Primary Agriculture Credit Cooperative Society Maryadit has published Construction Of 200 Mt Godown With New Office Building At Jarah Tehsil Morena Distt . Morena. Submission Date for this Tender is 10-08-2019. Building Work Tenders in Village Jarah District Morena Madhya Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
---|---|---|---|---|---|
1 | 1 | Earth work in excavation by mechanical means (Hydraulic excavation)/manual means in over areas foundation trencheds or drains (not exceeding 1.5m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m 2.6.1 p/1 All kinds of soil | 96.6 | Cum | |
2 | 2 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, Footings, bases of columns, etc. for mass concrete up to plinth level 5.9.1 Foundations, footings, bases of columns, etc. for mass concrete up to plinth level. | 139.92 | Sqm | |
3 | 3 | providing and laying in position cement concrete of specified grade excluding the const of centring and shuttering - All work upto plinth level with 40mm nominal size graded stone aggregate 4.1.2.3 M-7.5 | 5.88 | Cum | |
4 | 4 | Providing and laying in position specified grade of reinforced cement concrete (with 20mm nominal size graded stone aggregate) excluding the cost of centering shuttering, finishing and reinforcement All work up to plinth level. 5.1.1 M-20 Nominal Mix | 38.93 | Cum | |
5 | 5 | Suspended Floors, Roofs, Landings, Balconies and access platform, Shelves (Cast in Situ) Lintels, Beams, Girders, Bressumers and cantilevers, Columns, Pillars, Posts and Struts Walls in super Structure. | 355.97 | Sqm | |
6 | 6 | Reinforcement cement concrete work in walls (any thickness) including attached pilasters, uttresses, Plinth and string courses, fillets, columns, pillars, posts and struts uspended floor, roof slab, beam, etc. upto floor two level excluding cost of centering shuttering finishing and reinforcement 5.2.1 M-20 Normal mix (with 20mm nominal size graded stone aggregate) | 38.46 | Cum | |
7 | 7 | Brick work with well brunt open bhatta, bricks, Crushing Strength not less than 25kg/Sqcm and water absorption not more than 20% in foundation and plinth 6.5.2 Cement Mortar 1:6 (1 Cement : 6 Sand) | 7.84 | Cum | |
8 | 8 | Extra for brick work in superstructure above floor II Level for each additional floor or part thereof | 28.97 | Cum | |
9 | 9 | Extra for brick work in superstructure above floor II Level for each additional floor or part thereof | 20.58 | Cum | |
10 | 10 | Reinforcement for RCC work including straightening, Cutting, Bending, Placing in Position and Binding Including Cost of binding wire upto Floor two level including all wastage etc Complete 5.16.3 Cold Twisted bars (CTD) | 5775 | Kg | |
11 | 11 | Filling available Excavated Earth (Excluding rock) in Trenches plinth sides of foundation etc. in layers not exceeding 20 cm in depth. Consolidating each deposited layer by ramming and watering lead upto 50m and lift upto 1.5m | 99.46 | Cum | |
12 | 12 | Supplying and filling in plinth with hard muram/hard copra under floors including watering ramming consolidating and dressing complete | 196.27 | Cum | |
13 | 13 | Steel work welded in built up sections/framed work including cutting, hoisting, fixing in position and applying a priiming coat of approved steel primer using structural steel etc. as required. Hoisting fixing in position and applying a priming coat of approved steel 10.23.2 in gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. | 272.1 | Kg | |
14 | 14 | Providing and fixing 1mm thick M.S Sheet door with frame of 40 x 40 x 6 mm angle iron and 3mm M.S gusset plates at the junctions and corners, alll necessary fittings complete, including applying a priming coat of approved steel primer 10.5.1 Using M.S angele 40 x 40x 6 mm for diagonai braces | 14.16 | Sqm | |
15 | 15 | Providing and fixin g welded steel wire fabric fencing with posts of specified material and of stadard design placed and embeded in cement concrete blocks 45 x 45 x 60 cm of mix 1:5:10 (1 cement 5 Fine Sand : 10 Graded stone aggregate 40mm nominal size) every 15th post, last but one end post and corner post on one side only and struts embeded in cement concrete blocks 45 x 50 cm of the same mix, provided with welded steel wire fabric fixed between the posts fitted and fixed with G.I. staples on wooden plugs or tied to 6 mm bar nibs with G.I. binding wire (cost of posts, welded steel wire fabric, painting, earth work in excavation and concrete to be paid for separately) 10.30.1 25 x 25 mm size 12 gauge | 3.99 | Sqm | |
16 | 16 | 6 mm cement plaster 1:3 (1 cement 3 sand) finished with a floating coat of neat cement and thick coat of lime wash for bearing of RCC slabs and beams. | 211.56 | Sqm | |
17 | 17 | 12 mm Cement Plaster of Mix (1 Cement : 6 Sand) | 392.98 | Sqm | |
18 | 18 | 18 mm Cement plaster in two coats under layer 12 mm thick cement plaster 1:5 (1 Cement : 5 Sand) finished with a top layer 6mm thick cement plaster 1:6 (1 cement : 6 fine sand) | 273.89 | Sqm | |
19 | 19 | Applying one coat of cement primer of approved brand and manufacture on wall surface : 13.32.1 Cement Primer | 604.54 | Sqm | |
20 | 20 | Finishing walls with water proofing cement paint of required shade : New work (Two of more coats applied @ 3.84 kg /10 Sqm) | 273.89 | Sqm | |
21 | 21 | Painting Steel work with Deluxe Multi Surface Paint to give an even shade. Two or more coat applied @ 0.90 ltr/10 Sqm over and under coat of primer applied @ 0.80 ltr / 10 Sqm of approved brand or manufacture | 54.45 | Sqm | |
22 | 22 | Add Extra for Electrificate work and other miscellaneous and GST | 1 | other |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail