| 1 | 1 | Chequered precaasst cement Concreate tiles 22mm thick in foothpath courtyard do- do all compiot light shade pigmment wing white cement . | BI01010001010000000000000515BI0100001112 | 1634.87 | m2 |
| 2 | 2 | Providing and laying 25 mm thick Whitemakan marble stone slab florring -do-do- allcomplete job. | BI01010001010000000000000515BI0100001113 | 144.28 | m2 |
| 3 | 3 | Providing and laying polished granite stone flooring in reqired designand patterns in liner wall as carvilinear partion -do-do- allcomplete job | BI01010001010000000000000515BI0100001114 | 114.74 | m2 |
| 4 | 4 | Steel work welded in built up sections framed work -do-do- allcomplete job. In gratings ,frames guard bar ladder reiling brackets gates and similar work | BI01010001010000000000000515BI0100001115 | 1248 | kg |
| 5 | 5 | E/W in excavation in foundation of foundation with hard soil -do-do- all complete job | BI01010001010000000000000515BI0100001116 | 158.27 | m3 |
| 6 | 6 | Providing coarse clean local SAND IN FILLING in foundation trenches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and 1.5 M lifts including cost of all materials, labours, royalty and taxes all complete as per building specification and direction of Engineer Incharge (Mode of measurement compacted volume | BI01010001010000000000000515BI0100001117 | 105.51 | m3 |
| 7 | 7 | Providing designation 75-B, BRICK FLAT SOLING joints filled with local sand including cost of watering,taxes and royalty all complete as per building specification and direction of Engineer Incharge. (5.6.1) | BI01010001010000000000000515BI0100001118 | 691.91 | m3 |
| 8 | 8 | Providing P.C.C. M-10 with nominal mix of (1:2:4) in Foundation and plinth with approved quality of stone metal grade III -do-do- all complete job | BI01010001010000000000000515BI0100001119 | 105.51 | m3 |
| 9 | 9 | Dismatling Pucca Brick work -do-do- all complete job | BI01010001010000000000000515BI0100001120 | 3.765 | m3 |
| 10 | 10 | Providing designation 75 B BRICK WORK in CM. (1:6) in SUPERSTRUCTURE with approved quality of clean coarse & of F.M. 2.5 including providing 10mm thick mortar joints cost of screening,racking out joints to 15 mm depth,curing, taxes and royalty all complete as per building specification and direction of Engineer Incharge. | BI01010001010000000000000515BI0100001121 | 12.7 | m3 |
| 11 | 11 | Providing 12 mm Thk. cement plaster(1:6) on inside walls with clean course sand of FM-1.5 including screening, curing with all leads & lifts of water, scaffolding taxes & royalty all complete as per building specification and direction of E/I. | BI01010001010000000000000515BI0100001122 | 44.31 | m2 |
| 12 | 12 | Providing two coats of snow cement over a coat of cement primer over new surface including preparing the plastered surface by rubbing smooth with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification and direction of E/I. (5.8.18) | BI01010001010000000000000515BI0100001123 | 44.31 | M2 |
| 13 | 13 | Providing two coats of snow cement over a coat of cement primer over Old surface including preparing the plastered surface by rubbing smooth with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification and direction of E/I. (5.8.18) | BI01010001010000000000000515BI0100001124 | 138.58 | m2 |
| 14 | 14 | Providing two coats of dry distemper of approved shade and make over a coat of cement primer over new surface including preparing the plastered surface by rubbing smooth with pumice stone or fine sand paper applying putty wherever required scaffolding washing of floors and taxes all complete as per building specification and direction of E/I. | BI01010001010000000000000515BI0100001125 | 84.49 | m2 |
| 15 | 15 | Providing 2 coats of SYNTHETIC ENAMEL PAINT of approved shade and make over STEEL SURFACE grills& railings including cleaning the surface thoroughly scaffolding and taxes all complete as per building specification and direction of E/I. | BI01010001010000000000000515BI0100001126 | 27.88 | m2 |
| 16 | 16 | Providing and Lying 25mm thick Kotah stone slab flooring do-do- you all complete job | BI01010001010000000000000515BI0100001127 | 35.13 | m2 |
| 17 | 17 | Providing and Lying 25mm thick Kotah stone tiles in rises of steps skirting do-do- you all complete job | BI01010001010000000000000515BI0100001128 | 5.58 | m2 |
| 18 | 18 | Supply of angel of size 65*65*6mmdo-do- you all complete job | BI01010001010000000000000515BI0100001129 | 2.84339 | mt |
| 19 | 19 | labour for fabrication erecting hosting and fixing inpostion structure steel work do-do- you all complete job | BI01010001010000000000000515BI0100001130 | 2.84339 | m2 |
| 20 | 20 | Providing and fixing precoated galvanis steel sheet roofing accessories do- you all complete job | BI01010001010000000000000515BI0100001131 | 60.975 | m3 |
| 21 | 21 | CARRIAGE OF MATERIALS \nA) Local SAND ,LEAD - 3 km | BI01010001010000000000000515BI0100001132 | 105.51 | m3 |
| 22 | 21.1 | B) SAND ,LEAD - 5 km | BI01010001010000000000000515BI0100001133 | 62.87 | m3 |
| 23 | 21.2 | C) STONE CHIPS , LEAD - 15 KM. | BI01010001010000000000000515BI0100001134 | 94.87 | CU.M |
| 24 | 21.3 | D) BRICKS , LEAD- = 08 km | BI01010001010000000000000515BI0100001135 | 27.645 | TH. |
| 25 | 22 | Goods & Services Tax (G.S.T.) - 12% | BI01010001010000000000000515BI0100001136 | 3.51787e+06 | Rs. X |
| 26 | 23 | Labour Cess - 1% | BI01010001010000000000000515BI0100001138 | 3.94001e+06 | Rs. X |