Providing Additional Transformer Plinth, Structure Plinths, Cable Duct And Pipe Line For Bay Extension Portion And Supplying, Loading And Transporting Of Iron And Steel Materials, Fabrication And Erection Of Structures, Erection Of Equipments, Earthi, T.S.No.52 / 2018-19 Of Se / Gcc / Slm ( Gl ) -RcC 1:1.5:3 usrg 12 to 20 mmmm HBG metal, for cable duct and retaining wa wth form work includng cost of cement al rraterials, labour, lead, Wt, curng etc. complete but exchuding cost of steel reinforcement Supplying of Ms ra of size 90/120 I,s for transformer pk,th at site includrig cost of 89 aP lead, kft, etc., complete. Suppyying and fb&ng the GI Angles risde the cable duct rnchudrng cost of al mateirals, labour, lead, litt etc, complete providing steel rermforcement MS/ RTs rod ncludlng cost of bindrig wire, labour charges for cuttmg ,bending, tymng, 91 straightennng fcrig and placing nn postion niduding cost of al materials, labour, lead, hft etc., complete. Transporting, laymg and fbcing of RCC cover slab of Cable duct rch.udlng cost of al lead, 92 labour, lift, etc., complete.Fabrication and supply and fIxig of foundation bots of 25mm dia and 1.3m length includrig providing cleat at bottom and threadmg at top and gavantmig the top of bolt rncbudrng Double Nut and washer nchudng cost of all materasl, labour lead litt etc., commplete.s as directed by the Engineer richarge at site. Labour charges for fabricating the tenoalte as per specification and drawing nchudng 94 cost of lead, labour and lift etc., cormvlete Labour charges for fixrig of temrolate nckuding alignrig ii posttion ncuidng 95 labour, lead, bft etc., complete plastering w cm 1:3, 12 mm thick for transformer pbith, structure pliths, cable 96 duct and culverts nckuding cost of cement, all materials, labour, lead, litt etc., complete. white washng two coats usng whtte cement lncludmg cost of all labour, lead, ft 97 etc, complete.