Construction, Drilling Work, Bore Well, Drilling Work, Civil Construction, Civil Work, Building Construction, Sump, Irrigation Related Work, Lift Irrigation, Irrigation Work, Distribution and Conditioning, Pipe Supply, Casing Pipe, Pumps, Pump Supply, Val
Tender Overview
Project Description
Providing Irrigation Facilities To 7 Nos Of Sc Beneficiaries Under Scp In Sy No.167 / 1A+1B ( Sri Dandappa Durgappa Madar ) Of Konnur Village, Sy No. 10 / 1+2 / 2 ( Sri Durgappa Kashappa Madar ) Of Vanakihal Village, Sy No.115 / 1+A+2A / 1 ( Smt Mahadevi Shekappa Bhajantri ) , Sy No.397 / 1B ( Sri Subhas Bhimappa Dasar ) Of Kuntoji Sy No.214 / 1B ( Sri Yellappa Basappa Mulimani ) Of Davalagi Village, Sy No. 232 / 2A ( Smt Gurubai Hanumanth Lamani ) Of Basarkod Village And Sy No. 66 / 1A ( Smt Kashavva Basappa Madar ) Of Gundakarjaji Village In Muddebihal Taluka Of Vijayapur District, Thorough Bore Well Irrigation , Including Design, Supply, Installation, Testing And Commissioning Of Drip Irrigation System Consisting Of The Following: Drilling Of Bore Wells With Ms Casing Pipe, Submercible Motor With Pumpset. Earthing And Lightining Protection, Inter Connect Cables And Other Accessories. Drip Irrigation Which Includes Main And Sub Main Pipes Laterals At 1.20M Interval And Dripper Spacing At 0.30M, Filters, Fertigation Equipment, Valves, Air Release Valves, Fittings And Accessories As Per Bis / Relevant Standards, Etc, Including Construction Of Sump, Civil Works. The Work Also Includes Errection Of Transmission Line, Required No. Of Transformers As Per Kptcl / Hescom Norms, Line And Transformer Protection As Per Standards Etc Complete On Turnkey Tender Basis With Comprehensive O And M For Period Of Two Years From The Date Of Successful Commissioning Of System
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
Completed