Tender For 70Kl Under Ground Ethanol Tank Works- Excavation Upto 1.5 M Depth: Excavation In All Types Of Soil, For Footings, Steps, Plinth Beams, Equipment Foundations, Pile Caps, Drains, Trenches, Manholes, Underground Tanks, Etc Including Shoring Strutting As Required As Per Site Condition, Dewatering Where Required (Until Foundation Work Is Complete). Item Also Includes Carting, Stacking If Required By Hpcl Eic, Spreading, Levelling And Compacting/Consolidating Surplus Materials Within Plant Premises At Unobjectionable Area Or As Per Instruction Of Hpcl Eic, Excavation From 1.5 To 3.0 M Depth Excavation In All Types Of Sand, For Footings, Steps, Plinth Beams, Equipment Foundations, Pile Caps, Drains, Trenches, Manholes, Underground Tanks, Etc Including Shoring Strutting As Required As Per Site Condition, Dewatering Where Required (Until Foundation Work Is Complete). Item Also Includes Carting, Stacking If Required By Hpcl Engineer In Charge, Spreading, Levelling And Compacting/Consolidating Surplus Materials With Any Lead Within Plant Premises At Unobjectionable, Excavation From 1.5 To 3.0 M Depth Excavation In All Types Of Sand, For Footings, Steps, Plinth Beams, Equipment Foundations, Pile Caps, Drains, Trenches, Manholes, Underground Tanks, Etc Including Shoring Strutting As Required As Per Site Condition, Dewatering Where Required (Until Foundation Work Is Complete). Item Also Includes Carting, Stacking If Required By Hpcl Engineer In Charge, Spreading, Levelling And Compacting/Consolidating Surplus Materials With Any Lead Within Plant Premises At Unobjectionable Area, Excavation In Hard Rock (Any Rock Or Boulder Classified As One For Which Blasting Is Required) With Tractor/Trailer Mounted Jack Hammers Or Chiselling, Wedging Or Any Other Agreed Method For Areas Where Blasting Is Prohibited. Stacking The Excavated Debris And Stack Measurement And Applying 50% Deduction For Voids; Handling And Liftings And Transportation To Inside Etc