thereof. 89 ( A ) Dismantling Of Complete Steam Economizers Of Boiler No. 1, 2 And No. 3 ( ‘Taxmaco’ Make ) , Inside And Outside Cleaning Of Tubes, Cleaning Of Fins, Inside And Outside Painting Of Tubes, Header And Casing Etc..The Job Includes Taking All The Fins Of Tubes With Header, Removal Of Bends, All Flanges And Their Assembly After Cleaning, Painting, Hydraulic Testing, Commissioning & Trials. The Job Also Includes Replacement Of Weak And Worn-Out Tubes And Bends Etc., Repair Of Damaged & Other Components, As May Be Required. 90 ( B ) Replacement Of Worn Out Soot Blow Pipes:-The Work Includes Dismantling Of Existing Worn-Out Soot Below Pipe, Fitting Of New Pipe. 91 ( C ) Replacement Of Worn Out Soot Blow Headers :-The Job Includes Dismantling Of Existing Worn-Out Soot Blow Header, Fabrication Of New Header Similar To As Per Existing And Erection Thereof. 92 Dismantling Of Complete Steam Economizers Of Boiler No. 4 ( ‘Wil’ Make ) , Inside And Outside Cleaning Of Tubes, Cleaning Of Fins, Inside And Outside Painting Of Tubes, Header And Casing Etc..The Job Includes Taking All The Fins Of Tubes With Header, Removal Of Bends, All Flanges And Their Assembly After Cleaning, Painting, Hydraulic Testing, Commissioning & Trials. The Job Also Includes Replacement Of Weak And Worn-Out Tubes And Bens Etc., Repair Of Damaged & Other Components, As May Be Required. 93 Fabrication Of New Bagasse Blower Fan, Identical To Our Existing Bagasse Blower Fan. 94 Replacement Of Worn-Out Bagasse Feeding Shutter And Frame :- The Job Includes Dismantling Of Existing Worn-Out Bagasse Feeding Shutter & Frame; Fabrication & Fitting Of New Bagasse Feeding Shutter & Frame, Identical To The Existing One. 95 Replacement Of Bulged Channel Of Bagasse Carrier. 96 Replacement Of Weak And Worn-Out I.D. Fan Bottom Half Casing Including Dismantling Job. 97 Replacement Of Bulged Beam / Channel Of Boiler Furnace Roof & Bridge ( Texmacco Boiler ) 98 Strengthening Of I.D. / F.D. Fan Bed / Electric Feed Pump Bed Of Boiler. 99 Replacement Of I.D. / F.D. Fan Upper Half Casing :-The Job Includes Dismantling Of Existing Worn-Out Upper Half Casing Of I.D. / F.D. ; Fabrication Of New Casing, Identical To The Existing And Fitting Thereof In Position. 100 Replacement Of I.D. / F.D. Fan Bottom Half Casing :-The Job Includes Dismantling Of Existing Worn-Out Bottom Half Casing Of I.D. / F.D. ; Fabrication Of New Casing, Identical To The Existing And Fitting Thereof In Position. 101 Boiler No. 4 S.A. Fan Casing:- Dismantling Of Existing Worn-Out S / A Fan Casing, Fabrication Of New Casing Identical To Existing, From 6 Mm M.S. Plate & Fitting Thereof. 102 Fabrication Of Bagasse Blower Casing And Fitting As Per Existing. 103 Replacement Of Worn-Out Casing Of D.S.M. Screen:-The Scope Of Work Includes Dismantling Of Worn-Out Casing Of D.S.M. Screen, Fabrication And Fitting Of New Casing From 8 / 6 Mm M.S. Plate. 104 Scheduled Rates ( Schedule A ) 105 Mills And Boilers 106 Pine Apple Type Chevron Groove Cutting In Mill Rollers .The Job Will Have To Be Done By The Contractor By Chisel, Hammers On Marking As Per Existing Groove. The Marking Will Also To Be Done By The Contractor As Per Instruction Of Chief Engineer. 107 Forging Of Oval Holes Of Chain Links Of Cane Carrier / Aux. Cane Carrier / Rake Elevator / Bagasse Carrier To Correct Size To Suit The New Bush & Pins. 108 Dismantling Of Existing Worn-Out Side Casig Of Fibrizor / Plates In Existing Cane Carrier / Auxiliary Cane Carrier / Rake Carrier, And Fitting Of New M.S. Plate Of 6 / 8 / 10 / 12 Mm Including Hood And Side Runner Angle. 109 Replacement Of Worn-Out Juice Box Of D.S.M. Screen At Mills :-The Scope Of Work Includes Dismantling Of Worn-Out Juice Box Of D.S.M. Screen, Fabrication Of New Juice Box From 8 / 10 Mm M.S. Plate And Fitting Thereof. 110 Fabrication & Fitting Of Juice Gutter For D. S. M. Screens Juice Boxes From 5 / 6 Mm Thick M.S. Plate, Including Providing Proper Slope Of Flanges Etc. For Its Dismantling & Fitting. 111 Fabrication Of Juice Tray Under Bath-Maceration In Boot. 112 Dismantling Of Mill Juice Gutter From Mill Juice Tray To Mill Juice Whirller Tank Fabrication Of New Juice Gutter By 8 Mm M.S Plate. 113 Replacement Of Rake Elevator Including Replacement Of Side Plates:-The Job Involves Dismantling Of Existing Runners And Side Plate; Fabrication& Fitting Of New Runner And Side Plates. 114 Replacement Of Screw Conveyor Scrolls :-The Scope Of Work Includes Dismantling Of Worn-Out Scrolls & Fabrication Of New Scrolls Identical To Existing By 6 Mm Thick M.S. Plate Of 8 Dia Pipe As Per Existing And Giving Satisfactory Trail. ( Approx 16 Nos ) 115 Fabrication & Fitting Of T.R.P.F. Gear Guard From 3 / 5 Mm M.S. Plate 116 Fabrication Of New D.S.M. Screen Unit:-The Job Includes Fabrication Of Complete Unit Of D.S.M. Screen, Identical To The Existing One. 117 Replacement Of Worn-Out Stainless Steel Screens Of D.S.M. Screen. 118 Replacement Of Rake Elevator Worn-Out Runners :- The Job Includes Dismantling Of Existing Worn-Out Runners And Fabrication & Fitting Of New Runners, Identical To The Existing One. 119 Replacement Of Bottom Angle & Upper Channel Of Rake Elevator Runners Supports :-The Job Includes Dismantling Of Worn-Out Existing Angle And Channel Supports Fabrication Of New Angle / Channel Supports And Fitting Thereof. 120 A.      Fabrication Of New Juice Screw Conveyer For Mill: - The Job Includes Fabrication Of Trough By Using 8 / 12 / 25 Mm M.S. Plate And Scroll By 6 M.S. Plate And M.S. Pipe Of 8” Dia.As Per Existing And Erection Thereof, Including Giving Satisfactory Trail. 121 Dismantling Of Existing Worn-Out Bagasse Chute Of 4Th Mill Discharge Connected To Bagasse Elevator And Fabrication & Erection Of New One, As Per Existing By 8 Mm M.S. Plate And Angle Iron Etc. 122 Replacement Of Bagasse Feeding C.I. Chutes Of Boiler No. 1, 2, 3 :- The Job Includes Dismantling Of Existing Wornout Chutes And Fitting Of New C.I.Chuets . 123 Replacement Of Safety Guard Of Bagasse Carrier Sprocket, After Fabrication Of New As Per Existing One. 124 Fabrication Of Rake For Rake Carrier, As Per Existing Sample From M.S. Channel & Plates. 125 Dismantling & Fabrication Of Perforated Bottom Tray Of Rake Elevator :-The Job Includes Dismantling Of Existing Worn-Out Juice Tray, Fabrication Of New Juice Tray Of Existing Size, Including Drilling Of Holes ( Approx. 3500 Nos. Holes Of 10 Mm Size ) & Fitting Of Perforated Tray, As Per Directions Of Engineer I / C. 126 Fabrication Of New Double D.S.M. Screen Unit ( Including S.S. Screen ) Identical To The Existing One From 8 / 10Mm M.S. Plate. ( New / Old Plate ) 127 Fabrication Of Trpf Roller Guard Identical To Existing One From 5 / 6Mm M.S. Plate. 128 Replacement Of Worn-Out M.S. Chute At Boilers:-The Job Includes Dismantling Of Existing Worn-Out Chute, Fabrication Of New Chute Identical To The Existing And Fitting Thereof. 129 Fabrication Of Juice Tray Under Perforated Tray Of Rake Elevator :-The Scope Of Work Includes Dismantling Of Existing Worn-Out Tray Under Perforated Tray Of Rake Elevator; Fabrication Of New Tray Identical To Existing And Fitting Thereof In Position. 130 Boiling House 131 Fabrication Of Strainer Of Juice Catcher 132 Fabrication Of Strainer Of Juice Catcher For Raw-Juice / Sulphured Juice By Perforated Sheet / Wire Netting And Fitting In Juice Catcher. 133 Fabrication Of Raw-Juice Strainer Arrangement Above In Raw-Juice Receiving Tank Of Size Approx 5’X5’ With Wire Netting Proper Side Walls And Fitting Of Thereof And Giving Satisfactory Trials With Proper Platform For Cleaning This Strainer. 134 Juice Heater / V.L.J.Heater 135 ( A ) Replacement Of 2 Dia. Ammonia Coils Of Juice Heater :-The Job Includes Dismantling Of Existing Worn-Out Heavy / Light Ammonia Gas Coils, Fabrication Of New Coil, Identical To Existing One And Fitting Thereof. 136 ( B ) Replacement Of Worn-Out Top Header Of Juice Heater With All Inside Partition Plate :-The Job Includes Dismantling Of Existing Worn-Out Top Header Of Juice Heater With All Partition Plate, Fabrication & Fitting Of New Header With All Partition Plates Including Fitting Of Rubber Cord Arrangement And Existing Matching ‘Eye’ Bolts With Cover And Satisfactory Leak Proof Trial. 137 ( C ) Replacement Of Worn-Out Bottom Header Of Juice Heater With All Inside Partition Plate :-The Job Includes Dismantling Of Existing Worn-Out Bottom Header Of Juice Heater With All Partition Plate, Fabrication & Fitting Of New Header With All Partition Plates Including Fitting Of Rubber Cord Arrangement And Existing Matching ‘Eye’ Bolts With Cover And Satisfactory Leak Proof Trial. 138 ( D ) ( I ) Replacement Of Worn-Out Full Shell Of Juice Heater :-The Job Includes Dismantling Of Shell Of Juice Heater, Fabrication & Fitting Of New Shell Identical To The Existing One. The Job Is To Be Completed In All Respect Including Leak-Proof Hydraulic Testing At 100 Lbs / Sq. In. 139 ( Ii ) Replacement Of Worn-Out Half Shell Of Juice Heater :-The Job Includes Dismantling Of Shell Of Juice Heater, Fabrication & Fitting Of New Shell Identical To The Existing One. The Job Is To Be Completed In All Respect Including Leak-Proof Hydraulic Testing At 100 Lbs / Sq. In. 140 A ) Replacement Of Worn Out / Weak Portion Of Lower And Upper Vapour Flow Jacket Of Vapour Line Juice Heater. Work Includes Dismantling Of Worn Out Portion Of Lower And Upper Vapour Flow Jacket Of Quad 5Th Body, Inner And Outer Shell Fabrication & Erection Of The Same Identical With Existing One.After That Satisfactory Water Trial Of Complete Vapour Line Juice Heater To Be Done By The Contractor. 141 B ) Replacement Of Top & Bottom Cover Clits With I. Bolts And Paching Of Shell Both Top & Bottom Side Of Vapour Line Juice Heater. Work Includes Patching / Replacement Of Top & Bottom Compartment Area Of Header From Out Side With 8Mm M.S.Plate And Approx. Height 0.5 Mtrs.Each For Both Top & Bottom Side Of Vapour Line Juice Heater And Welding Of Clits At Their Place With I. Bolts According To Top & Bottom Covers After That Satisfactory Water Trial Of Complete Vapour Line Juice Heater To Be Done By The Contractor. 142 Juice Clarifier 143 ( A ) Replacement Of Worn-Out Juice Deflector Plate Inside The Juice Clarifier With Central Shaft Of Clarifier :- The Job Includes Replacement Of Worn-Out Juice Deflector Plate And Fabrication Of New Deflector Plate Identical To The Existing Plate And Fitting Thereof With Proper Supports Etc. 144 ( B ) Replacement Of Worn-Out Mud Squeezer Plate Inside The Juice Clarifier: - The Job Includes Replacement Of Worn-Out Mud Squeezer Plate And Fabrication Of New Squeezer Plate Identical To The Existing Plate And Fitting Thereof With Proper Supports Etc. 145 Sulphur Furnace 146 ( A ) Replacement Of Sublimer Pipe Of Sulphur Furnace :-The Scope Of Work Includes Dismantling Of Existing Worn-Out Sublimer Pipe, Fabrication Of New Ms Pipe Of 12 Dia. With Flanges, Reducer And Fitting / Erection Thereof. 147 ( B ) Replacement Of Top Cover Of Sulphur Furnace :-The Scope Of Work Include Dismantling Of Existing Worn-Out M.S. Top Cover Of So 2 Furnace, Fabrication Of New Top Cover Identical To The Existing One From 16 / 20 Mm M S Plate And Flanges From 20 / 25 Mm M S Plate And Fitting / Erection Thereof. 148 Vacuum Filters 149 Replacement Of Worn Out Spray Nozzles Pipe At Vacuum Filter :- The Job Includes Dismantling Of Existing Worn-Out Spray Pipe And Fabrication Of New Spray Pipe Alongwith Nipples Etc. Identical To Existing One And Fitting Thereof With Proper Supports, Etc.. 150 Evaporators 151 ( A ) Replacement Of Worn-Out Ammonia Pipe Header And Worn-Out Portion From Header To Tube Plate Of Evaporators / Pans. 152 ( B ) Circular Ammonia Coil Heavy And Light Of Vapour Cell / S.K. / Pan To Be Replace With Nipple Etc. As Per Existing One. 153 Replacement Of Water Washing Coil Of Evaporators:-The Job Includes Dismantling Of Worn-Out Washing Coils, Fabrication Of New Coil Identical In Dimensions From Ms Including Drilling / Cutting Required Nos. Of Holes As Directed And Fitting The Coil In Position. The Job Also Includes Giving Satisfactory Trials. 154 Dismantling, Cleaning And Refitting Of Juice Distribution Coils Of The Evaporator Bodies, Minor Repair Is Also To Be Done, If Required. 155 Vapor Line Juice Heater Job :- A ) Dismantling Of Existing Worn Out V.L.J.H. As A Whole Unit. 156 B ) After Dismantling Existing S.S. Tubes Are To Be Taken Out Carefully Resizing Of Tubes Length Is To Be Don In Factory Workshop Inder Contrcator Supervision. 157 C ) Fitting Of Vapor Line Juice Heator At Site With All Connection Of Juice , Vapor, Condensate Etc.And Thereof Successful / Satisfactory Water / Hydraulic And Vacuum Trails. 158 Pan 159 Replacement Of Worn-Out Steam Washing Coils Of Pans :-The Job Includes Dismantling Of Worn-Out Washing Coils, Fabrication Of New Coils Of Identical Dimensions From Ms Pipe Including Drilling / Cutting Of Required Nos. Of Holes And Fitting The Coil In Position. The Job Also Includes Giving Satisfactory Trials. 160 Replacement Of Down-Take Of Pan Calandria :-The Job Includes, Dismantling Of Existing Worn-Out Shell Of Down-Take And Fabrication Of New Down-Take By 10 / 12 Mm Ms Plate And Fitting Thereof, Including Giving Satisfactory Trials ( Hydraulic ) At 70 Lbs. 161 Strengthening Of Molasses Steel Storage Tank :-Strengthening Of Molasses Steel Storage Tank, As Per Directions Of Outer Agency And Giving Satisfactory Leak Proof Trials. 162 Replacement Of Worn-Out Header Rib Of Juice Heater ( Top & Bottom Header ) For Filling Of Rubber Square. 163 ( A )      Replacement Of Manholes :- Evaporator Bodies / Pans :-The Scope Of Work Includes Dismantling Of Old And Worn-Out Manholes Of Evaporator / Pan Bodies ( Top & Bottom ) , Fabrication New Manholes Identical To The Existing One And Fitting Thereof In Position; The Job Includes Giving Leak Proof Satisfactory Trials. 164 ( C )      Vapour Pipes, Save-All & Condensate Receiving Tanks. 165 ( D )     Condensate / Syrup Bottles :-The Scope Of Work Includes Fabrication And Fitting Of Manholes With Proper Lid / Cover ( Fabrication Of Flanges Drilling Of Holes Included ) . 166 Replacement Of Weak Calandria Shell Of Evaporator Body- The Scope Of Work Includes Dismantling Of Outer Shell Including Vapour Jacket Attached With Calandria Shell And Fabricated With 10 / 12Mm Thik M.S. Plate Identical To Existing One And Complete The Job And Trial 167 Replacement Of Half Calandria Shell Of Evaporator Body-The Scope Of Work Includes Dismantling Of Weak Half Portion Of Outer Shell Of Calandria Including Vapour Jacket As Per Existing And Fabricated With 10 / 12Mm Thick M.S. Plate As Identical To Existing One And Complete The Job & Trial 168 Dismantling And Fitting ( After Cleaning & Reaming Of Tube Plate Holes ) Of Brass Tubes / Ss Tubes 169 A.       Evaporator 170 B.       Pan 171 C.        Juice Heater 172 Repair Of Weak / Worn-Out Portion Of Save-All Of Pans / Evaporator :-A. Dismantling Of Worn-Out Portion Of Top Cover Of Save-All, Fabrication Of New Portion From 8 / 10 Mm Ms Plate And Fitting Thereof, Including Giving Satisfactory Leak-Proof Trials. 173 ( B ) Dismantling Of Worn-Out Weak Portion Of Outer Shell Of Save-All, Fabrication Of New Portion Of Outer Shell Identical To The Existing One And Fitting Thereof, Including Giving Satisfactory Trials. 174 ( C ) Dismantling Of Worn-Out Portion Of Inner Shell Of Save-All, Fabrication Of New Inner Shell Portion Identical To Existing One And Fitting Thereof. The Job Includes Dismantling & Fitting Of Outer Shell / Top Cover, Whichever Is Required To Attend The Job. 175 ( D ) Dismantling Of Weak / Worn-Out Fins / Angles Of Save-All And Fabrication Of New Fins / Angles, Identical To Existing And Fitting With Satisfactory Trials. 176 ( A ) Replacement Of Worn-Out And Weak Feed Deflector Of Pans :-The Job Includes Dismantling Of Existing Worn-Out And Weak Deflector Of Pan, Fabrication Of New Deflector By 10 / 12 Mm Ms Plate And Fitting Thereof With Proper Supports. 177 ( B ) Repair Of Worn-Out And Weak Feed Deflector Of Pans :-The Job Includes Dismantling Of Existing Feed Deflector With Supports And Fitting Thereof With Proper Supports After Due Repairs. 178 Replacement Of Worn-Out And Weak Feed Distributors Of Pans. -Dismantling Of Worn-Out And Weak Feed Distributor Along-With With Deflector; Fabrication Of New Feed Distributor By 6-8 Mm Plate & Refitting. The Job Includes Refitting Of Deflector, After Replacement Of Feed Distributor Plate. 179 Repair Of Worn-Out Portion Of Top Umbrella Of Pans / Evap.-The Job Includes Dismantling Of Broken / Dislocated Top Umbrella Of Pans / Evaporator, Its Repairs Where-Ever Required And Its Erection At Proper Place Including Providing Proper Supports. 180 Providing Supports Inside The Top Cone Of Pans / Semi Kestner / Evaporator / Condenser / Catcher / Save-All / Vapour Pipe ( Minimum 8 Supports Are To Be Fitted ) . 181 Providing Channel / Angle Supports Feed Pipe Line Of Pan. 182 ( A ) Replacement Of Bottom Cone Of Entrainment Catcher Of Pan ( External Catcher ) :-The Job Includes Dismantling Of Existing Worn-Out Bottom Cone Of Entrainment Catcher, Fabrication Of New One, Identical To The Existing One And Fitting Thereof In Position. 183 ( B ) Replacement Of Top Cover Of Entrainment Catcher Of Pan:- The Job Includes Dismantling Of Worn-Out Top Cover Of Catcher; Fabrication Of New One Identical To Existing One And Fitting Thereof. 184 ( C ) Replacement Of Worn- Out Partition Plate Of Entrainment Catcher Of Pan:-The Job Includes Dismantling Of Worn-Out Top Cover & Partition Plate Of Catcher; Fabrication Of New Top Cover And Partition Plate Identical To Existing One And Fitting Thereof. 185 ( D ) Replacement Of Weak / Worn-Out Shell Of External Catcher Of Pan By 8 / 10 / 12 Mm M.S. Plate. 186 A )       Half Portion Of Shell 187 B )      Full Portion Of Shell 188 Dismantling And Replacement Of Worn-Out Runners Of Size 75X10 Mm In Cane Carrier, Auxiliary Cane Carrier With Proper Strengthening Of Beam Supports. 189 Replacement Of Worn-Out Ammonia Pipe Of Evaporator Body Between Both Tube Plate Duly Hole Provided Ammonia Pipe & Fitted With Flange 190 Replacement Of Complete Body Of Pan- The Scope Of Work Includes Dismentling Of Worn Out Existing Save All, Top Body Cone, Body Shell & Tapered Portion Between Body Shell & Calandria There Of Fabrication Of New Save All, Top Body Cone, Body Shell & Taper Portion Between Body Shell & Calandria With 12Mm Plate Identical To Existing & As Per Drawing And Fitting With All Pipe Lines. Valves Etc. & Giving Satisfactory Leak Proof Hydaulic, Water & Vacuum Trials. 191 Clarifier 192 ( A ) Replacement Of Worn-Out Complete Top Roof Of 36’ Dia Clarifier – Dismantling Of Worn-Out Roof Of Clarifier. Fabrication & Erection Of Roof By 8Mm M.S. Plate With Proper Support Of Angle & Channels Are To Be Provided As Existing.Dismantling, Fabrication And Erection Of Top Portion Of Cylindrical Shell ( Connected With Top Roof Of Clarifier ) Plate Approx. One Ft. Long By New M.S. Plate 8Mm / 10Mm With Inside & Outside Welding ( Leak Proof Water Trial ) . 193 ( B ) Replacement Of Worn-Out Approx. Half Top Roof Of 36’ Dia Clarifier – Dismantling Of Worn-Out Roof Of Clarifier.-Fabrication & Erection Of Roof By 8Mm M.S. Plate With Proper Support Of Angle & Channels Are To Be Provided As Existing.-Dismantling, Fabrication And Erection Of Top Portion Of Cylindrical Shell ( Connected With Top Roof Of Clarifier ) Plate Approx. One Ft. Long By New M.S. Plate 8Mm / 10Mm With Inside & Outside Welding ( Leak Proof Water Trial ) . 194 Replacement Of Worn-Out Top Of Cylindrical Flash Tank Of Clarifier-The Scope Of Work Includes Dismantling, Fabrication And Erection Of Existing Top Of Flash Tank And Fitting Of Chimney Etc. 195 Crystallizer 196 Replacement Of Worn-Out Portion Of Vacuum Crystallizer –A:-Half Portion Of Shell With Outer Side Supports. 197 B..-Full Shell With Outer Side Supports.After Completion Of Job, Satisfactory Water And Vacuum Trial Of Unit To Be Given By Contractor. 198 ( A ) Repair Of Bent Shaft & Arms Of Crystallizers :- The Job Includes Taking Out The Bent Shaft Of Crystallizer ( 4 To 8 Sq. Shaft ) , Dismantling Of Its Connected Parts ( Arms Etc. ) And Fitting Thereof, After Due Repair Of Shaft & Arms Etc. 199 Replacement Of Complete Syrup / Molasses Storage Tank At Pan Floor With Proper Supports :-Dismantling Of Existing Worn-Out Syrup / Molasses Storage Tanks With Supports, Fabrication Of New Tanks & Erection Thereof Including Providing Proper Supports; The Job Also Include Giving Satisfactory Trials. 200 Replacement Of Half Round Bottom Shell Of Crystallizer With 10Mm / 8 Mm M.S. Platehalf Portion Of Full Crystallizer 201 B.      Half Portion Of Half Crystallizer 202 C.     1 / 4 Portion Of Half Crystallizer 203 Horizontal & Vertical Crystallizer 204 Minor Repairing And Strengthening Of Cont. Horizontal Crystallizer:- Patching Of Weak & Leaky Portion Of Hollow Shaft Where Cooling Coils Are Attached Or Portion Is Plugged. 205 ( A )      Strengthening Of Driving Shaft With Angle Iron. 206 ( B )     Dismantling Of Weak And Worn-Out Existing Cooling Coils, Fabrication & Fitting Of New Coils, Fitting Thereof And Satisfactory Trials For Leak Proof Working ( Water / Hydraulic Testing ) . 207 Repair Of Worn-Out / Week Portion Of The Cooling Coil Of Vertical Crystallizer. The Job Includes Dismantling Of Worn Out / Week Portion Of The Cooling Coil, Fabrication Of New Coil Identical For Existing Portion, Fitting The Same At Site And Hydraulic Testing Of Complete Coil. 208 D.M. Plant 209 Repair Of Blower Of D.M. Plant With Its Fin. 210 Fitting Of Sand Catcher At D.M. Plant The Scope Of Work Includes Fitting Of Sand Catcher In Water Inlet Line Of D.M.Plant Complete In All Respect As Per Terms & Conditions With All Valves, Pipe Lines Etc. Thereof Giving Satisifactory Leakproof Trials. 211 P.R. D.S. Fitting 212 Fitting Of P.R.D.S. In Boiling House-The Scope Of Work Includes Fitting Of P.R.D.S. In Boiling House To Reduce Boiler Pressure From 21 Kg To 7 Kg. With Necessary Inlet & Outlet Connection With New Header And Giving Successful Trials. 213 Replacement Of Worn-Out Pipe Of Cones ( Lifting Hood ) Of S / D Centrifugal Machine :- The Job Includes Dismantling Of 5 Size Worn-Out Pipe Of Discharge Cone Of S / D Machine; Fabrication Of Flange Identical To The Existing One And Fitting Of Pipe With Flange On Discharge Cone, Such That It Must Be Perfectly Aligned To The Shaft Of S / D Machine. 214 Replacement Of Worn-Out Cones Of S / D Centrifugal Machine :- The Scope Of Work Includes Dismantling Of Existing Worn-Out Cone; Fabrication Of New Cone From Ss Plate, Identical To The Existing Cone And Fitting The Same In Position. 215 Replacement Of Worn-Out Molasses Outlet Bends Of S / D Centrifugal Machines:-The Job Includes Dismantling Of Existing Worn-Out Molasses Outlet Bend, Fabrication Of New Bends From 5 Mm Thick M.S. Plate & Fitting Thereof. 216 Replacement Of Worn-Out Molasses Outlet ‘S’ Bend Of 1350 Kt Centrifugal Machine :- The Job Includes Dismantling Of Worn-Out 6 Size Bend, Fabrication Of New ‘S’ Bend Identical To The Existing “S” Bend & Fitting Thereof. 217 Replacement Of Worn-Out Tilting Chutes Of S / D Centrifugal Machine :-The Job Includes Dismantling Of The Tilting Chute Of S / D Machine And Fabrication Of The New From 2 Mm Thick M.S. Plate, Including Washing Nipple & Fitting Of The Same. 218 Replacement Of Monitor Casing Collar Ring Of S / D Centrifugal Machine :-The Job Includes Fabrication Of Monitor Case Collar Ring Of S / D Centrifugal M / C And Fitting Thereof In Position, After Dismantling The Existing Worn-Out Ring. 219 Replacement Of Worn-Out Top Ring Of S / D Centrifugal Machine Basket -The Job Includes Dismantling Of Worn-Out Top Ring, Fabrication Of New Ring By 10 / 12 Mm Thick Ms Plate And Fitting Thereof Perfectly. 220 Replacement Of Worn-Out Coil Of Super Heated Wash Water Column :-The Job Includes Dismantling Of Existing Worn-Out Coil, Fabrication Of New Coil From New Steam Pipe Identical To The Existing Coils, Hydraulic Testing At 350 Lbs. / Sq. Inch, Fitting Of The Same In Position & Steam Trials For Leak Proof Working. 221 Dismantling Of Old Transient Heater & Erraction Of New Transient Heater In Place Of Old Nk 1100 Continuous Machine.Scope Of Work:-All The Necessary Connections Of Pug Mill To Transient Heater & Transient Heater To Machine, Steam And Water Connections Etc. To Be Done. 222 Effluent Treatment Plant 223 ( A ) Dismantling, Fabrication & Erection Of New Aerator Fan Of E.T.P. As Per Existing. 224 ( B ) Dismantling, Replacement / Repairing Of Blades Of Aerator Fan Of E.T.P. As Required 225 Replacement Of Complete Hopper :- Dismantling Of Worn-Out Hopper Complete & Fabrication Of Hopper 1.5 Mtr. Width, Complete Erection With Drive, Identical To The Existing Hopper And Giving Satisfactory Trials Of Its Working. 226 ( A )      Modification In Sugar Distribution Arrangement From Sugar Elevator Chutes To Grader 227 ( B )     Modification In Uniform Sugar Distribution In Sugar Grader On Wire Netting. 228 Strengthening Of Complete Structure, Staging. Column, Platform Etc. Of Hot And Cold Water Over Head Storage Tank Near Evaporator Station In Boiling House. 229 Dismantling Of Various Tanks, Machinery Components From Various Places And Their Dragging To The Yard, Within A Radius Of 150 Mtrs. . 230 Dismantling Of Various Platforms, Staging And Columns Etc. 231 Fabrication & Erection Of Steel Staging And Platform Etc.. 232 - Do – But Columns, Structure And Purlins. 233 Fabrication & Erection Of Rectangular Tanks From 6 / 8 / 10 Or 12 Mm Thick M.S. Plate. 234 -Do- But Round Tank With Flat Bottom. 235 -Do- But Round Tank With Conical Bottom. 236 Erection Of Round Tank With Flat / Conical Bottom. 237 Dismantling, Repairing, Reinforcement And Refitting Of Stirrer Arms Of Crystallizers. 238 Fabrication Of Stair Cases With Footsteps Including Erection Thereof. 239 Fabrication Of Clamps And Its Tie Rods. 240 Fitting Of Pipe Line Supports With Clamps And Ties. 241 Fabrication & Erection Of Hand Railing By 1 / 2 To 2 Dia. Pipe. 242 Dismantling, Fabrication And Fitting Of Molasses Gutters / Massecuite Gutters / Juice Gutters, Sides Plates Of Bagasse Carrier / Sugar Elevator, Sugar Elevator Chutes, Boiler Id & F.D. Fan / Air Heator Tucting 243 Fabrication Of M.S. Pipe From 6 To 10 Mm Thick M.S. Plate In Different Section / Sizes. 244 Fitting Of M.S. / G.I. / S.S. Pipe Including Valves, Flanges, Bends Etc, Of Different Sections Up To Any Elevation, 1 / 2 To 3 Dia. Pipe. 245 - Above 3 To 6 Dia. Size. 246 - Above 6 To 14 Dia. Size. 247 - 16 Dia. To 24 Dia. Size. 248 - 26 To 36 Dia. Size. 249 - 38 To 46 Dia. Size. 250 Fitting Of Cast Iron Pipe From 3 To 12 Dia. Including Valves, Flanges, Bend Etc. :- 3 Dia. To 6 Dia. Size. 251 -          Above 6 To 8 Dia. Size. 252 -          Above 8 Dia To 12 Dia. 253 Dismantling Of Various Sizes Of Pipe Lines With Fittings :- / 2 Dia. To 3 Dia. Size. 254 -          Above 3 Dia. To 6Dia. Size. 255 -          Above 6 Dia. To 14 Dia Size. 256 -          Above 14 Dia. To 24 Dia Size. 257 -          Above 26 Dia. To 36 Dia. Size. 258 -          Above 38 Dia. To 46 Dia. Size 259 Dismantling, Repairing, Reinforcement And Refitting Of Stirrer Arms Of Pug Mill. 260 -Do- But Of Magma Mixer. 261 Dismantling, Fabrication & Refitting Of Stirrer Arms Of Magma Mixer / Pug Mill. 262 Dismantling, Cleaning And Refitting Of Various Size Of M.S. / G.I. / S.S. Pipe Lines With Fittings :- 1 / 2 Dia. To 3 Dia. Size. 263 -          Above 3 Dia. To 6 Dia. Size. 264 -          Above 6 Dia. To 14 Dia. Size. 265 -          16 Dia. To 24 Dia. Size. 266 Dismantling, Cleaning And Refitting Of 6 Dia. Cast Iron Pipe Line Of Sulphur Station. 267 Fabrication Of M.S. Tee From M.S. Pipe & Plate Of 6 To 10 Mm Size. 268 Fabrication Of Bends Of Different Sizes From 6 To 10 Mm Thick M.S. Plate / Pipe 269 Fabrication Of M.S. Elbow In Different Sizes From M.S. Pipe / Plate Of 6 To 10 Mm Size. 270 -Do- But Nipples. 271 Fabrication Of M.S. Flanges From 10 To 32 Mm Thick M.S. Plate, With Holes Duly Drilled. 272 Fitting Of Flanges Up To 42 Dia. . 273 Fabrication Of Reducers Of Different Sizes. 274 Fitting Of Reducers Of Different Sizes. 275 Fitting Of M.S. / G.I. / Ci Bends / Elbow / Tee / Nipples Etc. Up To 42 Dia.Size 276 Dismantling, Fabrication & Fitting Of Juice Sulphiter Arms 277 Replacement Of Old Manifolds Of Pans; Dismantling Of Existing Worn-Out Manifolds, Fabrication & Fitting Of The Same By New Pipe, Providing All Connections Of 1½”, 2, 3, 4, 5, 6 & 8 Dia Etc.. Complete In All Respects. 278 Fitting Of Any Type Of Valves :- Up To 8 Dia.. 279 -          Above 8 Dia. To 16 Dia. . 280 -          Above 16 Dia. To 24 Dia.. 281 -          Above 24 Dia. . 282 Fabrication Of Cross Of Different Sizes From M.S. Pipe. 283 Installation Of Different Type Of Pumps, The Job Includes Giving Satisfactory Trials Of The Unit Up To 10 H.P. Pumps. 284 -          Above 10 H.P. But Up To 30 H.P. 285 -          Above 30 H.P. But Up To 50 H.P. 286 -          Above 50 H.P. But Up To 80 H.P. 287 Fabrication Of Beds Of Different Size Of Motors / Pumps:- Pump Coupled With Motor Up To 10 H.P. 288 -          -Do- But Above 10 H.P. To 20 H.P. 289 -          -Do- But Above 20 H.P. To 40 H.P. 290 -          -Do- But Above 40 H.P. To 60 H.P. 291 -          -Do- But Above 60 H.P. To 80 H.P. 292 -          -Do- But Above 80 H.P. 293 Fabrication Of Scrapper For Bagasse Carrier As Per Existing Sample From M.S. Plate & M.S. Flate 294 Dismantling Of Various Type / Sizes Of Valves Of Any Type, Including Their Dragging From The Source Up To The Destination, Within The Factory :- Up To 8 Dia. 295 -          Above 8 To 12 Dia. 296 -          Above 12 Dia. To 16 Dia. 297 -          Above 16 Dia. To 20 Dia. 298 -          Above 20 Dia. To 24 Dia. 299 Replacement Of Buldged Columns, Beams Etc. Of Boiler No. 1, 2, 3 And No. 4:- The Scope Of Work Involves Dismantling Of Bulged And Twisted Beams, Columns Etc. And Fitting Of New After Fabrication, As Per The Directions Of Engineer Incharge. 300 Patching Of Different Sizes Of Tanks / Vessels / Gutters / Pipe Lines Etc. From 6 / 8 / 10 Mm Thick M. S. Plate. ( Upto 1 M2 Per Pc. ) 301 Fabrication & Fitting Of Different Size Guards Of Driving Gears From Of 6 / 8 Mm Thick M.S. Plate. 302 Fabrication & Fitting Of Lopper / Air Distributor Plate At Hopper 303 Strengthening Of Tank / Vessel By M. S. Plate 6 Mm To 12 Mm Thick 304 Dismantling, Cleaning And Refitting Of Nozzles Of M.C.S. 305 Dismantling Of M.S. Bends, Nipple, Tee, Reducer And Elbow 306 Dismantling, Cutting Of M. S. Flanges ( Usable ) From Old Pipe 307 Dismantling And Fitting Of M.S. / C. I. Cross 308 Fabrication Of M. S. Cross 6 Size 309 Fabrication Of Bagacillo Pipe Line ( G.I. / M.S. ) 3 Mm M.S. Thick Plate 310 Replacement Of Leaky Joints Between Flanges Of Any Pipe Line During Crushing Season. 311 Dismantling Of Old Beds Of Motors & Pumps 312 Dismantling And Fitting Of Double Beat Valve Of Juice Heater. 313 Dismantling, Fabrication & Fitting Of Strainer Box With Strainer Of M.S. / S.S. / Copper For Pumps As Per Existing. 314 Dismantling And Fitting Of C.I. Frame & Door Of “Taxmaco” Make Boiler Furnace As Per Existing. 315 Welding As Per Requirement For Any Equipment. 316 Replace Of Rake Carrier Sprocket Bed Bottom Side Plate Both Sides To Be Fabricated From 10 / 12 Mm Thick M.S. Plate 317 Fabrication Of Lime Screw Conveyer Scroll By 6 Mm As Per Existing Giving Satisfactory Trail. 318 Double Beat Valve 8” Dia ( Including Necessary Alteration In Each Valve Pipe Line Etc. ) 319 Replacement Of Baggase Elevator Wornout M.S.Chute 320 Replacement Of Mill Turbine Oil Brass / Cooler Copper Tube 321 Replacement Of M.S. Rail Of Cane Unloader Bridge . 322 Replacement Of M.S. Squre Of Cane Unloader Trolly. 323 Juice Sulphiter 324 A ) Replacement Of 10” Dia M.S / S.Scross Of So2 Gas Distribution Coil Of Juice Sulphiter -The Scope Of Work Includes Dismentling Of Existing 10” Dia Cross Of So2 Gas Distribution Coil Of Juice Sulphiter , .Fabrication Of 10” Dia M.S / S.S Cross Of So2 Gas Distribution Coil Of Juice Sulphiter Of 10” Size With S.S. ( M.S. ) Pipe. Fitting Of 10” Dia S.S / M.S Cross Of So2 Gas Distribution Coil Dismantling Of Worm Out Ducting Of Air Heater & Modification, Fabrication Of New Ducting From 5 / 6 Mm M.S. Plate As Per Direction Of I I / C. C.E. & Fitting Thereof & Giving Satisfactory Trial. 325 Replacement Of 10 Dia Perforated M / E / Ss Pipe For So2 Gass Distribution In Juice Sulphitor. 326 Fabrication Major Job 327 Juice Sulphiter 328 Replacement Of Top Cone Of Recovery Tower Of Juice Sulphiter:- The Job Includes Dismantling Of Existing Worn-Out Top Cone And Related Accessories, Fabrication Of New One, Identical To The Existing And Fitting Thereof. 329 Replacement Of Bottom Cone Of Recovery Tower Of Juice Sulphiter : The Job Includes Dismantling Of Existing Worn-Out Bottom Cone And Related Accessories, Fabrication Of New One, Identical To The Existing And Fitting Thereof. 330 Replacement Of Worn-Out Stirrer Arms Of Juice Sulphiter And Middle Shaft Portion With Ms Angle ( Approx. 4.5 Mtr. ) :- Dismantling Of Shaft, Gear And Other Accessories, Thereafter, Repair Of Shaft Or Replacement Of Shaft With New Ms Angle, Fitting, Alignment And Trials Thereof. 331 Juice Clarifier 332 Replacement Of Flocculating Chamber Complete Shell Of Juice Clarifier :-The Job Includes Dismantling Of Worn-Out Shell And Fabrication Of New One Identical To The Existing One And Erection Thereof. 333 Replacement Of Worn-Out / Weak Portion And Patching Job Of Flocculating Chamber Shell Of Juice Clarifier :-The Job Includes Dismantling Of Worn-Out / Weak Portion And Patching Job Of Flocculating Chamber Shell; Fabrication Of New Identical To The Existing One And Erection Thereof. 334 Repairing / Replacement Of Weak Portion Of Bottom Cone Of The Juice Clarifier :- The Job Includes Dismantling Of Part Of Bottom Cone Of Juice Clarifier, Where The Thickness Has Gone Below 7 Mm, Fabrication Of New Identical To The Dismantled One From 10 Mm M.S. Plate And Fitting Thereof In Position. 335 Replacement Of Vacuum Filter Condenser :- The Scope Of Work Includes Dismantling Of Existing Worn-Out Condenser, Fabrication Of New Condenser Identical To The Existing One And Fitting Thereof. 336 Evaporator Station 337 Savealls :- 338 A.       Dismantling Of Worn-Out Save-All, Fabrication Of New Save-All Identical To Existing One As Per Drawing, Including Providing Proper Supports, And Giving Satisfactory Leak Proof Trials :- 339 -          For Save-All Of Semi – Kestner. 340 -          For Save-All Of Vapour Cell. 341 -          For Save-All Of Evaporator Body No. 1, 2 & 3. 342 -          For Save-All Of Evaporator Body No. 4 And Standby Body No. 4. 343 -          For Save-All Of Evaporator Body No. 5 And Standby Body No. 5. 344 Replacement Of Top And Bottom Tube Plate Of Evaporator Body No. 5 –The Scope Of Work Includes Dismantling And Fitting Of Top And Bottom Tube Plate Of Evaporator Body No. 5 With Proper Alignment, Welding Thereof In Position; The Job Includes Giving Satisfactory Hydraulic Testing Of The Unit And After Completion Of Work. 345 ( A ) Replacement Of Worn-Out Central Cylindrical Condensate Tank ( Near Evaporator House ) –    Dismantling , Fabrication & Erection Of Existing Worn-Out Cylindrical Condensate Tank Wby 10 Mm M.S. Plate Providing All Condensate Line Connections & Proper Staighting Of Tank And Given Satisfactory Leak Proof Triel. 346 ( B ) Replacement Of Half Portion Of Worn-Out Central Cylindrical Condensate Tank ( Near Evaporator House ) – Dismantling , Fabrication & Erection Of Existing Worn-Out Cylindrical Condensate Tank Wby 10 Mm M.S. Plate Providing All Condensate Line Connections & Proper Staighting Of Tank And Given Satisfactory Leak Proof Triel. 347 Pan 348 Replacement Of Save-All Of Pans ( Complete ) :-The Scope Of Work Includes Dismantling Of Worn-Out Save-All Of Pans, Fabrication Of New Save-All, Identical To Existing One And As Per Drawing; The Job Includes Giving Satisfactory Leak Proof Trials. 349 Replacement Of Worn-Out / Weak Top Cone Of Pans :- The Scope Of Work Includes Dismantling Of Weak / Worn-Out Top Cone, Fabrication Of New Top Cone From 12 Mm Thick Ms Plate Identical To The Existing One And Fitting Thereof And Giving Satisfactory Leak Proof Hydraulic Trials. 350 ( A )   Half Top Cone 351 ( B ) Full Top Cone 352 Replacement Of Pan / Evaporator Weak Calandria Shell :-The Scope Of Work Includes Dismantling Of The Existing Calandria Shell, Fabrication Of New Shell By 10 / 12 / 15 Mm Ms Plate, Similar To Existing Size, Fitting Of Shell In Position By Both Side Welding And Giving Leak Proof Trials Of Calandria. 353 ( A )   Half Shell 354 ( B ) Full Shell 355 Replacement Of Weak And Worn-Out Body Shell Of Pan :- ( A )   The Scope Of Work Includes Dismantling Of Existing Worn-Out Shell With Save-All, Fabrication Of New Shell Identical To The Existing One Including Save All With Proper Sight Glasses, Washing Coils And Pipe Connections Etc., Fitting Therefore In Position With All The Pipes, Save-All And Connection And Giving Leak Proof Satisfactory Trials. 356 ( B ) Half Shell 357 ( C )   Full Shell 358 Replacement Of Old Worn-Out Bottom Cone Of Pan Between Calandria Shell & Body Shell Of Pan :-Dismantling Of Existing Worn-Out Cone Of Pan. Fabrication Of Above Cone By 12 Mm Ms Plate, Identical To Existing Size, Fitting Of Cone In Position By Both Side Welding And Giving Satisfactory Trials For Leak Proof Working Of Pan Body. 359 Dismantling, Fabrication & Installation Of New External Catcher ( Complete ) For Pan :-Fabrication Of New External Catcher For Pan By 10 / 12 Mm M.S. Plate Complete ( As Per Drawing ) , Its Installation In Pan Vapour Line And Giving Satisfactory Water / Vacuum Trials Of Complete Catcher. 360 Replacement Of Body Shell Of Vacuum Crystallizersthe Job Includes Dismantling Of Weak Worn-Out Portion Of Vacuum Crystallizer, Fabrication Of New Shell With 12Mm Ms Plate Identical To Existing One And Fitting Thereof With Proper External Supports And Valves, Nipples Etc. And Satisfactory Leak Proof Trials. 361 ( A )      Half Shell 362 ( B )     Complete Shell 363 Replacement Of Worn-Out Existing Cold / Hot Water Receiving Tanks :- Dismantling Of Existing Cold / Hot Water Tank; Fabrication Of New Tanks Identical To The Existing Tank & Erection Thereof; The Job Also Includes Providing Proper Supports And Connections. 364 Replacement Of Worn-Out Hollow Central Shaft Of Horizontal Continuous Crystallizer :-The Job Includes Dismantling Of Existing Central Shaft With Coils & Fabrication Of New Central Shaft With Ms Pipe And Fitting Thereof In Position With Coils And Giving Satisfactory Hydraulic Testing And Satisfactory Trial Of Drive. 365 Centrifugal Station 366 Replacement Of Worn-Out Hopper Bed :- The Job Includes Dismantling Of Existing Worn-Out Bed Of Hopper And Fabrication Of New Identical One, To Existing Bed And Erection Thereof. 367 Dismantling, Cleaning & Refitting Of Existing Water Cooling Coils Of Molasses Storage Tank, After Dismantling The Same And Fitting Thereof, After Due Checking. The Scope Of Work Also Includes Repairing / Replacement Of Worn-Out / Weak Portion Of Cooling Coils. 368 Replacement Of Weak Portion Of Magma Mixer ( A, B And C ) :-The Job Includes Dismantling Of Weak ‘U’ Shape Bottom Of Magma Mixer, Fabrication Of New Portion From 10 / 12 Mm Thick M.S. Plate And Fitting The Same In Position. 369 Replacement Of Worn-Out Trough Of Hopper:- The Job Includes Dismantling Of The Old Trough And Placing The Same At M.S. Scrap Yard, Fabrication Of New Trough And Its Assembly / Fitting With Connecting Rod After Proper Alignment. 370 Replacement Of Worn-Out Runners Of Sugar Elevator :- The Job Includes Dismantling Of Existing Worn-Out M.S. Plate Of Sugar And Seed Elevator & Fitting Of New Runner ( Flat ) Of The Required Size. 371 Fabrication Of New Strainer At M.C.S. / Injection :-The Job Includes Dismantling Of Worn-Out Strainer; Fabrication Of New Strainer Identical To Existing By 12 Mm Thick And Fitting Thereof. 372 Replacement Of Worn Out M.S. Sugar Elevator Buckets. The Job Includes Fabrication Of Sugar Elevator Bucket Of M.S Plate ( 8 / 10 / Mm Thick ) As Per Existing With Proper Holes At Corner And Their Fitting & Trial. 373 Repair Of Stainer At Mcs / Injection :- Dismanlting Worn Out / Weak Portion Of Stainor - Febrication Of New Portion Identical To Existing By 8 / 10 Mm Ms Plate 374 Mill & Boilers 375 Replacement Of Mill House Juice Whirller Tanks :- The Job Includes Dismantling Of Old Tanks ;Fabrication Of New Tank By Old / New 6 / 8 Mm M.S. Plate Or The Material Available, Complete In All Respects With Pipe Connections And Erection Thereof; The Scope Of Work Also Include Giving Satisfactory Trials Of The Unit. The Welding Is Required To Be Done From Both The Sides. 376 Fabrication Of New Pusher Roller Of Cane Fibrizor, Its Erection & Satisfactory Trials. The Job Shall Be Done As Per The Design / Instructions Of Engineer I / C. 377 Fabrication Of New F / D Fan Identical To Existing F / D Fan. 378 Fabrication & Fitting Of Juice Gutter For D. S. M. Screens Juice Boxes From 5 / 6 Mm Thick M.S. Plate, Including Providing Proper Slopes Of Flanges Etc. For Its Dismantling & Fitting. 379 Replacement Of Worn-Out Portion Of Trough Of Bagasse Carrier And Elevator :- The Job Includes Dismantling Of Worn-Out Trough Of Bagasse Carrier / Elevator; With Ansle Chamel Fabrication Of New Trough By 5 / 6 Mm Thick M.S. Plate And Erection Thereof. 380 Replacement Of Runners Of Bagasse Carrier And Bagasse Elevator:-The Scope Of Work Includes Dismantling Of Existing M.S. Runners And Fitting Of New Runner 75X10 Mm With Proper Supports. 381 Replacement Of Bagasse Carrier / Bagasse Elevator Side Plates Including Dismantling Of Worn-Out Side Plates. 382 Replace Of I / D Fan Bed Of Boiler, Including Fabrication Of Identical Bed. 383 Boiler I.D. Fan Bed Repair / Strengthening Work. 384 Boiler No. 4 Worn-Out Side Plate Replacement Work By Old Ms Plate Angle Iron, Channel From Scrap.

Key Value

Document Fees
INR 118 /-
EMD
INR 50000.0 /-
Tender Value
INR 9 Lakhs /-

BOQ Items

Sl. No. FEBRICATION JOB NORMAL Item Code / Make Quantity Units
1 1 JUICE HEATER BI01010001010000000000000515BI0100001112
2 2 Replacement of worn-out partition plates of Juice heater compartment, after fabrication of new partition plates identical to existing one and giving leak proof trial. BI01010001010000000000000515BI0100001113 6 EACH
3 3 LIME STATION 1 EACH
4 4 Replacement of worn out grit conveyor Scroll with Shaft- The scope of work includes dismantling of worn out conveyor and fabrication of new conveyor identical to the existing one and fitting thereof. FULL 1 EACH
5 5 Replacement of worn out grit conveyor Scroll with Shaft- The scope of work includes dismantling of worn out conveyor and fabrication of new conveyor identical to the existing one and fitting thereof. HALF 1 EACH
6 6 JUICE SULPHITOR 1 EACH
7 7 (a) Replacement of worn-out Cylindrical portion of Recovery Tower :- The job includes dismantling of existing worn-out cylindrical portion of recovery tower and connected pipe lines, fabrication of new one, identical to existing one & fitting thereof. 1 EACH
8 8 (b) Replacement of worn-out half Cylindrical portion of Recovery Tower :- The job includes dismantling of existing worn-out cylindrical portion of recovery tower and connected pipe lines, fabrication of new one, identical to existing one & fitting thereof. 1 EACH
9 9 Replacement of worn-out perforated baffle plate inside recovery tower of Juice Sulphiter :-The job includes dismantling of existing worn-out perforated plate and fabrication of new identical to existing one and fitting thereof. 2 Each
10 10 Replacement of worn-out perforated plate of Juice/Syrup Sulphiter :- A .Dismantling of worn-out perforated plates of Juice/Syrup Sulphiter. B:-B.Fabrication of new perforated plate identical to existing one and fitting thereof in position. 2 EACH
11 11 C.Repairing of worn-out top cover of Juice Sulphiter,:- The job includes dismantling of existing worn-out portion of cover, fabrication of new portion identical cover & fitting of the same in position with proper supports as required. 1 EACH
12 12 Replacement of Worn out bottom cone of correction Tank:- The scop of work include dismantling of worn out bottom of correction Tank & febrication of new bottom identical to exstiong one & fitting thereof with related connection etc. 2 EACH
13 13 The scope of work includes dismantling, fabrication and erection of worn out shell above the bottom cone of correction tank of juice sulphitor. -- A:- Half portion of shell 1 EACH
14 14 B:-    Full portion of shell 1 EACH
15 15 SULPHUR FURNACE 1 EACH
16 16 a.The job includes dismantling of worn-out sulphur melters and fabrication of new sulphur melter, identical to the exiting one and fitting thereof in position and giving satisfactory testing at 300 PSIG. 1 EACH
17 17 SULPHER MELTER:- REPLACEMENT OF WEAK/WORN-OUT STEAM COIL MELTER-The job includes dismantling of existing wornout stem coil ,fabrication of new steam coil identical to the existing,fitting thereof in position after testing the same at 300 psig. 3 EACH
18 18 Replacement of worn-out S.S./M.S. Pipe of Gas Cooler- Replacement of worn-out S.S. Pipe in SO2 Gas cooler. (4"¢), after fabrication of the same with M.S./S.S. pipe, identical to the existing. 8 EACH
19 19 Complete replacement of SO2 Gas cooler –Dismantling of worn-out gas cooler and shifted at scrap yard. Fabrication & erection of new gas cooler by 10mm M.S. Plate as existing cooler.Fitting of 4" dia S.S./M.S. pipe and water pipeline as in existing cooler, Leak proof trail of compete unit. 1 EACH
20 20 Replacement of existing worn-out Scrubber :-The job includes dismantling of existing worn-out scrubber, fabrication of new scrubber for SO 2 gas identical to the existing one and erection thereof. 1 EACH
21 21 Replacement of worn-out Top Cover of SO 2 Gas Scrubber :- The scope of work includes dismantling of existing worn-out top cover of scrubber, fabrication of new top cover/flange identical to the existing one from 12/16 mm thick MS Plate and fitting/erection thereof. 2 EACH
22 22 JUICE CLARIFIER 1 EACH
23 23 Dismantling of worn-out Juice withdrawal coils of Juice Clarifier, fabrication of coil identical to the existing in size with nipple etc. from MS Pipe & fitting thereof. 2 EACH
24 24 VACUUM FILTERS 1 EACH
25 25 Replacement of worn-out Heavy/Light Filtrate Juice Receiving Tanks.The scope of work includes dismantling of worn-out Heavy/Light Filtrate Juice Tank, fabrication of new tank, flange from 8 mm thick MS Plate and fitting thereof. 2 EACH
26 26 Replacement of Common Filtrate Juice Receiving tank :-The scope of work include dismantling of worn-out filtrate Juice tank, fabrication of new one from 10 mm thick MS Plate identical to the existing and fitting thereof. 1 EACH
27 27 Replacement of Mud Trough of Vacuum Filters :-a:- The scope of work includes dismantling of existing worn-out Mud Trough ; fabrication of new mud trough identical to existing one from 8 mm thick MS Plate and erection thereof. 1 EACH
28 28 (b) Replacement of half portion Mud Trough of Vacuum Filters :-The scope of work includes dismantling of existing worn-out Mud Trough ; fabrication of new mud trough identical to existing one from 8 mm thick MS Plate and erection thereof. 1 EACH
29 29 Replacement of worn-out external Catcher of Vacuum filter condenser, :-The job includes dismantling of existing worn-out external catcher; fabrication of the catcher identical to existing one and fitting thereof. 2 EACH
30 30 Fabrication & fitting of Vacuum Filter Mud agitator identical to existing, including dismantling of existing worn-out. 1 EACH
31 31 Replacement of worn-out side plates behind Vacuum Filter from M.S. Plate (3 mm thick) or G .I. Sheet with proper revitting. 2 EACH
32 32 Fabrication and erection of Bagacillo Cyclone identical to the existing one, after dismantling the existing worn-out. 1 EACH
33 33 Replacement of trough of Mud Mixer :-The scope of work includes dismantling of worn-out mud trough of Mixer and fabrication of trough identical to the existing one and fitting with leak proof trial. 1 EACH
34 34 Replacement of worn-out conveyor of Mud Mixer :-The scope of work includes dismantling of worn-out conveyor and fabrication of new conveyer identical to existing one and fitting thereof. 1 EACH
35 35 Replacement of Bagacillo screen at bagasse carrier, in place of old/ worn-out piece of screen. 4 EACH
36 36 job includes dismantling of agitator there of replacenent of worned out portion of angles /plat/channel of agilator and fiting after repair with proper trial. 3 EACH
37 37 Replacement of wornout top cover with flange of light/heavy filtrate receiving tank 2 EACH
38 38 EVAPORATOR STATION 1 EACH
39 39 (a) Replacement of worn-out down –take funnels of Evaporator :-The scope of work includes dismantling of worn-out down - take funnels with pipes and clamps etc., fabrication of new funnel identical to the existing one & fitting thereof with proper clamping & brackets, welding etc. and giving leak proof trials. 1 EACH
40 40 (b) Repair of worn-out down –take funnels of Evaporator :-The scope of work includes leaky/worn-out portion is to be welded/patched and leak proof trial is to be done. 3 EACH
41 41 (c) Partial replacement of worn-out /weak portion of vapour jacket of evaporator calandria with 8/10 mm/12 mm M.S.plate. 2 EACH
42 42 PAN 1 EACH
43 43 Replacement of worn-out washing arrangement for Sight Glass of Pans :-The job includes dismantling of worn-out sight glass washing pipes of Pan with nozzle, fabrication of identical washing system and fitting thereof with nozzles. 8 EACH
44 44 Replacement of worn-out til-tale bottle of Pans :-The scope of work includes dismantling of worn-out catcher bottles, fabrication of new bottles identical to the existing one, fitting of flanges and pipe connection thereof, including fitting of bottles etc. in position. The job also includes giving leak-proof testing of Catcher. 3 EACH
45 45 Replacement of top umbrella of Pans/Evap.The job includes fabrication of new umbrella of Pan/Evap. with 10/12mm MS Plate and fitting thereof with proper supports. 4 EACH
46 46 Fitting of sight glasses with Flanges :-The scope of work includes fabrication of flanges and their fitting in position with sight glasses. 10 Each
47 47 Providing supports inside/outside of Syrup Tanks/Molasses Tanks at Pan Floor (Minimum 8 supports are to be provided). 10 Each
48 48 Replacement of worn-out steam coils of Molasses storage tanks (behind Pans):-The job includes dismantling of existing weak and worn-out steam coils, fabrication of new coils identical to existing size and fitting thereof, drilling job is also included, including giving satisfactory trials. 12 Each
49 49 Replacement of Condensate Box of Calandria of Pans/Evaporator bodies :-The scope of work includes dismantling of worn-out condensate box, fabrication and fitting of new condensate box identical to the existing one, fitting thereof and giving satisfactory leak proof trials. 2 Each
50 50 Replacement of worn-out shell of Molasses Conditioner including pipe connections & valves etc.-The job includes dismantling of existing worn-out shell of molasses conditioner including pipe connection & valves etc., fabrication of new shell identical to existing on and fitting the same in position, including providing pipe connections and fitting of valves etc. 1 Each
51 51 Replacement of worn-out bottom cone of Molasses conditioner.-The job includes dismantling of existing worn-out bottom cone of molasses conditioner; fabrication of new bottom cone identical to existing one and fitting thereof. 1 Each
52 52 Replacement of worn-out M.S./S.S. sheet Inner of Discharge Valve of Pan, as per the existing; the job includes dismantling & fitting of all the parts of discharge valve, the M.S./S.S. sheet is to be include after machining. The job also includes giving satisfactory leak proof trials of the unit. 2 Each
53 53 Replacement of worn-out Bottom Plate of Syrup/Molasses Tanks at Pan station :-The job includes dismantling of existing supports, replacement of bottom plate with required inside/outside supports, as per existing and giving satisfactory leak proof water trials . 4 EachTank
54 54 Replacement of worn-out side plate up to 1 mtr. height approximately of Molasses /Syrup Tanks :-The job includes dismantling of worn-out side plate with supports, replacement of side plate with one mtr. ht. (approx.), with required supports, inside & outside, as per existing. The job also includes giving satisfactory leak proof water trials of unit. 4 EachTank
55 55 VERTICAL & HORIZONTAL CRYSTALLIZER 1 EACH
56 56 (a) Replacement of worn-out Scrolls of Crystallizers: - The job includes dismantling of existing worn-out scrolls of crystallizer: fabrication of new scroll by 8/10 mm size old/New MS Flat/strips. 25 PER M.
57 57 (b) Repair of worn-out Scrolls of Crystallizers :-The job includes dismantling of existing worn-out/weak scrolls of crystallizer; repair of weak scroll by 8/10 mm size old/New MS Flat/strips; the job also include strengthening of bent scrolls. 15 PER.M.
58 58 Replacement of Worn-out Cooling Coil of Vertical Crystallizer -The job includes dismantling of worn out Coil of Vertical Crystallizer, fabrication of new coil identical to the existing coil at site and fitting thereof . The scope of work also include giving hydraulic testing at 80 Psig and satisfactory trial of the coil 3 EACH
59 59 (a) Replacement of existing worn-out water coil of Molasses Storage storage tanks :-The job includes dismantling of existing worn-out water coil, fabrication of new coil by using 2" dia. pipe and drilling of holes for water spray, including fitting of coil in position, with proper supports. 25 Per Mtr
60 60 (b) Repair of existing worn-out water coil of Molasses Steel storage tanks :-The job includes dismantling of existing worn-out water coil, fabrication of new coil by using 2" dia. pipe and drilling of holes for water spray, including fitting of coil in position, with proper supports. 1 PRM
61 61 CENTRIFUGAL STATION 1 EACH
62 62 Replacement of worn-out Discharge Chutes of S/D Centrifugal Machines :-The job includes dismantling of existing worn-out sugar discharge chute of S/D Cont. Machine and fabrication of new chutes identical to the existing and fitting thereof. 2 EACHMtr
63 63 Replacement of worn-out discharge chutes of Continuous Centrifugal Machine :-The job includes dismantling of existing worn-out Discharge chutes of Cont. Centrifugal Machine and fabrication of new chutes identical to existing and fitting thereof. 3 EACHMtr
64 64 Replacement of Top Cover of Monitor casing of S/D Centrifugal Machine :-The job includes fabrication of top cover of monitor casing of S/D Machine identical to existing, dismantling of existing worn-out cover & fitting new fabricated cover. 2 EACH
65 65 Monitor casing of S/D Centrifugal Machine are to be made new, complete in all respects :- The job includes dismantling of worn-out existing monitor casing, fabrication of new casing identical to the existing one and fitting thereof. 1 EACH
66 66 Replacement of worn-out steam coil of the Sugar Melter :-The job includes dismantling of steam coil of Sugar Melter, fabrication of new circular coil with 3" dia. pipe identical to the existing and fitting thereof in position. 1 EACH
67 67 Replacement of steam coil of Hot/Cold Air Blower (For sugar drying) :-The job includes dismantling of worn-out steam coil of hot air blower, fabrication of new coil identical to existing from new pipe and fitting thereof in position and giving hydraulic testing at 100 lbs./sq. inch. 1 EACH
68 68 Replacement of worn-out Molasses Chamber of NK-1100 Centrifugal Machine :-The job includes dismantling of worn-out semi-circular chamber with bottom plate and air vent pipe, fabrication of molasses outlet chamber identical to the existing chamber with bottom plate by 6/8 mm M.S. plate and fitting at site with vent pipe etc. 1 EACH
69 69 Replacement of worn-out chutes of Sugar Elevator :-The scope of work includes dismantling of the existing worn-out chutes, fabrication of new chutes from 3 mm M.S. Plate identical to existing and fitting thereof. 2 EACH
70 70 Replacement of worn-out portion of side plates of sugar elevator :- The job includes dismantling of existing worn-out portion of side plates of sugar elevator, fabrication of new side plates of required size from 5/6 mm thick M.S. Plate and fitting thereof. 10 PSqMtr
71 71 Replacement of worn-out sugar discharge chute of sugar graders :-The scope of work includes dismantling of existing worn-out chute, fabrication of new chutes from 3 mm thick M.S. Plate and fitting thereof identically. 2 EACH
72 72 (A) Replacement of worn-out Molasses Separator circular ring of S.D. Machine:-The job includes dismantling of worn-out molasses separator ring, fabrication of new rings identical of existing ring & fitting at site with leak proof trial. 3 EACH
73 73 (B) Replacement of (Worn-out internal) stationary cylinder of Sugar Melter:-The job includes dismantling of worn-out cylinder (Stationary) of sugar melter, fabrication of new cylinder & fitting of the same with supporting angles identical to the existing. 1 EACH
74 74 (C) Replacement of worn-out staging for bearing housing and motor of S.D. machines :-The job includes dismantling of worn-out staging of S.D. centrifugal machines, fabrication and erection of new staging by 8" side channel identical to the existing one. 1 EACH
75 75 Replacement of worn-out Molasses outlet pipe of NK-1100 M/cs :-The job includes dismantling of worn-out molasses outlet pipe with reducer and fabrication of new outlets identical to the existing one and fitting thereof. 1 EACH
76 76 Replacement of top cover(Portable) of Monitor casing of S.D. Centrifugal Machine :-The job includes dismantling of existing worn-out Top Cover, fabrication of new Top Cover (Portable ) of Monitor casing of S.D. Centrifugal machine, identical to the existing and fitting thereof. 2 EACH
77 77 MILLS & BOILERS 1 EACH
78 78 Replacement of 50% portion of Juice Whirller tanks (Lower Half) of Mill House by new/old M.S. material by welding from both the sides and completing all the connections and removal of worn-out material to the scrap yard. 4 EACH
79 79 Replacement of Juice Trays below ‘TRPF’ Roller :-The job includes dismantling of existing worn-out juice trays below ‘TRPF’ rollers, fabrication of new Juice tray by 5/6/8 mm thick M.S. Plate and 30x30x6 mm size angle to the scrap yard. 2 EACH
80 80 Replacement of Bath Maceration boots with side Juice Box of Rake Elevators of Mill House :-Dismantling of existing worn-out bath maceration boots with side Juice box, Fabrication of new from 12 mm thick M.S. Plate identical to the existing the erection thereof; the job also include giving satisfactory water trials; the welding is required to be done from both the sides. 1 EACH
81 81 Replacement of worn-out sprocket drum of Rake Carrier chain drive:-The work includes dismantling of worn-out drum & fabrication of new drum identical to existing one from 8/10 mm M.S. Plate & fitting of the same. 1 EACH
82 82 Repair of worn-out Pusher Roller. 1 EACH
83 83 Replacement of weak & worn-out I/D fan Bottom and upper half casing :-The scope of work includes dismantling of worn-out portion of bottom & upper half casing of boiler No. 1,2, 3 and No. 4; fabrication of new casing including fitting thereof and giving satisfactory trials. 1 EACH
84 84 Replacement of I/D fan suction side ducting cone and damper:-The scope of work includes worn-out suction side ducting cone & damper of I/D fan, fabrication of new suction side ducting cone & damper and fitting thereof. 1 EACH
85 85 Fabrication & Erection of Expansion Joint of Boiler Ducting :-The scope of work includes dismantling of existing worn-out Expansion joints; fabrication of new expansion joint similar to the existing one from 3/5 mm thick M.S. Plate and erection thereof. 2 EACH
86 86 Fabrication of new I.D. Fan identical to our existing I.D. fans. 1 EACH
87 87 Fabrication of new F.D. Fan identical to our existing F.D. fans. 1 EACH
88 88 Repair of our existing I/D fans of the Boiler No. 1,2, 3 and No. 4;-The job involves replacement of worn-out vane plate, side plate etc; dismantling of old vane plate and side plate etc ,fabricating the new vane plate and side plate etc. and fitting thereof. 1 EACH
89 89 (a) Dismantling of complete steam economizers of Boiler No. 1, 2 and No. 3 (‘Taxmaco’ Make), inside and outside cleaning of tubes, cleaning of fins, inside and outside painting of tubes, header and casing etc..The job includes taking all the fins of tubes with header, removal of bends, all flanges and their assembly after cleaning, painting, hydraulic testing, commissioning & trials. The job also includes replacement of weak and worn-out tubes and bends etc., repair of damaged & other components, as may be required. 3 EACH
90 90 (b) Replacement of worn out Soot Blow Pipes:-The work includes dismantling of existing worn-out soot below pipe, fitting of new pipe. 1 EACH
91 91 (c) Replacement of worn out Soot Blow Headers :-The job includes dismantling of existing worn-out soot blow header, fabrication of new header similar to as per existing and erection thereof. 1 EACH
92 92 Dismantling of complete steam economizers of Boiler No. 4 (‘WIL’ Make), inside and outside cleaning of tubes, cleaning of fins, inside and outside painting of tubes, header and casing etc..The job includes taking all the fins of tubes with header, removal of bends, all flanges and their assembly after cleaning, painting, hydraulic testing, commissioning & trials. The job also includes replacement of weak and worn-out tubes and bens etc., repair of damaged & other components, as may be required. 1 EACH
93 93 Fabrication of new Bagasse Blower Fan, identical to our existing Bagasse Blower Fan. 2 EACH
94 94 Replacement of worn-out Bagasse Feeding Shutter and frame :- The job includes dismantling of existing worn-out Bagasse feeding shutter & frame; fabrication & fitting of new Bagasse Feeding Shutter & frame, identical to the existing one. 1 EACHSET
95 95 Replacement of bulged channel of Bagasse Carrier. 1 PRM
96 96 Replacement of weak and worn-out I.D. fan bottom half casing including dismantling job. 1 EACH
97 97 Replacement of bulged beam /CHANNEL of Boiler Furnace rooF & BRIDGE (TEXMACCO BOILER) 1 PBOILER
98 98 Strengthening of I.D. /F.D. fan bed/electric Feed Pump bed of Boiler. 1 EACH
99 99 Replacement of I.D./F.D. Fan upper half casing :-The job includes dismantling of existing worn-out upper half casing of I.D./F.D. ; Fabrication of new casing, identical to the existing and fitting thereof in position. 1 EACH
100 100 Replacement of I.D./F.D. Fan bottom half casing :-The job includes dismantling of existing worn-out bottom half casing of I.D./F.D. ; Fabrication of new casing, identical to the existing and fitting thereof in position. 1 EACH
101 101 Boiler No. 4 S.A. Fan casing:- Dismantling of existing worn-out S/A fan Casing, Fabrication of new casing identical to existing, from 6 mm M.S. Plate & fitting thereof. 1 EACH
102 102 Fabrication of bagasse blower casing and fitting as per existing. 2 EACH
103 103 Replacement of worn-out casing of D.S.M. Screen:-The scope of work includes dismantling of worn-out casing of D.S.M. Screen, fabrication and fitting of new casing from 8/6 mm M.S. Plate. 1 EACH
104 104 Scheduled Rates (Schedule 'A') 1 Nos
105 105 MILLS AND BOILERS 1 Nos
106 106 Pine Apple type Chevron groove cutting in Mill Rollers .The job will have to be done by the contractor by chisel, Hammers on marking as per existing groove. The marking will also to be done by the contractor as per instruction of Chief Engineer. 1 EACH
107 107 Forging of oval holes of chain links of Cane Carrier/Aux. Cane Carrier/Rake elevator/ Bagasse carrier to correct size to suit the new bush & pins. 1 EACH
108 108 Dismantling of existing worn-out side CASIG OF FIBRIZOR /plates in existing cane carrier/Auxiliary Cane Carrier/Rake Carrier, and fitting of new M.S. Plate of 6/8/10/12 mm including hood and side runner angle. 1 PMT
109 109 Replacement of worn-out Juice Box of D.S.M. Screen at Mills :-The scope of work includes dismantling of worn-out Juice Box of D.S.M. Screen, fabrication of new Juice box from 8/10 mm M.S. Plate and fitting thereof. 4 EACH
110 110 Fabrication & fitting of Juice Gutter for D. S. M. Screens Juice Boxes from 5/6 mm thick M.S. Plate, including providing proper slope of flanges etc. for its dismantling & fitting. 1 EACH
111 111 Fabrication of Juice tray under Bath-Maceration in Boot. 1 EACH
112 112 Dismantling of mill juice gutter from mill juice tray to mill juice whirller tank fabrication of new juice gutter by 8 mm M.S plate. 1 EACH
113 113 Replacement of Rake Elevator including replacement of side Plates:-The job involves dismantling of existing runners and side plate; fabrication& fitting of new runner and side plates. 1 PRM
114 114 Replacement of Screw Conveyor Scrolls :-The scope of work includes dismantling of worn-out scrolls & fabrication of new scrolls identical to existing by 6 mm thick M.S. Plate of 8" dia pipe as per existing and giving satisfactory trail. (APPROX 16 NOS) 1 EACH
115 115 Fabrication & Fitting of T.R.P.F. Gear guard from 3/5 mm M.S. Plate 1 EACH
116 116 Fabrication of new D.S.M. Screen Unit:-The job includes fabrication of complete unit of D.S.M. Screen, identical to the existing one. 1 EACH
117 117 Replacement of worn-out Stainless Steel screens of D.S.M. Screen. 2 EACH
118 118 Replacement of Rake Elevator worn-out Runners :- The job includes dismantling of existing worn-out runners and fabrication & fitting of new runners, identical to the existing one. 1 PRM
119 119 Replacement of bottom angle & Upper Channel of Rake Elevator runners supports :-The job includes dismantling of worn-out existing angle and channel supports fabrication of new angle/channel supports and fitting thereof. 40 PRM
120 120 A.      Fabrication of new juice screw conveyer for mill: - The job includes fabrication of trough by using 8/12/25 mm M.S. plate and scroll by 6" M.S. plate and M.S. pipe of 8” dia.as per existing and erection thereof, including giving satisfactory trail. 1 EACH
121 121 Dismantling of existing worn-out Bagasse Chute of 4th Mill Discharge connected to Bagasse Elevator and fabrication & erection of new one, as per existing by 8 mm M.S. Plate and angle iron etc. 1 EACH
122 122 Replacement of Bagasse Feeding C.I. Chutes of Boiler No. 1,2,3 :- The job includes dismantling of existing wornout chutes and fitting of new c.i.chuets . 1 EACH
123 123 Replacement of Safety Guard of Bagasse Carrier Sprocket, after fabrication of new as per existing one. 1 EACH
124 124 Fabrication of Rake for Rake Carrier, as per existing sample from M.S. Channel & Plates. 50 EACH
125 125 Dismantling & fabrication of perforated Bottom Tray of Rake Elevator :-The job includes dismantling of existing worn-out Juice Tray, fabrication of new Juice Tray of existing size, including drilling of holes (approx. 3500 Nos. holes of 10 mm size) & fitting of perforated tray, as per directions of Engineer I/c. 1 EACH
126 126 Fabrication of new double D.S.M. Screen unit (Including S.S. Screen) identical to the existing one from 8/10mm M.S. Plate. (New/Old plate) 2 EACH
127 127 Fabrication of TRPF Roller Guard identical to existing one from 5/6mm M.S. Plate. 2 EACH
128 128 Replacement of worn-out M.S. Chute at boilers:-The job includes dismantling of existing worn-out chute, fabrication of new chute identical to the existing and fitting thereof. 1 EACH
129 129 Fabrication of Juice Tray under perforated tray of Rake Elevator :-The scope of work includes dismantling of existing worn-out Tray under perforated tray of Rake Elevator; fabrication of new tray identical to existing and fitting thereof in position. 2 EACH
130 130 Boiling House 1 EACH
131 131 FABRICATION OF STRAINER OF JUICE CATCHER 1 EACH
132 132 Fabrication of strainer of juice catcher for Raw-juice/sulphured juice by perforated sheet/wire netting and fitting in juice catcher. 2 EACH
133 133 Fabrication of Raw-juice strainer arrangement above in Raw-Juice receiving tank of size approx 5’x5’ with wire netting proper side walls and fitting of thereof and giving satisfactory trials with proper platform for cleaning this strainer. 1 EACH
134 134 JUICE HEATER / V.L.J.Heater 1 EACH
135 135 (a) Replacement of 2" dia. Ammonia Coils of Juice Heater :-The job includes dismantling of existing worn-out heavy/Light Ammonia gas coils, fabrication of new coil, identical to existing one and fitting thereof. 2 EACH
136 136 (b) Replacement of worn-out Top Header of Juice Heater with all inside partition plate :-The job includes dismantling of existing worn-out top header of juice heater with all partition plate, fabrication & fitting of new Header with all partition plates including fitting of Rubber cord arrangement and existing matching ‘EYE’ bolts with cover and satisfactory leak proof trial. 1 EACH
137 137 (c) Replacement of worn-out Bottom Header of Juice Heater with all inside partition plate :-The job includes dismantling of existing worn-out bottom header of juice heater with all partition plate, fabrication & fitting of new Header with all partition plates including fitting of Rubber cord arrangement and existing matching ‘EYE’ bolts with cover and satisfactory leak proof trial. 1 EACH
138 138 (d) (i) Replacement of worn-out full shell of Juice Heater :-The job includes dismantling of shell of Juice Heater, fabrication & fitting of new shell identical to the existing one. The job is to be completed in all respect including leak-proof hydraulic testing at 100 Lbs/sq. in. 1 EACH
139 139 (ii) Replacement of worn-out half shell of Juice Heater :-The job includes dismantling of shell of Juice Heater, fabrication & fitting of new shell identical to the existing one. The job is to be completed in all respect including leak-proof hydraulic testing at 100 Lbs/sq. in. 1 EACH
140 140 a) Replacement of worn out/weak portion of lower and upper vapour flow jacket of vapour line juice heater. Work includes dismantling of worn out portion of lower and upper vapour flow jacket of Quad 5th body, inner and outer shell fabrication & erection of the same identical with existing one.after that satisfactory water trial of complete vapour line juice heater to be done by the Contractor. 1 EACH
141 141 b) Replacement of top & bottom cover clits with I. bolts and paching of shell both top & bottom side of vapour line juice heater. Work includes patching/replacement of top & bottom compartment area of header from out side with 8mm M.S.Plate and approx. height 0.5 mtrs.each for both top & bottom side of vapour line juice heater and welding of clits at their place with I. bolts according to top & bottom covers after that satisfactory water trial of complete vapour line juice heater to be done by the Contractor. 1 EACH
142 142 JUICE CLARIFIER 1 EACH
143 143 (a) Replacement of worn-out Juice Deflector Plate inside the Juice Clarifier with central shaft of clarifier :- The job includes replacement of worn-out Juice Deflector Plate and fabrication of new Deflector plate identical to the existing plate and fitting thereof with proper supports etc. 2 EACH
144 144 (b) Replacement of worn-out Mud Squeezer Plate inside the Juice Clarifier: - The job includes replacement of worn-out Mud Squeezer Plate and fabrication of new Squeezer plate identical to the existing plate and fitting thereof with proper supports etc. 10 EACH
145 145 SULPHUR FURNACE 1 EACH
146 146 (a) Replacement of sublimer pipe of sulphur furnace :-The scope of work includes dismantling of existing worn-out sublimer pipe, fabrication of new MS pipe of 12" dia. with flanges, reducer and fitting/erection thereof. 2 EACH
147 147 (b) Replacement of Top Cover of Sulphur furnace :-The scope of work include dismantling of existing worn-out M.S. Top cover of SO 2 furnace, fabrication of new Top Cover identical to the existing one from 16/20 mm M S Plate and flanges from 20/25 mm M S Plate and fitting/erection thereof. 1 EACH
148 148 VACUUM FILTERS 1 EACH
149 149 Replacement of worn out spray nozzles pipe at Vacuum Filter :- The job includes dismantling of existing worn-out spray pipe and fabrication of new spray pipe alongwith nipples etc. identical to existing one and fitting thereof with proper supports, etc.. 3 EACH
150 150 EVAPORATORS 1 EACH
151 151 (a) Replacement of worn-out ammonia pipe Header and worn-out portion from Header to tube plate of Evaporators/Pans. 2 EACH
152 152 (b) Circular ammonia coil heavy and light of Vapour Cell/S.K./Pan to be replace with nipple etc. as per existing one. 1 EACH
153 153 Replacement of water washing Coil of Evaporators:-The job includes dismantling of worn-out washing coils, fabrication of new coil identical in dimensions from MS including drilling/cutting required Nos. of holes as directed and fitting the coil in position. The job also includes giving satisfactory trials. 2 EACH
154 154 Dismantling, cleaning and refitting of Juice Distribution coils of the Evaporator bodies, minor repair is also to be done, if required. 8 EACH
155 155 Vapor line juice heater job :- a) Dismantling of existing worn out V.L.J.H. as a whole unit. 1 EACH
156 156 b) After dismantling existing S.S. tubes are to be taken out carefully resizing of tubes length is to be don in factory workshop inder contrcator supervision. 1 EACH
157 157 c) Fitting of vapor line juice heator at site with all connection of juice ,vapor,condensate etc.and thereof successful /satisfactory water/hydraulic and vacuum trails. 1 EACH
158 158 PAN 1 EACH
159 159 Replacement of worn-out Steam washing Coils of Pans :-The job includes dismantling of worn-out washing coils, fabrication of new coils of identical dimensions from MS Pipe including drilling/cutting of required Nos. of holes and fitting the coil in position. The job also includes giving satisfactory trials. 4 EACH
160 160 Replacement of down-take of Pan Calandria :-The job includes, dismantling of existing worn-out shell of down-take and fabrication of new down-take by 10/12 mm MS Plate and fitting thereof, including giving satisfactory trials(Hydraulic) at 70 lbs. 2 EACH
161 161 Strengthening of Molasses Steel storage Tank :-Strengthening of Molasses steel storage tank, as per directions of outer agency and giving satisfactory leak proof trials. 4 PMT
162 162 Replacement of worn-out header rib of Juice Heater (Top & Bottom header) for filling of Rubber square. 2 MTR
163 163 (a)     Replacement of Manholes :- Evaporator bodies/Pans :-The scope of work includes dismantling of old and worn-out Manholes of Evaporator/Pan bodies (Top & Bottom), fabrication new Manholes identical to the existing one and fitting thereof in position; the job includes giving leak proof satisfactory trials. 4 EACH
164 164 (c)     Vapour Pipes, Save-all & Condensate Receiving tanks. 2 EACH
165 165 (d)    Condensate/Syrup Bottles :-The scope of work includes fabrication and fitting of Manholes with proper Lid/Cover (Fabrication of Flanges drilling of holes included). 2 EACH
166 166 Replacement of weak calandria shell of evaporator body- The Scope of work includes dismantling of outer shell including vapour jacket attached with calandria shell and fabricated with 10/12mm thik M.S. plate identical to existing one and complete the job and trial 1 EACH
167 167 Replacement of half calandria shell of evaporator body-The scope of work includes dismantling of weak half portion of outer shell of calandria including vapour jacket as per existing and fabricated with 10/12mm thick M.S. plate as identical to existing one and complete the job & trial 1 EACH
168 168 Dismantling and fitting (After cleaning & reaming of Tube Plate holes) of brass tubes/SS Tubes 1 EACH
169 169 a.       Evaporator 1 EACH
170 170 b.       Pan 1 EACH
171 171 c.        Juice Heater 1 EACH
172 172 Repair of weak /worn-out portion of Save-all of Pans/Evaporator :-A. Dismantling of worn-out portion of top cover of Save-all, fabrication of new portion from 8/10 mm MS Plate and fitting thereof, including giving satisfactory leak-proof trials. 2 EACH
173 173 (b) Dismantling of worn-out weak portion of outer shell of Save-all, fabrication of new portion of outer shell identical to the existing one and fitting thereof, including giving satisfactory trials. 2 EACH
174 174 (c) Dismantling of worn-out portion of inner shell of Save-all, fabrication of new Inner shell portion identical to existing one and fitting thereof. The job includes dismantling & fitting of outer shell/Top cover, whichever is required to attend the job. 2 EACH
175 175 (d) Dismantling of weak/worn-out fins/angles of Save-all and fabrication of new fins/angles, identical to existing and fitting with satisfactory trials. 2 EACH
176 176 (a) Replacement of worn-out and weak feed Deflector of Pans :-The job includes dismantling of existing worn-out and weak deflector of Pan, fabrication of new deflector by 10/12 mm MS Plate and fitting thereof with proper supports. 2 EACH
177 177 (b) Repair of worn-out and weak feed Deflector of Pans :-The job includes dismantling of existing feed deflector with supports and fitting thereof with proper supports after due repairs. 2 EACH
178 178 Replacement of worn-out and weak feed distributors of Pans. -Dismantling of worn-out and weak feed distributor along-with with deflector; fabrication of new feed distributor by 6-8 mm Plate & refitting. The job includes refitting of deflector, after replacement of feed distributor plate. 2 EACH
179 179 Repair of worn-out portion of top umbrella of Pans/Evap.-The job includes dismantling of broken/dislocated Top Umbrella of Pans/Evaporator, its repairs where-ever required and its erection at proper place including providing proper supports. 4 EACH
180 180 Providing supports inside the Top Cone of Pans / Semi kestner/Evaporator/Condenser/Catcher/ Save-all /Vapour Pipe (Minimum 8 supports are to be fitted). 6 EACH
181 181 Providing channel/Angle supports Feed Pipe line of Pan. 6 EACH
182 182 (a) Replacement of Bottom Cone of entrainment catcher of Pan (External catcher):-The job includes dismantling of existing worn-out bottom cone of entrainment catcher, fabrication of new one, identical to the existing one and fitting thereof in position. 3 EACH
183 183 (b) Replacement of top cover of entrainment catcher of pan:- The job includes dismantling of worn-out top cover of catcher; fabrication of new one identical to existing one and fitting thereof. 3 EACH
184 184 (c) Replacement of worn- out partition plate of entrainment catcher of pan:-The job includes dismantling of worn-out top cover & partition plate of catcher; fabrication of new top cover and partition plate identical to existing one and fitting thereof. 3 EACH
185 185 (d) Replacement of weak/worn-out shell of external catcher of Pan by 8/10/12 mm M.S. Plate. 1 EACH
186 186 a)      Half portion of shell 2 EACH
187 187 b)     Full portion of shell 2 EACH
188 188 Dismantling and replacement of worn-out runners of size 75x10 mm in Cane Carrier, Auxiliary Cane Carrier with proper strengthening of beam supports. 1 PRM
189 189 Replacement of worn-out ammonia pipe of evaporator body between both tube plate duly hole provided ammonia pipe & fitted with flange 2 EACH
190 190 Replacement of complete body of Pan- The scope of work includes dismentling of worn out existing save all,top body cone,body shell & tapered portion between body shell & calandria there of Fabrication of new save all, top body cone,body shell & taper portion between body shell & calandria with 12mm plate identical to existing & as per drawing and fitting with all pipe lines. Valves etc. & giving satisfactory leak proof hydaulic,water & vacuum trials. 1 EACH
191 191 CLARIFIER 1 EACH
192 192 (a) Replacement of worn-out Complete top roof of 36’ dia clarifier – Dismantling of worn-out roof of clarifier. Fabrication & erection of roof by 8mm M.S. Plate with proper support of Angle & channels are to be provided as existing.Dismantling, fabrication and erection of top portion of cylindrical shell (connected with top roof of clarifier) Plate approx. one ft. long by new M.S. Plate 8mm/10mm with inside & outside welding (Leak proof water trial). 1 LS
193 193 (b) Replacement of worn-out Approx. Half top roof of 36’ dia clarifier – Dismantling of worn-out roof of clarifier.-Fabrication & erection of roof by 8mm M.S. Plate with proper support of Angle & channels are to be provided as existing.-Dismantling, fabrication and erection of top portion of cylindrical shell (connected with top roof of clarifier) Plate approx. one ft. long by new M.S. Plate 8mm/10mm with inside & outside welding (Leak proof water trial). 1 LS
194 194 Replacement of worn-out top of cylindrical Flash Tank of clarifier-The scope of work includes dismantling, fabrication and erection of existing top of Flash Tank and fitting of chimney etc. 1 EACH
195 195 CRYSTALLIZER 1 EACH
196 196 Replacement of worn-out portion of vacuum crystallizer –a:-half portion of shell with outer side supports. 1 EACH
197 197 B..-Full shell with outer side supports.After completion of job, satisfactory water and vacuum trial of unit to be given by contractor. 1 EACH
198 198 (a) Repair of bent shaft & arms of Crystallizers :- The job includes taking out the bent shaft of Crystallizer (4" to 8" sq. shaft), dismantling of its connected parts (arms etc.) and fitting thereof, after due repair of shaft & arms etc. 1 EACH
199 199 Replacement of complete syrup/Molasses storage tank at Pan floor with proper supports :-Dismantling of existing worn-out Syrup/Molasses storage tanks with supports, fabrication of new tanks & erection thereof including providing proper supports; the job also include giving satisfactory trials. 2 EACH
200 200 Replacement of half round bottom shell of crystallizer with 10mm/8 mm M.S. Platehalf portion of full crystallizer 2 EACH
201 201 b.      half portion of half crystallizer 2 EACH
202 202 c.     1/4 portion of half crystallizer 3 EACH
203 203 HORIZONTAL & VERTICAL CRYSTALLIZER 1 EACH
204 204 Minor repairing and strengthening of cont. horizontal crystallizer:- Patching of weak & leaky portion of hollow shaft where cooling coils are attached or portion is plugged. 2 EACH
205 205 (a)     Strengthening of driving shaft with Angle Iron. 2 EACH
206 206 (b)    Dismantling of weak and worn-out existing cooling coils, fabrication & fitting of new coils, fitting thereof and satisfactory trials for leak proof working (Water/Hydraulic Testing). 1 LSCOMP
207 207 Repair of worn-out/ week portion of the cooling Coil of Vertical Crystallizer. The job includes dismantling of worn out/ week portion of the cooling coil, fabrication of new coil identical for existing portion, fitting the same at site and hydraulic testing of complete Coil. 10 PRM
208 208 D.M. PLANT 1 EACH
209 209 Repair of Blower of D.M. Plant with its fin. 1 EACH
210 210 Fitting of Sand catcher at D.M. Plant The scope of work includes fitting of Sand Catcher in water inlet line of D.M.Plant complete in all respect as per terms & conditions with all valves,pipe lines etc. thereof giving satisifactory leakproof trials. 1 EACH
211 211 P.R. D.S. Fitting 1 EACH
212 212 Fitting of P.R.D.S. in Boiling House-The scope of work includes fitting of P.R.D.S. in Boiling House to reduce boiler pressure from 21 Kg to 7 Kg. With necessary inlet & outlet connection with new header and giving successful trials. 1 EACH
213 213 Replacement of worn-out pipe of cones (Lifting Hood ) of S/D Centrifugal Machine :- The job includes dismantling of 5" size worn-out pipe of Discharge Cone of S/D Machine; fabrication of flange identical to the existing one and fitting of pipe with flange on discharge cone, such that it must be perfectly aligned to the shaft of S/D Machine. 10 EACH
214 214 Replacement of worn-out cones of S/D Centrifugal Machine :- The scope of work includes dismantling of existing worn-out cone; fabrication of new cone from SS Plate, identical to the existing cone and fitting the same in position. 4 EACH
215 215 Replacement of worn-out Molasses outlet bends of S/D Centrifugal Machines:-The job includes dismantling of existing worn-out molasses outlet bend, fabrication of new bends from 5 mm thick M.S. Plate & fitting thereof. 2 EACH
216 216 Replacement of worn-out Molasses outlet ‘S’ bend of 1350 KT Centrifugal Machine :- The job includes dismantling of worn-out 6" size bend, fabrication of new ‘S’ bend identical to the existing “S” bend & fitting thereof. 4 EACH
217 217 Replacement of worn-out tilting chutes of S/D Centrifugal Machine :-The job includes dismantling of the tilting chute of S/D Machine and fabrication of the new from 2 mm thick M.S. Plate, including washing nipple & fitting of the same. 4 EACH
218 218 Replacement of Monitor casing collar ring of S/D Centrifugal Machine :-The job includes fabrication of Monitor case collar ring of S/D Centrifugal M/c and fitting thereof in position, after dismantling the existing worn-out ring. 2 EACH
219 219 Replacement of worn-out Top Ring of S/D Centrifugal Machine basket -The job includes dismantling of worn-out Top ring, fabrication of new ring by 10/12 mm thick MS Plate and fitting thereof perfectly. 2 EACH
220 220 Replacement of worn-out coil of Super Heated Wash Water Column :-The job includes dismantling of existing worn-out coil, fabrication of new coil from new steam pipe identical to the existing coils, hydraulic testing at 350 lbs. /sq. inch, fitting of the same in position & steam trials for leak proof working. 1 EACH
221 221 Dismantling of old Transient Heater & Erraction of New Transient Heater in place of old NK 1100 Continuous machine.Scope of Work:-All the necessary connections of Pug Mill to Transient Heater & Transient Heater to Machine, Steam and water connections etc. to be done. 1 EACH
222 222 EFFLUENT TREATMENT PLANT 1 EACH
223 223 (a) Dismantling, fabrication & erection of new aerator fan of E.T.P. as per existing. 1 EACH
224 224 (b) Dismantling, replacement/repairing of blades of aerator fan of E.T.P. as required 2 EACHFAN
225 225 Replacement of Complete Hopper :- Dismantling of worn-out Hopper complete & fabrication of hopper 1.5 mtr. width, complete erection with drive, identical to the existing hopper and giving satisfactory trials of its working. 1 PRM
226 226 (a)     Modification in sugar distribution arrangement from sugar elevator chutes to grader 3 EACH
227 227 (b)    Modification in uniform sugar distribution in sugar grader on wire netting. 2 EACH
228 228 Strengthening of complete structure, staging. column, platform etc. of hot and cold water over head storage tank near evaporator station in boiling house. 1 EACH
229 229 Dismantling of various tanks, machinery components from various places and their dragging to the yard, within a radius of 150 mtrs. . 1 PMT
230 230 Dismantling of various platforms, staging and columns etc. 1 PMT
231 231 Fabrication & Erection of Steel staging and Platform etc.. 1 PMT
232 232 - do – but columns, structure and purlins. 1 PMT
233 233 Fabrication & erection of rectangular tanks from 6 /8 /10 or 12 mm thick M.S. Plate. 1 PMT
234 234 -do- but round tank with flat bottom. 1 PMT
235 235 -do- but round tank with conical bottom. 1 PMT
236 236 Erection of round tank with flat / conical bottom. 1 PMT
237 237 Dismantling, repairing, reinforcement and refitting of Stirrer Arms of crystallizers. 1 EACH
238 238 Fabrication of stair cases with footsteps including erection thereof. 1 PRM
239 239 Fabrication of clamps and its tie rods. 1 EACH
240 240 Fitting of pipe line supports with clamps and Ties. 1 EACH
241 241 Fabrication & erection of hand Railing by 1/2" to 2" dia. pipe. 1 PRM
242 242 Dismantling, Fabrication and fitting of Molasses gutters/ Massecuite gutters /Juice Gutters, sides plates of Bagasse carrier/Sugar elevator, Sugar elevator chutes, Boiler ID & F.D. fan /AIR heator tucting 1 PMT
243 243 Fabrication of M.S. Pipe from 6 to 10 mm thick M.S. Plate in different section/sizes. 1 PMT
244 244 Fitting of M.S./G.I./S.S. Pipe including Valves, flanges, bends etc, of different sections up to any elevation, 1/2" to 3" dia. pipe. 1 PRM
245 245 - above 3" to 6" dia. size. 1 PRM
246 246 - above 6" to 14" dia. size. 1 PRM
247 247 - 16" dia. to 24" dia. size. 1 PRM
248 248 - 26" to 36" dia. size. 1 PRM
249 249 - 38" to 46" dia. size. 1 PRM
250 250 Fitting of Cast Iron Pipe from 3" to 12" dia. including valves, flanges, bend etc. :- 3" dia. to 6" dia. size. 1 PRM
251 251 -          above 6" to 8" dia. size. 1 PRM
252 252 -          above 8" dia to 12" dia. 1 PRM
253 253 Dismantling of various sizes of pipe lines with fittings :- /2" dia. to 3" dia. size. 1 PRM
254 254 -          above 3" dia. to 6"dia. size. 1 PRM
255 255 -          above 6" dia. to 14" dia size. 1 PRM
256 256 -          above 14" dia. to 24" dia size. 1 PRM
257 257 -          above 26" dia. to 36" dia. size. 1 PRM
258 258 -          above 38" dia. to 46" dia. Size 1 PRM
259 259 Dismantling, repairing, reinforcement and refitting of stirrer arms of Pug Mill. 1 EACH
260 260 -do- but of Magma Mixer. 1 EACH
261 261 Dismantling, fabrication & refitting of stirrer arms of Magma Mixer/Pug Mill. 1 EACHARM
262 262 Dismantling, cleaning and refitting of various size of M.S./G.I./S.S. pipe lines with fittings :- 1/2" dia. to 3" dia. size. 1 PRM
263 263 -          above 3" dia. to 6" dia. size. 1 PRM
264 264 -          above 6" dia. to 14" dia. size. 1 PRM
265 265 -          16" dia. to 24" dia. size. 1 PRM
266 266 Dismantling, cleaning and refitting of 6" dia. Cast Iron Pipe line of sulphur station. 1 PRM
267 267 Fabrication of M.S. Tee from M.S. Pipe & Plate of 6" to 10 mm size. 1 PID
268 268 Fabrication of bends of different sizes from 6 to 10 mm thick M.S. Plate/pipe 1 FT
269 269 Fabrication of M.S. Elbow in different sizes from M.S. Pipe/Plate of 6 to 10 mm size. 1 PID
270 270 -do- but nipples. 1 PID
271 271 Fabrication of M.S. Flanges from 10 to 32 mm thick M.S. Plate, with holes duly drilled. 1 PID
272 272 Fitting of flanges up to 42" dia. . 1 PID
273 273 Fabrication of reducers of different sizes. 1 PIMD
274 274 Fitting of reducers of different sizes. 1 PIMD
275 275 Fitting of M.S./G.I./CI Bends/Elbow/Tee/Nipples etc. up to 42" dia.size 1 PID
276 276 Dismantling, fabrication & fitting of Juice Sulphiter Arms 1 EACHARM
277 277 Replacement of old manifolds of Pans; dismantling of existing worn-out manifolds, Fabrication & fitting of the same by new pipe, providing all connections of 1½”, 2", 3", 4", 5", 6" & 8" dia etc.. complete in all respects. 1 EACH
278 278 Fitting of any type of Valves :- Up to 8" dia.. 1 PID
279 279 -          above 8" dia. to 16" dia. . 1 PID
280 280 -          above 16" dia. to 24" dia.. 1 PID
281 281 -          above 24" dia. . 1 PID
282 282 Fabrication of Cross of different sizes from M.S. Pipe. 1 PID
283 283 Installation of different type of Pumps, the job includes giving satisfactory trials of the unit Up to 10 H.P. pumps. 1 EACH
284 284 -          above 10 H.P. but up to 30 H.P. 1 EACH
285 285 -          above 30 H.P. but up to 50 H.P. 1 EACH
286 286 -          above 50 H.P. but up to 80 H.P. 1 EACH
287 287 Fabrication of beds of different size of motors /Pumps:- pump coupled with motor up to 10 H.P. 1 EACH
288 288 -          -do- but above 10 H.P. to 20 H.P. 1 EACH
289 289 -          -do- but above 20 H.P. to 40 H.P. 1 EACH
290 290 -          -do- but above 40 H.P. to 60 H.P. 1 EACH
291 291 -          -do- but above 60 H.P. to 80 H.P. 1 EACH
292 292 -          -do- but above 80 H.P. 1 EACH
293 293 Fabrication of Scrapper for Bagasse Carrier as per existing sample from M.S. Plate & M.S. Flate 1 EACH
294 294 Dismantling of various type/sizes of Valves of any type, including their dragging from the source up to the destination, within the factory :- up to 8" dia. 1 PID
295 295 -          above 8" to 12" dia. 1 PID
296 296 -          above 12" dia. to 16" dia. 1 PID
297 297 -          above 16" dia. to 20" dia. 1 PID
298 298 -          above 20" dia. to 24" dia. 1 PID
299 299 Replacement of buldged columns, beams etc. of Boiler No. 1, 2, 3 and No. 4:- The scope of work involves dismantling of bulged and twisted beams, columns etc. and fitting of new after fabrication, as per the directions of Engineer Incharge. 1 PMT
300 300 Patching of different sizes of tanks/vessels/Gutters/pipe lines etc. from 6/8/10 mm thick M. S. Plate. (Upto 1 m2 per Pc.) 1 PSM
301 301 Fabrication & fitting of different size Guards of driving gears from of 6/8 mm thick M.S. Plate. 1 EACH
302 302 Fabrication & fitting of lopper /Air distributor plate at Hopper 1 EACH
303 303 Strengthening of Tank/Vessel by M. S. Plate 6 mm to 12 mm thick 1 SQM
304 304 Dismantling, cleaning and refitting of nozzles of M.C.S. 1 Each
305 305 Dismantling of M.S. Bends, Nipple, Tee, Reducer and Elbow 1 PID
306 306 Dismantling, cutting of M. S. Flanges (usable) from old Pipe 1 PID
307 307 Dismantling and fitting of M.S./C. I. Cross 1 PID
308 308 Fabrication of M. S. Cross 6" size 1 PID
309 309 Fabrication of Bagacillo pipe line (G.I./M.S.) 3 mm M.S. thick plate 1 PMT
310 310 Replacement of leaky joints between flanges of any pipe line during crushing season. 1 PID
311 311 Dismantling of old beds of motors & Pumps 1 EACH
312 312 Dismantling and fitting of Double Beat Valve of Juice Heater. 1 PID
313 313 Dismantling, fabrication & fitting of Strainer Box with Strainer of M.S./S.S./ Copper for Pumps as per existing. 1 EACH
314 314 Dismantling and fitting of C.I. Frame & Door of “Taxmaco” make Boiler Furnace as per existing. 1 EACH
315 315 Welding as per requirement for any Equipment. 1 PRM
316 316 Replace of rake carrier sprocket bed bottom side plate both sides to be fabricated from 10/12 mm thick M.S. plate 1 EACH
317 317 Fabrication of lime screw conveyer scroll by 6 mm as per existing giving satisfactory trail. 1 EACH
318 318 Double beat valve 8” dia (including necessary alteration in each valve pipe line Etc.) 1 PID
319 319 Replacement of baggase elevator wornout M.S.chute 1 EACH
320 320 Replacement of mill turbine oil BRASS/ cooler copper tube 50 EACH
321 321 Replacement of M.S. rail of cane unloader bridge . 1 PRM
322 322 Replacement of M.S. squre of cane unloader trolly. 1 PRM
323 323 JUICE SULPHITER 1 EACH
324 324 A)Replacement of 10” dia M.S/S.Scross of So2 gas distribution Coil of Juice Sulphiter -The scope of work includes Dismentling of existing 10” dia cross of So2 gas distribution coil of Juice Sulphiter ,.Fabrication of 10” dia m.s/S.S cross of So2 gas distribution coil of Juice Sulphiter of 10” size with S.S.(M.S.) Pipe. Fitting of 10” dia S.S/M.S cross of So2 gas distribution coil Dismantling of Worm out ducting of air heater & modification, fabrication of new ducting from 5/6 mm M.S. Plate as per direction of I I/c. C.E. & fitting thereof & giving satisfactory trial. 1 EACH
325 325 Replacement of 10" dia perforated M/e /SS pipe for so2 gass distribution in juice sulphitor. 1 Each
326 326 FABRICATION MAJOR JOB 1 Each
327 327 JUICE SULPHITER 1 Each
328 328 Replacement of Top Cone of Recovery Tower of Juice Sulphiter:- The job includes dismantling of existing worn-out top cone and related accessories, fabrication of new one, identical to the existing and fitting thereof. 1 EACH
329 329 Replacement of Bottom Cone of Recovery Tower of Juice Sulphiter : The job includes dismantling of existing worn-out bottom cone and related accessories, fabrication of new one, identical to the existing and fitting thereof. 1 EACH
330 330 Replacement of worn-out stirrer arms of Juice Sulphiter and middle shaft portion with MS Angle (approx. 4.5 mtr.):- Dismantling of shaft, gear and other accessories, thereafter, repair of shaft or replacement of shaft with new MS Angle, fitting, alignment and trials thereof. 4.5 PM
331 331 JUICE CLARIFIER 1 EACH
332 332 Replacement of flocculating Chamber complete Shell of Juice Clarifier :-The job includes dismantling of worn-out shell and fabrication of new one identical to the existing one and erection thereof. 1 EACH
333 333 Replacement of worn-out /weak portion and patching job of flocculating Chamber Shell of Juice Clarifier :-The job includes dismantling of worn-out/weak portion and patching job of flocculating Chamber shell; fabrication of new identical to the existing one and erection thereof. 1 EACH
334 334 Repairing/Replacement of weak portion of Bottom Cone of the Juice Clarifier :- The job includes dismantling of part of bottom cone of Juice Clarifier, where the thickness has gone below 7 mm, fabrication of new identical to the dismantled one from 10 mm M.S. Plate and fitting thereof in position. 1 EACH
335 335 Replacement of Vacuum Filter Condenser :- The scope of work includes dismantling of existing worn-out condenser, fabrication of new condenser identical to the existing one and fitting thereof. 2 EACH
336 336 EVAPORATOR STATION 1 Nos
337 337 Savealls :- 1 NOS
338 338 A.       Dismantling of worn-out Save-all, fabrication of new Save-all identical to existing one as per drawing, including providing proper supports, and giving satisfactory leak proof trials :- 1 EACH
339 339 -          For Save-all of Semi – Kestner. 1 EACH
340 340 -          For Save-all of Vapour Cell. 1 EACH
341 341 -          For Save-all of Evaporator Body No. 1, 2 & 3. 1 EACH
342 342 -          For Save-all of Evaporator body No. 4 and Standby body No. 4. 1 EACH
343 343 -          For Save-all of Evaporator body No. 5 and standby body No. 5. 1 EACH
344 344 Replacement of top and bottom tube plate of Evaporator body No. 5 –The scope of work includes dismantling and fitting of top and bottom tube plate of Evaporator Body No. 5 with proper alignment, welding thereof in position; the job includes giving satisfactory Hydraulic testing of the unit and after completion of work. 1 SET
345 345 (a) Replacement of worn-out central cylindrical condensate tank (Near Evaporator House) –    Dismantling ,fabrication & erection of existing worn-out cylindrical condensate tank wby 10 mm m.s. plate providing all condensate line connections & proper staighting of tank and given satisfactory leak proof triel. 1 PMT
346 346 (b) Replacement of half portion of worn-out central cylindrical condensate tank (Near Evaporator House) – Dismantling ,fabrication & erection of existing worn-out cylindrical condensate tank wby 10 mm m.s. plate providing all condensate line connections & proper staighting of tank and given satisfactory leak proof triel. 1 PMT
347 347 PAN 1 EACH
348 348 Replacement of Save-all of Pans (Complete):-The scope of work includes dismantling of worn-out Save-all of Pans, fabrication of new save-all, identical to existing one and as per drawing; the job includes giving satisfactory leak proof trials. 2 EACH
349 349 Replacement of worn-out/weak Top cone of Pans :- The scope of work includes dismantling of weak/worn-out top cone, fabrication of new top cone from 12 mm thick MS Plate identical to the existing one and fitting thereof and giving satisfactory leak proof Hydraulic trials. 1 EACH
350 350 (a)  Half Top cone 1 EACH
351 351 (b) Full Top Cone 1 EACH
352 352 Replacement of Pan/Evaporator weak Calandria shell :-The scope of work includes dismantling of the existing Calandria shell, fabrication of new shell by 10/12/15 mm MS Plate, similar to existing size, fitting of shell in position by both side welding and giving leak proof trials of Calandria. 1 LS
353 353 (a)  Half Shell 1 LS
354 354 (b) Full Shell 1 LS
355 355 Replacement of weak and worn-out body shell of Pan :-(a)  The scope of work includes dismantling of existing worn-out shell with Save-all, fabrication of new shell identical to the existing one including save all with proper sight glasses, washing coils and pipe connections etc., fitting therefore in position with all the Pipes, Save-all and connection and giving leak proof satisfactory trials. 1 LS
356 356 (b) Half Shell 1 LS
357 357 (c)  Full Shell 1 LS
358 358 Replacement of old worn-out bottom Cone of Pan between Calandria shell & body shell of Pan :-Dismantling of existing worn-out cone of Pan. Fabrication of above cone by 12 mm MS Plate, identical to existing size, fitting of cone in position by both side welding and giving satisfactory trials for leak proof working of Pan Body. 1 LS
359 359 Dismantling, Fabrication & installation of new external catcher (Complete) for Pan :-Fabrication of new External catcher for Pan by 10/12 mm M.S. Plate complete (as per drawing), its installation in Pan Vapour Line and giving satisfactory water/vacuum trials of complete catcher. 2 LS
360 360 Replacement of Body Shell of vacuum crystallizersThe job includes dismantling of weak worn-out portion of vacuum crystallizer, fabrication of new shell with 12mm MS Plate identical to existing one and fitting thereof with proper external supports and valves, nipples etc. and satisfactory leak proof trials. 1 LS
361 361 (a)     Half Shell 1 LS
362 362 (b)    Complete shell 1 LS
363 363 Replacement of worn-out existing cold / Hot water receiving tanks :- Dismantling of existing cold/Hot water tank; fabrication of new tanks identical to the existing tank & erection thereof; the job also includes providing proper supports and connections. 1 LS
364 364 Replacement of worn-out Hollow Central Shaft of Horizontal Continuous Crystallizer :-The job includes dismantling of existing Central Shaft with coils & Fabrication of new Central Shaft with MS Pipe and fitting thereof in position with coils and giving satisfactory hydraulic testing and satisfactory trial of drive. 1 LS
365 365 CENTRIFUGAL STATION 1 EACH
366 366 Replacement of worn-out Hopper bed :- The job includes dismantling of existing worn-out bed of hopper and fabrication of new identical one, to existing bed and erection thereof. 1 EACH
367 367 Dismantling, Cleaning & refitting of existing water cooling coils of Molasses Storage tank, after dismantling the same and fitting thereof, after due checking. The scope of work also includes repairing/replacement of worn-out/weak portion of Cooling Coils. 4 PRM
368 368 Replacement of weak portion of Magma Mixer (A, B and C) :-The job includes dismantling of weak ‘U’ shape bottom of Magma Mixer, fabrication of new portion from 10/12 mm thick M.S. Plate and fitting the same in position. 1 PMT
369 369 Replacement of worn-out trough of Hopper:- The job includes dismantling of the old trough and placing the same at M.S. Scrap yard, fabrication of new trough and its assembly/fitting with connecting rod after proper alignment. 1 PRM
370 370 Replacement of worn-out Runners of sugar elevator :- The job includes dismantling of existing worn-out M.S. Plate of sugar and seed elevator & fitting of new runner (flat) of the required size. 2 PRM
371 371 Fabrication of new Strainer at M.C.S./ Injection :-The job includes dismantling of worn-out Strainer; fabrication of new strainer identical to existing by 12 mm thick and fitting thereof. 2 EACH
372 372 Replacement of worn out M.S. Sugar Elevator buckets. The job includes fabrication of Sugar Elevator Bucket of M.S plate (8/10/mm thick) as per existing with proper holes at corner and their fitting & trial. 20 EACH
373 373 Repair of stainer at mcs / injection :- dismanlting worn out /weak portion of stainor - febrication of new portion identical to existing by 8/10 mm ms plate 1 EACH
374 374 MILL & BOILERS 1 EACH
375 375 Replacement of Mill House Juice Whirller tanks :- The job includes dismantling of old tanks ;fabrication of new tank by old/new 6/8 mm M.S. Plate or the material available, complete in all respects with pipe connections and erection thereof; the scope of work also include giving satisfactory trials of the unit. The welding is required to be done from both the sides. 1 EACH
376 376 Fabrication of new pusher roller of cane Fibrizor, its erection & satisfactory trials. The job shall be done as per the design/instructions of Engineer I/c. 1 EACH
377 377 Fabrication of new F/D fan identical to existing F/D fan. 1 EACH
378 378 Fabrication & fitting of Juice Gutter for D. S. M. screens Juice Boxes from 5/6 mm thick M.S. Plate, including providing proper slopes of flanges etc. for its dismantling & fitting. 1 EACH
379 379 Replacement of worn-out portion of Trough of Bagasse Carrier and Elevator :- The job includes dismantling of worn-out trough of Bagasse Carrier/Elevator; with ansle chamel fabrication of new trough by 5/6 mm thick M.S. Plate and erection thereof. 70 PRM
380 380 Replacement of runners of Bagasse Carrier and Bagasse Elevator:-The scope of work includes dismantling of existing M.S. runners and fitting of new runner 75x10 mm with proper supports. 300 PRM
381 381 Replacement of Bagasse Carrier / Bagasse Elevator side plates including dismantling of worn-out side plates. 150 PRM
382 382 Replace of I/D fan bed of boiler, including fabrication of identical bed. 1 EACH
383 383 Boiler I.D. Fan bed repair/strengthening work. 1 EACH
384 384 Boiler No. 4 worn-out side plate replacement work by old MS Plate angle iron, channel from Scrap. 1 EACH
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail