7 Flush Pointing With Cm 1:3 For Random Rubble Masonry Wall Including Raking The Wall As Directed By The Engineer Incharge Including Cost Of All Materials, Labour Charges, Curing, T&P, Lead, Lift, Personal Protective Equipments, Other Safety Appliances, Etc., Complete. 8 Providing P.C.C. 1:2:4 Using 20Mm Hbg Metal & 12Mm Hbg Metal In Between Fencing Outer And Drain Area As Directed By The Engineer Incharge Including Cost Of All Materials, Labour Charges, Curing, Lead, Lift, T&Ps, Personal Protective Equipments, Other Safety Appliences, Etc., Complete 9 Providing Stone Pitching Of 230Mm Thick With Pointing In Cm 1:4 As Directed By The Engineer Incharge Including Cost Of All Materials, Labour Charges, Curing, Lead, Lift, T&P, Personal Protective Equipments, Other Safety Appliences, Etc., Complete 10 Brick Work 11 Plastering In Cm 1:5, 12Mm Thick For Surfaces Over Brick Work As Directed By The Engineer Incharge Including Cost Of All Materials, Labour Charges, Curing, Lead, Lift, T&P, Personal Protective Equipments, Other Safety Appliences, Etc., Complete 12 Colour Washing With Two Coats Of Cement Paint Over A Coat Of White Cement Over The Brick Work As Directed By The Engineer Incharge Including Cost Of All Materials, Labour Charges, Lead, Lift, Personal Protective Equipments, Other Safety Appliances, Etc., Complete