Supply of Terminal Automation System (Supply 4 inch PD Meter ,Erec 4 inch PD Meter,T andC 4 inch PD Meter,Supply 1.5 inch PD meter ,Erec 1.5 inch PD Meter ,T andC 1.5 inch PD Meter ,Supply 4 inch DCV,Erec 4 inch DCV,T andC 4 inch DCV,Supply 1.5 inch DCV, Erec 1.5 inch DCV ,T andC 1.5 inch DCV,Supply-Batch Cont,Erection-Batch Cont,T andC- Batch Cont,Supply-MS Additive Skid,Erec- MS Additive Skid ,T andC-MS Additive Skid ,Supply-HSD Additive Skid,Erec- HSD Additive Skid,T andC-HSD Additive Skid,Supply-SKO Additive Skid,Erec- SKO Additive Skid,T andC-SKOAdditive Skid,Supply-Additive Block,Erec- Additive Blcok,T andC-Additive Block,Supply-SS Pipe/Fittings,Erec-SS Pipe/Fittings,T andC-SS Pipe/Fittings ,Supply-Earth Relay,Erec-Earth Relay,T andC-Earth Relay,Supply-2KL Mobile Prover,Erec--2KL Mobile Prover,T andC--2KL Mobile Prover,Supply-Fixed Provers(3 Nos),Erec-Fixed Provers(3 Nos),T andC-Fixed Provers(3 Nos),Supply-Card Reader,Erec-Card Reader,T andC-Card Reader,Supply-Prox. Cards,Testing-Prox.Cards ,Supply-RIT ,Bihta Erec-RIT,T andC-RIT,Supply-Radar Gauge (A/G Tanks),Erec-Radar Gauge (A/G Tanks),T andC-Radar Gauge(A/G Tanks) ,Supply-Temp Sensors(A/G Tanks),Erec-Temp Sensors(A/G Tanks),T andC-Temp sensors(A/G Tanks),Supply-PT for density Measmt,Erec-PT for density Measmt,T andC-PT for density Measmt,Supply-Tank Side Indicator,Erec-Tank Side Indicator,T andC-Tank Side Indicator,Supply-CIU,Erec-CIU,T andC-CIU,Supply-Radar gauge U/G Tanks ,Erec--Radar gauge U/G Tanks,T andC-Radar gauge U/G Tanks,Supply-Temp Sensor U/G Tanks,Erec-Temp Sensor U/G Tanks ,T andC-Temp Sensor U/G Tanks,Supply-Density Probe U/G Tk,Erec-Density Probe U/G Tk , andC-Density Probe U/G Tk,Supply-DPT(Level) FWTk,Erec-DPT(Level) FWTk,T andC-DPT(Level) FWTk,Supply-PT,Erec-PT,T andC-PT,Supply-Density Meter,Erec-Density Meter,T andC-Density Meter,Supply-4 inchBAE,Erec-4 inchBAE,T andC-4 inchBAE, Supply-PG,Erection-PG,T andC-PG,Supply-EDU,Erection-EDU,T andC-EDU,Supply-BG with sensor,Erec-BG with sensor,T andC-BG with sensor, Supply-PLC System ,Erec-PLC System,T andC-PLC System,Supply-UPS with Bat Bank,Erec-UPS with Bat Bank,T andC-UPS with Bat Bank,Supply-EPB ,Erec-EPB,T andC-EPB ,Supply-Cables,Erec-Cables,T andC-Cables,Cable Trench,Supply-Cable trays ,Erec-Cable trays,T andC-Cable trays,Supply-FLPJB,Erec-FLPJB,T andC-FLPJB,Supply-Press.Switch,Erec-Press.Switch,T andC-Press.Switch,Supply-WPJB,Erection-WPJB,T andC-WPJB,Supply-LRC /TAS servers,Erec-LRC /TAS servers,T andCLRC /TAS servers,Supply-Client PC,Erec-Client PC,T andC-Client PC ,Supply-GW Servers,Erec-GW Servers ,T andC-GW Servers ,Supply-TAS S/W and Lic,Erec-TAS S/W and Lic,T andC-TAS S/W and Lic,Supply-DM Printer,Erec-DM Printer,T andC-DM Printer ,Supply-Eth.Swtch10/100Mbps,Erec-Eth.Swtch10/100Mbps,T andC-Eth.Swtch10/100Mbps,Supply-UTP CAT6 cabling,Erec-UTP CAT6 cabling,T andC-UTP CAT6 cabling,Supply-LAN Ntwk TAS,Erec-LAN Ntwk TAS ,T andc-LAN Ntwk TAS,Supply-Red.Tml Server,Erec-Red.Tml Server ,T andC-Red.Tml Server,Supply-Consoles/Tables/Chairs,Erect-Consoles/Tables/Chairs ,Supply-Integ TAS and VFD, Erec-Integ TAS and VFD ,T andC-Integ TAS and VFD,Supply-Integ TAS and MOVs,Erec-Integ TAS and MOVs,T andC-Integ TAS and MOVs ,Supply-Cabling FW Autmn,Erec-Cabling FW Autmn,T andC-Cabling FW Autmn,Supply-FA System, Erec-FA System,T andC-FA System,Supply-Limit Swch Valves,Erec-Limit Swch Valves,T andC-Limit Swch Valves,Supply-Earthing,Erec-Earthing,T andC-Earthing,Supply-PitlessWeigh Bridge(40M 166,Erec-Weigh Bridge,T andC- Weigh Bridge System,Supply-Top Loading Arm,Erec-Top Loading Arm,T andC-Top Loading Arm,Supply-Gate Barrier(Man.Opn),Erec-Gate Barrier(Man.Opn),T andC-Gate Barrier(Man.Opn),Supply-Cabling ETP Integ,Erec-Cabling ETP Integ,T andC-Cabling ETP Integ,Supply-4 inchBall Valve,Install-4 inch Ball Valve ,T andC-4 inch Ball Valve,Supply-3 inchBall Valve,Install-3 inch Ball Valve,T andC-3 inch Ball Valve,Supply-4 inch Mech Meter,Erec-4 inch Mech Meter,T andC-4 inch Mech Meter,Supply-Struc. Steel,Fab and Weld-Struc Steel,Paint and Compl-Struc Steel,TPI-Doc. Approval,Training,Documentation