Supply, Installation, Testing And Commissioning Of Electromechanical Equipments At New Tube Well Inside At 18 Mgd Sps, Nit No. 19 ( 18-19 ) Item No. 1 Deep Well Submersible Pump Set , Panel Board , Rubber Mat , Kit Kat Board , Led Tube Light , Pvc Insulated Pvc Sheathed Copper Conductor Cable , Lt Powert Aluminum Cable , Led Street Luminaries , Gi Pipe , Gi Tail , Gi Bend With Flanges , Pressure Gauge , Ms Clamp , Ms Bore Cover , Ci Df Non Rising Spindle Sluice Valve , Cidf Swing Check Nrv Ppn , Electronic Dozing Pump , Venturi Assembly , Wiring Of Light Point / Fan Point / Exhaust Fan Point / Call Bell Point With Pvc Insulated Copper Conductor Cable , Pre Wired , Fluorescent Fitting / Compact Fluorscent Fitting With Tube , Ceiling Fan / Wall Fan , Pvc Insulated Copper Conductor , Single Core Cable , Gi Strip , Gi Earth Pipe With Earthing , With Gi Nut Bolt , Spring , Washer , Electrode , Workmanship Charges , Workmanship Charges For Lowering The Submersible Pump Set One No. In New Bore Well, Fixing / Erection / Installation Of E&M Equipments, Accessories, Testing And Commissioning On Load With Satisfactory Functioning Of Pump. The Work Includes All Sundry Required Items For Completion Of Work, I.E. Eccentric Taper, Rubber Gasket, Necessary Reinforcement And Vibration Isolation Arrangement, Etc. And Loading, Unloading, Cartage, Making Good All Damages Caused During Installation And Restoring The Same To Their Original Finish As 9 Required, Adequate Safety Provision, Barricading, Warning Signal And Other Safety Measures While Executing The Work Or Wherever Necessary So As To Avoid Accident. The Components Of The Installation Shall Be Of Such Design So As To Satisfactory Function Under All Conditions The Tube Well Will Be Commissioned On Automation Mode And Timing To Be Set As Per Direction Of Engineeri In-Charge. The All Sundry Items Which Are Useful & Necessary For Operation Or Tube Etc