Supply, Installation, Testing And Commissioning Along With Comprehensive Annual Maintenance Contract For A Period Of 05 Yeras Of Acs For Workshop Building , Hasimara , Assam ., IAF , Hasimara , Assam.-West Bengal

Bharat Electronics Limited-BEL has published Supply, Installation, Testing And Commissioning Along With Comprehensive Annual Maintenance Contract For A Period Of 05 Yeras Of Acs For Workshop Building , Hasimara , Assam .. Submission Date for this Tender is 03-08-2019. Spare Part Tenders in IAF , Hasimara , Assam. West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

21183474
Supply, Installation, Testing And Commissioning Along With Comprehensive Annual Maintenance Contract For A Period Of 05 Yeras Of Acs For Workshop Building , Hasimara , Assam .
Open Tender
Indian
West Bengal
IAF , Hasimara , Assam.
03-08-2019

Tender Details

Supply, Installation, Testing And Commissioning Along With Comprehensive Annual Maintenance Contract For A Period Of 05 Yeras Of Acs For Workshop Building , Hasimara , Assam ., Supply Of 1 . 5Tr High Wall Inverter Type Split Ac , Supply Of 2Tr Cassette Type Split Ac , Supply Of 2Tr High Wall Inverter Type Split Ac , Supply Of 3Tr Cassette Type Split Ac , Installation Of 1 . 5 Tr High Wall Inverter / Five Star Rated Split Ac With All Suitable Clamping Arrangement On The Wall . Also , Any Minor Civil Damages To Be Addressed , Tools And Tackles Required For The Work Also To Be Considered . The Work Shall Be As Per The Per Annx-I & Ii , Extra Copper Pipe For 1 . 5Tr High Wall Inverter / Five Star Rated Split Ac To Be Provided Based On The Site Requirement Or As Directed By Engineer Incharge . The Refrigerant Pipe For Suction And Liquid Line Shall Be Insulated With Vidoflex Insulation Of Not Less Than 9 Mm Wall Thickness With Uv Tape . Measurement Will Be Consider For Both The Suction And Liquid Line Together . , Pvc Covering Pipe For 1 . 5 Tr High Wall Inverter / Five Star Rated Split Ac To Be Provided With All Fittings Like Elbows , Tees Etc . The Pvc Rigid Pipe Shall Be Fixed To The Wall By Using Clamps . Gi / Ss Screws And Clamps To Be Used For Clamping Outside The Building . , Pvc Rigid Drain Pipe Of 25 Mm Dia . For 1 . 5 Tr High Wall Inverter / Five Star Rated Split Ac To Be Provided With All Necessary Fittings Etc . The Drain Pipe Shall Be Fixed To The Wall By Using Clamps Including Nitrile Rubber Insulation With Uv Tape . , Suitable Electrical Cable For 1 . 5 Tr High Wall Inverter / Five Star Rated Split Acshall Be Provided For All The Ac Units . Necessary Cabling Between Indoor And Outdoor Unit Shall Be Provided By The Agency . Payment Will Made As Per Actual Measurement . , Installation Of 2 Tr High Wall Inverter / Five Star Rated Split Ac With All Suitable Clamping Arrangement On The Wall . Also , Any Minor Civil Damages To Be Addressed , Tools And Tackles Required For The Work Also To Be Considered . The Work Shall Be As Per The Per Annx-I & Ii , Extra Copper Pipe For 2 . 0 Tr High Wall Inverter / Five Star Rated Split Ac To Be Provided Based On The Site Requirement Or As Directed By Engineer-In-Charge . The Refrigerant Pipe For Suction And Liquid Line Shall Be Insulated With Vidoflex Insulation Of Not Less Than 9 Mm Wall Thickness With Uv Tape . Measurement Will Be Consider For Both The Suction And Liquid Line Together . , Pvc Covering Pipe For 2 . 0 Tr High Wall Inverter / Five Star Rated Split Ac To Be Provided With All Fittings Like Bends , Elbows , Tees Etc . The Pvc Rigid Pipe Shall Be Fixed To The Wall By Using Clamps . Gi / Ss Screws And Clamps To Be Used For Clamping Outside The Building . , Pvc Rigid Drain Pipe Of 25 Mm Dia . For 2 . 0 Tr High Wall Inverter / Five Star Rated Split Ac To Be Provided With All Necessary Fittings Etc . The Drain Pipe Shall Be Fixed To The Wall By Using Clamps Including Nitrile Rubber Insulation With Uv Tape . , Suitable Rated Electrical Cable For 2 . 0 Tr High Wall Inverter / Five Star Rated Split Ac Shall Be Provided For All The Ac Units . Necessary Cabling Between Indoor And Outdoor Unit Shall Be Provided By The Agency . Payment Will Made As Per Actual Measurement . , Installation Of 2 . 0 Tr Cassette Split Ac With All Suitable Clamping Arrangement On The Wall . Also , Any Minor Civil Damages To Be Addressed , Tools And Tackles Required For The Work Also To Be Considered . The Work Shall Be Carriedout Out As Per Annx-I & Ii , Extra Copper Pipe For 2 . 0 Tr Cassette Split Ac To Be Provided Based On The Site Requirement Or As Directed By Engineer In Charge . The Refrigerant Pipe For Suction And Liquid Line Shall Be Insulated With Vidoflex Insulation Of Not Less Than 9 Mm Wall Thickness With Uv Tape . Measurement Will Be Consider For Both The Suction And Liquid Line Together . , Pvc Covering Pipe For 2 . 0 Tr Cassette Split Ac To Be Provided With All Fittings Like Bends , Elbows , Tees Etc . The Pvc Rigid Pipe Shall Be Fixed To The Wall By Using Clamps . Gi / Ss Screws And Clamps To Be Used For Clamping Outside The Building . , Pvc Drain Pipe Of 25 Mm Dia . For 2 . 0 Tr Cassette Split Ac To Be Provided With All Necessary Fittings Etc . The Drain Pipe Shall Be Fixed To The Wall By Using Clamps Including Nitrile Rubber Insulation With Uv Tape , Suitable Rated Electrical Cable For 2 . 0 Tr Cassette Split Ac Shall Be Provided For All The Ac Units . Necessary Cabling Between Indoor And Outdoor Unit Shall Be Provided By The Agency . Payment Will Made As Per Actual Measurement . , Installation Of 3 . 0 Tr Cassette Split Ac With All Suitable Clamping Arrangement On The Wall . Also , Any Minor Civil Damages To Be Addressed , Tools And Tackles Required For The Work Also To Be Considered . The Work Shall Be Carriedout As Per The Annx-I & Ii , Extra Copper Pipe For 3 . 0 Tr Cassette Split Ac To Be Provided Based On The Site Requirement Or As Directed By Engineer In Charge . The Refrigerant Pipe For Suction And Liquid Line Shall Be Insulated With Vidoflex Insulation Of Not Less Than 9 Mm Wall Thickness With Uv Tape . Measurement Will Be Consider For Both The Suction And Liquid Line Together . , Pvc Covering Pipe For 3 . 0 Tr Cassette Split Ac To Be Provided With All Fittings Like Bends , Elbows , Tees Etc . The Pvc Rigid Pipe Shall Be Fixed To The Wall By Using Clamps . Gi / Ss Screws And Clamps To Be Used For Clamping Outside The Building . , Pvc Drain Pipe Of 25 Mm Dia . For 3 . 0 Tr Cassette Split Ac To Be Provided With All Necessary Fittings Etc . The Drain Pipe Shall Be Fixed To The Wall / Chajji By Using Clamps Including Nitrile Rubber Insulation With Uv Tape . , Suitable Rated Electrical Cable For 3 . 0 Tr Cassette Split Ac Units Shall Be Provided For All The Ac Units . Necessary Cabling Between Indoor And Outdoor Unit Shall Be Provided By The Agency . Payment Will Made As Per Actual Measurement . , Core Cutting To Be Carriedout By Supplier As Per Site Requirement At Any Height Or As Per Direction Of Engineer In Charge . Minor Hole To Be Made On The Wall / Chajja / Windows For Refrigerant Piping In Between Indoor And Outdoor Unit . The Pvc Pipe Shall Be Placed On The Drilled Hole And Cementing Or Pop Plastering To Be Made Surrounding The Outer Surface Of The Pvc Pipe And The Wall . The Lintel & Floor Hole To Be Carried Out By The Contractor By Core Cutting . The Required Scaffolding / Ladder Also To Be Included . Core Cutting Payment Will Be Made Extra . , Testing And Commissioning Of High Wall Inverter / Five Star Rates Split Ac To Be Carriedout For 24 Hrs For Each Acs . Additional Charging Of Refrigerant Gas During Testing To Be Carried Out By Agency . , Testing And Commissioning Of Cassette Type Split Ac To Be Carriedout For 24 Hrs For Each Acs . Additional Charging Of Refrigerant Gas During Testing To Be Carried Out By Agency . , Dg Set For Commissioning Of Acs Shall Be Arranged By Agency For Testing And Commissioining Of All Split Acs As Per The Annexure-Ii . Necessary Transport Shall Be Arranged By Agency . , Preventive Maintenance To Be Carriedout During Stipulated Guarantee / Warranty Period Of 12 Months . Servcing To Be Done For All The Equipments And Components Once In Four ( 4 ) Months Including Necessary Consumables ( If Required Any ) , All As Specified , Directed By Engineer-In-Charge . Service Report Shall Be Submitted After Carryingout The Each Preventive Maintenance . Note: Necessary Tools And Tackles Required For Carryingout Maintenace To Be Arranged By Agency . ( Note : For All 19 Nos Of Acs ) , First Year Comprehensive Annual Miantenace Contarct For Complete Physical Work Including All Equipments And Components Including All Spares , Compressors , Refrigerant , Oil , Consumables , Cables , Wires Etc . , For First Year After Expiry Of Stipulated Guarantee / Waranty Period All As Speicifi

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Sl. No. Item Description Item Code / Make Quantity Units
1 1 Supply of 1.5TR High Wall Inverter type Split AC 4 Nos
2 2 Supply of 2TR Cassette type Split AC 11 Nos
3 3 Supply of 2TR High Wall inverter type Split AC 2 Nos
4 4 Supply of 3TR Cassette Type Split AC 2 Nos
5 5 Installation of 1.5 TR High wall Inverter/Five star rated split AC with all suitable clamping arrangement on the wall. Also, any minor civil damages to be addressed, Tools and tackles required for the work also to be considered. The work shall be as per the per Annx-I & II\n 4 Nos
6 6 Extra copper pipe for 1 .5TR High wall Inverter/Five star rated Split AC to be provided based on the site requirement or as directed by engineer incharge. The refrigerant pipe for suction and liquid line shall be insulated with Vidoflex insulation of not less than 9 mm wall thickness with UV Tape.Measurement will be consider for both the Suction and liquid line together. 40 MTRS
7 7 PVC covering pipe for 1.5 TR High wall Inverter/Five star rated split AC to be provided with all fittings like elbows,tees etc.The PVC rigid pipe shall be fixed to the wall by using clamps.GI/SS screws and clamps to be used for clamping outside the building. 60 MTRS
8 8 PVC rigid Drain pipe of 25 mm dia. for 1.5 TR High wall Inverter/Five star rated split AC to be provided with all necessary fittings etc.The drain pipe shall be fixed to the wall by using clamps including nitrile rubber insulation with UV tape. 60 MTRS
9 9 Suitable electrical cable for 1.5 TR High wall Inverter/Five star rated split ACshall be provided for all the AC units.Necessary cabling between indoor and outdoor unit shall be provided by the agency.Payment will made as per actual measurement. 80 MTRS
10 10 Installation of 2 TR High wall Inverter/Five star rated split AC with all suitable clamping arrangement on the wall. Also, any minor civil damages to be addressed, Tools and tackles required for the work also to be considered. The work shall be as per the per Annx-I & II 2 Nos
11 11 Extra copper pipe for 2.0 TR High wall Inverter/Five star rated Split AC to be provided based on the site requirement or as directed by engineer-in-charge. The refrigerant pipe for suction and liquid line shall be insulated with Vidoflex insulation of not less than 9 mm wall thickness with UV Tape. Measurement will be consider for both the Suction and liquid line together. 20 MTRS
12 12 PVC covering pipe for 2.0 TR High wall Inverter/Five star rated split AC to be provided with all fittings like bends, elbows, tees etc. The PVC rigid pipe shall be fixed to the wall by using clamps. GI/SS screws and clamps to be used for clamping outside the building. 30 MTRS
13 13 PVC rigid drain pipe of 25 mm dia. for 2.0 TR High wall Inverter/Five star rated split AC to be provided with all necessary fittings etc. The drain pipe shall be fixed to the wall by using clamps including nitrile rubber insulation with UV tape. 30 MTRS
14 14 Suitable rated electrical cable for 2.0 TR High wall Inverter/Five star rated split AC shall be provided for all the AC units. Necessary cabling between indoor and outdoor unit shall be provided by the agency. Payment will made as per actual measurement. 40 MTRS
15 15 Installation of 2.0 TR Cassette split AC with all suitable clamping arrangement on the wall. Also, any minor civil damages to be addressed, Tools and tackles required for the work also to be considered. The work shall be carriedout out as per Annx-I & II 11 Nos
16 16 Extra copper pipe for 2.0 TR Cassette Split AC to be provided based on the site requirement or as directed by engineer in charge. The refrigerant pipe for suction and liquid line shall be insulated with Vidoflex insulation of not less than 9 mm wall thickness with UV Tape. Measurement will be consider for both the Suction and liquid line together. 165 MTRS
17 17 PVC covering pipe for 2.0 TR Cassette Split AC to be provided with all fittings like bends, elbows, tees etc. The PVC rigid pipe shall be fixed to the wall by using clamps. GI/SS screws and clamps to be used for clamping outside the building. 165 MTRS
18 18 PVC Drain pipe of 25 mm dia. for 2.0 TR Cassette Split AC to be provided with all necessary fittings etc. The drain pipe shall be fixed to the wall by using clamps including nitrile rubber insulation with UV tape 165 MTRS
19 19 Suitable rated electrical cable for 2.0 TR Cassette Split AC shall be provided for all the AC units. Necessary cabling between indoor and outdoor unit shall be provided by the agency. Payment will made as per actual measurement. 275 MTRS
20 20 Installation of 3.0 TR Cassette split AC with all suitable clamping arrangement on the wall. Also, any minor civil damages to be addressed, Tools and tackles required for the work also to be considered. The work shall be carriedout as per the Annx-I & II 2 Nos
21 21 Extra copper pipe for 3.0 TR Cassette Split AC to be provided based on the site requirement or as directed by engineer in charge. The refrigerant pipe for suction and liquid line shall be insulated with Vidoflex insulation of not less than 9 mm wall thickness with UV Tape. Measurement will be consider for both the Suction and liquid line together. 30 MTRS
22 22 PVC covering pipe for 3.0 TR Cassette Split AC to be provided with all fittings like bends, elbows, tees etc. The PVC rigid pipe shall be fixed to the wall by using clamps. GI/SS screws and clamps to be used for clamping outside the building. 30 MTRS
23 23 PVC Drain pipe of 25 mm dia. for 3.0 TR Cassette Split AC to be provided with all necessary fittings etc. The drain pipe shall be fixed to the wall/chajji by using clamps including nitrile rubber insulation with UV tape. 30 MTRS
24 24 Suitable rated electrical cable for 3.0 TR Cassette split AC units shall be provided for all the AC units. Necessary cabling between indoor and outdoor unit shall be provided by the agency. Payment will made as per actual measurement. 50 MTRS
25 25 Core cutting to be carriedout by supplier as per site requirement at any height or as per direction of Engineer in charge. Minor hole to be made on the wall/chajja/windows for refrigerant piping in between indoor and outdoor unit. The PVC pipe shall be placed on the drilled hole and cementing or POP plastering to be made surrounding the outer surface of the PVC pipe and the wall. The lintel & floor hole to be carried out by the contractor by core cutting. The required scaffolding/ladder also to be included. Core cutting payment will be made extra. 38 Nos
26 26 Testing and commissioning of High wall Inverter/Five star rates split AC to be carriedout for 24 Hrs for each AC's. Additional charging of refrigerant gas during testing to be carried out by agency.\n 6 Nos
27 27 Testing and commissioning of Cassette type split AC to be carriedout for 24 Hrs for each AC's. Additional charging of refrigerant gas during testing to be carried out by agency. 13 Nos
28 28 DG Set for commissioning of AC's shall be arranged by agency for testing and commissioining of all Split AC's as per the Annexure-II. Necessary transport shall be arranged by agency. 1 LT
29 29 Preventive maintenance to be carriedout during stipulated guarantee/warranty period of 12 months. Servcing to be done for all the equipments and components once in Four (4) Months including necessary consumables (if required any), all as specified, directed by Engineer-in-charge. Service report shall be submitted after carryingout the each Preventive maintenance. Note: Necessary tools and tackles required for carryingout maintenace to be arranged by agency.(Note : for all 19 Nos of AC's) 3 EACH
30 30 First Year Comprehensive Annual Miantenace Contarct for complete physical work including all equipments and components including all spares, compressors, refrigerant, oil, consumables, cables, wires etc., for first year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete. Note: Necessary tools and tackles required for carrying out maintenace to be arranged by agency. for all 19 Nos of AC's 1 AU
31 31 Second year Comprehensive Annual Miantenace Contarct for complete physical work including all equipments and components including all spares, compressors, refrigerant, oil, consumables, cables, wires etc., for Fourth year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete. Note: Necessary tools and tackles required for carrying out maintenace to be arranged by agency for all 19 Nos of AC's 1 AU
32 32 Third Year Comprehensive Annual Miantenace Contarct for complete physical work including all equipments and components including all spares, compressors, refrigerant, oil, consumables, cables, wires etc., for Fourth year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete. Note: Necessary tools and tackles required for carrying out maintenace to be arranged by agency for all 19 Nos of AC's 1 AU
33 33 Fourth Year Comprehensive Annual Miantenace Contarct for complete physical work including all equipments and components including all spares, compressors, refrigerant, oil, consumables, cables, wires etc., for Fourth year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete. Note: Necessary tools and tackles required for carrying out maintenace to be arranged by agency for all 19 Nos of AC's 1 AU
34 34 Fifth Year Comprehensive Annual Miantenace Contarct for complete physical work including all equipments and components including all spares, compressors, refrigerant, oil, consumables, cables, wires etc., for Fourth year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete. Note: Necessary tools and tackles required for carrying out maintenace to be arranged by agency for all 19 Nos of AC's 1 AU
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail