Tamil Nadu Transmission Corporation Limited-TANTRANSCO has published Cutting And Levelling The Site , Formation Of Concrete And Bitumen Road For The Proposed Kalivelampatty 230 110 Kv Ss . . Submission Date for this Tender is 04-09-2019. Road Work Tenders in KAVIVELAMPATTY Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
---|---|---|---|---|---|
1 | 1 | Cutting and Levelling site including cost of cutting the gravelly soil consolidation as per specification & levelling with power roller including all labour lead and lift etc complete. | |||
2 | 1.1 | Hard gravelly soil | Item1 | 14195 | Cum |
3 | 1.2 | SDR not requiring blasting. | Item2 | 4732 | Cum |
4 | 1.3 | MR and DMR not requiring blasting | Item3 | 2366 | Cum |
5 | 1.4 | Hard rock measured in solid including blasting and stacking | Item4 | 1183 | Cum |
6 | 1.5 | Hard Rock by wedging cheselling, | Item5 | 1183 | Cum |
7 | 2 | Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. | Item6 | 2356 | Cum |
8 | 3 | PCC 1:3:6 mix using 20mm HBS machine crushed metal for foundation with out form work including cost of all labour ,materials, , lead, lift, curing, etc., complete. | Item7 | 471 | Cum |
9 | 4 | RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal for raft foundation without formwork including cost of all materials, labour lead, litf, etc., complete. But excluding cost fo steel reinforcement (by using mixer machine). | Item8 | 727 | Cum |
10 | 5 | RCC 1:1.5:3 using 12 to 20mm HBS metal(machine crushed) for wall with formwork including cost of all labour, materials, lead, lift, etc, complete. But excluding cost fo steel reinforcement (by using mixer machine). | Item9 | 134 | Cum |
11 | 6 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone with steel mould, including cost of all materials, form work,centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For culvert deck slab concrete with 230mm thick. | Item10 | 140 | Sqm |
12 | 7 | Supplying and fabricating and placing in position of MS / RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. | Item11 | 67000 | Kg |
13 | 8 | Providing expansion joint for road concrete as per specification in both direction using prevalid aspheltics pad 20 mm thick to full width and depth of 150mm thick plastering with CM 1:3, 20 mm thick including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification. | Item12 | 615 | Rm |
14 | 9 | providing water mixed macadam 1;1 proportion using quarry dust and 40mm metalmixed with machine adding required water for road and bell mouth including cost of allmaterials ,labour,well consolidation with power roller lead,lift,etc complete | Item13 | 2076 | Cum |
15 | 10 | Plastering with CM. 1:3 mix 12mm thick for , RCC pillars, ., including cost of materials, labour, lead, lift, curing, etc., complete. | Item14 | 140 | Sqm |
16 | 11 | Providing and laying 50mm consolidated thick Dense Bituminous Macadam using 0.35 cum of 26.50-13.20mm, 0.21cum of 13.20-2.36mm and 0.14cum of 2.36mm & below with 0.01cum.of Filling materials and with 49.50 Kgs of bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne power roller to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, paver finisher, power rollers and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP clause 507 MORTH.Tack Coat of 2.5 kg Bitumen Emulsion and Close Graded premix surfacing 20mm compacted thick etc as per standard specification complete.\n\n\n\n\n | Item15 | 2360 | Sqm |
17 | 12 | Removing the excess earth to the nearby bund or low laying area instructed by field engineer including all lead, lift, etc., complete. | Item16 | 200 | Cum |
18 | 13 | Refilling with excavated earth other than sand in foundation and sides of masonry, consolidation as per std.specn.with water including all, labour, lead , lift, etc., complete. | Item17 | 100 | Cum |
19 | 14 | Design various components of road & culvert with detailed drawing etc. including Cost of all labour, lead, lift etc,complete | Item18 | 1 | Job |
20 | 15 | SGST & CGST (If applicable quote the value, if not enter '0') | Item19 | 1 | Percentage |
21 | 16 | IGST (If applicable quote the value, if not enter '0') | Item20 | 1 | Percentage |