Tender For Dry Dock Repair Of Csd Shipra
Tender Value
10.86 Lakhs
Estimated cost
Bid Submission
02 Aug 2019
0 days left
EMD
21720
Bank guarantee accepted
Document Fee
5000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Kolkata → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
tender for Dry Dock Repair Of Csd Shipra
BOQ
| Sl.No. | Item Description | Item Code / Make | Quantity | Units | |
|---|---|---|---|---|---|
| 1 | 1 | Beaching , blocking, unblocking including dock hire /mooring charges for repair of vessel as required . | BI01010001010000000000000515BI0100001124 | 1 | comp. Job |
| 2 | 2 | Ultrasonic testing to be done of hull, deck plate & LWL ship side plate, etc for checking of thickness as per direction of IWT Surveyor / EIC. | BI01010001010000000000000515BI0100001125 | 400 | SPOT |
| 3 | 3 | Cropping & renewal of under water & deck plate etc with steel thickness as per drawing as required after ultrasonic testing & its report as per direction of IWT Surveyor/ EIC. | BI01010001010000000000000515BI0100001126 | 1 | TON |
| 4 | 4 | Sea chest, Mud Box, Stainer to be checked, repaired, cleaned and painted as required as per direction of IWT Surveyor/ EIC. | BI01010001010000000000000515BI0100001127 | ||
| 5 | 4.1 | Labour charges | BI01010001010000000000000515BI0100001128 | 4 | no. |
| 6 | 5 | All Sea water valves, Fresh water valves, fire water valves to be pressure tested with and serviced / renewed as per direction of EIC /surveyor.(82 no.s) | BI01010001010000000000000515BI0100001129 | ||
| 7 | 5.1 | Labour charges | BI01010001010000000000000515BI0100001130 | 1 | comp. Job |
| 8 | 5.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001131 | ||
| 9 | 6 | All HSD valves(20 Nos.), LO valves(1 Nos.) and its entire pipe line to be serviced / renewed as per direction of EIC / surveyor. | BI01010001010000000000000515BI0100001132 | ||
| 10 | 6.1 | Labour charges | BI01010001010000000000000515BI0100001133 | 1 | comp. Job |
| 11 | 6.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001134 | ||
| 12 | 7 | Cleaning and painting of bilges with one coat primer and 2 coats of marine quality paints as per direction of EIC/Surveyor. | BI01010001010000000000000515BI0100001135 | 1 | comp. Job |
| 13 | 8 | Repair and servicing of gland cooling pump(Make= Kirloskar,Capacity=17 ltr/s, Input Power=18.5 KW, Speed=1500 rpm, Total head=180m) of dredge pump unit to make oprational with renewal of spares. All plumber block with bearings of pump and belt adjustment pulley needs to be checked and necessary repair/replacement to be carried out as required as per direction of EIC/Surveyor. | BI01010001010000000000000515BI0100001136 | ||
| 14 | 8.1 | Labour charges | BI01010001010000000000000515BI0100001137 | 1 | no. |
| 15 | 8.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001138 | ||
| 16 | 9 | InAll hydraulic lines to be checked and leakage to be arrested with renewal of its gaskets, seals, o-rings, high pressure hoses, solenoid, emergency hydraulic system, sensors etc as required and make leak proof and ensure air free operation as per direction of EIC/ Surveyor.The glass of the Quick Closing Valve enclosure boxes are broken and to be replaced.The Emergency hydraulic pump is non operational as the control switch relay is reportedly not working and to be repaired to make operational. Also fill up the hydraulic oil in the tank as well as make operational of all hydraulic lines and ensure air free operation as per direction of EIC/ Surveyor. | BI01010001010000000000000515BI0100001139 | ||
| 17 | 9.1 | Labour charges | BI01010001010000000000000515BI0100001140 | 1 | comp. Job |
| 18 | 9.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001141 | ||
| 19 | 10 | Down/major overhauling of generator engine model no. 4R1040T, make - Kirlosker , Capacity: 82 HP, Speed :1500 RPM 50 KVA (Running hours - 12888 hrs ) is to be done, cooler to be cleaned, tappet, silencer, checking of exhaust line etc as required as per direction of EIC/ Surveyor. | BI01010001010000000000000515BI0100001142 | ||
| 20 | 10.1 | Labour charges | BI01010001010000000000000515BI0100001143 | 1 | no. |
| 21 | 10.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001144 | ||
| 22 | 11 | Entire electrical/electronics, AC/DC line, panel of engine room, wheel house, accomodation (lights, fans etc) ,engine room (including emergency lights), general alarm bell, D.C. horn, air horn, battery charger, switch boards, sensor, lighting, navigational lights, search light, fire alarm, hooter, siren, bed light, table light, light cover, exhaust fan & other fittings etc. are to be checked and rectified the defects as required, with renewal of required materials. Line & wiring to be checked and serviced/ repaired. | BI01010001010000000000000515BI0100001145 | ||
| 23 | 11.1 | Labour charges | BI01010001010000000000000515BI0100001146 | 1 | comp. Job |
| 24 | 11.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001147 | ||
| 25 | 12 | Auxialiary spud guard/bracket (made of 2 nos. pipe of dia=3.5 inch, lenght=07 ft 4'' and other structural members) is damaged.The structural members to be cut, refabricated and welded as per initial condition includin labor and materials as required as per direction of EIC/Surveyor. | BI01010001010000000000000515BI0100001148 | 1 | comp. Job |
| 26 | 13 | Greasing lines points/nipples and grease pump of dredge pump(Make-Woerner, Type:PMF-B)to be repaired with renewal of spare parts as required as per direction of EIC/Surveyor. All grease lines to be checked and repaired with renewal of its pipe, adaptor, nozzle, tube, coupling nut, connector, screw sleeve, coupler, grease pump and nipple etc as required as per direction of EIC/ Surveyor. | BI01010001010000000000000515BI0100001149 | ||
| 27 | 13.1 | Labour charges | BI01010001010000000000000515BI0100001150 | 1 | comp. Job |
| 28 | 13.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001151 | ||
| 29 | 14 | One no. attach bathroom's all accessories i.e taps, showers, comode top & cover, flush tank, door & locker locks, valves, flushing tank pipe, complete wash basin, mirror etc and fitments etc to be renewed as required and ensure leakage proof of water. The galley,cabin basin tap, sink and other fitting also to be checked, repaired/renewed as required as per direction of EIC/Surveyor. | BI01010001010000000000000515BI0100001152 | ||
| 30 | 14.1 | Labour charges | BI01010001010000000000000515BI0100001153 | 1 | comp. Job |
| 31 | 14.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001154 | ||
| 32 | 15 | Supply of fire hose (Length-20 m, dia-2.5 inch) as required as per direction of EIC/Surveyor. | BI01010001010000000000000515BI0100001155 | 2 | no. |
| 33 | 16 | One air vent (Height-07 ft 4'', dia-5'') of HSD tank was broken and damaged from foundation the same has to be fixed/restored and strengthening of structure to make operational including labour charges and materials cost as required as per direction of EIC/ Surveyor. | BI01010001010000000000000515BI0100001156 | 1 | comp. Job |
| 34 | 17 | Repairing of battery box (4' 10'' X 3' 3'' X 1' 9'') including labor and materials with all accessories and strengthening of structure including labour charges and materials cost as required as per direction of EIC. | BI01010001010000000000000515BI0100001157 | 1 | comp. Job |
| 35 | 18 | Fairing & cropping damaged railing pipe and stand(MS flat bar) to be straightened, welded, providing nut-bolts and railing to be cut in necessary manner, including labour & material cost as required as per direction of EIC/Surveyor. | BI01010001010000000000000515BI0100001158 | 10 | RM |
| 36 | 19 | All gauges/indicators to be checked and replaced in wheel house, engine room, deck, pump room etc. | BI01010001010000000000000515BI0100001159 | ||
| 37 | 19.1 | Labour charges | BI01010001010000000000000515BI0100001160 | 1 | comp. Job |
| 38 | 19.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001161 | ||
| 39 | 20 | Carriage distance and alignment to be calibrated with wheel house (distance sensor to be renewed and I no. spare to be provided) as required as per direction of EIC/ Surveyor. | BI01010001010000000000000515BI0100001162 | ||
| 40 | 20.1 | Labour charges | BI01010001010000000000000515BI0100001163 | 1 | comp. Job |
| 41 | 20.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001164 | ||
| 42 | 21 | Dredge pump to be opened & fitted after renewal of its seals etc, and necessary repairs of dredgepump/ casing/ impeller is to be done with remetalling, welding, plastic carbide or other means as required as per direction of EIC/ Surveyor. | BI01010001010000000000000515BI0100001165 | ||
| 43 | 21.1 | Labour charges | BI01010001010000000000000515BI0100001166 | 1 | comp. Job |
| 44 | 21.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001167 | ||
| 45 | 22 | Servicing and repair of GPS power, VHF, SCM talk back system, with renewal of spares as required as per direction of EIC/ Surveyor. To check and service/ repair of computer , GPS power, VHF, SCM talk back system, air horn, battery charger, both side CT board, etc with renewal of spares as required as per direction of EIC/ Surveyor. | BI01010001010000000000000515BI0100001168 | ||
| 46 | 22.1 | Labour charges | BI01010001010000000000000515BI0100001169 | 1 | comp. Job |
| 47 | 22.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001170 | ||
| 48 | 23 | PLC control system(Make- Daemon) of dredger is out of order the same has to be rewired, repaired and redrawn to make operational with existing one. By synchronizing with PC and all functions/operation like winch, spud etc and other command from wheel house. With renewal of spares/accessories as required as per direction of EIC/Surveyor. | BI01010001010000000000000515BI0100001171 | ||
| 49 | 23.1 | Labour charges | BI01010001010000000000000515BI0100001172 | 1 | comp. Job |
| 50 | 23.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001173 | ||
| 51 | 24 | All blowers including motors to be serviced, repaired with renewal of spares as required as per direction of EIC/ Surveyor. | BI01010001010000000000000515BI0100001174 | ||
| 52 | 24.1 | Labour charges | BI01010001010000000000000515BI0100001175 | 3 | no. |
| 53 | 24.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001176 | ||
| 54 | 25 | Main spud and Auxiliary spud clamp cylinder housing to be aligned for free movement as required as per direction of EIC/ Surveyor. | BI01010001010000000000000515BI0100001177 | ||
| 55 | 25.1 | Labour charges | BI01010001010000000000000515BI0100001178 | 1 | comp. Job |
| 56 | 25.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001179 | ||
| 57 | 26 | The AVR of the of 3 phase alternator Make:Crompton Greaves,61 KW (50 KVA),415V, 1500 rpm of Main Generator(with auxuiliary engine) is malfunctioning. The servicing of the AVR and alternator, heat varnishing, megger testing etc is to be done to with renewal of necessary spare parts as required as per direction of EIC/ Surveyor. | BI01010001010000000000000515BI0100001180 | ||
| 58 | 26.1 | Labour charges | BI01010001010000000000000515BI0100001181 | 1 | comp. Job |
| 59 | 26.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001182 | ||
| 60 | 27 | Inter cooler(box) system for all running machinery and equipment(i.e. gear box(dredge pump) & hydraulic system) required to be chemically clean, renewal of tube and pressure tested with renewal of spares as required as per direction of EIC/ surveyor. | BI01010001010000000000000515BI0100001183 | ||
| 61 | 27.1 | Labour charges | BI01010001010000000000000515BI0100001184 | 2 | no. |
| 62 | 27.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001185 | ||
| 63 | 28 | Air Compressors Atlas Copco, Type: Reciprocating, Model: LT 7-30, Capacity: 20Cu.m/hr@30bar to be top overhauled with renewal of spare parts and made operational as required with engage/disengage to drive motor. Also renew the electric starter, pressure gauge, solenoid switches, clutch and other accessories e.g. control unit etc. as required as per direction of EIC/ surveyor. | BI01010001010000000000000515BI0100001186 | ||
| 64 | 28.1 | Labour charges | BI01010001010000000000000515BI0100001187 | 2 | no. |
| 65 | 28.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001188 | ||
| 66 | 29 | Servicing and repair of sea water pump as required as per direction of EIC/ surveyor. | BI01010001010000000000000515BI0100001189 | ||
| 67 | 29.1 | Labour charges | BI01010001010000000000000515BI0100001190 | 1 | no. |
| 68 | 29.2 | Cost of spares ( Actual bill/invoice + 10%) | BI01010001010000000000000515BI0100001191 | ||
| 69 | 30 | Fire extinguisher to be hydraulic tested, refilled with same refilling materials and made operational after renewal of accessories, certificate is to be produced as required as per direction of Surveyor/ EIC. | BI01010001010000000000000515BI0100001192 | ||
| 70 | 30.1 | DCP 5 KG | BI01010001010000000000000515BI0100001193 | 3 | no. |
| 71 | 30.2 | Mechanical foam type 9 Ltr AFFF | BI01010001010000000000000515BI0100001194 | 5 | no. |
| 72 | 30.3 | Liquid Co2 9 kg | BI01010001010000000000000515BI0100001195 | 1 | no. |
| 73 | 30.4 | DCP 9 KG | BI01010001010000000000000515BI0100001196 | 2 | no. |
AI Tender Summary
Tender Timeline
Jul 22, 2019
11:30 IST
Tender Published
Tender notice published.
CompletedAug 02, 2019
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedAug 03, 2019
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender