Bharat Electronics Limited-BEL has published Supply, Installation, Testing And Commissioning Along With Comprehensive Annual Maintenance Contract For A Period Of 05 Yeras Of Acs For Workshop Building , Hasimara , Assam .. Submission Date for this Tender is 03-08-2019. Spare Part Tenders in IAF , Hasimara , Assam. West Bengal. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
---|---|---|---|---|---|
1 | 1 | Supply of 1.5TR High Wall Inverter type Split AC | 4 | Nos | |
2 | 2 | Supply of 2TR Cassette type Split AC | 11 | Nos | |
3 | 3 | Supply of 2TR High Wall inverter type Split AC | 2 | Nos | |
4 | 4 | Supply of 3TR Cassette Type Split AC | 2 | Nos | |
5 | 5 | Installation of 1.5 TR High wall Inverter/Five star rated split AC with all suitable clamping arrangement on the wall. Also, any minor civil damages to be addressed, Tools and tackles required for the work also to be considered. The work shall be as per the per Annx-I & II\n | 4 | Nos | |
6 | 6 | Extra copper pipe for 1 .5TR High wall Inverter/Five star rated Split AC to be provided based on the site requirement or as directed by engineer incharge. The refrigerant pipe for suction and liquid line shall be insulated with Vidoflex insulation of not less than 9 mm wall thickness with UV Tape.Measurement will be consider for both the Suction and liquid line together. | 40 | MTRS | |
7 | 7 | PVC covering pipe for 1.5 TR High wall Inverter/Five star rated split AC to be provided with all fittings like elbows,tees etc.The PVC rigid pipe shall be fixed to the wall by using clamps.GI/SS screws and clamps to be used for clamping outside the building. | 60 | MTRS | |
8 | 8 | PVC rigid Drain pipe of 25 mm dia. for 1.5 TR High wall Inverter/Five star rated split AC to be provided with all necessary fittings etc.The drain pipe shall be fixed to the wall by using clamps including nitrile rubber insulation with UV tape. | 60 | MTRS | |
9 | 9 | Suitable electrical cable for 1.5 TR High wall Inverter/Five star rated split ACshall be provided for all the AC units.Necessary cabling between indoor and outdoor unit shall be provided by the agency.Payment will made as per actual measurement. | 80 | MTRS | |
10 | 10 | Installation of 2 TR High wall Inverter/Five star rated split AC with all suitable clamping arrangement on the wall. Also, any minor civil damages to be addressed, Tools and tackles required for the work also to be considered. The work shall be as per the per Annx-I & II | 2 | Nos | |
11 | 11 | Extra copper pipe for 2.0 TR High wall Inverter/Five star rated Split AC to be provided based on the site requirement or as directed by engineer-in-charge. The refrigerant pipe for suction and liquid line shall be insulated with Vidoflex insulation of not less than 9 mm wall thickness with UV Tape. Measurement will be consider for both the Suction and liquid line together. | 20 | MTRS | |
12 | 12 | PVC covering pipe for 2.0 TR High wall Inverter/Five star rated split AC to be provided with all fittings like bends, elbows, tees etc. The PVC rigid pipe shall be fixed to the wall by using clamps. GI/SS screws and clamps to be used for clamping outside the building. | 30 | MTRS | |
13 | 13 | PVC rigid drain pipe of 25 mm dia. for 2.0 TR High wall Inverter/Five star rated split AC to be provided with all necessary fittings etc. The drain pipe shall be fixed to the wall by using clamps including nitrile rubber insulation with UV tape. | 30 | MTRS | |
14 | 14 | Suitable rated electrical cable for 2.0 TR High wall Inverter/Five star rated split AC shall be provided for all the AC units. Necessary cabling between indoor and outdoor unit shall be provided by the agency. Payment will made as per actual measurement. | 40 | MTRS | |
15 | 15 | Installation of 2.0 TR Cassette split AC with all suitable clamping arrangement on the wall. Also, any minor civil damages to be addressed, Tools and tackles required for the work also to be considered. The work shall be carriedout out as per Annx-I & II | 11 | Nos | |
16 | 16 | Extra copper pipe for 2.0 TR Cassette Split AC to be provided based on the site requirement or as directed by engineer in charge. The refrigerant pipe for suction and liquid line shall be insulated with Vidoflex insulation of not less than 9 mm wall thickness with UV Tape. Measurement will be consider for both the Suction and liquid line together. | 165 | MTRS | |
17 | 17 | PVC covering pipe for 2.0 TR Cassette Split AC to be provided with all fittings like bends, elbows, tees etc. The PVC rigid pipe shall be fixed to the wall by using clamps. GI/SS screws and clamps to be used for clamping outside the building. | 165 | MTRS | |
18 | 18 | PVC Drain pipe of 25 mm dia. for 2.0 TR Cassette Split AC to be provided with all necessary fittings etc. The drain pipe shall be fixed to the wall by using clamps including nitrile rubber insulation with UV tape | 165 | MTRS | |
19 | 19 | Suitable rated electrical cable for 2.0 TR Cassette Split AC shall be provided for all the AC units. Necessary cabling between indoor and outdoor unit shall be provided by the agency. Payment will made as per actual measurement. | 275 | MTRS | |
20 | 20 | Installation of 3.0 TR Cassette split AC with all suitable clamping arrangement on the wall. Also, any minor civil damages to be addressed, Tools and tackles required for the work also to be considered. The work shall be carriedout as per the Annx-I & II | 2 | Nos | |
21 | 21 | Extra copper pipe for 3.0 TR Cassette Split AC to be provided based on the site requirement or as directed by engineer in charge. The refrigerant pipe for suction and liquid line shall be insulated with Vidoflex insulation of not less than 9 mm wall thickness with UV Tape. Measurement will be consider for both the Suction and liquid line together. | 30 | MTRS | |
22 | 22 | PVC covering pipe for 3.0 TR Cassette Split AC to be provided with all fittings like bends, elbows, tees etc. The PVC rigid pipe shall be fixed to the wall by using clamps. GI/SS screws and clamps to be used for clamping outside the building. | 30 | MTRS | |
23 | 23 | PVC Drain pipe of 25 mm dia. for 3.0 TR Cassette Split AC to be provided with all necessary fittings etc. The drain pipe shall be fixed to the wall/chajji by using clamps including nitrile rubber insulation with UV tape. | 30 | MTRS | |
24 | 24 | Suitable rated electrical cable for 3.0 TR Cassette split AC units shall be provided for all the AC units. Necessary cabling between indoor and outdoor unit shall be provided by the agency. Payment will made as per actual measurement. | 50 | MTRS | |
25 | 25 | Core cutting to be carriedout by supplier as per site requirement at any height or as per direction of Engineer in charge. Minor hole to be made on the wall/chajja/windows for refrigerant piping in between indoor and outdoor unit. The PVC pipe shall be placed on the drilled hole and cementing or POP plastering to be made surrounding the outer surface of the PVC pipe and the wall. The lintel & floor hole to be carried out by the contractor by core cutting. The required scaffolding/ladder also to be included. Core cutting payment will be made extra. | 38 | Nos | |
26 | 26 | Testing and commissioning of High wall Inverter/Five star rates split AC to be carriedout for 24 Hrs for each AC's. Additional charging of refrigerant gas during testing to be carried out by agency.\n | 6 | Nos | |
27 | 27 | Testing and commissioning of Cassette type split AC to be carriedout for 24 Hrs for each AC's. Additional charging of refrigerant gas during testing to be carried out by agency. | 13 | Nos | |
28 | 28 | DG Set for commissioning of AC's shall be arranged by agency for testing and commissioining of all Split AC's as per the Annexure-II. Necessary transport shall be arranged by agency. | 1 | LT | |
29 | 29 | Preventive maintenance to be carriedout during stipulated guarantee/warranty period of 12 months. Servcing to be done for all the equipments and components once in Four (4) Months including necessary consumables (if required any), all as specified, directed by Engineer-in-charge. Service report shall be submitted after carryingout the each Preventive maintenance. Note: Necessary tools and tackles required for carryingout maintenace to be arranged by agency.(Note : for all 19 Nos of AC's) | 3 | EACH | |
30 | 30 | First Year Comprehensive Annual Miantenace Contarct for complete physical work including all equipments and components including all spares, compressors, refrigerant, oil, consumables, cables, wires etc., for first year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete. Note: Necessary tools and tackles required for carrying out maintenace to be arranged by agency. for all 19 Nos of AC's | 1 | AU | |
31 | 31 | Second year Comprehensive Annual Miantenace Contarct for complete physical work including all equipments and components including all spares, compressors, refrigerant, oil, consumables, cables, wires etc., for Fourth year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete. Note: Necessary tools and tackles required for carrying out maintenace to be arranged by agency for all 19 Nos of AC's | 1 | AU | |
32 | 32 | Third Year Comprehensive Annual Miantenace Contarct for complete physical work including all equipments and components including all spares, compressors, refrigerant, oil, consumables, cables, wires etc., for Fourth year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete. Note: Necessary tools and tackles required for carrying out maintenace to be arranged by agency for all 19 Nos of AC's | 1 | AU | |
33 | 33 | Fourth Year Comprehensive Annual Miantenace Contarct for complete physical work including all equipments and components including all spares, compressors, refrigerant, oil, consumables, cables, wires etc., for Fourth year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete. Note: Necessary tools and tackles required for carrying out maintenace to be arranged by agency for all 19 Nos of AC's | 1 | AU | |
34 | 34 | Fifth Year Comprehensive Annual Miantenace Contarct for complete physical work including all equipments and components including all spares, compressors, refrigerant, oil, consumables, cables, wires etc., for Fourth year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete. Note: Necessary tools and tackles required for carrying out maintenace to be arranged by agency for all 19 Nos of AC's | 1 | AU |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail