5 Charges For Checking Control Circuits Charges For Checking Control Circuits, Replacing Defective Relays, Transducers, Meters, Ct&Vt Terminal Tightness Checking And Attending Defects Reported By Operator In Control Panels Like Grp, Davr, Bts, Rtcc, Ecp, Data Concentrator, Dg Set , Tdbfp Eop , Main Turbine Eop, Testing Of Relays In Grp Panel As Instructed By Maintenance Engineer In Charge. This Work Shall Include Consumables Like Cotton / Banian Waste, Cleaning Brush, Polyethin Covers With Proper Tie Arrangement, Necessary Tools, Hot Air Blower Etc., This Work Shall Include Consumables Like Cotton / Banian Waste, Cleaning Brush, Polyethin Covers With Proper Tie Arrangement, Necessary Tools And Hot Air Blower Etc., 6 6 Charges For Cleaning Grp, Davr, Bts, Rtcc, Ecp Charges For Cleaning Grp, Davr, Bts, Rtcc, Ecp, Data Concentrator, Tdbfp Eop Panels And Relay Compartments In 11Kv, 3.3 Kv, 415 V Switchgear Panels. This Work Shall Include Consumables Like Cotton / Banian Waste, Cleaning Brush, Polyethin Covers With Proper Tie Arrangement, Necessary Tools, Hot Air Blower Etc., This Work Shall Include Consumables Like Cotton / Banian Waste, Cleaning Brush, Necessary Tools And Hot Air Blower Etc., 7 7 Charges For Light Up Works Charges For Light Up Works, Which Includes Checking The Healthiness Of Protective Equipments, Ensuring The Permissive For Presynchronization And Post Synchronization, As Instructed By Maintenance Engineer In Charge. 8 8 Charges For Attending Defects In Thyristor Bridges Charges For Attending Defects In Thyristor Bridges, Blowers, Control And Lci Panels, Replacing Defective Electronic Modules, Relays, Timers, Power & Auxiliary Contactors, Checking Of Control Circuits And Terminal Tightness Of Id Fan Vfd Control. This Work Shall Include Consumables Cotton / Banian Waste, Cleaning Brush, Necessary Tools And Hot Air Blower Etc