}

Supply, Installation And Commissioning Of Bulk Water Meter Including Construction Of R.C.C Chamber And Ms Kiosk For Housing The Water Meter And Peripherals For Water Supply Service Connection For Bengal Ultimate Resorts Llp At Plot No.-11E-9/1. Aa-Ll Und, kolkata-West Bengal

Public Health Engineering Department has published Supply, Installation And Commissioning Of Bulk Water Meter Including Construction Of R.C.C Chamber And Ms Kiosk For Housing The Water Meter And Peripherals For Water Supply Service Connection For Bengal Ultimate Resorts Llp At Plot No.-11E-9/1. Aa-Ll Und. Submission Date for this Tender is 17-07-2019. Gardening Tenders in kolkata West Bengal. Bidders can get complete Tender details and download the document.




Tender Notice

20998770
Supply, Installation And Commissioning Of Bulk Water Meter Including Construction Of R.C.C Chamber And Ms Kiosk For Housing The Water Meter And Peripherals For Water Supply Service Connection For Bengal Ultimate Resorts Llp At Plot No.-11E-9/1. Aa-Ll Und
Open Tender
NCB
West Bengal
Kolkata
17-07-2019

Tender Details

Supply, Installation And Commissioning Of Bulk Water Meter Including Construction Of R.C.C Chamber And Ms Kiosk For Housing The Water Meter And Peripherals For Water Supply Service Connection For Bengal Ultimate Resorts Llp At Plot No.-11E-9/1. Aa-Ll Under New Town Kolkata Water Supply Divn. -I Of Ntk Project 2. Different Diameter Laying Of Ms Pipe Along With Fitting And Fixing Of Specials At Tank No.1 And Near Plot No.Ac-196 And Other Ancillaiy Works In Aa-I Of N.T.K Project Under New Town Kolkata W/S. Divn.-I, P.H.E. 3. Construction Of Stamped Road For Internal Pathway Infront Of Petra Jordon & Back Side Of China Wall At Replica Of The Seven Wonders Within The Eco-Tounsm Park Under New Town Kolkata W/S Division-I, P.H.E. Dte. 4. Day To Day Survey Work Using Total Station Theodolite & Auto Level Instruments And Other Moderate Instruments, Machinery Alongwith Necessary Skilled / Unskilled Personel, Tools And Plants And Machinery All Complete For Providing Phe Services At Auction Area-i,ii and iii of new town for the period of 01.08.2019 to 30.11.2019 5. Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the at Water Treatment Plant site (Main gate) beside Administrative Building, WTP back side gate under New Town Kolkata Water Supply Project (AA -I) for the period from 01.08.2019 to 30.09.2019.(2 months) 6. Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the Head Work Site Zone-V cum Stackyard-1 (Tank No-05) under New Town Kolkata Water Supply Project (AA —1) for the period from 01.08.2019 to 30.11.2019 (4 months) 7. Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the Head Work Site Zone-VI cum Stackyard-2 (Tank No-06) under New Town Kolkata Water Supply Project (AA -I) for the period from 01.08.2019 to 30.11.2019 (4 months) 8. Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the O.H.R. site including D.P.S. of AA- UC (Tank No. 13) under New Town Kolkata Water Supply Project (AA-IT) for the period from 01.08.2019 to 30.11.2019. (Stack Yard 4) (4 months) 9. Engagement or security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the Booster Station-I (AA-I-D) for the period from 01.08.2019 to 30.11.2019. (4 months) 10. Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the Head Work Site Zone-X under Stackyard-3 (Tank No-lO) under New Town Kolkata Water Supply Project (AA —1) to for the period from 01.081019 to 30.11.2019 (4 months)Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the OHR. site at Zone-V I including SLS. / D.PS. or AA- Hi) (Tank No. 12) unler New Town Kolkata Water Supply Project (AA-1J) for the period from 01.08.2019 to 30.11.2019. (4 months) 11. Engagement or secudity personnel for guarding of Govt. materials and other valuable fixed and movable assets of the O.H.R. site at Zone-V of AA-iID (Tank No. 11) and guarding of pipes and specials at SiT site of AA-IIC under New Town Kolkata Water Supply Project (AA-LI) for the period from 01.08.2019 to 30.11.2019. (4 months) 12. Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the Head Work site including S.L.S./D.P.S.-VII of CBD Area under New Town Kolkata Water Supply Project (AA-IT) for the period from 01.082019 to 30.11.2019. (4 months) 13. Engagement of security personnel for guarding of Govt. materials and other valuable lixed and movable assets of the Head Work site including S.L.S. / D.P.S. of AA-IIG (Tank No. 18) under New Town Koilkata Water Supply Project (AA-Ii) for the period from 01.08.2019 to 30.11.2019. (Stack Yard 5) (4 months) 14. Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the O.H.R. site at Zone-N of AA-ILB and Jatragachi R.R. Plot (Tank No. 15) under New Town Kolkata Water Supply Project (AA-ll) for the pediod from 01.08.2019 to 30.11.2019 15. Engagement of security personnel for guarding of Govt. materials and other valuable fixed and movable assets of the O.H.R. site at Zone-IV of AA-I1E and Jatragachi R.R. Plot (Tank No. 15) under New Town Kolkata water Supply Project (AA-U) for the period from 01 .08.2019 to 30.11.2019 (4 months) 16. Operation & Maintenance of various dia D.I./M.S. W/S Pumping Main in AA-I (irom CWR within WTP Campus upto Zone-I to Zone-Vu & from BS-I to Zone-IX to ZoneX )) including flow balancing in reservoir, minor repairing of valve/pipeline/specials . De-watering of pipeline and trench as required and other related ancilliary works from 01.08.2019 to 30.11.2019 ( 4 months) in NTK Project under P.H.E. Dte. 16. Operation & Maintenance of various dia D.I./M.S. W/S Pumping Main in AA-II (from BS-I to AA-II and CBD area)includiing flow balancing in reservoir, minor repairing of valve/pipeline/specials , De-watering of pipeline and trench as required and other related ancilliary works from 01.08.20 19 to 3030.11.2019 (4 months) in NTK Project under P.H.E. Dte 30.11.2019 in ntk project under 17. Operation & Maintenance of various dia D.I./M.S. W/S Pumping Main in AA-II (from BS-I to AA-IL and CBD area)including flow balancing in reservoir-, minor repairing of valve/pipeline/specials , De-watering of pipeline and trench as required and other related anciliary works from 01.08.2019 to 30.11.2019(4 months) in NTK Project under P.H.E. Dte 18. Operation & Maintenance of various dia D.I./M.S. W/S Pumping Main in AA-ffl (from BS-1 to OHRs at AA-llI A, IIiB, IIIC and different plots like Unitech, Roseclale, UEM, ITI, Saporjee, Arts Acr, Garden Vista etc.)including flow balancing in reservoir minor repairing of valve/pipeline/specials , De-watering of pipeline and trench as required and other related ancilliary works from 01.08.2019 to 30.11.2019(4 months) in NTK Project under P.H.E. Dte

Key Value

Document Fees
Refer document
EMD
INR 9841.0 /-
Tender Value
INR 4.92 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail