Supply Of Instrumentation Works For Modification Of Hgu-214, - 116.8 1T X 1.5 Sq. Mm Xlpe Insulated Armoured, Frls Pvc Sheathed , Overall Shielded , Signal Cable, Nis Black 116.9 8T X 1.5 Sq. Mm Xlpe Insulated Armoured, Frls Pvc Sheathed , Overall Shielded , Signal Cable, Nis Black 117 1C X 6 Sq. Mm, Copper, Xlpe Insulated Armoured, Frls Pvc Sheathed , Earthing Cable ( Yellow With Green Strip ) 117.1 1C X 10 Sq. Mm, Copper, Xlpe Insulated Armoured, Frls Pvc Sheathed , Earthing Cable ( Yellow With Green Strip ) 117.2 3C X 2.5 Sq. Mm, Copper, Xlpe Insulated Armoured, Frls Pvc Sheathed , Power Cable, Black 117.3 3C X 4 Sq. Mm, Xlpe Insulated Armoured, Frls Pvc Sheathed , Power Cable, Black 118 Loop Checking Shut Down Activity: Hot Loop Checking Of Instruments Including Continuity Test, Troubleshooting, Checking The Correctness Of Instrument Parameters Such As Tag No, Range, Unit, Etc At Both Instrument And Control System End, Ensuring Correctness Of Installation Of Line Mounted Instruments Like Orifice Plates In Line With Flow Direction, Inlcuding But Not Limited To Basic Tools & Tackles ( Screw Driver, Valid Multimeter, Continuity Tester, Etc. ) , Submission Of Loop Checking Reports, Etc Exclusive Of Supply Of Special Tools Such As Hart Communicator, Process Calibrator, Etc. 118.1 I / O -- Analogue Input. 118.2 I / O -- Analogue Output. 118.3 I / O -- Digital Input. 118.4 I / O -- Digital Output. 118.5 I / O -- Foundation Fieldbus Analog Input. 119.1 Identification Of Instrument Items 120 Commissioning Assistance Providing Technical Assistance During Pre-Commissioning / Commissioning Activities By Deploying Different Categories Of Skilled Personnel As Listed Below. 120.1 Supply Of Manpower On Man Day Basis, Including Tools, Tackles And Accessories, For Commissioning Considering 12 Hours, Either Day Or Night -- Instrument Technician ( Skilled )