South Eastern Coalfields Limited-SECL has published Extension Of Lt Overhead Line Around The Periphery Of New Working Patch For Lighting Purpose At Chhal Ocm Of Secl , Raigarh Area . . Submission Date for this Tender is 05-08-2019. Overhead Line Tenders in raigarh Chhattisgarh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description | Item Code / Make | Quantity | Units | |
---|---|---|---|---|---|
1 | 1 | Erection of metallic pole of following length in cement concrete 1:3:6 (1 cement : 3 coarse sand :6 graded stone aggregate 40 mm nominal size) foundation including excavation and refilling etc. as required. Above 8 mtrs upto 10 mtrs | 69 | no's | |
2 | 2 | Supplying & erection of stay set complete (Galvanised) with 19/20 mm dia x 1.8 meters long stay rod, anchor plate of size 45cm x 45cm x 7.5mm thick,thimble,stay clamp, turn buckle(20mm x 600mm),7/4.00mm dia G.I stay wire and 11KV strain insulator etc in cement concrete 1:3:6(1 cement: 3 coarse sand: 6 graded stone aggregate 40mm nominal size) foundation including excavation and refilling and secured with holding clamps,bolts,nuts,etc as required. | 30 | set | |
3 | 3 | Supplying of channel iron 75mm x40mm x 6 mm(7.14 kg per meter) cross arm for 4 wire overhead line complete with clamps clamps,bolts,nuts and washers including drilling holes for insulator pins etc (as per drawing) and painting with primer and finish paint as required. | 46 | set | |
4 | 4 | Supplying and erection of 75mm X 90mm shackle insulator with G.I. Bolts, Nuts and straps etc as required. | 198 | no's | |
5 | 5 | Erection of angle iron/channel iron,cross arm on wood/RCC/ steel tubular/rail/PCC pole etc. as required. | 102 | set | |
6 | 6 | Supplying of two lengths of channel iron 75mm x 40mm x6 mm(7.14 kg per meter)double pole cross arm for three wire 11KV overhead line conductors complete with through bolts and nuts for clamping to the poles, 50mm x 6mm M.S flats welded on one side to the channel iron and with bolts and nutson the other side for tying the cross arms together,including drilling holes for insulator pins,bolts, nuts etc and painting with primer and finish paint as required. | 20 | set | |
7 | 7 | Erection of double pole 3 wire cross arm for 11KV/22KV/33KV overhead lines as required | 20 | set | |
8 | 8 | Erection of ACSR conductor of 7/2.11 mm to 7/3.00 mm diameter including binding etc. as required. Length=2.2 km 3conductor in 40M span=2200*3= 6600 m | 6.6 | km | |
9 | 9 | Supplying and fixing MV horn gap lightning arrestor as required. | 6 | no's | |
10 | 10 | Supply of 6/8SWG G.I wire for running earth Length=2.2km weight =0.12*2200= 264kg | 264 | kg | |
11 | 11 | Erection of 8 SWG G.I wire including Binding etc..as required for running earth. | 264 | kg | |
12 | 12 | supply of angle iron bracket(50x50x6mm),65cm long for running earth & Light fixture | 56 | no's | |
13 | 13 | supply of clamps,nuts& bolts etc for running earth bracket | 56 | no's | |
14 | 14 | Earthing with G.I. earth pipe 4.5 metre long, 40 mm dia including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe etc. with charcoal/ coke and salt as required. | 4 | no's | |
15 | 15 | Total impact of GST for the purpose of CTC | 1 | Nos |