Supply Of Dismantling The 100 Kva Transformers From Existing Dip And Mounting The T/F New Erected Dip As Per Respo Nomms., No., 4 , Mounting The Tif New Erected Dip By Support Of Hydra Machine Because Of Busy Traffic Area.. No., 4 , Dismantling Of 11 Ky Line And Making Bundel, Km.. 0.41 , Dismantling Opening Of 11 Ky Guarding At Road Site, Span, 6 , Dismantling Of Existing 11 Kv Abc, Km, 0.2 , Resagging Of Existing 11 Kv Abc, Km, 0.2 , Dismounting The La, Dtr Box. And Connects And Fixing The Same In New Erected Dip., No., 4, Doing The Connections In Meter And Jumpering In Dip From Top To Bottom., No., 4 Earthing The La, T/F Body, Neutral Dip By Pipe Earthing As Per Norms With Matenal., No., 16 , Earthing The Cable Jointing Kit & Pole With Help Of Earthing Rod. No.,4 , Opening & Dismantling Of Lt 3 Q5w Line In Existing Line. Km., 0.71 , Lopping & Chopping Of Tree Branches Of The Line., Job, 7 , Hanging The Ht Xlpe Cable Into The Acsr Supporting Wire With Same Distance And Clamping In Properly With Cost Of Material.. No., 150, Dismantling Of 11 Ky Sp-55 Pole With All Accessories Sip, No.,23 , Dismantling Of 11 Ky Sp-55 Pole With All Accessories D/P, No., 4 , Dismantling Of Lt Line Sp.21 Pole With All Accessories Sip, No., 1 , Dismantling Of Lt Line Pcc Pole With All Accessories S/P, No.,2 , Erection Of Stey Set Set With Cc No,2 , Erection Of Earth Rod With Cc, No,8, Extra Labour For Arranging Of Traffic Control During Shifting The Line.. Job, 1 , Back Cartage Of Following Material From Work Site To K.D. Chauraha S/S With Loading & Unloading At Both Ends.. A. St Pole Sp-33 (After Cutting Sp-55) No., 8, B. Small Material, Qti.. 27.51