Supply , Engineering , Procurement Construction And Commissioning Of 100 Tons Per Day Cattle Dung To Biogas Plant At Hingonia Gaushala , Jaipur , Rajasthan, Hingonia-Rajasthan

Indian Oil Corporation Limited-IOCL has published Supply , Engineering , Procurement Construction And Commissioning Of 100 Tons Per Day Cattle Dung To Biogas Plant At Hingonia Gaushala , Jaipur , Rajasthan. Submission Date for this Tender is 12-08-2019. Bio Gas Plant Tenders in Hingonia Rajasthan. Bidders can get complete Tender details and download the document.




Tender Notice

21133074
Supply , Engineering , Procurement Construction And Commissioning Of 100 Tons Per Day Cattle Dung To Biogas Plant At Hingonia Gaushala , Jaipur , Rajasthan
Open Tender
Indian
Rajasthan
Hingonia
12-08-2019

Tender Details

Supply , Engineering , Procurement Construction And Commissioning Of 100 Tons Per Day Cattle Dung To Biogas Plant At Hingonia Gaushala , Jaipur , Rajasthan

Key Value

Document Fees
Refer document
EMD
INR 1247595.0 /-
Tender Value
Refer document

BOQ Items

Sl. No. Item Description Item Code / Make Quantity Units
1 1 SUPPLY PART (SP-1) Price of Materials indicated under this part (at Sl. No. 1 ) shall not exceed 65% (Sixty five percent) of Lump sum Price as per SCC-Part B clause 1.h). Refer Clause 1.k of SCC-Part B of tender before filling the prices)\nSupply of all materials required for permanent incorporation to set up the UNIT/ Works complete in all respects including commissioning and taking in line 100TPD cattle dung to Biogas facilities made up as follows: item1
2 1.01 MATERIAL HANDLING PACKAGE (FEED HOPPER/CONVEYOR/SHREDDER ETC.,) item2 1 Lump-sum
3 1.02 TANKS item3 1 Lump-sum
4 1.03 DIGESTORS & PRE-DIGESTORS item4 1 Lump-sum
5 1.04 PUMPS item5 1 Lump-sum
6 1.05 AGITATORS item6 1 Lump-sum
7 1.06 BLOWERS item7 1 Lump-sum
8 1.07 GAS HOLDER BALLOONS item8 1 Lump-sum
9 1.08 SCREW EXTRUDER (PRESS) item9 1 Lump-sum
10 1.09 FLARE SYSTEM PACKAGE item10 1 Lump-sum
11 1.1 Any other item if not covered above but required for the successful completion of work as per best engineering practices excluding gas compressor & purification package item11 1 Lump-sum
12 2 SERVICES PART (SP-2) Charges for Services required for permanent incorporation to set up the UNIT/ Works complete in all respects including testing, commissioning and taking in line 100TPD cattle dung to Biogas facilities AGAINST SP-1.1 for 100TPD cattle dung to Biogas facilities, made up as follows: item12
13 2.01 Detailed design and Engineering as per Contract Documents. (Price of services indicated under this shall not exceed 10% of SP-2)\n item13 1 Lump-sum
14 2.02 INSTALLATION AND COMMISSIONING SERVICES ETC. \nProviding services for pre-fabrication, fabrication, erection, construction, installation, testing, pre-commissioning, mechanical completion, commissioning required for completing and establishing all materials provided against SP-1 100TPD cattle dung to Biogas facilities as a fully functional and operative Unit, including (but not limited to) providing all labors and manpower, resources, transportation, store management, construction equipment, tools, tackles and aids, safety devices, testing devices, facilities, utilities, communication systems, material and other reconciliations, handing over of final drawings / documents / manuals, obtaining and satisfying all statutory licenses, clearances, consents, no objections, approvals and certificates and complying with all statutory formalities etc. And all other services whatsoever required for completing the works in all respects in accordance with the contract documents of the plant as per bidding documents and Direction of Engineer-in-charge.\n\n item14 1 Lump-sum
15 2.03 General Civil and Architectural Works\n item15 1 Lump-sum
16 2.04 Structural Works item16 1 Lump-sum
17 2.05 Complete testing of the whole facilities under as per the standard procedures in line with tender documents\n item17 1 Lump-sum
18 2.06 Construction Material (Cement, Unit Reinforcement Steel, Painting, etc)\n item18 1 Lump-sum
19 2.07 Any other service if not covered above but required for the completion of work (Bidder to identify) item19 1 Lump-sum
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail