Power Generation and Transmission, Power Transmission, Overhead Line, Electrical Industry, Light and Bulbs, Electric Pole, Electrical Product, Conductor, Electrical Boxes, Distribution Box, Transfomers, Distribution Transformer, City-Karnataka

Bangalore Electricity Supply Company Limited has published Power Generation and Transmission, Power Transmission, Overhead Line, Electrical Industry, Light and Bulbs, Electric Pole, Electrical Product, Conductor, Electrical Boxes, Distribution Box, Transfomers, Distribution Transformer. Submission Date for this Tender is 30-11-2017. Overhead Line Tenders in City Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

14299209
Power Generation and Transmission, Power Transmission, Overhead Line, Electrical Industry, Light and Bulbs, Electric Pole, Electrical Product, Conductor, Electrical Boxes, Distribution Box, Transfomers, Distribution Transformer
Tender
Indian
Karnataka
City
30-11-2017

Tender Details

A.The Psc/Pscc Poles Shall Be Procured By The Ttk Agency From Approved Vendors Of Bescom Duly Observing Corporate Norms. B.Supply Of Materials, Construction And Testing Of 11Kv Ht Lines On 9 Mts Psc /Pscc Poles Using Rabbit Acsr Conductor . C.Supply And Erection Of 25 Kva 4 Star Rated 3 Phase Aluminum Wound Distribution Transformer On Single/Double Pole Structure As Per Specification Including Providing Of Distribution Box With Dlms Meters Under Rate Contract As Detailed In The Relevant Bid Documents. D.Supply Of Materials, Construction And Testing Of Lt 3Ph 4 Wire Lines On 8 Meter Psc Poles Using Rabbit Acsr Conductor . E.The Unit Rates For The Work For Material And Labour Will Be Finalized Based On The Total Amount Quoted By The Bidder For All The Items Mentioned In The Price Sheet, In Comparison With The Total Amount Works Out For The Same Items In The Price Sheet As Per Rates Specified In The Bescom Sr 2016-17 With Gst And Recently Amended Material Rates On Percentage(%) Basis. F.The Agency Has To Supply And Erect The Materials Which Are Not Included In The Tender (Left Out Materials) Duly Obtaining Approval From Superintending Engineer Ele., Ramanagara Circle And Complete The Works For Which Amount Is Payable At Prevailing Sr At The Time Of Execution Of Work. G.While Arranging Payment To The Awarded Contractor ( Agency) Actual Inventory Of Materials Used And Labour Incurred For Each Work Will Be Considered. H.The Concerned Executive Engineer O M Division Will Issue Work Awards For Individual Works. I.Rate Contract Is For A Period Of Six Months From The Date Of Loi Which Is Extendable For Three Months Based On The Performance/Circumstances. J.The Bidders Shall Note That, They Should Quote Unit Rates For Each Item Based On Sr 16-17 With Gst And Recently Amended Material Rates. Any Fake Rate Quoted For The Materials/And Or Labour May Lead To Disqualification.

Key Value

Document Fees
INR 2500 /-
EMD
INR 100000.0 /-
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail