}

Supply And Installation , Testing And Commissioning Along With Accessories And Camc For A Period Of 05 Years For 1 . 5 Tr And 2Tr High Wall Inverter Type Split Air Conditioners For Rpsc Building , Allahabad - 03 Nos, RPSC Building , Allahabad-Uttar Pradesh

Bharat Electronics Limited-BEL has published Supply And Installation , Testing And Commissioning Along With Accessories And Camc For A Period Of 05 Years For 1 . 5 Tr And 2Tr High Wall Inverter Type Split Air Conditioners For Rpsc Building , Allahabad - 03 Nos. Submission Date for this Tender is 03-08-2019. Spare Part Tenders in RPSC Building , Allahabad Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

21180225
Supply And Installation , Testing And Commissioning Along With Accessories And Camc For A Period Of 05 Years For 1 . 5 Tr And 2Tr High Wall Inverter Type Split Air Conditioners For Rpsc Building , Allahabad - 03 Nos
Open Tender
Indian
Uttar Pradesh
RPSC Building , Allahabad
03-08-2019

Tender Details

Supply And Installation , Testing And Commissioning Along With Accessories And Camc For A Period Of 05 Years For 1 . 5 Tr And 2Tr High Wall Inverter Type Split air conditioners For Rpsc Building , Allahabad - 03 Nos , supply of 1 . 5tr high wall inverter type split ac , supply of 2tr high wall inverter type split ac , installation of 1 . 5 tr high wall inverter/five star rated split ac with all suitable clamping arrangement on the wall . also , any minor civil damages to be addressed , tools and tackles required for the work also to be considered . the work shall be as per the per annx-i & ii , copper pipe for 1 . 5tr high wall inverter/five star rated split ac to be provided based on the site requirement or as directed by engineer incharge . 3 . the refrigerant pipe for suction and liquid line shall be insulated with vidoflex insulation of not less than 9 mm wall thickness with uv tape . measurement will be consider for both the suction and liquid line together . , pvc covering pipe for 1 . 5 tr high wall inverter/five star rated split ac to be provided with all fittings like elbows , tees etc . the pvc rigid pipe shall be fixed to the wall by using clamps . gi/ss screws and clamps to be used for clamping outside the building . , cpvc ( sdr11 ) drain pipe for 1 . 5 tr high wall inverter/five star rated split ac to be provided with all fittings etc . the drain pipe of suitable size shall be provided for the indoor units . the drain pipe shall be fixed to the wall by using clamps including nitrile rubber insulation with uv tape . , suitable electrical cable for 1 . 5 tr high wall split ac shall be provided for all the ac units . necessary cabling between indoor and outdoor unit shall be provided by the agency . payment will made as per actual measurement . ll made as per actual measurement . , installation of 2 tr high wall inverter/five star rated split ac with all suitable clamping arrangement on the wall . also , any minor civil damages to be addressed , tools and tackles required for the work also to be considered . the work shall be as per the per annx-i & ii , copper pipe for 2 tr high wall inverter/five star rated split ac to be provided based on the site requirement or as directed by engineer incharge . 3 . the refrigerant pipe for suction and liquid line shall be insulated with vidoflex insulation of not less than 9 mm wall thickness with uv tape . measurement will be consider for both the suction and liquid line together . , pvc covering pipe for 2 tr high wall inverter/five star rated split ac to be provided with all fittings like elbows , tees etc . the pvc rigid pipe shall be fixed to the wall by using clamps . gi/ss screws and clamps to be used for clamping outside the building . , cpvc ( sdr11 ) drain pipe for 2 tr high wall inverter/five star rated split ac to be provided with all fittings etc . the drain pipe of suitable size shall be provided for the indoor units . the drain pipe shall be fixed to the wall by using clamps including nitrile rubber insulation with uv tape . , suitable electrical cable for 2 tr high wall split ac shall be provided for all the ac units . necessary cabling between indoor and outdoor unit shall be provided by the agency . payment will made as per actual measurement . , core cutting to be carried out by supplier as per site requirement at any height or as per direction of engineer in charge . minor hole to be made on the wall/chajja/windows for refrigerant piping in between indoor and outdoor unit . the pvc pipe shall be placed on the drilled hole and cementing or pop plastering to be made surrounding the outer surface of the pvc pipe and the wall . the lintel & floor hole to be carried out by the contractor by core cutting . the required scaffolding/ladder also to be included . core cutting payment will be made extra . , testing and commissioning of high wall inverter/five star rates split ac to be carried out for 24 hrs for each acs . additional charging of refrigerant gas during testing to be carried out by agency . , dg set for commissioning of acs shall be arranged by agency for testing and commissioning of all split acs as per the anex-ii . necessary transport shall be arranged by agency . note : for all the 03 nos of acs . , preventive maintenance to be carried out during stipulated guarantee/warranty period of 12 months . servcing to be done for all the equipments and components once in six months including necessary consumables ( if required any ) , all as specified , directed by engineer incharge . note: necessary tools and tackles required for carrying out maintenace to be arranged by agency . note : for all the 03 nos of acs . , comprehensive annual miantenace contarct for first year after the completion of warranty period , complete physical work including all equipments and components including all spares , compressors , refrigerant , oil , consumables , cables , wires , etc for first year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc . , complete . note :necessary tools and tackles required for carrying out maintenace to be arranged by agency . note : for all 03 nos of acs , comprehensive annual miantenace contract for second year after the completion of warranty period , complete physical work including all equipments and components including all spares , compressors , refrigerant , oil , consumables , cables , wires , etc for second year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc . , complete . note :necessary tools and tackles required for carrying out maintenace to be arranged by agency . note : for all the 03 nos of acs , comprehensive annual miantenace contarct for third year after the completion of warranty period , complete physical work including all equipments and components including all spares , compressors , refrigerant , oil , consumables , cables , wires , etc for third year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc . , complete . note :necessary tools and tackles required for carrying out maintenace to be arranged by agency . note : for all the 03 nos of acs , comprehensive annual miantenace contarct for fourth year after the completion of warranty period , complete physical work including all equipments and components including all spares , compressors , refrigerant , oil , consumables , cables , wires , etc for fourth year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc . , complete . note :necessary tools and tackles required for carrying out maintenance to be arranged by agency . note : for all the 03 nos of acs . , comprehensive annual maintenance contract for fifth year after completion of warranty period complete physical work including all equipments and components including all spares , compressors , refrigerant , oil , consumables , cables , wires , etc for fifth year after expiry of stipulated guarantee/warranty period all as specified and /or directed etc . , complete . note :necessary tools and tackles required for carrying out maintenance to be arranged by agency . note : for all the 03 nos of acs .

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document

BOQ Items

Sl. No. Item Description Item Code / Make Quantity Units
1 1 Supply of 1.5TR High Wall Inverter type Split AC 1 Nos
2 2 Supply of 2TR High Wall inverter type Split AC 2 Nos
3 3 Installation of 1.5 TR High wall Inverter/Five star rated split AC with all suitable clamping arrangement on the wall. Also, any minor civil damages to be addressed, Tools and tackles required for the work also to be considered. The work shall be as per the per Annx-I & II\n 1 Nos
4 4 Copper pipe for 1 .5TR High wall Inverter/Five star rated Split AC to be provided based on the site requirement or as directed by engineer incharge.3. The refrigerant pipe for suction and liquid line shall be insulated with Vidoflex insulation of not less than 9 mm wall thickness with UV Tape.Measurement will be consider for both the Suction and liquid line together. 8 Rmt
5 5 PVC covering pipe for 1.5 TR High wall Inverter/Five star rated split AC to be provided with all fittings like elbows,tees etc.The PVC rigid pipe shall be fixed to the wall by using clamps.GI/SS screws and clamps to be used for clamping outside the building. 5 Rmt
6 6 cPVC (SDR11) Drain pipe for 1.5 TR High wall Inverter/Five star rated split AC to be provided with all fittings etc.The drain pipe of suitable size shall be provided for the indoor units. The drain pipe shall be fixed to the wall by using clamps including nitrile rubber insulation with UV tape.\n 6 Rmt
7 7 Suitable electrical cable for 1.5 TR High Wall split AC shall be provided for all the AC units.Necessary cabling between indoor and outdoor unit shall be provided by the agency.Payment will made as per actual measurement.ll made as per actual measurement. 8 Rmt
8 8 Installation of 2 TR High wall Inverter/Five star rated split AC with all suitable clamping arrangement on the wall. Also, any minor civil damages to be addressed, Tools and tackles required for the work also to be considered. The work shall be as per the per Annx-I & II 2 Nos
9 9 Copper pipe for 2 TR High wall Inverter/Five star rated Split AC to be provided based on the site requirement or as directed by engineer incharge.3. The refrigerant pipe for suction and liquid line shall be insulated with Vidoflex insulation of not less than 9 mm wall thickness with UV Tape.Measurement will be consider for both the Suction and liquid line together. 17 Rmt
10 10 PVC covering pipe for 2 TR High wall Inverter/Five star rated split AC to be provided with all fittings like elbows,tees etc.The PVC rigid pipe shall be fixed to the wall by using clamps.GI/SS screws and clamps to be used for clamping outside the building. 10 Rmt
11 11 cPVC (SDR11) Drain pipe for 2 TR High wall Inverter/Five star rated split AC to be provided with all fittings etc.The drain pipe of suitable size shall be provided for the indoor units. The drain pipe shall be fixed to the wall by using clamps including nitrile rubber insulation with UV tape. 14 Rmt
12 12 Suitable electrical cable for 2 TR High Wall split AC shall be provided for all the AC units.Necessary cabling between indoor and outdoor unit shall be provided by the agency.Payment will made as per actual measurement. 17 Rmt
13 13 Core cutting to be carried out by supplier as per site requirement at any height or as per direction of Engineer in charge. Minor hole to be made on the wall/chajja/windows for refrigerant piping in between indoor and outdoor unit. The PVC pipe shall be placed on the drilled hole and cementing or POP plastering to be made surrounding the outer surface of the PVC pipe and the wall. The lintel & floor hole to be carried out by the contractor by core cutting. The required scaffolding/ladder also to be included. Core cutting payment will be made extra. 3 Nos
14 14 Testing and commissioning of High wall Inverter/Five star rates split AC to be carried out for 24 Hrs for each Acs.Additional charging of refrigerant gas during testing to be carried out by agency. 3 Nos
15 15 DG Set for commissioning of Acs shall be arranged by agency for testing and commissioining of all Split Acs as per the Anex-II.Necessary transport shall be arranged by agency.Note : for all the 03 Nos of AC's. 1 AU
16 16 Preventive maintenance to be carried out during stipulated guarantee/warranty period of 12 months.Servcing to be done for all the equipments and components once in six months including necessary consumables(if required any),all as specified,directed by engineer incharge.Note: Necessary tools and tackles required for carrying out maintenace to be arranged by agency.Note : for all the 03 Nos of AC's. 2 Each
17 17 Comprehensive Annual Miantenace Contarct for First year after the completion of warranty period, complete physical work including all equipments and components including all spares,compressors,refrigerant,oil,consumables,cables,wires,etc for first year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete.\nNote :Necessary tools and tackles required for carrying out maintenace to be arranged by agency.Note : for all 03 Nos of AC's 1 AU
18 18 Comprehensive Annual Miantenace Contract for Second year after the completion of warranty period, complete physical work including all equipments and components including all spares,compressors,refrigerant,oil,consumables,cables,wires,etc for second year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete.\nNote :Necessary tools and tackles required for carrying out maintenace to be arranged by agency. Note : For all the 03 Nos of AC's 1 AU
19 19 Comprehensive Annual Miantenace Contarct for Third Year after the completion of warranty period, complete physical work including all equipments and components including all spares,compressors,refrigerant,oil,consumables,cables,wires,etc for third year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete.\nNote :Necessary tools and tackles required for carrying out maintenace to be arranged by agency. Note : For all the 03 Nos of AC's 1 AU
20 20 Comprehensive Annual Miantenace Contarct for Fourth Year after the completion of warranty period, complete physical work including all equipments and components including all spares,compressors,refrigerant,oil,consumables,cables,wires,etc for fourth year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete.\nNote :Necessary tools and tackles required for carrying out maintenace to be arranged by agency. Note : for all the 03 Nos of AC's. 1 AU
21 21 Comprehensive Annual Miantenace Contarct for Fifth Year after completion of warranty periodcomplete physical work including all equipments and components including all spares,compressors,refrigerant,oil,consumables,cables,wires,etc for fifth year after expiry of stipulated guarantee/waranty period all as speicified and /or diredted etc.,complete.\nNote :Necessary tools and tackles required for carrying out maintenace to be arranged by agency. Note : for all the 03 Nos of AC's. 1 AU
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail