Construction Of Second Floor Over Existing First Floor At Ncwb, Btm Layout, Bengaluru. -Dismantling Weather Proof Course, Tile Work, Bbm, Plastering, M25 Rcc, Centering Farm Work, Rcc Roof, M20 Cc, Rcc Chejja, Tmt Steel, Light Weight Concrete, Light Weight Concrete Block Wall, Flush Doors, Grp Doors Frame, Aluminium Window, Ss Railing, Plaster Mesh, Ceiling Plastering, Inside And Outside Plastering, Lime Rendering, Plastic Emulsion Paint, Rough Plastering, Glazed Tiles Daadoing, Vitrified Tiles Flooring, Ceramic Tiles Flooring, Granite Flooring For Stair Case, Texture Paint, Wall Putty, Antifungal Paint, Wood Primer, Enamel Paint, Expanded Metal Work, Dismantling Structure, M20 Plain Cc, Iso Water Proof Sealer, Water Proofing For Toilets, European Water Closet, Wash Basin, Mirrors, Towel Rail, Ms Stay, Pedestal For Wash Basin, Gratings, Nahani Trap, Hdpe Pipe, Brass Bib Cock, Brass Stop Cocok, Brass Gate Valve, Brass Ball Valve, Pvc Connection Pipe, Water Tanks, Pillar Cocks, Cpvc Pipe, Wooden Ward Robe, 2 Legged Scaffolding, Venetion Blinds, Work Station, Ms Gate, False Ceiling, Acoustic Veneer Paneling, Mobile Pedestal Unit, Aluminium Partition, Aluminium Doors, Standing Table, Meeting Table, And Electrification Works Etc.=> Open