TDR : 57122833
Gujarat Energy Transmission Corporation Limited

Tender Brief :

Jamnagar, Gujarat

Tender For Work of erection of 66KV equipment, structures, control wiring, yard Lighting, Installation of Earthing, Control-Room Electrification providing and fixing of furniture etc. at New 66kv Khapat S/S.

Published: 20 Aug 2026
Opening: Ref Document
Closing: 10 Sep 2026
Amount: 32.24 Lakhs
EMD: 40000
Tender Fee: 1180


Works Bio Gas Plant Diesel Power Plants Electrical Substation Gas Power Plants Geothermal Power Plants
16
Days Left
Tender Summary / Eligibility Criteria
Work of erection of 66KV equipment, structures, control wiring, yard Lighting, Installation of Earthing, Control-Room Electrification providing and fixing of furniture etc. at New 66kv Khapat S/S.
Documents Download All
9874f98cf112429ab7bfbe9d0cdecde4
9874f98cf112429ab7bfbe9d0cdecde4.html
TB55
TB55.pdf
No Boq
No Corrigendum
Probable Bidders

AI engine predicts probable bidders to help you bid strategically.

MSME Exception
Explore More →
Technical
Tender involves procurement of high capacity electrical equipment including diaphragm coupling of pump & motor with 90kW capacity at 2900 RPM. The project scope includes installation, testing, commissioning and operational handover.
Previous / Similar Result
BRR : 11009274 Tender for Civil Work For Construction Of Control Room Building With Septic Tank, Bore Well, Electrification Works, Fencing, Yard Retaining Wall, Levelling The Yard, Reinforced Cement Concrete Cable Duct, Water Line Arrangements, Earth Pits, Drainage Facility, Reinforced Cement Concrete Road With Culvert, Formation Of Paver Block Work And Structural Plinth Foundation Concrete Works And Electrical Work For Labour Charges For Fabrication, Erection Of Structures Including Supply Of Ms Materials, Erection Of Equipments And Earthing Etc., For The Establishment Of Gopalapuram 110/11 Kv Sub Station With 1X10mva,, 110/11Kv Power Transformer Etc.
Contract Date : Ref. Documents   |   Contract Value : Ref. Documents
BRR : 8274690 Construction of 110kV Substation Kadampuzha – Yard equipment erection.-- 1 Transport of Line and Earth conductors materials issued departmentally for the works from departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges etc as directed by Board staff.-general area 2 Transport of Insulators and accessories, power conductor accessories and earth conductor accessoriesetc materials issued departmentally for the works from departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges etc as directed by Board staff.-general area 3 Transport of Tower extensions and other structures and all other materials including earthing materials materials issued departmentally for the works from departmental stores and distribution to locations for erection including storage if necessary, loading and unloading charges etc as directed by Board staff.-general area 4 Erection of yard structures and assembling of columns and beams using bolt and nut including punching of holes. 5 Fabrication of structures for erecting equipments. The GI & MS angles will be supplied departmentally 6 Transportingby head load, the materials issued departmentally to the site from the place of storage and distribution to erection site. (Distance to be specified ) 7 Drilling holes in yard structure 8 Cutting of steel angle in yard structure erection 9 Welding charge for welding on iron parts using arc welding as per standards 10 Erection of 1 No. 110/66KV CT/PT/CVT/CC/220KV NCT on the already erected structure of above 1.5m height after opening of crates at the place of storage, leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools& tackles etc. 11 Conveying to the erection site and erecting carefully 1 No. 33KV CT/PT/110KV NCT & RVT/NCT(52/36kV) on the already erected structure after opening of crates at the place of storage leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools& tackles etc. 12 Erection of 1 No. 11KV CT/PT/11KV NCT on the already erected structure after opening of crates at the place of storage leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers. 13 Erection of 1 No. 110/66KV LA/Post insulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers. 14 Erection of 1 No. 11KV LA (station type ) /11KV Post insulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers. 15 Unpacking carefully and leading one set of 3 pole EHT110/66KV Circuit Breaker from the place of storage, including support structure , mechanism box compressor, pipe lines etc. to site , cleaning and erecting on foundation using suitable lifting tools, after disassembling necessary parts if required, to lines and levels and assembling all the parts , connecting mechanism etc. in complete shape and making ready for commissioning as per the direction of departmental officers. 16 Erection of one set 110/66KV Bus Isolator on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels, erection of mechanism box , checking operation and aligning properly, including cutting, welding etc.complete as per the direction of departmental officers. 17 Erection of one set 110/66KV line Isolator on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers. 18 Uncoiling, paving out, stringing and fixing of bus bar using ACSR Kundah / Moose single conductor for one phase of 66/110KV bus of span up to 30M by cutting the conductor to sufficient length, crimping using compressor / bolting the two ends, washing, cleaning and drying the insulator discs, fixing the conductors to the yard structure with sufficient tension using string of insulators and hardware complete. at both ends, fixing of arcing hornes including transportation of materials from the stockyard to the site under the supervision and direction of department staff at site.(All materials will be supplied departmentally at free of cost). 19 Stringing and fixing earth wire of size 7/9, 7/10 or 7/3.15 between top of the columns and to terminal tower at 33/66/110/220KV substations with compressed / bolted ends at proper tension including uncoiling and cutting of conductor , jumpering, giving earth bond connections by drawing the end of the conductor through the columns, jointing where ever necessary providing back stays at the time of stringing etc. as per the direction of the departmental officers. 20 Providinginterconnection between equipments using ACSR Moose/ Kundah/ wolfSingle conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. 21 Providing droppers and connecting to lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolfSingle conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase) 22 Laying of departmentally supplied GI strip/Copper strip of suitable sizeincluding cleaning and neatly bending of strips ,cutting, removing of metal/earth in the yard and burying earth strip to the required depth re-doing the yard metalling as per the direction of the departmental officers. 23 Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip & other end of the strip with yard structure at 2 points 50mm apart each welding points having 50mm length and 6mm thick on both sides & end of the strip including the charges for connecting the strip with structure using bolted joints as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost of anti corrosive paint etc. complete. 24 Welding overlapping joints of 50x6mm GI strip with 50mm long, 6mm thick welding on all three sides after doing 2 Nos. bolted joints at the centre as specified after cleaning the surface. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes( No.E7018) cost of anti corrosive paint etc. complete. 25 Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip and connecting other end with nuts & bolts if required as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost of anti corrosive paint etc. complete. 26 Welding one end of the GI strip 50x6mm with the structure with a welding length of 50mm & 6mm thickness on both sides & end of the strip and connecting other end with bolts & nuts if required including hire charges of DC arc welding set, current charges, cost of low hydrogen DC arc welding electrodes (No.E7018) cost of anti corrosive paint etc. complete.
Contract Date : 31 Oct, 2025   |   Contract Value : 8.47 Lakhs
BRR : 10356696 Tender For Erection Work - Complete Erection Of 01 No. 132Kv And 01 No. 33Kv Feeder Bay Along With Transformer Erection For Additional 20Mva, 132/33Kv Transformer At 132Kv S/S. Bisnoor; 1 Erection of 132/33 kV 20 MVAKV Power X-mer 2 Complete assembly and erection of 132/33 KV 40MVA/ 20MVApower transformer with all associated equipments. Connection / wiring etc. including installation of marshalling boxes, control cabinet. RTCC Panel etcradiators, cooling fans, all accessories etc. for transformer including their preliminery checks . Body protection cabling and termination work. Unloading / Handling of Transformer Accessories and Applying Vacuum, Filling of Transformeroil, oil filtaration till desired results and other necessary works associated with transformer installation. (Fillter Machine and vacuum pump shall be provided by the Company ). 3 Erection of substation Structure 4 Erection of structures of 132/33KV Gantries,Busbar equipment etc. including their shifting from storage place, fixing & alignment of templates for grouted /bolted type structure foundations,tightening of nuts & bolts washers,etc,& including alignment & levelling of structure and other associated works. 5 Erection of 132 KV CВ 6 Erection of structures and alignment, shifting of breaker upto the place and placement of circuit breaker on structure and alignment.Complete assembly of circuit breaker including erection of control cabinet & mechanism box, interconnecting piping work erection of all accessories for the equipment and making interconnections. 7 Erection of 132KV CТ 8 Erection of 132 kV current transformer Including shiftingupto civil foundation and placement on structure and fixing of junction box including all accessories& making all interconnections, earthing etc. and mounting of junction boxes. 9 Erection of 132 KV 3-phase Isolators 10 Erection of 132 KV 3-phase motorised Isolators Including shifting upto civil foundation & placement of complete isolatoronisolator structure.Erection/ mounting of mechanism box,interconnection, pipings, alignment of contacts & all associated activities to make the installation complete including checking of successful mechanical and electrical operation. 11 Erection of 132 KV LA 12 Including shifting of 132 kV surge/lightening arrestors upto civil foundation& placement of equipments on structure including all accessories and making all connections and earthings etc. also include checking & installation of insulator base and surge counters. 13 Erection of 132 KV C&R Panel 14 Shifting up to control room (including storage if required) and placement complete with all relays & accessories.The placement of C&R panel to be done on MS channel frame and MS Channel frame will suitable grouted in control room as per drawing. The cutting, welding& fabrication of of MS channel frame is to be done as per drawing. Proper alignment of C&R panel and earthing to be done. . Making of all interconnections for the control & relay panel on terminal block as per drawing including all AC & DC connections. 15 Erection of 132 KV Solid Core Insulator 16 Erection of 132 kV PI/ solid core insulators on the structure, complete including shifting within the s/s premises. 17 Erection of 33 KV CВ 18 Erection of structures and alignment, shifting of breaker upto the place and placement of circuit breaker on structure and alignment.Complete assembly of circuit breaker including erection of control cabinet & mechanism box, interconnecting piping work erection of all accessories for the equipment and making interconnections. 19 Erection of 33 KV CT 20 Erection of 33 kV current transformer Including shiftingupto civil foundation and placement on structure and fixing of junction box including all accessories& making all interconnections, earthing etc. and mounting of junction boxes 21 Erection of 33 KV 3-phase Isolators 22 Erection of 33 KV 3-phase Isolators Including shifting upto civil foundation & placement of complete isolatoronisolator structure.Erection/ mounting of mechanism box,interconnection, pipings, alignment of contacts & all associated activities to make the installation complete including checking of successful mechanical operation. 23 Erection of 33 KV LA 24 Including shifting of 33/36 kV surge/lightening arrestors upto civil foundation& placement of equipments on structure including all accessories and making all connections and earthings etc. also include checking & installation of insulator base and surge counters. 25 Erection of 33 KV C&R Panel 26 Shifting up to control room (including storage if required) and placement complete with all relays & accessories.The placement of C&R panel to be done on MS channel frame and MS Channel frame will suitable grouted in control room as per drawing. The cutting, welding& fabrication of of MS channel frame is to be done as per drawing. Proper alignment of C&R panel and earthing to be done. . Making of all interconnections for the control & relay panel on terminal block as per drawing including all AC & DC connections. 27 Erection of 33 KV Solid Core Insulator 28 Erection of 33 kV PI/ solid core insulators on the structure, complete including shifting within the s/s premises. 29 Erection of Junction Box 30 Erection of junction box on the structure, complete earthing etc. including shifting within the s/s premises. 31 Laying of copper cables (armoured / unarmoured) in trenches, on racks/cable trays /angle support, overhead racks, conduits, including dressing of cables. 32 2Core 2.5 Sq.mm Unarmoured 33 4Core 2.5 Sq.mm Unarmoured 34 8Core 2.5 Sq.mm Unarmoured 35 12Core 2.5 Sq.mm Unarmoured 36 19Core 2.5 Sq.mm Unarmoured 37 Cable Termination 38 2Core 2.5 Sq.mm Unarmoured 39 4Core 2.5 Sq.mm Unarmoured 40 8Core 2.5 Sq.mm Unarmoured 41 12Core 2.5 Sq.mm Unarmoured 42 19Core 2.5 Sq.mm Unarmoured 43 Providingsteel risers and making earth mesh (duly buried at a depth of 0.5 mtrs) by MS flat of different size,including backfilling, welding etc. and bolting of risers to the structures/equipments at desired places. 44 M.S.Flat for earthing ( 65mm X 8mm ) 45 M.S.Flat for earthing ( 50mm X 6mm ) 46 Installation of25 mm dia X 3000 mm long M.S. rod earth electrodes directly driven/drilled (40 to 50 mm dia) into earth including excavation (irrespective of type of soil encountered) ,backfilling with bentonite soil (to be arranged by contractor) and welding to earth conductor /MS flat of earthing mesh.etc. 47 Preparation of Earth pits 1.5x1.5x3 m as per MPPTCL’s drawingwhich includes excavation and associated Brick Messonary Work (irrespective of the soil encountered ) embedding of 4nos. GI pipe of size 40mm dia 3m long, back filling with black cotton soil free from stones 48 Installation of HPSV/HPMH lignting fixture on gantry columns 49 Stringing of Overhead conductors between the various132/33 kV structures , fixing of 132/33 kV string /disc insulator, providing jumpers between equipment, fixing of clamps and connectors, including shifting within the s/s premises. 50 Twin Zebra conductor (in Mtrs) 51 Single Zebra conductor (in Mtrs) 52 Stringing of Overhead earth wire between the various132/33 kV structures,their clamping, tightinng etc. to protect equipments/buses etc. from lightining etc.
Contract Date : Ref. Documents   |   Contract Value : Ref. Documents
BRR : 9349800 Installation of Additional 5 MVA, 66/11 KV Power Transformer at 6.3 MVA Receiving Station Housing Colony, Kathua (To be spared from Receiving Station Hatlimorh-II) in respect of Sub-Transmission Division Kathua- 1 66KV TRANSFORMER BAY FOR 66/11KV SUB STATION 2 SITC of 66 KV Isolator without Earthing Blade 800 Amp 31.5 KA,3 Phase, double break centre rotating type, G.O isolator alongwith Support insulators, operating mechanism, base channel, down pipe and all required accessories as per scope of work and approved drawings confirming to IS Standards. 3 SITC of 66KV 1-phase CT, 250-125/5-5-2.89 A 3 core, dual ratio. Core- I metering (250-125/5 A, 15 VA, 0.2s accuracy class), core-II protection( 250-125/5A, 15VA,5P10) & Core-III Differential (250-125/2.89A PS Class)Current transformer along with junction box (1 No. junction box for 3 Nos CTs)as per Technical specifications, scope of work & approved drawings) (3 No. CTs in 1 set). 4 SITC of 66 KV SF6 Circuit Breaker 72.5 KV, 1250 A, 31.5 KA, 3-Phase outdoor type circuit breaker alongwith support Structures, Marshalling box, terminal connectors, closing and tripping coils 30V DC and required accessories complete as per technical specification scope of work and approved drawings confirming to IS Standards 5 SITC of 66 KV LA i.e, gapless surge arrestor 60 KV, 10 KA, 1 phase station type lighteninh arrestor with mounting platform (3 Nos LA in one set) 6 SITC Steel Structures 7 Supplying and erection of GI steel structure 8 GI Nuts & Bolts of sorts 9 SITC of Conductor & Hardware 10 ACSRPanther Conductor 200 mm2 for 11kv Bus Bars and droppers 11 T-clamps 12 Supply and erection of 66 KV Polymeric composite type insulator 13 Supply and erection of tension fittings for 66 KV polymeric insulators 14 Supply and erection of suspension fittings for 66 KV polymeric insulators 15 Supply and installation of 66 KV Post insulators polymeric type 72.5 KV, 350 KV impulse 16 ITC POWER TRANSFORMER FOR 66/11 kV SUBSTATION 17 Dismantling, loading, carriage, unloading, re-erection and commissioning of 5 MVA, 66/11 KV ONAN type Power Transformer (to be lifted from Receiving Station Hatlimorh-II to Receiving Station Housing Colony, Kathua) 18 Plate Earthingof Power Transformer- using GI Pipe 50mm dia , 3m long , GI strip of size 50x6mm welded with Galvanised Plate of size (600x600x6)mm, all ISI marked, to be connected with 66 KV Breaker, Isolator, 66 KV CT & 66 KV LA as per IS2629/85, GI Nuts and bolts, refilled with good earth, charcoal dust, salt, etc.through GI strip. The rate includes excavation of earthing Pit of 3 meter depth, disposal of excavated earth from site of earthing to out side substation and backfilling should be using Good Earth (3 cum), Charcoal Dust( 100 kg) and Salt( 40 kg) for each earthing and making of chamber at the top with funnel and chamber cover. 19 Supply, laying and fixing of GI Earthing Electrodes 20mm dia 2.5 mtr long through GI strip as per IS with welding 20 ITC of 11 KV switchgear andXPLE Power Cables 21 Dismantling (to be dismantled from Receiving station Hatlimorh-I ), loading, carriage, unloading, re-erection and commissioning of 11KV VCB Panel set (01 No. Incomerand 01 No.Outgoingvaccum circuit breaker SCADA compatible) including retrofitting of these VCB Panels with Existing VCB Panels and civil works etc associated with fixing of these VCB panelsat Receiving Station Housing Colony Kathua 22 11KV XPLE 3-core 400 sq.mm power cable , round wire armoured cable, FRLS confirming to IS7098 ( part-II)- 1985 standards 23 11 kV Cable KitsThree Core, 400 mm2 ‐Outdoor (01 No spare) 24 11 kV Cable KitsThree Core, 400 mm2 ‐Indoor(01 No spare) 25 Supply and erection of 13 mtr ST poles 26 Supply and applying of Red oxide to ST Poles 27 Supply and applying of Aluminium paints to ST Poles 28 Supply and fixing Danger plates with clamps 29 Supply and fixing Anti-climbing devices with clamps 30 Cement bottoming 1:2:4 mix as per REC standard 0.7 cum/pole 31 Supply, fabrication and erection of GI Channel Iron, Angle Iron and Flat Iron of sorts 32 COMMONMISCELLENOUSWORKS IN 66/11KV RECEIVING STATION 33 Equipment Foundation for 66 KV PI, 66 KV LA, 66 KV Isolator, 66KV 1-phase CT, 66 KV SF6 Circuit Breaker and11 KV Busbar structure foundations of concrete RCC M-20 (1:1.5:3) 34 Foundation for Power Transformer of concete RCC M-20 (1:1.5:3) 35 Construction of cable duct along with covers for laying of 11KV XLPE cable(Ht:-3 Ft, Breadth:- 3 Ft) 36 Bore well complete in all respect with submersible pump, 3-phase, 3HP Motor along with starter. 37 COMMON MISCELLANEOUS EQUIPMENTS 66/11kV SUB STATIONS 38 Stone metalling in outdoor yard with stone aggregate of 50 mm(300 Cuft) 39 Earthing Mat of proposed Bay (GI Flat 50mm x 8 mm size) complete at par with existing 66 KV Bay.
Contract Date : Ref. Documents   |   Contract Value : Ref. Documents
BRR : 7296200 Tender For Construction Of 110 Kv Substation Kothakurussi - Erection Of Yard Structures And Equipments At 110 Kv Substation Kothakurussi-Capital work of 110kV Substation,Kothakurussi -Erection of Yard structures and Equipments at 110kV Substation Kothakurussi.-after dragging up to 50M using suitable lifting device carefully without causing any damage to equipments and fastening in the lorry make it ready for transportation as per the direction of the department officers. 2 Unloading one 110/66KV LA from department lorry to substation site using suitable lifting device and dragging to safe place without causing any damage to CT as per the direction of the department officers. 3 Loading one 110/66KV CT / CVT / PT / CC from the place of its storage to department lorry using required lifting device without causing any damage to equipment and its parts. 4 110KV CT, PT 5 110KV NCT 6 11KV NCT 7 Unloading one 110/66KV CT/PT/CVT/CC from department lorry to substation site using suitable lifting device and dragging to safe place without causing any damage to CT as per the direction of the department officers. 8 110KV CT, PT 9 110KV NCT 10 11KV NCT 11 Loading one set 110/66KV Circuit breaker with its interrupting poles, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices to department lorry and fastening for transportation 12 Unloading one set 110/66KV Circuit breaker with its interrupting poles, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices from department lorry to substation site and stacking properly for safe storage. 13 Loading one 110/66KV LA from the place of its storage to department lorry, if required, after dragging up to 50M using suitable lifting device carefully without causing any damage to equipments and fastening in the lorry make it ready for transportation as per the direction of the department officers. 14 11KV LA 15 Unloading one 110/66KV LA from department lorry to substation site using suitable lifting device and dragging to safe place without causing any damage to CT as per the direction of the department officers. 16 11KV LA 17 Loading one set 110/66KV Line Isolator with its insulator stacks, supporting channels, connecting pipes, isolating rods, earth switches, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices to department lorry and fastening for transportation 18 Unloading one set 110/66KV Line isolator with its insulator stacks, supporting channels, connecting pipes, isolating rods, earthing rods, mechanism box, structures and all its accessories safely without causing any damage using necessary lifting devices from department lorry to substation compound and stacking properly for safe storage. 19 Loading 1x500 sq. mm XLPE cable from its place of storage to department lorry and properly without causing any damage to its insulation and make ready for transporting as per the direction of department officers. 20 Unloading 1x500 sq. mm XLPE cable from department lorry to substation site and stacking properly without causing any damage to its insulationas per the direction of department officers. 21 Loading MS / GI materials hard ware fittings of line work and clamps for equipments and bus from the place of its storage to department lorry and make it ready for transportation as per the direction of departmental officers. 22 Unloading MS / GI materials, hard ware fittings of line work and clamps for equipments and bus from department lorry to substation site and stacking for proper storage as per the direction of departmental officers. 23 Transportingby head load, the materials issued departmentally to the site from the place of storage and distribution to erection site 24 Drilling holes in yard structure 25 Cutting of steel angle in yard structure erection 26 Welding charge for welding on iron parts using arc welding as per standards 27 Fabrication of structures for erecting equipments. The GI & MS angles will be supplied departmentally 28 Erection of yard structures and assembling of columns and beams using bolt and nut including punching of holes. 29 Erection of 1 No. 110/66KV CT/PT/CVT/CC/220KV NCT on the already erected structure of above 1.5m height after opening of crates at the place of storage, leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools& tackles etc. 30 Conveying to the erection site and erecting carefully 1 No. 33KV CT/PT/110KV NCT & RVT/NCT(52/36kV) on the already erected structure after opening of crates at the place of storage leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers, including all labour charges, hire charges of tools& tackles etc. 31 Erection of 1 No. 11KV CT/PT/11KV NCT on the already erected structure after opening of crates at the place of storage leading to site carefully keeping at vertically not allowing tilting from vertical position more than the specified angles, keeping lines and levels as per the direction of the departmental officers. 32 Erection of 1 No. 11KV LA (station type ) /11KV Post insulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers. 33 Erection of 1 No. 110/66KV LA/Post insulator on the already erected structure after opening of crates at the place of storage leading to site carefully, keeping lines and levels as per the direction of the departmental officers. 34 Erection of one set 110/66KV Bus Isolator on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels, erection of mechanism box , checking operation and aligning properly, including cutting, welding etc.complete as per the direction of departmental officers. 35 Erection of one set 110/66KV line Isolator on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers. 36 Unpacking carefully and leading one set of 3 pole EHT110/66KV Circuit Breaker from the place of storage, including support structure , mechanism box compressor, pipe lines etc. to site , cleaning and erecting on foundation using suitable lifting tools, after disassembling necessary parts if required, to lines and levels and assembling all the parts , connecting mechanism etc. in complete shape and making ready for commissioning as per the direction of departmental officers. 37 Uncoiling, paving out, stringing and fixing of bus bar using ACSR Kundah / Moose single conductor for one phase of 66/110KV bus of span up to 30M by cutting the conductor to sufficient length, crimping using compressor / bolting the two ends, washing, cleaning and drying the insulator discs, fixing the conductors to the yard structure with sufficient tension using string of insulators and hardware complete. at both ends, fixing of arcing hornes including transportation of materials from the stockyard to the site under the supervision and direction of department staff at site.(All materials will be supplied departmentally at free of cost). 38 Stringing and fixing earth wire of size 7/9, 7/10 or 7/3.15 between top of the columns and to terminal tower at 33/66/110/220KV substations with compressed / bolted ends at proper tension including uncoiling and cutting of conductor , jumpering, giving earth bond connections by drawing the end of the conductor through the columns, jointing where ever necessary providing back stays at the time of stringing etc. as per the direction of the departmental officers. 39 Providinginterconnection between equipments using ACSR Moose/ Kundah/ wolfSingle conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. 40 Providing droppers and connecting to lines / equipments or jumper between two buses without suspension insulators using ACSR Moose/ Kundah/ wolfSingle conductor at both ends with compressed/ bolted ends including uncoiling and cutting of conductor as per the direction of departmental officers. (For one phase) 41 Laying of departmentally supplied GI strip/Copper strip of suitable sizeincluding cleaning and neatly bending of strips ,cutting, removing of metal/earth in the yard and burying earth strip to the required depth re-doing the yard metalling as per the direction of the departmental officers. 42 Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip & other end of the strip with yard structure at 2 points 50mm apart each welding points having 50mm length and 6mm thick on both sides & end of the strip including the charges for connecting the strip with structure using bolted joints as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost of anti corrosive paint etc. complete.(Structure earthing) 43 Welding overlapping joints of 50x6mm GI strip with 50mm long, 6mm thick welding on all three sides after doing 2 Nos. bolted joints at the centre as specified after cleaning the surface. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes( No.E7018) cost of anti corrosive paint etc. complete. 44 Welding one end of the bended GI strip of size 50x6mm with the riser of the already laid earth mat, welding 150mm in length, 6mm thick on both sides & end of the strip and connecting other end with nuts & bolts if required as per the directions of the department officers. Charges includes hire charges of DC arc welding set, current charges, cost of low hydrogen content DC arc welding electrodes(No.E7018) cost of anti corrosive paint etc. complete.(Equipment earthing) 45 Welding one end of the GI strip 50x6mm with the structure with a welding length of 50mm & 6mm thickness on both sides & end of the strip and connecting other end with bolts & nuts if required including hire charges of DC arc welding set, current charges, cost of low hydrogen DC arc welding electrodes (No.E7018) cost of anti corrosive paint etc. complete. 46 Fixing departmentally supplied marshalling kiosk in the existing PT/CT structure by making suitable fixing arrangements including cutting , welding, drilling holes etc as required. 47 Collecting from store or substation wherever available tools and materials such as jacks pulling and lifting machines,rails,sleepers, plies, ropes, empty drums, dummy plates, bolts and nuts gaskets, etc. including loading and unloading in department vehicle and accompanying and returningthe same after completing the work as per the direction of departmental officers.( Only if required) 48 Unloadingthe power transformers of weight 20T to 30T, carefully and safely inch by inch inserting railsand trawling to the platform made with sleepers and thus lowering very carefully inch by inch for placing on the rail track and hoisting to the plinth with out causing damage to transformer and accessories as per the direction of the departmental officer observing all safety precautions. 49 Pulling the power transformers of weight 20T to 30T, on the rail track, travelling for a distance up to 30M, using sleepers, rails, jacking, pulling and keeping ready for placing on the correct plinth as per the direction of departmental officers at site, safely without damaging any equipments and observing all safety precautions. 50 Loading to the department lorry the accessories of 10/12.5MVA transformer such as bushings with proper package, coolers, conservator tank, connecting pipes, bolt and nuts, wheels, rollers, fans, driving mechanism, cooler control box and oil drums etc. safely fastening them properly, accompanying the vehiclewith transformer from ……………….. to ……………and unloading and stacking in convenient place, taking all safety precautions as per the direction of departmental officers. 51 Assembling the 10 /12.5 MVA, 110/11 or 66/11KV transformer with all accessories in complete shape and filling oil if required including arresting the movement of the transformer by locking as per the direction of the departmental officers. 52 Covering the transformer with tarpaulin using ropes, bamboos etc. 53 Giving three phase connection to the filter unit from the supply mains using cable including fitting three numbers of fuse units near the filter unit and laying the cable from control room to filter unit and trial run of filter unit after giving connection etc. complete. ( Only iffound absolutely necessary and where departmental staff is not available ). 54 Hot oil circulation after draining oil from transformer, evacuating the transformer by using vacuum pump after providing LT connection to the pump , connecting the hose to transformer, operating carefully and continuously for attaining sufficient vacuum and keeping in vacuum for 24 hours and operating filter unit carefully and continuously for 24 hours except halt due to poor voltage and trouble in filter plant etc complete as per the direction of dept. officers. 55 Disconnecting the power connections to the filtering plant/ vacuum pump, coiling the cable, disconnect the hoses and coiling them and folding and removing tarpaulin used for covering the transformer, moving the filter plant and vacuum pump to a distant place as directed by the department staff. ( where departmental staff is not available and is found absolutely necessary) 56 Loading the 6000/5000litre/hr.or above transformer oil filter plant tolorry using tripod, chain block, pulley block, rope etc., after pulling it to the convenient position for lifting and fixing it firmly for safe transportation to the location as directed by department officers, unloading the same without causing any damage and placing it carefully at convenient place etc. complete as directed by department officers at site where ever required. 57 Turning and shifting 6000 L/H capacity transformer oil filtering plant or wheel mounted 10000/15000 Litre. oil tank with all accessories for a distance of 20Mto road, towingthe machine with department lorry by the use of D-Shackle and iron ropes , accompanying the lorry including supervision through out the journey especially in turnings to avoid falling of plant. Remove the machine from the lorry and drags up to 10M for safe storage where ever required. 58 Loading the empty oil tank of capacity 10000/15000 Ltr. From the place of its storage using wooden blocks, lever etc. and moving the tank to a distance of 10M from switch yard then loading the same to the dept. vehicle using chain pulley etc. carefully tying the tank in vehicle accompanying the vehicle up to Kothakurussisubstation, removing ties andunloading the tank carefully by the use of wooden blocks rails, chain pulley etc. again moving the tank to a distance of 50M, for safe storage. 59 Loading one vacuum plant of capacity 3HP with its pipelines to department lorry and unloading the same at the required substation as per the direction of departmental officers. 60 Laying 1 x 500 sq mm XLPE cables in trench including drawing through pipes wherever necessary 61 Doing out door/indoor cable termination of 1x500 mm2 11KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket 62 For mounting 1 x 500 mm2 out door / indoor cable termination 63 Unpacking the transformer / feeder C&R panels, 110V battery charger, OLTC cubicle LT panel at the place of storage transporting to the place of erection and erecting after providing foundation bolt keeping to lines and levels as per the direction of departmental officers. 64 Unpacking at the place of storage and transporting 11KV indoor VCB/SF6 switch gear panel and its accessories to the place of erection and erecting after fixing foundation bolts by chipping concrete wherever necessary, tightening, keeping lines and levels taking all safety precautions including erection of potential transformers as per the direction of departmental officers. 65 Interconnection of panels and 11KV bus bars after opening covers, earthing, inter panel wiring, etc. and making ready for commissioning of breaker as per the direction of the departmental officers. 66 Assembling 55 cells of 100AH conventional battery, pore the acid in required level, connect the battery to the charger and charge to the required specific gravity level, check the specific gravity and voltage of each cells hourly. After attaining the required specific gravity and voltage keep the same for 24 hours, discharge the same up to 50% of the rating and then boost charge the same monitor the voltage and specific gravity regularly and make the battery ready for station use. 67 For 200AH Battery 68 Preparing wiring schedule per transformer / feeder bay of 110 or 66kV with details of type of cable, core and colour, ferrule No. and terminal no of equipments/panelsincluding giving full details in A4 sheet with computer print providing outer border line and sheet no etc. and supplying in the shape of book with special binding etc. and assisting the departmental officers at the time of relay testing and commissioning 69 Master Copy 70 Additional Copy 71 Uncoiling 20/19 core 2.5sqmm, 12 core 4 sqmm control cable (Armoured or un armoured) from cable drums cutting to required length and laying through trench/pipe/cable tray grouping the same neatly using cable tie and carefullyincluding for providing loop wherever necessary and providing cable marker at both ends of cable as per direction of departmental staff at site. 72 Uncoiling 12/7/6 core 2.5 sq mm control cable (armoured and un armoured) from cable drums and cutting to required length and laying through trench/pipe/cable tray grouping the same neatly using cable tie and carefullyincluding for providing loops wherever necessary and cable marker, at both ends of cable as per direction of departmental staff at site. 73 Uncoiling 4/2 core 2.5sqmm control cable (armored or unarmored) from cable drums and cutting to required length and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessaryand cable marker at both ends of cable as per direction of departmental staff at site. 74 Uncoiling 5/4/3/2 core 4sqmm control cable(armoured or un armoured) from cable drums and laying through trench/pipe/cable tray neatly and carefully including for providing loops wherever necessaryand cable marker at both ends of cable as per direction of departmental staff at site. 75 Fixing all type of terminal connecting strip with terminal connectors in the marshalling box or panel boardwherever necessary (terminal connecting strip will be supplied departmentally ) charges includes for providing necessary suitable hole etc complete as per direction of departmental staff at site. 76 Termination of cables in panel by using cable glands of fixing the cable rigidly by any means as per direction of departmental staff at site charges include for providing necessary suitable hole in the gland plate etc. 77 20/19 core 2.5sqmm cable/12 core 4 sqmm cable (using gland of size 28-32mm) 78 12/7/6 core 2.5 sqmm cable (using gland of size 25mm) 79 4/2 core 2.5 sq mm cable/4/2 core 4 sq mm cable (using gland of size 16-22mm) 80 Doing termination of all sizes of PVC insulated copper control cable 2.5mm², pealing, providing number and letter ferrules in the wire, stripping ends, crimping with suitable lugs and connecting to the terminals in the panel board and marshalling kiosk etc., neatly and carefully including cost of copper sockets and ferrules as per the direction of Departmental Officers at site. 81 Doing termination of all sizes of PVC insulated copper control cable 4.0 mm², pealing, providing number and letter ferrules in the wire, stripping ends, crimping with suitable lugs and connecting to the terminals in the panel board and marshalling kiosk etc., using cable tieand cable tie neatly and carefully including cost of copper sockets and ferrules as per the direction of Departmental Officers at site. 82 Supplying aluminium cable tags punching number and alphabets up to 7 digits and binding to cable using copper wire including cost of all materials as per the direction of Board Officials at site. 83 Making of cable clamps using 25x 3 mmGI strip (hot dipped)as per no of cablesin cable tray cutting and holing to required length and for fixing as per the direction of departmental officers at site including supply of suitable nut and bolts. 84 Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m., asdirected by Engineer-in-Charge: All kinds of soil 85 Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size) 86 Supplying and laying tarpaulin sheet of thickness 150GSM of approved make and quality over levelled surface including cost of tarpaulin sheet, wastage overlaps, conveyance and labour charges ect. Complete. 87 Supply and stacking Stone Aggregate (Single size) : 20 mm nominal size 88 Spreading 40mm stone aggregate/20mm stone aggregate in the yard about thickness of 15cm as per the direction of department officers at site 89 Conveying of precast RCC slabs (of various size) manually from stacking place within initial lead etc. complete and laying carefully in position without damaging the edges of slabs as well as cable trench side wall as per directions of Engineer-in- Charge. 90 Loading HT A type pole from the stacking place and unloading the same at work site (transport by vehicle). 91 Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 poles excluding loading & unloading. 92 Fitting and erecting one HT DP using A type pole in position incl. fitting 2 channel cross arms, digging & back filling pit, drawing earth leads. 93 Drilling hole of various sizes on existing Channel/Cross Arm. 94 Additional rate for excavation of Pit for A type pole in Hard Laterite. 95 Providing one Earth using earth pipe including digging separate pit at standard distance away from the pole/structure & backfilling. 96 Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite 97 Fitting one Additional 3m Channel cross arm (35x35x5mm), in existing 11kV DP incl. conveyance of materials. 98 Erection of one set 11KV Isolator / AB switch (station class)on the already erected structure including opening crates and conveyance of all accessories from the place of storage to the place of erection to lines and levels including erection of mechanism box checking operation and aligning properly as per the direction of departmental officers. 99 Erecting one 250kVA Transformer to existing Plinth/Platform and giving connections,includingloading from TMR/SRS/other stacking place & unloading at site but excluding cost for transporting transformer 100 Providing concrete muffing (0.45x0.45x1.5m) inclusive of cost of all material (as per specification). 101 Loading 3x300 sq. mm XLPE cable from its place of storage to department lorry and properly without causing any damage to its insulation and make ready for transporting as per the direction of department officers. 102 Unloading 3x300 sq. mm XLPE cable from department lorry to substation site and stacking properly without causing any damage to its insulationas per the direction of department officers. 103 Laying 3 x 300 sq mm XLPE cables in trench including drawing through pipes wherever necessary. 104 Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 11KV gradedirect in ground including excavation, sand cushioning,protective covering and refilling the trench etc as required. 105 Doing out door/indoor cable termination of 3x300 mm233KV XLPE cable very carefully observing directions of manufactures and departmental staff including crimping of socket 106 Mounting one 3x300 mm2 XLPE out door cable termination of structures very carefully without causing any damaged to the drilling holes wherever necessary as directed by the departmental officers 107 Random rubble masonry in CM 1:6 for foundation and basement including cost of all materials, conveyance, labour charges, etc. complete as perspecifications.
Contract Date : 29 Apr, 2025   |   Contract Value : 45.02 Lakhs
Disclaimer

We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Tender Detail
Website https://tender.nprocure.com/
Quantity
MSME Exemption No
Tender Type Open Tender
Startup Exemption Click Here
Competitive Bidding NCB
Similar Tenders
TENDER INSIGHTS

858

Electric Tenders
Live
CLICK TO KNOW MAXIMUM WIN

Tell us about your Product / Services,

We will Find Tenders for you

🇮🇳 +91
TenderDetail
Loading tenders