Tender For 10 Walk Down And Visual Inspection On Pumps And Blowers In Stp And Etp Area, Observe For Any Gland Leaks Rectify The Same Gland Tightening Or Changing The Gland Packings Lubricating Of Bearings, Topping Up Of Oil, Keeping The Area Neat And Tidy Etc., As Per The Direction Of Engineerincharge 11 Phosphate Dosing Pumps :For Hp / Ip / Lp Drums Dismantling Of The Pump Decoupling & Coupling, Checking Of Suction & Discharge Valve, Replacement Of Gland Packing, Replacement Of Worn Out Bearings, Worm Wheel And Shaft, If Any, Changing Of Gear Box Oil Etc. And Assembling Of The Pump After Completion Of Work, Coupling With Motor As Directed By Engineer Incharge. 12 Hp Bfp : De Mechanical Seal / Bearing Inspection Charges For Decoupling, Coupling Hub Removal, Checking Of Drive End Bearing, Oil Labrinth And Mechanical Seals And Replacing If Necessary, Cleaning Of Seal Water Cooler, Flushing Of Cooling Water Pipings, Replacement Of Damaged Gasket And O Ring Etc., Reinstallation, Alignment And Coupling After The Work Was Completed, Etc., As Per Direction Of Engineer In Charge 13 Hp Bfp : Nde Mechanical Seal / Bearing Inspection Charges For Decoupling, Coupling Hub Removal, Checking Of Non Drive End Bearing, Oil Labrinth And Mechanical Seals And Replacing If Necessary, Cleaning Of Seal Water Cooler, Flushing Of Cooling Water Pipings, Replacement Of Damaged Gasket And O Ring Etc., Reinstallation, Alignment And Coupling After The Work Was Completed, Etc., As Per Direction Of Engineer In Charge 14 Ip / Lp Bfp : De Mechanical Seal / Bearing Inspection Charges For Decoupling, Coupling Hub Removal, Checking Of Drive End Bearing, Oil Labrinth And Mechanical Seals And Replacing If Necessary, Cleaning And Flushing Of Cooling Water Pipelines, Replacement Of Damaged Gasket And O Ring Etc., Reinstallation, Alignment And Coupling After The Work, Etc., As Per Direction Of Engineer In Charge