}

Supply Of Electric Energy Audit Of Assets Held On Charge Of Ge Af Bihta, GE AF BIHTA-Bihar

Military Engineer Services-MES has published Supply Of Electric Energy Audit Of Assets Held On Charge Of Ge Af Bihta. Submission Date for this Tender is 31-07-2019. Energy Audit Tenders in GE AF BIHTA Bihar. Bidders can get complete Tender details and download the document.




Tender Notice

21157901
Supply Of Electric Energy Audit Of Assets Held On Charge Of Ge Af Bihta
Open Tender
Indian
Bihar
GE AF BIHTA
31-07-2019

Tender Details

Supply Of Electric Energy Audit Of Assets Held On Charge Of Ge Af Bihta , 1 . The Following Job Work Is Required To Carry Out Electrical Energy Audit Of Assets Held On Charge Of Ge ( Af ) Bihta In Respect Of Air Force Station Bihta And Air Force Station Darbhanga Broadly Include . ( A ) Complete Survey Of The Entire Electrical Distribution Networks Starting From Main Receiving Station 33 Kv / 11Kv ( Mrs ) In Both Tachnical Areas And Domestic Areas To Include Survey Of The Facility / Plants And Their Current Energy Consumtion Pattern And Submit In Form Of A Comprehensive Survey Report . ( B ) Checking The Strength Of Primary / Secondary Aspects , Insulation Level , Power Efficiency And Power Factor . ( C ) Bench Marking Of Energy Performance And Matching Of Energy Use To The Requirement , Ways To Maxime System Efficiencies , Optimizing The Input Energy Requirement Etc . ( D ) Target To Achieve Energy Cost Reduction & Identify Energy Conservation Technologies , Retrofits Energy Audit Procedure And Aligning Current Consumption With Current Industry Benchmarks . ( E ) Investigating The Existing System To Bring Out Basic Five Aspects As Given Below :- ( I ) How Much Energy Is Being Consumed ? ( Ii ) How Is The Energy Being Consumed ? ( Iii ) Where Is The Energy Being Consumed ? ( Iv ) When Is The Energy Being Consumed ? ( V ) What Is The Quality Of The Energy Consumed ? ( F ) Give Recommendation On The Basis Of The Survey Reoprt To Include Cost Effective Measures To Optimize Energy Resources And Methods To Achieve Maximum Energy Efficiency Of All Assets Alongwith Boq / Financial Evaluation / Specificiations / Approved Brands Etc So As To Aid In Preparation Of Dpr And Conculsion Of Contracts In Near Future . Note : Areas Covered By Electrical Energy Audit ( I ) Complete Electrical Distribution Network ( Sld ) Showing Grid Sub Station With All Power Transformers And Distribution Transformers . ( Ii ) Complete Analysis Of Electrical Parameters I . E Voltage , Current , Frequency , Power Factor Etc . ( Iii ) Health Status Of All Electrical Measuring / Controlling And Tripping System Of Mrs . 2 . Details Of Electical Assets Is Attached As Appx A And Appx B However The Firm Intersted To Bid For The Subject Work Is Expected To Clear The Aspects Regarding Total Assets Once Again From Ge Before Submitting The Bid And No Representation In This Regard At The Later Stage Will Be Entertained . 3 . The Energy Audit Will Be Deemed To Considered Completed On Successful Submission Of :- ( A ) Surevey Report To Include Specific Recommendations On Each Aspect As Bought Out Above Alongwith Boqs -05 Copies , Duly Recommended By Ge And Final Technical Check And Completion Certificate From Dcwe ( E / M ) . ( B ) Full Payment Against Same Will Be Released On Completion Of Job . ( C ) Total Time Period For Completion Of Job Is 60 Days From Issue Of Job Order . For Any Further Delay , Refer To Terms And Conditions Of The Subject Quotation Is Attached As Appx C . 4 . Report Will Be Submitted Separtely For Af Stn Bihta & Af Stn Darbhanga .

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
INR 1.50 Lakhs /-

BOQ Items

Item Description Item Code / Make Quantity Units
1 1. The following job work is required to carry out Electrical Energy Audit of assets held on charge of GE (AF) Bihta in respect of Air Force Station Bihta and Air Force Station Darbhanga broadly include. \n(a) Complete survey of the entire electrical distribution networks starting from main receiving station 33 KV/11KV (MRS) in both tachnical areas and domestic areas to include survey of the facility/plants and their current energy consumtion pattern and submit in form of a comprehensive survey report.\n(b) Checking the strength of primary/secondary aspects, insulation level, power efficiency and power factor.\n(c) Bench marking of Energy performance and Matching of energy use to the requirement, ways to maxime system efficiencies, Optimizing the input energy requirement etc.\n(d) Target to achieve energy cost reduction & Identify energy conservation technologies, retrofits Energy Audit procedure and aligning current consumption with current Industry Benchmarks.\n(e) Investigating the existing system to bring out basic five aspects as given below :- \n(i) How much energy is being consumed? (ii) How is the energy being consumed? (iii) Where is the energy being consumed? (iv) When is the energy being consumed? (v) What is the quality of the energy consumed? \n(f) Give Recommendation on the basis of the survey reoprt to include cost effective measures to optimize energy resources and methods to achieve maximum energy efficiency of all assets alongwith BOQ/financial evaluation/specificiations /approved brands etc so as to aid in preparation of DPR and conculsion of contracts in near future.\nNote : Areas covered by Electrical Energy Audit \n(i) Complete Electrical Distribution network (SLD) showing grid sub station with all power transformers and distribution transformers. \n(ii) Complete analysis of electrical parameters i.e voltage, current, frequency, power factor etc.\n(iii) Health status of all electrical measuring/controlling and tripping system of MRS.\n2. Details of Electical Assets is attached as Appx 'A' and Appx 'B' however the firm intersted to bid for the subject work is expected to clear the aspects regarding total assets once again from GE before submitting the bid and no representation in this regard at the later stage will be entertained. \n3. The Energy Audit will be deemed to considered completed on successful submission of :-\n(a) Surevey report to include specific recommendations on each aspect as bought out above alongwith BOQ's -05 copies, duly recommended by GE and final technical check and completion certificate from DCWE (E/M).\n(b) Full payment against same will be released on completion of job.\n(c) Total time period for completion of job is 60 days from issue of job order. for any further delay, refer to Terms and conditions of the subject quotation is attached as Appx 'C'.\n4. Report will be submitted separtely for AF Stn Bihta & AF Stn Darbhanga. 1 Job
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail