gujarat energy transmission corporation limited

Tender Brief :

Amreli, Gujarat

Tender For Erection, Testing & Commissioning Work Of 66Kv Equipments, Structures, Control Wiring, Yard Lighting, Control-Room Electrification, Supply Of Furniture, P&F Cctv Camera Surveillance System Etc. At 66Kv Nesdi-2 S/S (Tal.Khambha, Dist.Amreli).

Published: 14 Aug 2026
Opening: 07 Sep 2026
Closing: 07 Sep 2026
Amount: 48.83 Lakhs
EMD: 40000
Tender Fee: 1180


Works Access Control Systems Air Rifles Airport Signaling Systems Alarm Systems Alcohol analyzer
20
Days Left
Tender Summary / Eligibility Criteria
Tender For Erection, Testing & Commissioning Work Of 66Kv Equipments, Structures, Control Wiring, Yard Lighting, Control-Room Electrification, Supply Of Furniture, P&F Cctv Camera Surveillance System Etc. At 66Kv Nesdi-2 S/S (Tal.Khambha, Dist.Amreli).
Documents Download All
bebadac2-69b4-498c-9a1a-376444a8c830
bebadac2-69b4-498c-9a1a-376444a8c830.pdf
No Boq
No Corrigendum
Probable Bidders

AI engine predicts probable bidders to help you bid strategically.

MSME Exception
Explore More →
Technical
Tender involves procurement of high capacity electrical equipment including diaphragm coupling of pump & motor with 90kW capacity at 2900 RPM. The project scope includes installation, testing, commissioning and operational handover.
Previous / Similar Result
BRR : 9231079 Tender For 66 Kv Substation Sullar; 1 25/31.5 MVA, 66/11kV T/Fs 2 66 kV SF-6 Breaker along with 20% extra SF-6 Gas 3 66 kV Isolator with E/Switch 4 66 kV Isolator without E/Switch 5 66 kV Surge Arrestor 6 66 kV CTs for Line & Bus Coupler (600-300-150/1-1-1A) 7 66 kV CT for T/F (300-200-150/0.577-1-1A) 8 66 kV PT for line 9 66 kV NCT (300-200-150/1A) 10 11 kV NCT (1800-900/5A) 11 11 kV Surge Arrestor 12 11 kV 15 Panel Board (2000A)(including one no. bus sectionalizer panel) 13 66kV C&R Panels with SAS:a) Bus Coupler Protection and Circuit Breaker Panel (Without Auto Reclose) with SAS 14 b) Line Protection and Circuit Breaker Panel (Without Auto Reclose) with SAS with line current differential- cum- distance protection relay 15 c) Transformer Protection and Circuit Breaker Panel (Without Auto Reclose) with SAS 16 9000 KVAR 12.65 kV Automatically Switched Capacitor Bank along with allied equipment as per technical specification 17 220V 100AH Battery San Tubular 18 220 V 20/30 A Battery charger (SMPS) 19 220V D.C.D.B. 20 415 V LT AC Distribution Board 300 A 21 11/0.4 kV Station T/F 200 KVA 22 (a) 1.1 kV Copper Control Cable unarmoured for 66kV bays of size 7Cx4mm2, 4Cx4mm2, 2Cx4mm2,2Cx6mm2, 3Cx2.5mm2, 16Cx2.5mm2, 10Cx2.5mm2 & 7Cx2.5mm2 including junction box etc. refer Section-5 of copper & control cable & Section-7 for switchyard erection. 23 (b) Stainless steel MK (200 TB) 24 11 kV Power Cable XLPE 1C x1000mm2 for T/F to 11kV incomer (4 run per phase for each transformer allocating them 2 runs per phase for each 11kV I/C). 25 Termination kit at both ends for 11 kV XLPE Power Cable(1C x1000 mm2 ) Termination kits for (indoor/outdoor) both ends alongwith assessories constitute a set of each cable. 26 11 kV Power Cable XLPE3C x 400sq mm for Capacitor Bank 27 Termination kit at both ends for 11 kV XLPE Power Cable( 3C x 400 mm2) Termination kits for (indoor/outdoor) both ends alongwith assessories constitute a set of each cable. 28 11 kV Power Cable XLPE 3C x 50 sq mm for station T/F 29 Termination kit at both ends for 11 kV XLPE Power Cable( 3C x 50 mm2) Termination kits for (indoor/outdoor) both ends alongwith assessories constitute a set of each cable. 30 650/1100 Volts 3.5 core 240 mm2 aluminium power cable from Aux. T/F to ACDB. 31 650/1100 Volt 3.5 core 70 mm2 aluminium cable for oil filtration set. 32 650/1100 Volt 4core 16mm2 unarmoured with copper power cable for MLDB and other cable required as per contract for 66 kV bays. 33 Earthing Mat Material. The earth mat will be designed/ quoted for soil resistivity of 50Ωm. In case soil resistivity is more than 50Ωm then the earth mat will be designed for actual soil resistivity. The payment of extra material to be used for earth mat shall be made on pro rata basis. The approximate area of earth mat to be laid is given in the corresponding columns of the substations. However, item will remain a Lot item. (calculations may be made considering fault/shock duration of 1 sec., 5400 m2) 34 Fire Fighting equipments as per section-6:i) 22.5 Kg Capacity FE CO2 type, Trolley Mounted 35 ii) 25 Kg Capacity FE DCP type, Trolley Mounted 36 iii) DCP 10 Kg Capacity, Wall mounted 37 iv) FE CO2 6.5 Kg Capacity, Wall mounted 38 v) DCP 5 Kg Capacity, Wall mounted 39 vi) Foam Type 9 Litre Capacity, Wall mounted 40 vii) Water CO2 9 Litre, Wall mounted 41 viii) Fire Buckets (12 Nos. with stand in one set) 42 Complete lightning of control room building, switch yard area, road and street as per section-7 of the specification:a) Supply and installation of 2 fittings of 240W LED lamps with all accessories for Complete lighting of outdoor Switch yard area as per clause 16.0 of section 7 of the specifications. 43 b) Supply and installation of 35W LED tube on tubular steel poles along with the boundary wall at a distance of 30 meter as per as per clause 16.0 of section 7 of the specification 44 c) Complete lighting of road and street by providing 90W LED lamps on tubular steel poles at a distance of 15meter along the roads and streets as per as per clause 16.0 of section 7 of the specification. 45 d) Supply and installation of post top lantern 40W LED Lamps with all complete accessories at the entrance gate of sub-station. 46 e) Supply and installation of 40W LED Lamps with all complete accessories on corners of control room building. 47 Complete Substation automation system of 66/11kV substation including hardware (along with transducers) and software along with associated equipment for the bays (bay as defined in the technical specification, sec-sub-station automation system) as per technical specification. Name of 66 kV BayPresent Future66 kV T/F Bay2 66 kV Line Bay 46*66 kV Bus Coupler Bay 1 * Provision shall be made in SAS to accomodate future scope (i.e. 6 No. 66 kV bays as per space available in GELO) alongwith present scope.Note: Signals from protection relays in 11 kV incomer would also be wired to substation automation system (SAS) 48 Time synchronization equipment 49 High wall type split AC unit2 Ton capacity for C&R Panel room and SCADA room: (as per technical specification). 50 Computer system (SFF) with: Intel core i5 processor with 11th generation or higher as specified in sectiion-04 51 Multi-Function Monochromatic Laser Jet Machine (A4-25 PPM or more) with print copy and scan function, Duplexing feature, composite cartridge, ADF, A4 or larger flatbed size, Networking and wi-fi both, at least 1 input tray, 3 years on site OEM warranty. 52 BOM FOR SAMAST COMPLIANT IEM (ON SEPARATE CUBICLE) FOR 11KV I/C: 1. (a) 3P4W Interface Energy Meters (ABT type) 0.2s Class 1A with TTB & BCS 53 1 (b) Testing of IEM System from NABL accredited lab 54 2. Wired Indoor Meters Panel suitable for 8 meters 55 3. 16 P Industrial Grade un-managed Network switch 56 4. (a) Data concentrator unit (DCU)/ communication Gateway (IG) with dual SIM Modem along with enclosure and accessories 57 4. (b) 3C x 2.5 Sq. mm Un-armoured cable for DCU and Switches 58 5. Cat-6 cable-unshielded 59 6. PVC conduit Pipe - 3/4 with accessories for Cat-6 cable 60 7. Armored Fibre Optic Cable (2 pair) 61 8. HDPE conduit - 40/33 with accessories 62 9. 4Cx4 Sqmm armoured cable for PT 63 10. 4Cx4 Sqmm armoured cable for CT 64 48V 120AH Battery Bank San Tubular 65 48V SMPS Battery Charger (for 48V 120AH Battery Bank San Tubular Battery) 66 For 66kV Substation HVPNL Chaurmastpur 1. The supply of Numerical Line Current Differential-cum- Back up Distance Protection Relay in place of existing Distance Protection Relay on the existing C&R panels (non-SAS compliant) installed at 66kV S/stn. HVPNL, Chaurmastpur (for 66 kV D/C Chaurmastpur - Sullar Lines)2. The erection/ retrofitting, testing & commissioning of Numerical Line Current Differential-cum- Back up Distance Protection Relay in place of existing Distance Protection Relay on the existing C&R panels (non-SAS compliant) above at sr. no. 40 (1) installed at 66kV S/stn. HVPNL, Chaurmastpur shall be the part of scope of successful bidder. 67 For 66kV Substation HVPNL Layalpur Basti 1. The supply of Numerical Line Current Differential-cum- Back up Distance Protection Relay in place of existing Distance Protection Relay on the existing C&R panels (non-SAS compliant) installed at 66kV S/stn. HVPNL, Layalpur Basti (for 66 kV D/C Layalpur Basti – Sullar Lines).2. The erection/ retrofitting, testing & commissioning of Numerical Line Current Differential-cum- Back up Distance Protection Relay in place of existing Distance Protection Relay on the existing C&R panels (non-SAS compliant) above at sr. no. 41 (1) installed at 66kV S/stn. HVPNL, Layalpur Basti (for 66 kV D/C Layalpur Basti – Sullar Lines) shall be the part of scope of successful bidder. 68 Bolted type 11kV tension string assembly with 3 numbers Anti FOG type disc insulators (E&M strength 9000 kg) per string with all hardware accessories including ball & socket connections and tension clamp sets suitable for twin tarantulla conductor. Alternatively the bidder may quote silicon polymer composite insulator string in place of Disc Insulators 69 66 kV Bolted type tension string assembly with 6 numbers Anti FOG type disc insulators (E&M strength 9000 kg) per string with all hardware accessories including ball & socket connection and tension clamp set suitable for single zebra conductor. Alternatively the bidder may quote silicon polymer composite insulator string in place of Disc Insulators 70 66 kV bolted type tension string assembly with 6 numbers Anti FOG type disc insulators (E&M strength 9000 kg) per string with all hardware accessories including ball & socket connections and suspension clamp set suitable for Twin zebra conductor. Alternatively the bidder may quote silicon polymer composite insulator string in place of Disc Insulators 71 66 kV bolted type suspension string assembly with 5 numbers Anti FOG type disc insulators (E&M strength 9000 kg) per string with all hardware accessories including ball & socket connections and suspension clamp set suitable for Singlezebra conductor. Alternatively the bidder may quote silicon polymer composite insulator string in place of Disc Insulators 72 66 kV bolted type suspension string assembly with 5 numbers Anti FOG type disc insulators (E&M strength 9000 kg) per string with all hardware accessories including ball & socket connections and suspension clamp set suitable for Twin zebra conductor. Alternatively the bidder may quote silicon polymer composite insulator string in place of Disc Insulators 73 Boltless C-Type Wedge connectors matching with conductor size. 74 Copper lugs glands, PVC ferrules for control cabling. 75 Fiber cleats, Aluminium clamps, bolts, nuts, washers etc., for fixing control cables in trenches. 76 Galvanized iron perforated tray with side coupler plate bolts, nuts, washers and clamps etc. of size 75x25x2 mm, 150x25x2mm, 100x25x2mm etc. & G.I. Conduits of 50mm/100mm dia from equipment to main trench as per Section-7, Switchyard erection. 77 ACSR Zebra Conductor 78 AAC Tarantulla Conductor 79 7/3.15 GS Earth wire 80 Spacers for Twin Tarantullaand Twin Zebra Conductor 81 U-bolt 20mm dia. 82 Mandatory spares for hardware/mechanical/Electrical auxiliaries to be supplied. 10 % of the finally approved quantities for item mentioned from Sr. No. 68 to 72. 83 2.5 ″ dia HDD/PVC pipe for 4c x 4 mm2 c/cable from CT, VT to maintaining system as per sec-5. 84 Item for associated structure workA)‘Lattice type steel structure for 66 kV AIS Sullar. Supply of material, preparation of fabrication drawing, galvanizing and delivery of lattice type steel structure for tower and beams for 66/11KV switchyard fabricated from steel conforming to IS: 2062 including nuts-bolts gusset plates foundation bolts and other accessories as per drawings supplied by the owner:Main S/Stn. tower and beam:a)Tower type CT-4 85 b) Tower type CT-5 86 c) Tower type CT-6 87 d) Tower type CT-8 88 e) Beam type CB-6 89 f) Beam type CB-7 90 g) Tower type DT-2 91 h) Tower type DT-3 92 i) Beam type DB-2X 93 B) Equipment Structure:a) 66 kV CT Drg. No. HTD/ST-88R 94 b) 66 kV NCT Drg. No. HTD/ST-145 (if required ) 95 c) 66 kV PT Drg. No. HHW/ST-66 96 d) 66 kV Surge Arrestor Drg. No. HTD/ST-89 97 e) 66 kV Isolator Drg. No. HTD/ST-87R 98 f) 66 kV L&E Switch Drg. HTD/ST-87R 99 g) 11 kV NCT Drg. HTD/ST-149 (if combined structure used) or 11 kV NCT Drg. HTD/ST-88R (if required). 100 EARTH WORK :Earth filling with good earth (as per satisfaction of Executive Engineer/Civil Works Division), laying in layers (as per specification), dressing, including carriage, irrespective of lead, loading, unloading, watering and compaction in layers with roller including compensation of earth complete in all respect. 101 2. FOUNDATIONS:Supply of labour, T&P, material and construction of RCC footings & pedestals etc. for steel gantry and equipment structures complete in all respects as per technical specifications & approved drawings including cost of excavation, concreting, cement, reinforcement steel, form work, grouting, holding down bolts, backfilling etc.and other items not mentioned herein but required for the completion of work.A. GANTRY TOWERS66kV sidei) CT-4 102 ii) CT-5 103 iii) CT-6 104 iv) CT-8 105 33kV sidei) DT-2 106 ii) DT-3 107 B. EQUIPMENT 66kV sidei) 66KV LA 108 ii) 66KV CVT/PT 109 iii) 66KV NCT 110 iv) 66kV CT 111 v) 66kV L&E & Isolator 112 11kV sidei) 11kV NCT 113 3. BREAKER FOUNDATIONDesign, engineering, supply of labour, material, equipment & const. of foundations for breaker including all associated works PCC, RCC, structural steel, steel reinforcement & any other item not specifically mentioned herein but reqd. for completion of work as per tech. spec.i) 66 kV Breaker Foundation 114 4. CAPACITOR BANK FOUNDATIONSDesign, Engg. & supply of labour, material & construction of foundations for following rating capacitor bank with capacitor unit (with allied equipments) & series Reactor etc. including chain link fencing 1.8M height around cap. bank complete in all respect including any other items not specifically mentioned herein but required for completion of job as per technical specification.i) 9000KVAR 12.65 kV Capacitor Bank 115 5. TRANSFORMER FOUNDATION5.1 Design, Engg., supply of labour, material and construction of foundation for station transformer including all associated works, RCC, PCC, Reinforcement steel, misc. structural steel and other items not mentioned herein but required for the completion of work as per technical specifications.i) 11/0.4kV 200KVA Station T/F 116 5.2 Construction of transformer foundation including all associated works, RCC, PCC, reinforcement steel, misc. structural steel and other items not mentioned herein but required for completion of work as per technical specifications & approved drgs. In case extra foundation(s) has/have to be constructed (as per approved T/F drawing) to complete the job, nothing extra would be paid on this count.i) 25/31.5 MVA 66/11 kV T/F Foundation 117 6. CABLE TRENCHESSupply of labour, material such as cement, reinforcement steel, GI angles, flats, PCC & brick pillars below cable trenches for construction of Out-Door Cable Trenches (ODCT) of required depth/ type with pre-cast RCC covers including associated works like Cable Trench Culverts,crossings for roads and sump- pit-cum-pump chamber with 2HP motor of reputed make, starter, volt meter, amp-meter etc. as per foundation & trench layout plan attached, HVPNL drgs. & tech. specs. complete in all respect. i) D-type trench 118 ii) E-type trench 119 iii) G-type trench 120 iv) H-type Trench 121 v) GI Pipe 122 vi) Sump Pit Cum Pump Chamber 123 7. SITE SURFACING7.1 Providing, supplying & laying 100mm thick PCC (1:4:8) using 20mm nominal coarse aggregates and supplying & spreading 100mm thick layer of 40mm nominal size uncrushed/ crushed/broken stone pebbles over the PCC including construction of toe wall (exposed wall plastered with cement mortar 1:5) to hold 40mm single size uncrushed/ crushed /broken stone pebbles wherever required in the bays covered under the present scope as detailed in the GELO & instructions of engineer incharge. 124 7.2 Providing, supplying & laying 100mm thick in two layers of 50mm each of 20mm nominal size uncrushed/crushed/ broken stone pebbles gravel fill including dressing, rolling & compacting complete in all respects as per specs. & instructions of engineer incharge. 125 8. ROADS & PCC PAVEMENT8.1 Supply of labour, material and construction of cement concrete roads and walkways/shoulders from NH/SH/etc. to Switch yard/Switch house building as per GELO/CLO as per sectional detail drawing no. HCD/SK-181 R1 and technical specification.i) 6.0M wide road (Near main gate of substation) 126 ii) 3.66m wide road within substation land 127 iii) PCC in front and rear of parking area of SH Building as per tech. specification and drawing HCD/SK-172. 128 9. ROAD CULVERTSDesign Engineering and construction of Pipe culvert(s) at suitable locations under the approach road (from main PWD/ HUDA/Municipal/Village road to the sub-station entry point) including, cost of labour, material complete in all respects as per I.R.C. Standards. 129 10. BOUNDARY WALL10.1 Supply of labour, material and construction of front, C & U/C boundary walls including main gate foundations as per GELO/CLO, technical specifications. & HVPNL drg. HCD/TS-1176 R3 including excavation backfilling, lean & DPC complete in all respect.i) 6 ft. high with GI barbed wire on angles at top. 130 ii) 4½ ft. high front wall including providing grill at top of wall & construction of main entrance gate (with wicket gate). 131 iii) 4½ ft. side wall with GI barbed wire 132 10.2 Supply of labour, T&P, material and construction of front, side & U/C boundary walls including main gate(s) (brickwork below DPC level) as per GELO/CLO, tech. spec. & HVPNL drawings complete in all respects. 133 11. U/C FENCING & GATESProviding & fixing chain link fencing including foundations, GI angle iron posts and gate(s) complete as per electrical layout & tech. spec. & as per drawing attached. 134 12. DRAINAGE–CUM-RAIN HARVESTING SYSTEMThe successful bidder shall evolve design & drawing for drains, manholes with RCC covers andsettlement tankincluding preparation of drainage layout drawing for disposal of rain water from building’s roof top & switch yard (s/stn.) area into respective bore well(s) in such a way that there shall be no ponding of water on the roof and switch yard (s/stn.). The layout so developed shall be got approved from the employer. The location of sump-pit-cum-pump chamber shall preferably be locatedon corner(s) of the s/stn. and shall be got decided from the concerned XEN/Civil Works Division on the basis of surroundings of the substation(s). The successful bidder will also supply labour and material for construction of sump-pit-cum-pump chamber as per HVPNL drgs. & provide one no. non clog pump(s) of 5HP of reputed make capacity with main switch, starter, volt meter, Amp. Mtr. etc. (for each sump pit) for disposal of excess water to outfall point. Any other item(s) not mentioned herein but is/are required for completion of works shall be done by the successful bidder without any extra cost to the employer.i) Drain Section-1 135 ii) Drain Section-2 136 iii) Drain Section-3 137 iv) Road Crossing 138 v) Trench Crossing 139 vi) Sump Pit Cum Pump Chamber 140 13. CONTROL ROOM BUILDINGSupply of labour, material, T&P and construction of control room building complete in all respect as per tech. specs. including exterior weather proof paint, interior emulsion, all internal services like water supply including supply & providing of 5000ltr. capacity double layer Sintex/Diplast PVC tank, Sewerage system, electrification including wiring, modular switches, maximum 20W 4ft. long LED tubes with fittings minimum 1960 lumens, ceiling/exhaust fans, Finishing, Plinth protection, RCC flooring, Indoor trenches, Soakage pit near the switch house building, connection of sewerage system to Soakage pit/Sewerage system of local authorities (as applicable), connection to main water supply system of local authority, bore (Tubewell) (as applicable) etc. & any other item not mentioned herein but required for completion of works. 141 14. RCC M-20 inclusive of labour, material, shuttering, Steel reinforcement etc. complete in all respects to compensate excess quantity required to be executed due to difference in existing ground level and the formation level to be fixed after contouring or difference on account of revised drg issued at the time of construction and the tender drg.
Contract Date : Ref. Documents   |   Contract Value : Ref. Documents
BRR : 9231097 Construction Of 66 Kv Ais Substation Mussimble, Yamuna Nagar With 2X25/31.5 Mva 66/11 Kv Power T/Fs And 66 Kv Ais Substation Sadopur, Ambala With 2 X 25/31.5 Mva 66/11 Kv T/Fs On Turnkey Basis-- 1 25/31.5 MVA 66/11 kV T/Fs 2 66 kV SF-6 Breaker along with 20% extra SF-6 Gas 3 66 kV Isolator with E/Switch 4 66 kV Isolator without E/Switch 5 66 kV Surge Arrestor 6 66 kV CTs for Line & Bus Coupler (600-300-150/1-1-1A) 7 66 kV T/F CT (300-200-150/0.577-1-1A) 8 66 kV PT for line 9 66 kV NCT (300-200-150/1A) 10 11 kV NCT (1800-900/5A) 11 11 kV LA 12 11 kV 15 Panel Board 2000A (including one no. bus sectionalizer panel) 13 66kV C&R Panels with SAS:a) Bus Coupler Protection and Circuit Breaker Panel (Without Auto Reclose)with SAS compliant 14 b) Line Protection and Circuit Breaker Panel (Without Auto Reclose) with SAS 15 c) Line Protection and Circuit Breaker Panel without Auto Reclose (SAS Compliant) with Line Current Differential-cum-Distance Protection Relay (for 66 kV D/C Dhulkote-Sadopur Lines) 16 d) Line Protection and Circuit Breaker Panel without Auto Reclose (SAS Compliant) with Distance Protection Relay (for 66 kV S/C Layalpur Basti-Sadopur Lines) 17 e) Transformer Protection and Circuit Breaker Panel (Without Auto Reclose)with SAS compliant 18 9000 KVAR 12.65 kV Automatically Switched Capacitor Bank along with allied equipments as per technical specification. 19 220V 100AH Battery San Tubular 20 220 V 20/30A Battery charger (SMPS) 21 220V D.C.D.B. 22 415 V LT AC Distribution Board 300 A 23 11/0.4 kV Station T/F 200 KVA 24 (a) 1.1 kV Copper Control Cable unarmoured for 66kV bays of size 7Cx4mm2, 4Cx4mm2, 2Cx4mm2, 2Cx6mm2, 3Cx2.5mm2, 16Cx2.5mm2, 10Cx2.5mm2 & 7Cx2.5mm2 including junction box etc. refer Section-5 of copper & control cable & Section-7 for switchyard erection 25 (b) Stainless steel MK (200 TB) 26 a) 11 kV Aluminium Power Cable XLPE 1C x1000mm2 for T/F to 11kV incomer (4 runs per phase for each transformerallocating them 2 runs per phase for each 11kV I/C) 27 b) Termination kit at both ends for 11kV XLPE power Cable (1C x 1000mm2) Termination Kits for (Indoor/Outdoor) both ends along with accessories constitute a set for each cable. 28 a) 11 kV Aluminium Power Cable XLPE 3C x 400sq mm for Capacitor Bank 29 b) Termination kit at both ends for 11kV XLPE power Cable (3C x 400mm2) Termination Kits for (Indoor/Outdoor) both ends along with accessories constitute a set for each cable. 30 a) 11 kV Aluminium Power Cable XLPE 3C x 50 sq. mm for station T/F 31 b) Termination kit at both ends for 11kV XLPE power Cable (3C x 50mm2) Termination Kits for (Indoor/Outdoor) both ends along with accessories constitute a set for each cable. 32 650/1100 Volts 3.5 core 240 mm2 aluminium power cable from Aux. T/F to ACDB. 33 650/1100 Volt 3.5 core 70 mm2 aluminium cable for oil filtration set. 34 650/1100 Volt 4core 16mm2 unarmoured with copper power cable for MLDB and other cable required as per contract for 66kV bays. 35 Earthing Mat Material. The earth mat will be designed/quoted for soil resistivity of 50Ωm. In case soil resistivity is more than 50Ωm then the earth mat will be designed for actual soil resistivity. The payment of extra material to be used for earth mat shall be made on pro rata basis. The approximate area of earth mat to be laid is given in the corresponding columns of the substations. However, item will remain a Lot item (calculations may be made considering fault/shock duration of 1 sec).(7400 sq. meter for Mussimble & 5900 sq. meter for Sadopur) 36 Fire Fighting equipments as per section-6:i) 22.5 Kg Capacity FE CO2 type, Trolley Mounted 37 ii) 25 Kg Capacity FE DCP type, Trolley Mounted 38 iii) DCP 10 Kg Capacity, Wall mounted 39 iv) FE CO2 6.5 Kg Capacity, Wall mounted 40 v) DCP 5 Kg Capacity, Wall mounted 41 vi) Foam Type 9 Litre Capacity, Wall mounted 42 vii) Water CO2 9 Litre, Wall mounted 43 viii) Fire Buckets (12 Nos. with stand in one set) 44 Complete lightning of control room building, switch yard area, road and street as per section-7 of the specification:a) Supply and installation of 2 fittings of 240W LED lamps with all accessories for Complete lighting of outdoor Switch yard area as per clause 16.0 of section 7 of the specifications. 45 b) Supply and installation of 35W LED tube on tubular steel poles along with the boundary wall at a distance of 30 meter as per as per clause 16.0 of section 7 of the specification 46 c) Complete lighting of road and street by providing 90W LED lamps on tubular steel poles at a distance of 15meter along the roads and streets as per as per clause 16.0 of section 7 of the specification. 47 d) Supply and installation of post top lantern 40W LED Lamps with all complete accessories at the entrance gate of sub-station. 48 e) Supply and installation of 40W LED Lamps with all complete accessories on corners of control room building. 49 Complete Substation automation system of 66/11kV substations including hardware (along with transducers) & software along with associated equipment for the bays (bay as defined in the technical specification, sec-substation automation system) as per technical specification.66 kV Mussimble Present FutureSr. No.DescriptionNo. of 66 kV Bays1. T/F2 12.Line 223. B/C 1-66kV SadopurNo. of 66 kV Bays Sr. No.DescriptionPresent Future1. T/F 2 6*2.Line3 3. B/C 1 * As per space available in GELO. Accordingly, provision shall be made in SAS to accommodate future scope along with present scope. Note: signals from protection relays in 11 kV incomer would also be wired to substation automation system (SAS) 50 Time synchronization equipment 51 High wall type split AC unit of 2 Ton capacity for SCADA room & C&R Panel room (as per technical specification). 52 Computer system (SFF) with: Intel core i5 processor with 11th generation or higher as specified in Section-04 53 Multi-Function Monochromatic Laser Jet Machine (A4-25 PPM or more) with print copy and scan function, Duplexing feature, composite cartridge, ADF, A4 or larger flatbed size, Networking and wi-fi both, at least 1 input tray, 3 years on site OEM warranty 54 BOM FOR SAMAST COMPLIANT IEM (ON SEPARATE CUBICLE) FOR 11KV I/C:1 (a) 3P4W Interface Energy Meters (ABT Type) 0.2s Class 1A with TTB & BCS (2 No. for each 11 kV Incomer) 55 1 (b) Testing of IEM System from NABL accredited lab 56 2. Wired Indoor Meters Panel suitable for 8 meters 57 3. 16 P Industrial Grade un-managed Network switch 58 4 (a) Data concentrator unit (DCU)/communication Gateway (IG) with dual SIM Modern alongwith enclosure and accessories 59 4 (b) 3C x 2.5 sq. mm Un-armoured cable for DCU and Switches 60 5. Cat-6 cable-unshielded 61 6. PVC conduit pipe-3/4 with accessories for Cat-6 cable (In line with cat-6 cable) 62 7. Armored Fibre Optic Cable (2 pair) 63 8. HDPE conduit - 40/33 with accessories (In line with armored cable for CT/PT) 64 9. 4Cx4 Sqmm armoured cable for PT 65 10.4Cx4 Sqmm armoured cable for CT 66 48V 120AH Battery Bank San Tubular 67 48V SMPS Battery Charger (for 48 V 120 AH Battery Bank San Tubular Battery) 68 For 220 kV Substation, BBMB, Dhulkote: 1. The supply of Numerical Line Current Differential-cum- Back up Distance Protection Relay for C&R Panels (non-SAS compliant)installed at 220 kV Substation, BBMB, Dhulkote (for 66 kV D/C Dhulkote - Saddopur Lines). 69 2. The erection/ retrofitting, testing & commissioning of Numerical Line Current Differential-cum- Back up Distance Protection Relay in place of existing Distance Protection Relay on the existing C&R Panels (non-SAS compliant) above at sr. no. 68 installed at 220 kV Substation, BBMB, Dhulkote (for 66 kV D/C Dhulkote - Saddopur Lines) shall be the part of scope of successful bidder. 70 Bolted type 11kV tension string assembly with 3 numbers Anti FOG type disc insulators (E&M strength 9000 kg) per string with all hardware accessories including ball & socket connections and tension clamp sets suitable for twin tarantulla conductor. Alternatively the bidder may quote silicon polymer composite insulator string in place of Disc Insulators 71 66 kV Bolted type tension string assembly with 6 numbers Anti FOG type disc insulators (E&M strength 9000 kg) per string with all hardware accessories including ball & socket connection and tension clamp set suitable for single zebra conductor. Alternatively the bidder may quote silicon polymer composite insulator string in place of Disc Insulators 72 66 kV Bolted type tension string assembly with 6 numbers Anti FOG type disc insulators (E&M strength 9000 kg) per string with all hardware accessories including ball & socket connection and tension clamp set suitable for twin zebra conductor. Alternatively the bidder may quote silicon polymer composite insulator string in place of Disc Insulators 73 66 kV bolted type suspension string assembly with 5 numbers Anti FOG type disc insulators (E&M strength 9000 kg) per string with all hardware accessories including ball & socket connections and suspension clamp set suitable for single zebra conductor. Alternatively the bidder may quote silicon polymer composite insulator string in place of Disc Insulators 74 66 kV bolted type suspension string assembly with 5 numbers Anti FOG type disc insulators (E&M strength 9000 kg) per string with all hardware accessories including ball & socket connections and suspension clamp set suitable for twin zebra conductor. Alternatively the bidder may quote silicon polymer composite insulator string in place of Disc Insulators 75 Boltless C-Type Wedge connectors matching with conductor size. 76 Copper lugs glands, PVC ferrules for control cabling. 77 Fiber cleats, Aluminium clamps, bolts, nuts, washers etc., for fixing control cables in trenches. 78 Galvanized iron perforated tray with side coupler plate bolts, nuts, washers and clamps etc. of size 75x25x2 mm, 150x25x2mm, 100x25x2mm etc. & G.I. Conduits of 50mm/100mm dia from equipment to main trench as per Section-7, Switchyard erection. 79 ACSR Zebra Conductor (approx.) 80 AAC Twin Tarantulla Conductor (approx.) 81 7/3.15 GS Earth wire 82 Spacers for TwinTarantulla/ZebraConductor 83 U-bolt 20mm dia. 84 Mandatory spares for hardware/mechanical/Electrical auxiliaries to be supplied. 10 % of the finally approved quantities for item mentioned from Sr. No. 70 to 74. 85 2.5 ″ dia HDD/PVC pipe for 4c x 4 mm2 c/cable from CT, VT to maintaining system as per sec-5, chapter-5. 86 Item for associated structure workA)‘‘Lattice type steel structure for 66kV AIS Mussimble (Yamuna Nagar) & Sadopur (Ambala), Supply of material, preparation of fabrication drawing, galvanizing and delivery of lattice type steel structure for tower and beams for 66/11KV switchyard fabricated from steel conforming to IS: 2062 including nuts-bolts gusset plates foundation bolts and other accessories as per drawings supplied by the owner.66kV Cable support structure of galvanized iron along with foundation to be designed by bidder as per site requirement/size of cableMain S/Stn. tower and beam:a)Tower type CT-4 87 b) Tower type CT-5 88 c) Tower type CT-6 89 d) Tower type CT-8 90 e) Beam type CB-6 91 f) Beam type CB-7 92 g) Tower type DT-2 93 h) Tower type DT-3 94 i) Beam type DB-2X 95 B) Equipment Structure:a) 66 kV CT Drg. No. HTD/ST-88R 96 b) 66 kV NCT Drg. No. HTD/ST-145 (if required ) 97 c) 66 kV PT Drg. No. HHW/ST-66 98 d) 66 kV Surge Arrestor Drg. No. HTD/ST-89 99 e) 66 kV Isolator Drg. No. HTD/ST-87R 100 f) 66 kV L&E Switch Drg. HTD/ST-87R 101 g) 11 kV NCT Drg. HTD/ST-149 (if combined structure used) or 11 kV NCT Drg. HTD/ST-88R (if required). 102 1. EARTH WORK 1.1 Earth filling with good earth (as per satisfaction of Executive Engineer/Civil Works Division), laying in layers (as per specification), dressing, including carriage, irrespective of lead, loading, unloading, watering and compaction in layers with roller including compensation of earth complete in all respect. 103 1.2 DewateringDewatering of subsoil water for lowering of water table to enable excavation of earth, concreting for all type of works and backfilling, by boring of tube wells or deploying well point system so that continuous lowering of water table is made till completion of work, without disturbing the soil characteristics. The rate shall include all type of expenditure for required dewatering arrangements. 104 2. FOUNDATIONSWORK FOR 66 KV MUSSIMBLE:Supply of labour, T&P, material and construction of RCC footings & pedestals etc. for steel gantry and equipment structures complete in all respects as per HVPNL standard drawing, technical specifications including cost of excavation, concreting, cement, reinforcement steel, form work, grouting, holding down bolts, backfilling etc.and other items not mentioned herein but required for the completion of work.A. GANTRY TOWERS i) CT-4 105 ii) CT-5 106 iii) CT-6 107 iv) CT-8 108 v) DT-2 109 vi) DT-3 110 B. EQUIPMENT 66kV sidei) 66KV LA 111 ii) 66KV CVT/PT 112 iii) 66KV CT 113 iv) 66kV L&E & Isolator 114 v)66kV NCT 115 11kV sidei) 11kV NCT 116 3. FOUNDATIONS WORK FOR 66 KV SADOPUR:Design engineering & supply of labour, T&P, material and construction of RCC footings & pedestals etc. for steel gantry and equipment structures complete in all respects as per technical specifications & approved drawings including cost of excavation, concreting, cement, reinforcement steel, form work, grouting, holding down bolts, backfilling etc.and other items not mentioned herein but required for the completion of work.The successful bidder shall develop the designs & drawings as per the soil investigation report attached in specification and shall get these checked/vetted from any professsional institute as per contract before final approval.A. GANTRY TOWERS i) CT-4 117 ii) CT-5 118 iii) CT-6 119 iv) CT-8 120 v) DT-2 121 vi) DT-3 122 B. EQUIPMENT 66kV sidei) 66KV LA 123 ii) 66KV CVT/PT 124 iii) 66KV CT 125 iv) 66kV L&E & Isolator 126 v)66kV NCT 127 11kV sidei) 11kV NCT 128 4. BREAKER FOUNDATIONDesign, engineering, supply of labour, material, equipment & const. of foundations for breaker including all associated works PCC, RCC, structural steel, steel reinforcement & any other item not specifically mentioned herein but reqd. for completion of work as per tech. spec.i) 66 kV Breaker Foundation 129 5. RoadsSupply of labour, material and construction of cement concrete roads and walkways/shoulders from NH/SH/etc. to Switch yard/Switch house building as per GELO/CLO as per sectional detail drawing no. HCD/SK-181 R1 and technical specification.i. 6.0m wide road (Near main gate of substation) 130 ii. 3.66 wide road 131 6. CAPACITOR BANK FOUNDATIONSDesign, Engg. & supply of labour, material & construction of foundations for capacitor bank with capacitor unit (with allied equipments) & series Reactor etc. including chain link fencing 1.8M height around cap. bank complete in all respect including any other items not specifically mentioned herein but required for completion of job as per technical specification.i) 9000 KVAR 12.65 kV capacitor bank 132 7. ROAD CULVERTDesign, Engineering and const. of Pipe culvert(s) at suitable locations under the approach road (from main PWD/ HUDA/Municipal/Village road to the sub-station entry point) including, cost of labour, material complete in all respects as per I.R.C. Standards. 133 8. TRANSFORMER FOUNDATION FOR 66 KV MUSSIMBLE : 8.1 Construction of transformer foundation including all associated works, RCC, PCC, reinforcement steel, misc. structural steel and other items not mentioned herein but required for completion of work as per technical specifications & approved drgs. In case extra foundation(s) has/have to be constructed (as per approved T/F drawing) to complete the job, nothing extra would be paid on this count..25/31.5MVA,66/11kV T/F foundationcomplete in all respect. 134 9. TRANSFORMER FOUNDATIONWORK FOR 66 KV SADOPUR: 9.1 Design Engineering & construction of transformer foundation including all associated works, RCC, PCC, reinforcement steel, misc. structural steel and other items not mentioned herein but required for completion of work as per technical specifications & approved drgs. In case extra foundation(s) has/have to be constructed (as per approved T/F drawing) to complete the job, nothing extra would be paid on this count.The successful bidder shall develop the designs & drawings as per the soil investigation report attached in specification and shall get these checked/vetted from any professsional institute as per contract before final approval..25/31.5MVA,66/11kV T/F foundationcomplete in all respect. 135 10 Statipon Transformer Foundation work: Design, Engg., supply of labour, material and construction of foundation for station transformer including all associated works, RCC, PCC, Reinforcement steel, misc. structural steel and other items not mentioned herein but required for the completion of work as per technical specifications.11/0.4kV 200KVA Station T/F 136 11. OUTDOOR CABLE TRENCHES:Supply of labour, material such as cement, reinforcement steel, GI angles, flats, PCC & brick pillars below cable trenches for construction of Out-Door Cable Trenches (ODCT) of required depth/ type with pre-cast RCC covers including associated works like Cable Trench Culverts crossings for roads and sumpit-cum-pump chamber with 2HP motor of reputed make, starter, volt meter, amp-meter etc. as per approved trench layout plan, HVPNL drgs. & tech. specs. complete in all respecti) D-type trench 137 ii) E-type trench 138 iii) F-type trench 139 iv) G-type trench 140 v) H-type trench 141 vi) Road culvert 142 vii) Sump Pit Cum Pump Chamber 143 12. SITE SURFACING:12.1Providing, supplying & laying 100mm thick in two layers of 50mm each of 20mm nominal size uncrushed/crushed/ broken stone pebbles gravel fill including dressing, rolling & compacting complete in all respects as per specs. & instructions of engineer incharge. 144 12.2 Providing, supplying & laying 100mm thick PCC (1:4:8) using 20mm nominal coarse aggregates and supplying & spreading 100mm thick layer of 40mm nominal size uncrushed/ crushed/broken stone pebbles over the PCC including construction of toe wall (exposed wall plastered with cement mortar 1:5) to hold 40mm single size uncrushed/ crushed /broken stone pebbles wherever required in the bays covered under the present scope as detailed in the GELO & instructions of engineer incharge. 145 13. BOUNDARY WALL13.1 Supply of labour, T&P, material & construction of front, side & U/C boundarybelow DPC level as per GELO/CLO, tech. spec. & HVPNL drgs including excavation, PCC, brickwork, back filling, plaster, painting etc. complete in all respects. 146 13.2 Supply of labour, material and construction of front, C & U/C boundary walls above DPC including main gate foundationsas per GELO/CLO, technical specifications. & HVPNL drg. HCD/TS-1176 R3 including DPC complete in all respect.i. 6 ft. high U/C B/wall with barbed wire on angles at top. 147 ii. 4½ ft. high front wall including providing grill at top of wall & construction of gate pillars. 148 iii. 4½ ft. high side wall with barbed wire on angles at top of wall. 149 14. CONTROL ROOM BUILDING FOR 66 KV MUSSIMBLE: Supply of labour, material, T&P and construction of control room building complete in all respect as per tech. specs. including exterior weather proof paint, interior emulsion, all internal services like water supply including supply & providing of 5000ltr. capacity double layer Sintex/Diplast PVC tank, Sewerage system, electrification including wiring, modular switches, maximum 20W 4ft. long LED tubes with fittings minimum 1960 lumens, ceiling/exhaust fans, Finishing, Plinth protection, flooring, Indoor trenches, Soakage pit near the switch house building, Rcc pipe around the building to drain of water,connection of sewerage system to Soakage pit/Sewerage system of local authorities (as applicable), connection to main water supply system of local authority, bore (Tubewell) (as applicable) etc. & any other item not mentioned herein but required for completion of works. 150 15. CONTROL ROOM BUILDING FOR 66 KV SADOPUR:The design of foundation below plinth level is in the scope of successful bidder. However, the architectural design and the structural design above plinth level shall be kept same as per HVPNL standard drawings attached with bidding documents. Design engineering, supply of labour, material, T&P and construction of control room building complete in all respect as per tech. specs. including exterior weather proof paint, interior emulsion, all internal services like water supply including supply & providing of 5000ltr. capacity double layer Sintex/Diplast PVC tank, Sewerage system, electrification including wiring, modular switches, maximum 20W 4ft. long LED tubes with fittings minimum 1960 lumens, ceiling/exhaust fans, Finishing, Plinth protection, flooring, Indoor trenches, Soakage pit near the switch house building, connection of sewerage system to Soakage pit/Sewerage system of local authorities (as applicable), connection to main water supply system of local authority, bore (Tubewell) (as applicable) etc. & any other item not mentioned herein but required for completion of works.The successful bidder shall develop the designs & drawings as per the soil investigation report attached in specification and shall get these checked/vetted from any professsional institute as per contract before final approval. 151 16. U/C FENCING & GATESProviding & fixing chain link fencing including foundations, GI angle iron posts and gate(s) complete as per electrical layout & tech. spec. & as per drawing attached. 152 17. PCC PAVEMENTConstruction of PCC pavement in front, rear or side (as per site requirement of the switch house building) as per drawing no. HCD/SK-172 & technical specifications. 153 18. DRAINAGE–CUM-RAIN HARVESTING SYSTEM for 66 kV substation Mussimble 18.1 Supply of labour, material for construction ofrecharge structures with bore well(s) as per HVPN drawings & specs. complete in all respect . The location of recharge structures shall preferably be located on corner(s) of the substation and shall be got decided from the concerned Engineer in-Charge on the basis of surroundings of the substation(s). In case ground water table is less than 8m from FGL, rain harvesting well shall not be constructed (the drainage system with sump pit is to be constructed as per item mentioned below). 154 18.2 The successful bidder shall evolve design & drawing for drains, manholes with RCC covers andsettlement tankincluding preparation of drainage layout drawing for disposal of rain water from building’s roof top & switch yard (s/stn.) area into respective bore well(s) in such a way that there shall be no ponding of water on the roof and switch yard (s/stn.). The layout so developed shall be got approved from the employer. The location of sump-pit-cum-pump chamber shall preferably be locatedon corner(s) of the s/stn. and shall be got decided from the concerned Engineer in-Charge on the basis of surroundings of the substation(s). The successful bidder will also supply labour and material for construction of sump-pit-cum-pump chamber as per HVPNL drgs. & provide one no. non clog pump(s) of 5HP of reputed make capacity with main switch, starter, volt meter, Amp. Mtr. etc. (for each sump pit) for disposal of excess water to outfall point. Any other item(s) not mentioned herein but is/are required for completion of works shall be done by the successful bidder without any extra cost to the employer.i)Drain Section-1 155 ii) Drain Section-2 156 iii) Drain Section-3 157 iv) Road Crossing 158 v) Trench Crossing 159 vi) Sump Pit Cum Pump Chamber 160 19. DRAINAGE–CUM-RAIN HARVESTING SYSTEM for 66 kV substation Sadopur The successful bidder shall evolve design & drawing for drains, manholes with RCC covers andsettlement tankincluding preparation of drainage layout drawing for disposal of rain water from building’s roof top & switch yard (s/stn.) area into respective bore well(s) in such a way that there shall be no ponding of water on the roof and switch yard (s/stn.). The layout so developed shall be got approved from the employer. The location of sump-pit-cum-pump chamber shall preferably be locatedon corner(s) of the s/stn. and shall be got decided from the concerned Engineer in-Charge on the basis of surroundings of the substation(s). The successful bidder will also supply labour and material for construction of sump-pit-cum-pump chamber as per HVPNL drgs. & provide one no. non clog pump(s) of 5HP of reputed make capacity with main switch, starter, volt meter, Amp. Mtr. etc. (for each sump pit) for disposal of excess water to outfall point. Any other item(s) not mentioned herein but is/are required for completion of works shall be done by the successful bidder without any extra cost to the employer.The successful bidder shall develop the designs & drawings and shall get these checked/vetted from any professsional institute as per contract before final approval.i)Drain Section-1 161 ii) Drain Section-2 162 iii) Drain Section-3 163 iv) Road Crossing 164 v) Trench Crossing 165 vi) Sump Pit Cum Pump Chamber 166 20. RCC M-20 for 66 kV substation Mussimble inclusive of labour, material, shuttering, steel reinforcement etc. complete in all respects to compensate excess quantity required to be executed due to difference in existing ground level and the formation level to be fixed after contouring or difference on account of revised drawing issued at the time of construction and the tender drawing. 167 21. RCC Retaining wall for 66 kV substation Sadopur Design engineering, supply of labour, material and construction of T/L shaped RCC retaining wall below DPC to retain the earth filling complete in all respect. The successful bidder shall develop the designs & drawings as per the soil investigation report attached in specification and shall get these checked/vetted from any professsional institute as per contract before final approval.Difference between NGL & FGL from 2.5 to 3.5 mtr. 168 22. Distamtlement for 66 kV substation Sadopur :-Dismantling of existing residential quarters, OHT and underground tank etc. Dismantling including foundations of following structure. The material whatsoever shall be the property of the successful bidder. The dismantled material shall not be allowed for reuse at any of the sub-stations; however, HVPNL may allow use of bricks for brick ballast purpose only.Dismantling of existing residential quarters, Overhead tank, toilet, boundary wall and underground tank etc complete in all respect.
Contract Date : Ref. Documents   |   Contract Value : Ref. Documents
BRR : 10591948 tender for WORK OF REPLACEMENT OF EXISTING 100 MVA 220 / 132 KV TRANSFORMER (EMCO MAKE) WITH NEW 160 MVA 220 / 132 KV TRANSFORMER (TAL MAKE) AND OTHER ASSOCIATED WORKS AT 220 K.V. SUB STATION KURSI ROAD UNDER E.T.D. - II, LUCKNOW Sl. No. Item Description 1 Following Works are to be carried out at 220 K.V. Sub Station Kursi Road, Lucknow for replacement of existing 100 MVA 220 / 132 KV Transformer (EMCO make) by new 160 MVA 220 / 132 KV Transformer (TAL make) alongwith associated works against Increasing Capacity including all cost of men, T&P, Crane, 6 - 12 KL / Hr. capacity Centrifuging Machine with Operator, Carriage Vehicle etc. to complete the job satisfactorily as per direction of site Engineer : 2 Draining of Oil from 100 MVA EMCO make Transformer at 220 KV Sub Station Kursi Road into 209 Liter Capacity Oil Drums. 3 Dismantling of existing 120 KV LAs alongwith associated structures instailed in 100 MVA 220/132 KV Transformer Bay after due cutting of earthing, opening of jumpers etc. (1 Job per L.A. with structure). 4 Complete dismantling of all the water & air pipe lines, pipe supports etc. of Emulsifire Systern around the 100 MVA 220/132KV Transformer alongwith Shifting & Stacking of all the dismantled items at safe storage place at the Sub Station. 5 Opening of HV & LV side Jumpers, Removal of Neutral & Main Tank Earthing, Opening of Control / Power Cable Connections of 100 MVA 220/132 KV Transformer including opening of connections of associated OLTC & Marshalling Box. 6 Complete safe Dismantling of the accessories of 100 MVA 220/132 KV Transformer including opening of Jumpers, removal of earthing, opening of Cable connections, Removal of Conservator Tank, Pipe Lines, Bushings, Cooling Fans & Pumps, Marshaling Box, Radiators after Draining of Radiator Oil in empty Drums then fixing of blanking plates on the radiators, pipe lines, conservator tank turret etc. (Suitable Blanking Plate including Bolts & Nuts as required if not available at substation, shall be provided/arranged by the Contractor.) 7 Safe Shifting & proper Stacking at storage place of all the dismantled accessories of 100 MVA 220/132 KV Transformer i.e. Conservator Tank, Pipe Lines, Bushings, Cooling Fans & Pumps, Marshaling Box, Radiators, Headers, A Frame etc. and T/F Oil Drums at the safe storage place at the Sub Station. 8 Proper packing of HV/LV neutral bushings of the dismantled 100 MVA 220/132 KV Transformer in separate wooden cases / crates of the bushings after proper wrapping of bushing with polythene sheet alongwith reparing of wooden cases, to be provided by contractor. 9 (A) Shifting of Main Tank of the dismantled 100 MVA (EMCO make) 220/132 KV Transformer from the Plinth up to 20 Meter distance including turning of Tank, as required. 10 (B) Additional Shifting of the tank of above transformer upto 200 Meter distance. (01 Job for every 5 Meter and / or part there of) 11 Dismantling and shifting of existing 100 MVA TF RTCC panel from ACDB room including opening connection of control cables , identifying cables for future connection & shifting RTCC panel at place of storage as per instructions of supervising engineer (SDO/JE) 12 (A) Shifting of Main Tank of the new 160 MVA (TAL make) 220/132 KV Transformer to its Plinth from Place of Unloading up to 20 Meter distance including turning of Tank, as required. 13 (B) Additional Shifting of the tank of above transformer upto 120 Meter distance. (01 Job for every 5 Meter and / or part there of) 14 Complete erection of the 160 MVA (TAL make) Transformer including its radiators, conservator tank, turrets, connecting pipe lines, HV / HV / neutral bushings, cooling fans, OLTC drive mechanism box, marshalling box, OTI, WTI, capillary tubes etc. 15 Supply of dry Nitrogen gas having DEW point (-60°C to -65°C) under vacuum fro top valve of the transformer upto pressure of 2PSI (as per tehcnical norms of Transformer) and maintaning the same in the main tank for 12 Hrs. including cost of nitrogen gas and nitrogen gas filling device for dry cycle. 16 Create the vacuum inside the T/F tank & maintain it for 24 Hrs. dry air cycle of T/F creating vacuum inside the main tank of T/F, maintaning it for 24 Hrs. then filling of dry air bearing dew point (-60°C to -65°C) for 24 Hrs. And repeating the same till the PPM value of main tank is achieved below 05 PPM filling the oil step by step in 160 MVA T/F. 17 Centrifuging of completed T/F oil in T/F oil tank by connecting centrifuging machine to be provided by the contractor and taking the BDV,PPM & IR values of the oil & TF bushings periodically till the required value in achieved as per direction of Supervising Engineer (Centrifuging machine, BDV & PPM machine, megger shall be arranged by the contractor). After centrifuging ,DGA test of oil sample is to be carried out. 18 Carriage of oil tank of 20KL (01 Nos) capacity from 220 KV S/S Chinhat to 220 KV S/S Kursi Road distance upto 20 KM including loading and unloading at respective place and after work completion. Carriage of oil tanks of 20 KL (01 Nos.) from 220 K.V. Sub Station Kursi Road to 220 KV S/S Chinhat. 19 Delta earthing of 160 MVA Transformer consisting of fabrication of delta set with 03 Nos. 40 mm / 33 mm dia size 03 Mtr. ling electrode, its placing inside ground and connecting all the these electrode with 75x10mm M.S. Flat 700 mm deep and connecting the same with earthmat at two places. Also connecting delta to earth mat of substation at two places as per drawing provided by site engineer from UPPTCL. The work also to be done for painting the welding joint in black colour below earth level and green colour above ground level in two coats. (MS Rods & MS Flat will be provided by the department free of cost). 20 Erection of 132 KV LAs including erection of associated ALP structures, earthing of the LAs with existing M.S. Flat and jumpering with ACSR Zebra Conductors to connect with 132 KV Jack Bus with the help of ACSR Zebra Conductor, associated terminal connectors, P.G. Clamps etc. (01 Job per LA with associated structure). 21 Jumpering of HV side bushing of the 160 MVA transformer to connect with HV side CTs through 220 KV LAs with ACSR Zebra Conductor, associated terminal connectors etc. 22 Jumpering of LV side bushing of the 160 MVA transformer to connect with LV side CTs through 132 KV LAs with ACSR Zebra Conductor, associated terminal connectors, PG Clamps etc. 23 Laying of following size control cables from C&R panel to marshalling box/equipment/ junction box etc in switch yard for new 160 MVA T/F as per cable schedule along with saddling at every 750mm distance with MS saddles of size 25x3 sq mmincluding carriage of cable drums from store to laying site and shifting back remaoning drumsto store after work completion. The work shall also include interconnection of control cables with marshalling box , OLTC panel to RTCC panel, ferruling, dressing of cables and other associated works for satisfactory completion of job as per technical specificatons: 24 2C x 2.5 sq mm 25 4C x 2.5 sq mm 26 6C x 2.5 sq mm 27 10C x 2.5 sq mm 28 Erection of new 160 MVA TF RTCC panel including shifting from place of storage to ACDB room as per directions of site engineer (SDO/JE). 29 Earthing of main tank, marshalling box, drive mechanism, Transformer neutral, , RTCC panel etc of new 160 MVA Transformer with 50 x 6 mm and 75 x 10 mm size MS flats, its jointing with already existing earth mats/ deltas including necessary modification in existing support for earthing of neutral bushing for its earthing work and then painting of earthing strips as per technical specifications. 30 Making termination / connection of the control & power cables as per new cable schedule of 160 MVA Transformer, RTCC Panel, control & relay panel, cooling fans, pumps, marshalling box. OLTC, driving mechanism etc. dressing & binding of additional control cables, if required as per site requirement alongwith making necessary holes in the gland plate / box, wherever required including providing & fixing of cable glands of appropriate sizes providing of ferrules etc. 31 Testing of new 160 MVA Transformer 32 Conducting test of 160 MVA T/F (M/s TAL make) by arranging appropriate equipments for following items :-i. DGA test of Transformer oil & Water Content Test of Transformer oil 33 Conductioning test of 160 MVA T/F (M/s TAL make) by arranging appropriate equipments for following items :-1. WRM-01 No.2. Tan Delta-02 No. (Pre-erection and post-erection)3. Turret CT Ratio. Polarity, Knee Point continuity & I.R. Test 34 Work of re-erection, hydraulic testing, & commissioning of water spraying and fire detection mulsifyre system comprising of following detailed pipe lines with all cost of men, material, T&P etc required for the job as per details below: 35 Supply and installation of 80 mm dia B-class GI pipe for support with round clamp at top & flanges at bottom as per specifications including grouting and painting etc. 36 Providing, laying, installation , testing and commissioning of new 50 mm dia B class GI pipe with elbows, Tees, sockets, flanges, bends etc including its painting and connection to already dismantled existing pipe lines ( as may be required) 37 Providing, laying, installation , testing and commissioning of new 40 mm dia B class GI pipe with elbows, Tees, sockets, flanges, bends etc including its painting and connection to already dismantled existing pipe lines ( as may be required) 38 Providing, laying, installation , testing and commissioning of new 25 mm dia B class GI pipe with elbows, Tees, sockets, flanges, bends etc including its painting and connection to already dismantled existing pipe lines ( as may be required) 39 Supply, installation of HV nozzle projector HD make. 40 Supply, installation , testing of QB detector 41 Laying, installation, testing & commissioning of old G.I. Pipe B Class including cutting, welding etc. and providing suitable Flangs alongwith necessary fitting viz bends, elbow, tees, reducer, gasket etc.:- 42 25 mm dia. G.I. Pipe 43 50 mm dia. G.I. Pipe 44 65 mm dia. G.I. Pipe 45 80 mm dia. G.I. Pipe 46 100 mm dia. G.I. Pipe 47 150 mm dia. G.I. Pipe 48 Installation of HV nozzle projector 49 Installation of HV HD Fire detector 50 Erection, hydraulic testing & commissioning of complete mulsifyre system by installation of high velocity water spraying & fire detection system on 160 MVA 220/132KV TF by using old dismantled/newly laid additional pipe lines including providing of new gaskets/packings of required sizes along with necessary welding / jointing and earthing of pipe supports after re-construction of damaged RCC foundation for pipr supports. 51 Painting of above installed water spraying & fire detection system on 160 MVA 220/132KV TF in 02 coats of synthetic enamel paint after due application of 01 coat of red oxide primer after removal of old paint by rubbing with emery paper. The water pipe lines shall be painted in P.O. red color , Air pipe lines in sky blue color,Pipe supports in black color, earthing strips in Bus green color. 52 Electrical Safety processing fees needed for providing all relvant safety clearance documents from electrical safety department for energisation of the above commissioned 160 MVA Transformer and its accessories (Note: The amount payable is actual rate of challan or quoted rate, whichever is lower) 53 160 MVA Power Transformer 54 All LA (220/132 KV) associated with newly commissioned 160 MVA Transformer 55 HT inspection fees 56 Work of re-erection, hydraulic testing, & commissioning of water spraying and fire detection mulsifyre system on 132/33 KV 63 MVA M/s Atlanta make Transformer, comprising of following detailed pipe lines with all cost of men, material, T&P etc required for the job as per details below: 57 Providing, laying, installation , testing and commissioning of new 150 mm dia B class GI pipe with elbows, Tees, sockets, flanges, bends etc including its painting and connection to already dismantled existing pipe lines ( as may be required) 58 Supply and installation of 80 mm dia B-class GI pipe for support with round clamp at top & flanges at bottom as per specifications including grouting and painting etc. 59 Providing, laying, installation , testing and commissioning of new 40 mm dia B class GI pipe with elbows, Tees, sockets, flanges, bends etc including its painting and connection to already dismantled existing pipe lines ( as may be required) 60 Providing, laying, installation , testing and commissioning of new 25 mm dia B class GI pipe with elbows, Tees, sockets, flanges, bends etc including its painting and connection to already dismantled existing pipe lines ( as may be required) 61 Supply, installation of HV nozzle projector HD make. 62 Supply, installation , testing of QB fire detector 63 Replacement of diaphragm along with re-installation of quick opening flood, deluge valve HD make 150NB as per maximum working pressure 10kg/sq mtr of deluge valve system. 64 Erection, hydraulic testing & commissioning of complete mulsifyre system by installation of high velocity water spraying & fire detection system on 63 MVA 132/33 KV TF by using old dismantled/newly laid additional pipe lines including providing of new gaskets/packings of required sizes along with necessary welding / jointing and earthing of pipe supports after re-construction of damaged RCC foundation for pipe supports. 65 Painting of above installed water spraying & fire detection system on 63 MVA 132/33 KV TF in 02 coats of synthetic enamel paint after due application of 01 coat of red oxide primer after removal of old paint by rubbing with emery paper. The water pipe lines shall be painted in P.O. red color , Air pipe lines in sky blue color,Pipe supports in black color, earthing strips in Bus green color. 66 Following works including Providing of materials are to be carried out at 220 KV S/S Kursi Road Lucknow for Proper Lighting arrangement along the 160 MVA Transformer bay and other crucial places in switchyard with all cost of men, materials ,T&P etc . Except Cables Which shall be Provided by the Department as per direction of Supervising Engineer . 67 Providing of Lighting Junction Box of size of 280 mm x 150 mm made of 16 SWG M.S. B.P. Sheet & Painted with smoke Grey colour synthetic enamel Paint, duly fitted with 1 No 6 Amp. S.P. M.C.B. on Anodised M.S. Channel ,1 No Bakelite Fuse Fitting with 6 Amp. ,Capacity NS 6 type HRC Fuse,01 No . Copper Neutral Link ,Bakelite terminal strip of 4 Nos. terminals,Cable Glands suitable for 2C /4C x 2.5 Sq. mm size incoming /outgoingControl cable etc.& fixing on the GI Structure at designated height with the help of suitable duly fabricated M.S. Bracket Clamps and Due earthung of the Junction Box including Cable Terminations. 68 Providing & Fixing of G.I. S.L. Pole Bracket duly made of 40 mm dia B class 1.20 Meter long M.S. Pipe of (ID 35 mm& OD 40 mm) and bent at one end by quarter circle in 1.0 mtr. At an angle of 30 deg for fixing of 150 watt LED street Light Luminaries Fittings with the help of MS Bracket Clamps of suitable size for fixing on G.I. column structure at designated place. 69 Provinding & Fixing of 150 Watt LED Street Light Luminaries Fittings of PHILIPS/ CROMPTON / HAVELLS/ BAJAJ Make in Single Piece die cast aliminium Alloy Housing with Pot Optics Reflector & Toughed Clear Glass Cover with Frame for Lamp Compartment including Cable Termination . 70 Cable laying & Termination- 71 Laying of following size PVC insulated Copper Control cable from LT ACDB Cubical to Various Junction Boxes below ground level in PVC Conduit pipe (Provided by the contractor ) after due excavation ,back filling etc. including all labour ,PVC Pipe etc. required for proper completion of the work . 72 2 C x 2.5 Sq mm 73 Laying of Control cables between LT Lightinig Junction box & LED Street Light Fittings along GI Structure including necessary clamping with suitable M.S. street clamp with Proper Dressing . 74 Providing & fixing of Post Lamp Glow Light of latest design complete with white color defuser suitable for installation at main entrance/garden/lawn lighting. 75 Fabrication of protective net for radiators of 132/33 KV Transformers, control room glass window, JE room glass window and associated works: 76 Providing, fabrication and fixing of protection net in front of radiator of Trasformer, made of MS channel, angle, mesh and cross section type net. Size of protection net , including all cost of men and material- 77 132/33 KV 100 MVA Transformer M/s Atlanta make, size 2500x5000 sq mm for radiator and 6100x2500 sq mm for marshalling box (total area 27.75 sq mtr) 78 132/33 KV 63 MVA Transformer M/s Atlanta make, size 6000x2500 sq mtr for radiator 79 JE Room glass window 80 Control room glass window 81 Providing, fabrication and grouting of MS Channelin front of radiator by concreting for support of protection net by welding or nut & bolt as required , including all cost of men and material: 82 132/33 KV 100 MVA Transformer M/s Atlanta make, 4500 mm size at 4 places ( Total length 18 mtr ) 83 132/33 KV 63 MVA Transformer M/s Atlanta make, 4500 mm size at 2 places ( Total length 9 mtr) 84 JE Room glass window, 3000 mm size at 2 places ( total length 6 mtr) 85 Control room glass window , 3000 mm size at 4 places ( Total length 12 mtr) 86 Fabrication and fixing of 03 no. P.I. on the top of front protection for extra support of LV side conductor including all cost of men & material: 87 132/33 KV 100 MVA Transformer M/s Atlanta make 88 132/33 KV 63 MVA Transformer M/s Atlanta make 89 Spray/ brush Painting of following equipments/items painting includes one coat of red oxide and two coats of Green/Red colour good quality Asian/Burger/Nerolac make paint after through rubbing and cleaning of old scale of painted surface to remove rust,dust etc. 90 Earthing strip 75 x 10 mm in green Colour 91 Earthing strip 50 x 06 mm in green Colour 92 Switchyard lighting JB in smoke grey color 93 220KV CT/CVT in smoke grey color 94 220KV SF6 CB in smoke grey color 95 220KV & 132KV Isolator operating box in smoke grey color 96 132KV CT/CVT in smoke grey color 97 33 KV Isolator Operating Box in smoke grey colour. 98 33 KV CT & PT Junction Box in smoke grey colour. 99 Work and supply related to work of installation of CCTV camera at crucial places of substation for protection from theft and surveillance of store and switchyard equipment 100 Providing and fixing of outdoor Static (Bullet)IP 2MPCCTV Network camera having resolution 1920x1080,full HD 1080p video, 140 dB, WDR ,3d DNR smart heater ,Image sensor 1/2.8, progressive Scan CMOS,Shutter time 1/100000 Sec. Day and Night IR cut filter with auto Switch weather proof IP 67 protection,IR range 100-120 Meter Model No DS-2CD4A25FWDIZ(H)(S) of Hikvision make or equivalent model of BOSCH/CAME make. 101 Providing and fixing of Full HDoutdoor Dome IP 2MPCCTV camera having resolution 1920x1080,full HD 1080p video, digital WDR ,3d DNR smart heater ,Image sensor 1/2.8, progressive Scan CMOS,Day and Night IR cut filter with auto Switch weather proof IP 67 protection,IR range 50-70 Meter Model No DS-2CD432F-I(Z)(H)(S) of Hikvision make or equivalent model of BOSCH/CAME make. 102 Providing and fixing of 16 Channel Embedded plug and play NVR having 16 channel,2TB HD, SupportH.264+& h.264, 6 MP ,Integrated 16 Port PoE, HDMI, resolution 1920x1080p upto 2 SATA Interface, Model No7614NI-E2/16P of Hikvision make or equivalent model of BOSCH/CAME make. 103 Providing and Fixing of 32 Full HD LED TV (model No KDL-32W700B 80cm) of Sony make 104 Supply and fixxing of 3KVA on -Line UPS with isolation transformersuitable for single phaseAC power supply and single phase outputAC ,floor mounted type with 120 minut power backup APC make (modal No.SURTD3000XLI) or equivalent modelof standerd make. 105 Providing & fixing of 4TB Hard Disk of seagate make for storing the servilance data. 106 Providing & fixing of power supply board 24 Volt DC/24Amp AC of standard make. 107 Porviding & fixing of Power Over Eathernet (POE) Switch (08 Port), 10/1000 MBPS of D-Link make model No. DGS-1210-10P (08 Port) 10/100/1000 MBPS 108 Providing & laying 40 mm dia size HDPE pipe of standard make for laying of power supply cable/OFC/CAT-6 Data cable as per requirement. 109 Providing & laying of RG-60 3 GHZ Co-axial optical fiber cable of Fonolex/Standard make for CCTV wiring. 110 Providing & laying of Cat-6 Data Cable of D-link make for connecting PTZ Cameras to NVR. 111 Providing & laying of 3 Core 1.5 Sq. mm Multi Strnad Copper Wire Power Cable of Finolex/Standard make as per IS alongwith providing & fixing of Junction Boxes whereever required. 112 Providing of Computer Table of Godrej make as per sample. 113 Earthing of Cameras & NVR as per technical specification (01 Job each) 114 Work related to supply & installation of Fire Detection System operating on the basis of feedback by Smoke Detectors in BCUs, Store, ACDB room, Battery room, & office building at 220 KV substation Kursi Road Lucknow 115 Supply & installation of 08-12 Zone Conventional fire detection and fire alarm system with power supply arrangement. (Make compatible with IS: 2189:1999 tested by ERTL (N) and System Sensor (Agni suraksha/ Agni devices/ daksh OR equivalent). 116 Supply & installation of Manual Call Point A breakable glass cover fixed in such a way that the actuating push button is kept depressed as long as the glass is intact and released when the glass is broken. A small steel hammer shall be attached to the assembly with a steel chain to facilitate breaking of glass. The manual call points shall be suitable for surface or fully / partly recessed mounting. 5mm high red painting/printed word IN CASE OF FIRE BREAK GLASS shall be provided on the front face. The manual call point shall be compatible with all conventional control panels. (Make Agni Suraksha (ASES) / Safeway Equivalent Agni Devices). 117 Electronic hooter 11 dB/24V DC with strobe (ABS-V) The enclosure should be 1.5 mm thickness duly painted and marked FIRE ALARM. All hooters shall produce a similar sound and shall maintain the same during their operation. (Make Agni Suraksha (ASES) / Safeway Equivalent/ Agni Devices). 118 Providing & Fixing of lonisation type Smoke Detectors The detector while sensitive to all type of smokes will be insensitive to ambient lights, air drafts, and changes within the operating temperature and voltage ranges. The Detector shall meet the requirements of either EN 54/ FM/ UL or LPC and shall be specifically approved by FM/ UL/LPCB. Apollo / System Sensor /Edward/Bosch. 119 Providing & Fixing of Heat Detectors (for the area like Battery room, AC plant area, DG room, etc) It is a combination of rate of rise and fixed temperature principle using thermistor and with automatic compensation for changes of ambient conditions. The thermal detectors are tested and approved to EN54 part 5 (2000) Class A1R Apollo / System Sensor / Edward / Bosch/Agni suraksha. 120 Providing & Fixing of Response Indicator Lamp assembly consisting of lamp holder and lamp shall be suitable for mounting on walls, partition etc. The housing shall be suitable for surface/flush mounting of 1.5mm thick sheet steel and the facia 3mm acrylic mounted outside a cabin, and directly connected to the detector inside the cabin. In normal circumstances the lamp should flicker but in the event the detector inside the cabin senses a fire, the lamp should glow. 121 Supply and laying 2x1.5sqmm PVC insulated and sheathed stranded copper wire. Wiring for fire alarm system in general shall comply with IS: 2189 and IS: 732 amended up to date. The detectors shall be wired by ISI marked 1.5 sq mm PVC insulated stranded FRLS copper conductor wires of 1100 volts grade as required and desired on site. Crimping type of lugs are also included in the rates of laying wires and its connections.PVC insulated copper conductor wires shall confirm to IS: 694. And, PVC insulated copper conductor armoured cables should confirm to IS: 1554 (part-1). Make National/Plaza/Kalinga or any other standard make 122 Supply and laying 4x1.5sqmm PVC insulated and sheathed stranded copper wire. Wiring for fire alarm system in general shall comply with IS: 2189 and IS: 732 amended up to date. The detectors shall be wired by ISI marked 1.5 sq mm PVC insulated stranded FRLS copper conductor wires of 1100 volts grade as required and desired on site. Crimping type of lugs are also included in the rates of laying wires and its connections. Make National/Plaza/Kalinga or any other standard make 123 Supply and installation of SMF Batteries with suitable rating as required for 24 Hours backup from Exide / Standard / Amco Prestolite/any other standard make. 124 Signage with backlit facility for Control building marking for various Fire / emergency exit points. 125 Supply and laying of Ms/PVC conduit pipe 25mm as per Requirement of site. 126 Provising, fixing & installation of different types of boards i.e. Glow Sign Board, Shutdown Notice Board, Instruction Board etc as detailed bwlow, to be carried out at 220KV substation Kursi Road Lucknow as per specifications and directions of supervising engineer: 127 Providing, fixing and installation of Glow Sign Board of size 10 ft x 6 ft for substation single line diagram to be fixed in control room building of the substtaion. The Glow Sign Board should be illuminated using sufficient number of LED tube lights. The board shall be made of ACrilic sheet and shall be provided with back support frame & fixing arrangement. 128 Name plates made of 2mm thick Aluminium Sheet coveredwith 3 M HIP retro reflective sheet of following size with details / name written by 3M HIP Retro reflective sheet as per prescribed color scheme to be fixed with the help of nuts & bolts at already installed equipment structure in switchyardwith all cost of plates, nut-bolts, misc materials, T&Pand labour as per specificatins & directions of supervising engineer: 129 300mm x200mm 130 450mm x 250mm 131 500mm x 250mm 132 R,Y,B phase plate sets consisting of one plate of red,, yellow, blue colors in each set & plates of dia 250mm duly made of 2mm thick aluminium sheet with face to be fully covered in red , yellow, blue phase colors in 3 M HIP retro reflective sheetand the phase plate set to be fixed with the help of suitable size G.I. bolts, nuts on already installed equipment structure etc at the substation.
Contract Date : Ref. Documents   |   Contract Value : Ref. Documents
BRR : 9921536 Tender For Material Supply, Spares & Special Tools - RGC - Construction of 33/110kV Step Up GIS at Pushpakandam-- 1 Design, Engineering, Manufacture, Testing at manufacturers works, Delivery at site including all materials, accessories such as OLTC,RTCC, with Transformer Oil and 10% extra Oil, spares,Gaskets, OTI,WTI,MOLG indicators with transducers and Tools as per specification , loading and unloading, transportation, handling, proper storage at siteThree Phase Two Winding Transformer33/110kV, 60MVA Capacity with optical sensors and Remote Data Transfer facility with optical communication media, and all other accessories complete, with SAS Integration Scope , all required valves and flanges for NIFPS shall be provided for transformer at the time of transformer design itself,inclusive of necessary connectors/clamps suitable for Aluminium tube/ACSR conductor(All other items as per technical specification / Layout drawings) - intended for Renewable Energy Evacuation 2 Design, Manufacture, Testing at Manufacturers works, Transportation and Delivery of 110 kV, 3 Phase Encapsulated Double Busbar Indoor Gas Insulated Switchgearequipmentand other accessories at Substation siteand as per respective Technical Specifications, Single Line Diagram, General Arrangement Drawings, IS/IEC standards, approval of KSEBLand relevant special conditions applicable. The quote for each bay shall include necessary interconnecting GI bus ducts within the building. The supply include all accessories of GIS bay, earthing materials for forming the earth grid inside the GIS hallas per standards of GIS earthing (Cu/Al), including RF Earthing, Cable tray, control cable from GIS to LCC, LCC panel, ladder etc. complete. 3 110 kV GIS Feeder Bay with PT(40kA/ 1250A min) 4 110kV GIS Double Bus bar arragement with PT(40kA/ 2500A min) 5 110kV GIS Bus Coupler Bay(40kA/2500A min) 6 110kV GIS Transformer Bay (40kA/1250A min) 7 Polymer housedSurge Arrester suitable for 110kV, 10kA, Class 3 withclamps, terminal connectors suitable for connection of any type of conductor or Al/cu pipe bus as per requirement, leakage current measuring meter with counter, flexible copper cable of required size and all accessories complete 8 110kV composite solid core station post insulator , clamps, connectors etc suitablefor Al/ Cu Pipe Bus /Conductors. 9 Neutral CT (NCT) 36kV 3150Afor 60 MVA 110/33kV, Power Transformer with structure including clamps,terminal connectors and 36kV composite solid core post insulator with structure for support of GI earthing conductor/strip with terminal connector and all other accessories complete-Ratio 1200-600/1-1 Amps(33 kV side) 10 Neutral CT (NCT) 36kV 3150A for 60 MVA 110/33kV, Power Transformer with structure including clamps,terminal connectors and 36kV composite solid core post insulator with structure for support of GI earthing conductor/strip with terminal connector and all other accessories complete-Ratio 400-200/1-1 Amps(110 kV side) 11 UG power cable- 110kV, Single core, 630sqmm, Aluminium conductor,XLPE insulated,Aluminium Corrugated sheathedandHDPE Outer jacket under ground cable having rated short circuit capacity for both conductor and armourwith necessary Non - Magnetic , Metalic Trefoil/flat formation clamps atminimum 3 metre interval, steel/nylon cable ties wherever necessary 12 Outdoor termination kit suitable for 110kV, 630 Sqmm Single core Copper/ Aluminium UG cable for yard structure mountinginclusive of all accessories like earthing cable, suitable Non - Magnetic, Metalic clamp for fixing cable to support structure etc at 1m interval complete. 13 Indoor Plug in Type GIS termination kit for 110kV 630 Sqmm XLPE Single coreCopper/ Aluminium UG cable,inclusive of all accessories like earthing cable, suitable Non - Magnetic , Metalic clamp for fixing cable to support structure etc at 1m interval complete. 14 Supply of 4IPS Schedule 40 Al. Tube including requiredJointing Sleeves, Expansion joints, etc. withnecessary fixing clamp and all accessories complete for 110kV,33kV equipment to equipment connection 15 Three Phase Link Box 6.6kV withoutSVL for 110kV cable with copper bonding cable(minimum cross-section 300sq.mm) including all accessories 16 Three Phase Link Box 6.6kV withSVL for 110kV cable with copper bonding cable(minimum cross-section 300sq.mm) including all accessories 17 33kV Indoor composite VCBPanels having bus capacity 31.5 kA for 3sec, 3150A at STC continuous rating, 4 nos feeder bays having capacity not less than 1250A ,2 nos transformer feeder bays (for 33/110kV transformer) having capacity not less than 2000A ,1 nos transformer feeder bay ( for 33/11 kV5MVA Transformer ) having capacity not less than 1250A and1 nos bus coupler with bussection panel not less than 3150A, two bus PT panel at both side of the bus .Every feeder/incomer/ bus coupler shall have CT, E/S, synchro check, SEM Energy Meter, Ammeter, Voltmeter, Control and Protectionincluding earthing as per standards(Cu), cable tray, control cables etc completeand as per SLDand specifications. 33/110 kV 60 MVA Transformer feeder shall have provision for termination of cable size 3 runs per phase of 630 sqmm Aluminium cable. Each incomer panel (transformer) shall be provided with additional special protection class CT cores for differential protection scheme M1 and M2 at 110kV transformer C&R panel. All the feeders shall be remote controlled from SCMS and from the local console of the numerical relays with Bay Control Unit and protection unit including supply of the same. The supply includes one number VCBfor each ratings as spare (2000A, 1250A) and two numbers of service trolley for VCB , E/S, PT and spares (as per attached list clause 6.6 & 6.7 of volume 2, Chapter 27). 18 Polymer housedSurge Arrester suitable for 33kV, 10kA, Class-3 with clamps, terminal connectors etc. suitable for connection ofany type of conductor or Al /Cu pipe bus as per requirement, including leakage current measuring meter with counter, flexible copper cable of required size and all accessories complete (33kV Feeder/ Transformer) 19 33kV 800A Triple Pole Line Isolator with Structure, clamps, terminal connectors etc. suitable for connection of any type of conductor or Al/Cu pipe bus as per requirement 20 33kV Pin insulator with pin 21 33kV composite solid core station post insulator with high level structure with clamp & connectors suitable for Al pipe/conductor. 22 UG power cable- 33kV 1Cx630sqmm Aluminium 33kV, XLPE Aluminium armoured having rated short circuit current capacity for both conductor and armour and HDPE outer jacket for 33/110kV 60MVA transformer incomer with necessary Non-magnetic, metallic, Trefoil/flat formation clamps at minimum 3 metre interval and steel/nylon cable tie wherever necessary 23 Outdoor Heat shrinkable termination kit suitable for 33kV, 630 Sqmm XLPE Single core Aluminium UG cablewith necessary clamps, connectors suitable for connection ofany type of conductor or Al /Cu pipe buswith all accessoriesincluding cost of bimetallic strip etc. and suitable Non-magnetic, metallic clamps for fixing cable to support structure at 1m interval complete. 24 Indoor Heat shrinkable termination kit suitable for 33kV, 630 Sqmm XLPE Single core AluminiumUG cablewith necessary clamps, connectors suitable for connection ofany type of conductor or Al /Cu pipe buswith all accessoriesincluding cost of bimetallic strip etc. and suitable Non-magnetic, metallic clamps for fixing cable to support structure at 1m interval complete. 25 Design, Engineering, manufacturing, testing at Manufactures worksite, supply, delivery,loading and unloading, transportation, handling, proper storage at site,supervisionof erection, testing and commissioning of 33/11kV, 5MVA three phase two windingtransformer as per technical speciationsincluding all materials, accessories such as Off Load Tap Changer, Transformer Oil and 10% extra Oil, spare Gaskets, OTI,WTI,MOLG indicators with transducers as per specification and Remote Data Transfer facility with optical communication media, with SAS Integration Scope , inclusive of necessary connectors/clamps suitable for Aluminium tube/ACSR conductor(All other items as per technical specification / Layout drawings) - intended for Renewable Energy Evacuation 26 Neutral CT (NCT) for 5 MVA 33/11kV Power Transformer with structure including clamps,terminal connectors andcomposite solid core post insulator with structure for support of GI earthing conductor/strip with terminal connector and all other accessories complete -Ratio 200/1-1 Amps (33kV side) 27 Neutral CT (NCT) for 5 MVA 33/11kV Power Transformer with structure including clamps,terminal connectors andcomposite solid core post insulator with structure for support of GI earthing conductor/strip with terminal connector and all other accessories complete -Ratio 300/1-1 Amps (11kV side) 28 Alumimium UG Cable- 33kV, 3Cx300 sq.mm XLPE insulated, Galvanised steel strips armoured power cable for feeders / Aux Tfr with necessarymetallic, non magnetic clamps atminimum 3 metre interval, steel/nylon cable tie wherever necessary 29 Outdoor Termination kit Heat Shrinkable Type for 3Cx300sqmm Aluminium 33kV, XLPE Galvanised steel strips armoured power cable with necessary clamps, connectors suitable for connection ofany type of conductor or Al /Cu pipe buswith all accessoriesetc. and suitable clamps for fixing cable to support structure at 1m interval complete 30 Indoor Termination kit Heat Shrinkable Type for 3Cx300sqmm Aluminium 33kV, XLPEGalvanised steel strips armoured power cable with necessary clamps, connectors suitable for connection ofany type of conductor or Al /Cu pipe buswith all accessoriesetc. and suitable clamps for fixing cable to support structure at 1m interval complete 31 Distribution Transformer 11kV/433V, 250 kVA, Star rated (BEE Latest notification as on date of tender)with 11kV & 433V outdoor cable entry box, suitableDistribution Box with LT cable (Trfr to LT box) with 500Amps Fuse and MCCB including all accessories like Busbar, Metering Cabinets etcand its fixing -mounting arrangement on plinth 32 11kV Outdoor type RMU withcombination of 2( two) numbers ofSF6 insulated/arc quenching motorized Load Break Switches and one Vacuum/SF6 breaker suitable for 11KV/433V Auxillary Transformer/ Outgoing feederas per the KSEBL approved make with CT, VT, Control and Protection Relays - Overcurrent/REF etc. and Metering, Indications complete (SCADA compatable) as per the technical specification 33 11kV Outdoor type RMU withcombination of 2( two) numbers ofSF6 insulated/arc quenching motorized Load Break Switches as per the KSEBL approved make with CT, VT, Control and Protection Relays - Overcurrent/REF etc. and Metering, Indications complete (SCADA compatable) as per the technical specification 34 Supply of 11kV indoor VCB 5 panel set with combinations of Incomer feeder panel with PT (1 number), Outgoing feeder panel (3 number) and transfomer panel (1 number) with bay control and protection unit (BCPU) for integration with upstream Substation Automation System (SAS) through HSR/PRP topology (IEC 61850 edt 2 compliant) with protection philosophy specified in technical specification along with supply of accessories necessary for operational spares and special tools (as per attached list clause 37.6 & 38 of volume 2, Chapter 30). Bus Bar ratings are 2000A. Circuit breaker shall be E2 M2 C2 class as per IEC 62271-200. Feeder, transformer and incomer panel shall have capacitive voltage indicators (CVI) and only incomer panel BPCU will have PT inputs. Feeder,transfomrer and incomer panels shall house one each multi-function meter (MFM) and DLMS compatible energy meters. Each Incoming and outgoing feeders shall be equipped with split core type CBCT for Sensitive Earth Fault Protection 35 Supply of Polymeric type LA suitable for 11kV 36 3Cx300sqmm 11kV Aluminium XLPE insulated under ground armoured cable, with necessaryclamps for fixing with support structure at 3 m interval 37 3Cx300sqmm11kV Aluminium XLPE Under ground cable Termination Kit Outdoor Heat Shrinkable 38 3Cx300mm2 11kV Aluminium XLPE Under ground cable Termination Kit Indoor Heat Shrinkable 39 Supply of Hot dip Galvanised LatticeStructurefor 33kV,11kV& 110 kV Switch Yard, Columns/Beams/Pre fabricated Cable Supports in Trenches/lightning mast structure/ lighting mast structure/ equipment structures unless otherwise not specified else where in the BOQ etcinclusive of N&Betc(as per respective Technical Specifications, standards and relevant special conditions). 40 EOT Crane of suitable capacity (minimum 5T safe working load) with single hook and double girder arrangement for GIS Hall. Contractor shall submit the capacity calculation of the crane incorporating 25% additional load considering erection and maintenance of largest GIS component / assembly. 41 DG set 125 kVA silent type, Outdoor plinth mounted withAMF panel, Auto Load Change over module and panels, Battery and its charger, Diesel Tank etc with SAS integration facilities including all accessories complete 42 Battery Set - 110 V, 400Ah , Lead Acid plante Battery SetC10 Duty cycle (Rating is tentative and final sizing as per the load calculation shall be under bidder scope) & Installationwith Battery Racks made with acid proof material ,two number of indsutrial type flame proof exhaust fan and all necessary arrangements including tool kit like hydro meter, chemical gloves, multimeter etc. 43 48V, 200 AH VRLA Battery Set with all associated accessories for reliable communication & data acquistion project complete as per specifications 44 SCADA compatible 110V Dual mode (FC+ BC) Battery Charger, with independent Float (FC)and Boost charging (BC) (2 number rectifier unit) min-FC-80A, BC-80A, suitable for 110V Battery bank as per design and shall charge Battery set as per technical requirement during float /boost mode without interruption to load. The charger shall have two independent incomer supply.(Battery charger shall meet the full DC load during boost condition and the Bidder shall propose the final sizing of the battery charger during detailed engineering for approval)(Both set shall be of different make ) 45 Battery Charger - 48 V Dual mode (FC+BC) (Float - 30A/Boost - 60A) - SCADA compatible, SMPS based,Suitable to VRLA Battery set and shall be able to charge Battery set as per requirement during float /boost mode as well as it shall supply to load as per rated voltage of load components inclusive of necessary power, communication and control cables with all accessories complete -Compact type 46 SCADA compatible DCDB-110 V with minimum 20 + 20 Outgoing feeders duplex type (Floor Mountable) with changeover panel having interlock facility with 20% spare feeder breakers for station control and protection systems as per the station requirement, facility shall be there to charge any battery set with any of the battery chargerwith interlock. Ratings shall be as per the battery sizing calculation. 47 DCDB 48 V with change over facility and min 20 Nos. of Distribution Outlets( 2 Nos.- 10A and 18 Nos. 6A)-DUPLEX Type-SCADA/SAS Compatible-Wall mountable 48 SCADA compatible LT 3 phase 50Hz Panel Boardwith Insulated Aluminium Bus Bar, 2 nos incomers (Auxillary Transformer / DG Set), automatic interlock/load change over facilty, two sets of outgoing,panel with LED indications, panel meters,ACB /MCCB(incomers), MCCB (feeders), Earth Bus bar etc., for LT Power Distribution to Control room/equipments including all accessories complete as perspecifications having minimum 20% spare feeders.Remote operation shall be possible for incomers and DG set.(Panel sizing and rating to be proposed by the bidder during detailed engineering for approval). 49 SCADA compatible LT MLDB/LDB/Street light control DB with Lighting Transformer, Surge Protection Devices, MCCB, MCB, RCCB, ELCB and all accessories complete as per technical specifications for Control Room and Yard lighting including all sub distribution boards, and SCADA compatible ACDB/Sub ACDB for Air Conditioners & AHU with soft starting feature etc. including MCCB, MCB, RCCB, ELCB. (The DB sizing and rating shall be proposed by the bidder, with 20% spare capacity, during detailed engineering for KSEBL approval) 50 SCADA compatible LT Emegency Lighting Distribution Board (ELDB) with 63A Incomer and minimum 12Nos 10A Outgoing Feeders and DC Emegency Lighting Distribution Board (DC ELDB) and related accessories including MCCB/MCB,RCCB/ ELCB as perstandard specifications for Emergency lighting in the substation / Switchyard, charges including all sub distribution boards 51 LT A.C Three Phase Self mounted Indoor Power Kiosk IP 42 with 1 incomer MCCB 63A including indicating lamps,single phase and three phaseindustrial type16A sockets etc. at GIS hall 52 LT A.C Three Phase Self mounted Outdoor Power Kiosk (IP 56) with 1 incomer MCCB 250A, 2 Outgoing MCCB 160A & 100A including indicating lamps,3 phase and singlephase industrial type 16A sockets etc. complete for Transformer oil filteration unit, welding purpose etc. 53 Supply of Protection Panels/Equipments, Substation Automation System and materials as per technical specifications, IS/IEC Standards applicable 54 Control and Protection panel for Transformer with Differential Protection,REF (Transformer management relay) for HV and LV [M1 and M2 relay shall be of different make / platform and each shall have-87, 67/67N, 64R-Low Impedance, Transformer Mechanical Protection- Bucholz, OLTC Bucholz, OLTCPanel Control & signal interfacing with RTCC panel, OTI, WTI, PRD1 &2 through high impedance tripping relays, MOLG Alarms etc.,] 33/110kV 60MVA, with BCU , IEC 61850 Edition 2compatible and provision for interface to SCADA system. Energy meters as per technical specifications and suitable for GIS switchgear modules 55 Busbar Protection panel for8 bays (110kV Bus) as per specifications -with zone segregated tripping, LBB, end zone protection, local HMI for displaying differential current, SLD, Isolator Position etc., with output tripping relays (drawout type) and provision for interface to SCADA/SAS system 56 Control and Protection panels (main 1 and 2- 87L,21,67/67N,50N,59,PSB, 79A/R,49,81 O/U) for 110kV Feeders with BCU , IEC 61850 Edition 2compatible and provision for interface to SCADA systemas per tech specifications and suitable for GIS switchgear modules (M1 and M2 relay shall be of different make / platform and the combination shall exactly suit with the remote end M1 and M2 relays). Over and above the normal Tri-Vector Meter, the contractor should supply SEM Meters as per SRLDC/PGCIL Standards, additionally. 57 Control and Protection panel for 110kV Bus Coupler with BCU and additional Common BCU for Auxiliary control System and Monitoring including the panel as per standard and requirement of 110kV GIS 58 Design, Manufacture and Supply of Complete SAS system for 110kV GIS , as per detailed technical specification , SAS system Architecture andSLD , Reduntant Servers, Reduntant Gateway, Reduntant Routers with Hardware Firewalls,2 Nos Operator Work Station with HMI -Desktop (one operating work station with extended HMI at Nedumkandam (10Km away)) , 2 Nos. Engineering Work Station(Lap top and Desk top) , one metering PC with DCU for SAMAST metering and Remote Station Controls, necessary Panels and Furnitures etc completewith all necessary accessories, cables,converters, GPS based Time Syncronising Unit IEC compatible to cater data to and from all bays and transformer, SCADA compatible panels,interfacing /intergating line differential relay in CR panel, SAS gateway server panel etc to FODP/Communication equipment in communication room as per specification, including supply of all necessary converters for interfacing with the communication equipment , unarmoured OF cable , 40mm PLBHDPE pipe duct , all interconnecting cables , Patch chords devices etc. complete. The scope include integrating 33kV and 11 kV systems.SAS Architecture should be suitable for plug and play integration of future bays. [Including mandatory Spares as specified in volume 2 - Technical Specfications, Chapter 11, Annexure C] 59 Design, Manufacture and Supply of materials / item for Power Cable, Control Cables and instrumentation cable, Supply of various sizes of 1.1 kV FRLS-0H PVC armoured copper cable for control , Aluminum/ Copper LT power cable as per approved cable schedule (to be prepared by contractor and got approved), and provision of all types of cables from Power and Auxilliary Transformer and other equipments/switchgears, for the substation (Aluminium cables of size 185 mm2 and above shall be XLPE type) includingties , tags etc. supply of suitable size PVC pipe and accessoriesfor drawing exposed cables as per the technical specifications, IS/IEC Standards applicable. 60 12x4mm2 Control CableCopper 61 4x6mm2 Control CableCopper 62 4x4mm2 Control Cable Copper 63 2x4mm2 Control Cable Copper 64 19x2.5mm2 Control CableCopper 65 12x2.5mm2 Control Cable Copper 66 7x2.5mm2 Control Cable Copper 67 4x2.5mm2 Control Cable Copper 68 3x2.5mm2 Control Cable Copper 69 2x2.5mm2 Control Cable Copper 70 2x1.5mm2 Control Cable Copper 71 4x0.5mm2 instrumentation Cable Copper 72 4x10mm2 PVC InsulatedLT copper cables 73 2x10mm2 PVC Insulated LT copper cables 74 2x1.5 sq.mm or higher size PVC Insulated shielded copper cables for Transformer OTI & WTI wiring 75 20/25 mm dia FRLS PVC Rigid/Flexible Conduit including all clamps, clips etc. for Fire Alarm Panel and sensor wiring purpose 76 3 1/2C x300 Sqmm 1.1kV LTXLPE insulated armoured Aluminium cable 77 3 1/2C x 240 Sqmm 1.1kV LT XLPE insulated armoured Aluminium cable 78 3 1/2C x 120 Sqmm1.1kV LT XLPE insulated armoured Aluminium cable 79 3 1/2C x 90 Sqmm1.1kV LT XLPE insulated armoured Aluminium cable 80 3 1/2C x 70 Sqmm1.1kV LT XLPE insulated armoured Aluminium cable 81 3 1/2C x 50 Sqmm 1.1kV LT XLPE insulated armoured Aluminium cable 82 3 1/2C x 35 Sqmm1.1kV LT XLPE insulated armoured Aluminium cable 83 3 1/2C x 25 Sqmm1.1kV LT XLPE insulated armoured Aluminium cable 84 4C x 16 Sqmm1.1kV LT XLPE insulated armoured Aluminium cable 85 1x 95 sqmm DC cable (stranded and flexible) NFPA category FRLSLH Copper Cable for battery. 86 1x 70 mm2 DC cable (stranded and flexible) NFPA category FRLSLH Copper Cable for battery. 87 1x35 mm2 DC cable (stranded and flexible) NFPA category FRLSLH Copper Cable for battery. 88 Supplying aluminium cable tags with punching number and alphabets up to 7 digits or higher as per requirement for 220/33/11kV power cables including cost of all materials as per the technical and standard specifications 89 Hot dip galvanized ladder type cable tray with joint plate and N&B size300x100x2 with all accessories complete 90 Hot dip galvanized ladder type cable tray with joint plate and N&B size 450x100x2and with all accessories complete 91 Hot dip galvanized ladder type cable tray with joint plate and N&B size600x100x2 and with all accessories complete 92 Design, Manufacturere, Testing at Manufacturs works, transporation and Delivery of the Conductor/ Earthing Materials and associated materials for Gas Insulated Substation as per technical Specifications and IS/IEC Standards applicable 93 Aluminium Bus bar 120*10mm 94 ACSR Wolf Conductor 95 110 kV 90kN Silicon Composite Longrod Insulator 96 110 kV 70kN Silicon Composite Longrod Insulator 97 110 kV Single Tension H/W and Accessories suitable for Single Wolf 98 110 kV Single Suspension H/W and Accessories suitable for Single Wolf 99 wedge – connector suitale for wolf/Kundah 100 wedge with paddlesuitale for wolf/Kundah 101 Earth Wire 7/3.15 mm Galvanised Steel wire with required hardwares accessories and earthbond 102 Tension Clamp and Tail Clamp for 7/3.15 mm Earth Wire 103 32/40mm MS rod for earthing 104 GI strip all sizes as per requirement for earthing 105 Clamp and saddle for GI strip/wire 106 Test link for lightning protection 107 1.5m GI lightning spike with fixing clamps 108 Design and supply ofVentilation system for GIS hall(positive pressure type)with prefilters and fine filters of washable type for 100% capacity of GIS hall, with air displacement of 5 times the volume of GIS hall per hour (one operating + one standby , consisting of two units each having capacity 5 times air changes per hourof GIS hall workingcyclically for 50% of time)with soft starting feature,comprising of GI ducts( with provision for nitrile rubber insulation if taken externally), fire dampers, exhaust dampers, grills, noise reduction system etc. complete.The system shall be monitored via SCADA including necessaryelectrical panels. 109 Design, Manufacturere, Testing at Manufacturs works, transporation and Delivery of the Fire and Safety Equipments and materials for 33/110kV Gas Insulated Substation as per technical Specifications and IS/IEC Standards applicable- Portable and wheel/ trolley mounted fire extinguishers for Control room 110kV GIS Hall, 110kV Switchyard Relay panel room of GIS Hall,Transformers and other Strategic locations including its installation at site 110 Dry chemical powder of 9kg capacity 111 Dry chemical powder of 25kg capacity 112 Dry chemical powder of 50kg capacity 113 CO2 gas type of capacity 6.5kg 114 CO2 gas type of capacity 22.5kg 115 Mechanical foam type capacity 9LT 116 Mechanical foam type capacity 50LT - 117 Fire Stand with 4 buckets(Including Concreting as per drawings) 118 SCADA compatible - Main Fire Alarm Control Panel (Zone of protection as per approved scheme) complete with Charger, Rectifier, Visual Display, battery back up complete as per the station requirement 119 Photo Electric type Smoke detector with base compatable for Fire Alarm Panel 120 Photo Electric type Heat detector with base compatable for Fire Alarm Panel 121 Supply of Beam Detector and Reflector for GIS with base compatable for Fire Alarm Panel 122 Audio Alarm with Hooters cum Speakers compatable for Fire Alarm Panel 123 Manual Call point of Break Glass Type with hammer and chain 124 Insulating Mat (Size 2000x1000x2mm) class A including its fixing at site as per Technical Specification and IS 125 Safety Chart for First Aid, Electric Shock & Fire and Fire Fighting Equipments including its fixing accessories complete 126 Lighting and General / Miscellaneous Items 127 Optical Fibre Cable (12F Single Mode and 12F Multimode) , SM and MM Patchcords, all necessary connectors complete, as per site requirement for extended HMI, bus bar protection other than SASas per site requirement and technical specification 128 Ground Enhancement Material (GEM) ( Per Bag -11.33 Kgs ) - Conforms IEC 62561-7 Standard. The GEM shall have Resistivity of less than 20 Ohm-cm and Environmental friendly 129 Visual Monitoring System (VMS) with surveilliancecamera as per technical specification and layout drawing (Including local PC monitoring set up having sufficient storage capacity, remote end PC monitoring if necessary set up shall be in the scope of supply) including necessary power and communicationcables, interconnecting hardwares, PVC pipes and all other accessoriesetc complete as per the technical specifications (minimum requirement : Fixed Camera : min 8 Nos, Pan Tilt Zoom Camera : min 2 Nos, Fixed Variable Focus: min 4 Nosand storage >8TB) 130 Design of Air Conditioning system and Supply of5 Star rated (as per latest BEE notification)2TR or higher capacity split type inverter Air Conditioners, with stabilizer, Power Isolator etc.for Control & Relay panel room, Communication room, SCADA room, Bay Control Room (each room has got minimum one unit of redundancy, cyclically operated with Room temperature indicator) as per detailed engineering and approval. Temperature indicators shall be integrated to SCADA 131 SPARES for GIS - 220/110kV 132 Tripping & closing coil(Each Breaker type Module) 133 Motor for disconnector of each type of equipment 134 Motor for CB spring charging (each Breaker Type) 135 SF6 Pressure Guage for Circuit Breaker 136 SF6 Pressure Guage for other compartments 137 SF6 Pressure Relief Device 138 Auxillary contact assembly for Circuit Breaker 139 Auxillary contact assembly for Disconnector/Isolator-each type 140 SF6 gas 141 Moisture absorbant catridge 142 NRV gas filling valve for equipment 143 Indication lamps and lamps for semaphores & annunciators- one for each type & colour 144 Annunciator full set each type with one set of relay card 145 Special tools for Installation and Maintenance -220/110kV 146 Gas Leakage detector - DILO make 147 Special spanners for General maintenance for supplied GIS 148 SF6 gas bottle locking , measuring and filling assembly with whole hose 149 Measuring Instruments 150 Clamp on meter- capable to measure mA range .• High sensitivity, miniature AC/DC clamp meter.Range: 200mA/2/20A AC, 2/20A DCMin. resolution for AC: 0.1mAMin. Resolution for DC: 1mAJaw size: 7.5mm all required accessories from following make and model Fluke,MEGGER,KYORITSU 151 Phase Sequence meter with Standard accessories -Fluke,MEGGER,KYORITSU 152 Digital Multimeter 279FC TRMS Thermal or advancedFluke,MEGGER Model 153 Analog Multimeter, with Standard accessories - Fluke,MEGGER,KYORITSU 154 SF6 gas Analyser including DEW point,purtity & Hygrometer etc.
Contract Date : 01 Apr, 2026   |   Contract Value : 369.42 Crore
BRR : 6239075 tender for Soil investigation, Design and Supply of all materials, labour, T&P etc. complete required for completion of following works of “Nagar Palika Parishad Kasganj Water Supply Scheme”:i) Construction of Over Head Tank,Pump house, Boundary wall with gate, Staff quarter, LCS Room, Site Development, Approach Road, Repairing of Over Head Tank & CWR Cum Pump House.ii) Laying & Jointing of Rising Main, Water Supply Distribution Network, House Connections.iii) Construction of Tube Wells including PLC SCADA and automation of all Tube Wells & OHT as per specifications in tender document complete in all respectThe scope of work includes commissioning, testing, trial & run, defect liabilities and handing over the complete works of “Nagar Palika Parishad Kasganj Water Supply Scheme” with its appurtenant works to Nagar Palika Parishad Kasganj, Distt. Kasganj, (U.P.) Sl. No. Item Description 1 CIVIL WORKS 2 ESTIMATE FOR PUMP HOUSE IN ZONE 3 Provide all materials, labour, T&P etc. complete and construct Pump house size (3.6x3.0x3.0)m Chlorinating room size (1.8x1.2x3.0)m as per departmental type design and drawing (drawingno‐D‐2)andasperthe specificationsforcivilwork given in the bid document, including supply of all material, labour and T&P etc complete as per instructions of Engineer ‐in ‐ charge. 4 Rebore tubewell platform and existing pump house plaster, painting & Pointing etc. completed. 5 Rising Main 6 Supply of ISI mark DI K-7/K-9 S&S pipes & specials (push on joints) of following class and diameters inclusive of jointing material (Rubber gasket of EPDM Quality) including supply & fiing of specials with all statutory duties and taxes, third party inspection charges, transit insurance, freight, transportation to store / site of work, unloading. stacking etc. complete as directed by Engineer-in-charge. 7 150mm dia D.I Class- k9 8 200mm dia D.I Class- k7 9 200mm dia D.I Class- k9 10 250mm dia D.I Class- k7 11 Excavation Work 12 Excavation of earth in ordinary soil (loam, clay or sand) for pipe line and rising main trenches including lift upto 1.50 m and lead upto 50 m and refilling watering, ramming of the excavated earth into the trench and also disposal of surplus earth upto 50m from the center of the trenches including supply of all material labour, T&P etc complete as per instructions of Engineer ‐in ‐charge. 13 ordinary soil 14 Valve Chamber 15 Supply of following size of D.I.. D/F sluice valves as per I.S. 780-1960 tested to 10 Kg/Sq.m fixing in pipe line trenches, jointing and testing complete. 16 150mm dia D.I Class- k9 17 200 MM dia D.I CLASS- K9 18 250 mm dia D.I Class- k9 19 Supply of all materials, labour T&P and construct masonary type sluice valve chamber. 20 Carting, laying and jointing of the following sizes of pipes into the trenches including cost of all jointing materials, labour and T&P testing etc. complete. 21 150mm dia D.I Class- k9 22 200mm dia D.I Class- k7 23 200mm dia D.I Class- k9 24 250mm dia D.I Class- k7 25 Carting, laying and jointing of the following sizes of sluice valveinto the trenches including cost of all jointing materials, labour and T&P testing etc. complete. 26 150mm dia D.I Class- k9 27 200mm dia D.I Class -k9 28 250mm dia D.I Class- k9 29 Dismantling and reinstatement of following type of road surfaces for laying of pipe line including sorting out of serviceable material and disposal of unserviceable materials. 30 Dismantling of Interlocking Road 31 Reinstatment of Interlocking Road (with 40% new tiles and 60% used old tiles) 32 Dismantling of C.C. Road 33 Reinstatment of C.C. Road 34 Dismantling Bituminous surface 35 Reinstatement Bituminous surface 36 Dismantling of BOE Road 37 Reinstatement of BOE road 38 R.C.C Overhead Tank 39 Supply of all materials labour T&P etc. for complete construction of R.C.C. Over Head Tank of followingcapacityand staging min 0.6m above ground level with main components, soil testing and assuming bearingcapacity of soil as 8 MT, including cost of supply of design and drawings. All the water retaining components of OHT shall be casted in M‐30 grade cement concrete and minimum grade of concrete of foundation and staging should be M‐25 with approved cement, coarse sand and stone grit as per I.S. 11682 and I.S.456 Seismic effects and wind load should be taken into consideration as per I.S. 1893 for earthquake resistance and I.S. 875 part‐III for wind load on structure and including 1M wide RCC doglegged staircase with separate coloumns, 1 m wide R.C.C. M30 balcony, M.S. ladder made of 50x50x6 mm angle section and 20mm plain M.S. bars with hand rails of 20mm medium class G.I. pipes, One aluminum ladder inside the tank from top dome to bottom dome, R.C.C. railing with 20mm dia medium class G.I.pipe (in 3 rows) on both sides of stair case, supported on 50x50x6mm M.S. angle section, spaced at intervals not more than 1.5m, Proper ventilator at top dome in circular shape of 1.2 m dia,Ultra Sonic Water level indicator fabricated with sensor connecting to automation, Lightening conductor as per I.S.S.2309 or its latest amendments of latest electricity rules, consisting of proper elevation rod with 5 or more fork points as prescribed in ISS 2309‐1969 and ISS 3013‐1966, C.I. manhole of min 60x60cm size with locking arrangement, Supply, fixing, jointing of D.I.D/F Pipes of appropriate size with D.I.D/F specials conforming to IS 8329/2000 as vertical pipes for inlet(300mm), outlet(300mm), overflow and washout as per latest / relevant I.S. specifications withall jointing materials for proper completion of work, Construction of bed blocks in 1:2:4 PCC with cement, coarse sand and approved stone grit , Constructionof washout / overflow chamber and chambers for sluice / butter fly valves as per departmental type design and drawing, Supply of 200 mm dia PVC pipe as per I.S.‐ 4985/2000 for disposal of water from overflow and washout chamber to suitable point outside the water works compound, Painting of all concrete surface and steel pipe works with three coats. 40 1200 Kl /18M Staging 41 1200 Kl /16M Staging 42 1100 Kl /20M Staging 43 Testing Bearing Capicity of soil. 44 Repairing of 750 kl /19 m staging over head tank 45 Repairing of 2100 kl cwr cum pump house 46 Distribution System 47 Supply of High Density Polyethylene Pipes & electro-fusion specials (HDPE (PN-6)/PE-100), confirming to IS 4984 / 14151 / 12786 / 13488 (and other related I.S. codes) in coils / standard lengths with necessary jointing material like electro-fusioncoupler for Joints/Junctions , flanged joint, including all statutory duties and taxes, third party inspection charges, transit insurance, freight, transportation to store / site of work, unloading & stacking the same in covered shade duly protecting from sunrays & rains etc. complete as directed by Engineer-in-charge. 48 HDPE PIPE PE-100, PN-6 49 90 mm dia 50 110 mm dia 51 125 mm dia 52 140 mm dia 53 160 mm dia 54 D.I. K-7 Pipe 55 200 mm dia 56 250 mm dia 57 300 mm dia 58 350 mm dia 59 400 mm dia 60 Carting laying and jointing of the following sizes of pipes into the trenches including cost of all jointing materials, labour and T&P testing etc. complete. 61 HDPE PIPE PE-100, PN-6 62 90 mm dia 63 110 mm dia 64 125 mm dia 65 140 mm dia 66 160 mm dia 67 D.I. K-7 Pipe 68 200 mm dia 69 250 mm dia 70 300 mm dia 71 350 mm dia 72 400 mm dia 73 Distribution System - Pipeline Excavation 74 Distribution System - Connections 75 Provision for Single Tap making ferrule house connection in 90 to 160 mm dia distribution main with fixing of saddle pieces, connection fittings, GM ferrule of 15mm dia including brass tape with welded, 20mm dia (OD) HDPE pipe (12.5 kg/cm2) and 20 mm dia (OD) G.I. pipe class B upto house holder also including excavation of trenches, supply of all fittings maerials, labour, T&P etc. all work complete but excluding dismantling and reinstatement of all type roads as per direction of engineer incharge. 76 House service connections 77 For 90mmto 110mm dia 78 For 125mm to 160mm dia 79 For 180mm to 250mm dia 80 For 300mm dia 81 For 350mm to 500mm dia 82 Sluice valve chamber (masonry Type) - dia upto 200 mm ‐ 1000 (L) x 1200 (W) x 1300 (H) mm 83 Sluice valve chamber (surface box Type) 84 Sluice valve chamber (surface box Type) - Fire Hydrantchamber (750 (L) X 450 (W) X 1000 (H) mm) 85 Air Valve Chamber 350 (L) x 350 (W) x 500 (H) mm 86 D.I.. D/F Sluice/Scour valves as per I.S. 780 suitable for a working pressure of 10 Kg/Sqm. 87 Sluice valve ‐ 350 mm dia 88 Sluice valve ‐ 300 mm dia 89 Sluice valve ‐ 250 mm dia 90 Sluice valve ‐ 200 mm dia 91 Sluice valve ‐ 150 mm dia 92 Sluice valve ‐ 125 mm dia 93 Sluice valve ‐ 100 mm dia 94 Sluice valve ‐ 80 mm dia 95 Scour Valve 96 Scour valve ‐ 80 mm dia 97 Air valve 20 mm dia 98 Carting from store to site of work, lowering, fixing and jointing of following fittings in trenches. 99 D.I. Sluice valve 100 Sluice valve ‐ 350 mm dia 101 Sluice valve ‐ 300 mm dia 102 Sluice valve ‐ 250 mm dia 103 Sluice valve ‐ 200 mm dia 104 Sluice valve ‐ 150 mm dia 105 Sluice valve ‐ 125 mm dia 106 Sluice valve ‐ 100 mm dia 107 Sluice valve ‐ 80 mm dia 108 Scour Valve 109 Scour valve ‐ 80 mm dia 110 Air valve 20 mm dia 111 Construction of 1.5 m high and 230 mm thick boundary wall with 300 mmx300 mm thick pillar made in Brick masonry in 1 cement and 4coarse sand mortar, the spacing between two pillar should not be more than 3.5m c/c and the depth of foundation should not be less than 0.60m, at the site of water works as per departmental type design and drawing, and, as per specifications given in the bid document including supply of all materials, labour T&P etc.for proper completion of work as per instructions of Engineer ‐in ‐ charge. (Drawing No.D‐1) 112 Boundary Wall (for Campus Area) 113 Supply and fixing of 3.6 m x 1.20 m MS gate including fabrication and supply of steel and construction of bounary wall pillars of size 1.35mx0.23mx0.23m with ornamental brick work 115mm th. around RCC, as per departmental type design and drawing (Drawing No. D‐1) and as per specifications laid down in the bid document, including supply of all material,labour,T&P etc.required for proper completion of work as per instructions of Engineer‐in‐charge. 114 MS Gate 115 ConstructionofInterlockingpavementforapproachtowater works, as per departmental type design and drawing and as per specifications laid down in the bid document, including supply of all materials , labour, T&P etc.required for proper completion of work as per instructions of Engineer ‐in ‐charge. 116 Inter Locking Pavement for Approach Road 117 Drain for campus 118 Construction of LCS ROOM 119 Provide all materials labour, T&P etc. and construct single room staff quarter / office room at water works site identified by the Engineer‐in‐charge as per department type design and drawing and specifications of civil works laid down in the bid document, includingallmaterial labour,T&Petccompleteforproper completion of work as per instructions of Engineer ‐in ‐charge. (Drawing No.D‐7) Extra depth for Site conditions to be added 120 STAFF QUARTER 121 E&M WORKS 122 Construction ofTW No 1 (Rebore) of Zone 1C 123 Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. 124 Transportation, Erection and Dismantling of Rig Machine 125 Drilling by RC/DC Rig Machine 600 mm dia 126 0 to 65 mtr. deep 127 65 to 100 mtr. deep 500 mm dia 128 100 to 130 mtr. 500 mm dia 129 Tubewell Assembly 130 M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect. 131 300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 132 200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 133 Supply of pea gravel 134 Logging of bore hole by departmental / approved electric logger 135 Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. 136 Lowering of 300mm dia pipe from GL to 60m deep BGL. 137 Lowering of 200mm dia pipe from 60 to 100m deep BGL. 138 Lowering of 200mm dia pipe from 100 to 120m deep BGL. 139 Development of Tubewell by compressor 140 Transportation, Installation and Dismantling of 250 PSI Compressor 141 Development of Tubewell by Adequate Capacity Air compressor 142 Development of Tubewell by O.P. Unit 143 Transportation, Installation and Dismantling of3 Cusec O.P. Unit & Yield Test. 144 Development of Tubewell by Adequate Capacity by O.P. Unit 145 Chemical and Bacterological test of water sample from depaprtmental/ approved lab 146 Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. 147 PUMPING PLANTfor Zone-1C, Tw No-1(Rebore)& TW No- 2(Existing) 148 For TW No 1 (Rebore) 149 SITC of Submersible pump setof Discharge1200 lpm at 57m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items). (Head, discharge & HP are tantitive may vary as per site condition) 150 25 H.P. or above as per site condition. 151 3 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 152 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 153 4 x 16 sq. mm Al. cable 154 Automatic chlorination system compactable to SCADA system 155 Soft starter with RS-485 port-400V Classminimum 22 Kw rating or above as per site condition 156 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition 157 Motor operated actuator with sluice valve 150mm Sluice Valve 158 CE & UL certified Inteligent Smart Energy Meter 159 CE & UL certified Electro magnatice flow Meter 150mm size 160 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 161 CE & UL certified pressure transmitter 162 CE & UL certified Surge protector 3 phase at main switch. 163 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 164 Installation, commissioning & testing for one tubewell / OHT 165 For Tw No 2 (Existing) 166 SITC of Submersible pump set of Discharge 1100 lpm at 58 m Head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset,Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).(Head, discharge & HP are tantitive may vary as per site condition) 167 25 H.P. or above as per site condition. 168 3 Mtr. long heavy duty size 150 mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 169 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 170 4 x 16 sq. mm Al. cable 171 Automatic chlorination system compactable to SCADA system 172 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition 173 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition 174 Motor operated actuator with sluice valve 150 mm Sluice Valve 175 CE & UL certified Inteligent Smart Energy Meter 176 CE & UL certified Electro magnatice flow Meter 150mm size 177 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 178 CE & UL certified pressure transmitter 179 CE & UL certified Surge protector 3 phase at main switch. 180 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 181 Installation, commissioning & testing for one tubewell / OHT 182 SCADA Automation of PUMPING PLANTat Zone-01C, TW No-1(Rebore) & T.W. No 2 (Existing) 183 SCADA Automation Items 184 CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x2) 185 G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges (1x2) 186 CE & UL certified 7 HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter. (1x2) 187 Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x2) 188 Trial run for 03 months period for each tubewell through SCADA (1x2) 189 TRIAL &RUN of Pumping Plant of Tw 1(Rebore)& 2(Existing) of Zone 1C 190 03 Month operation & maintenance includingStaff & chlorine. 191 Construction of TW No 1 & 3 of Zone-1 D 192 Drilling of borehole for Tubewell contruction by RC/DC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. 193 Transportation, Erection and Dismantling of Rig Machine 194 Drilling by RC/DC Rig Machine 600 mm dia 195 0 to 65 mtr. deep (65x2) 196 65 to 100 mtr. deep 500 mm dia (35x2) 197 100 to 130 mtr. 500 mm dia (30x2) 198 Tubewell Assembly 199 M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect. 200 300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. (60.5x2) 201 200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. (60x2) 202 Supply of pea gravel (38.22x2) 203 Logging of bore hole by departmental / approved electric logger. 204 Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. 205 Lowering of 300mm dia pipe from GL to 60m deep BGL. (60x2) 206 Lowering of 200mm dia pipe from 60 to 100m deep BGL. (60x2) 207 Lowering of 200mm dia pipe from 100 to 120m deep BGL. (20x2) 208 Development of Tubewell by compressor 209 Transportation, Installation and Dismantling of 250 PSI Compressor (1x2) 210 Development of Tubewell by Adequate Capacity Air compressor (40x2) 211 Development of Tubewell by O.P. Unit 212 Transportation, Installation and Dismantling of3 Cusec O.P. Unit & Yield Test. (1x2) 213 Development of Tubewell by Adequate Capacity by O.P. Unit (80x2) 214 Chemical and Bacterological test of water sample from depaprtmental/ approved lab. (1x2)Note- it done by department. 215 Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. (1x2) 216 PUMPING PLANTfor Zone-1D 217 For TW No 1 & 3 218 SITC of Submersible pump set of Discharge 1200 lpm at 35 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).(Head, Discharge & HP are tantative may vary as per site condition) 219 15 H.P. or above as per site condititon (1x2) 220 3 Mtr. long heavy duty size 150 mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) (2x2) 221 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. (36x2) 222 4 x 16 sq. mm Al. cable (50x2) 223 Automatic chlorination system compactable to SCADA system (1x2) 224 Soft starter with RS-485 port-400V Class minimum15 Kw rating or above as per site condition (1x2) 225 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition (1x2) 226 Motor operated actuator with sluice valve 150mm Sluice Valve(2x2) 227 CE & UL certified Inteligent Smart Energy Meter (1x2) 228 CE & UL certified Electro magnatice flow Meter 150 mm size (1x2) 229 CE & UL certified hydro static type sub soil water level transmitter for tubewell. (1x2) 230 CE & UL certified pressure transmitter (1x2) 231 CE & UL certified Surge protector 3 phase at main switch(1x2) 232 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT(1x2) 233 Installation, commissioning & testing for one tubewell / OHT (1x2) 234 For TW No 2 (Existing) 235 SITC of Submersible pump set of Discharge 1000 lpm at 35 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items). (head , discharge & HP are tantative may vary as per site condition) 236 12.5 H.P. or above as per site condition 237 3 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 238 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 239 4 x 16 sq. mm Al. cable 240 Automatic chlorination system compactable to SCADA system 241 Soft starter with RS-485 port-400V Class minimum15 Kw rating or above as per site condition 242 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.)or above as per site condition 243 Motor operated actuator with sluice valve 150mm Sluice Valve 244 CE & UL certified Inteligent Smart Energy Meter 245 CE & UL certified Electro magnatice flow Meter 150mm size 246 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 247 CE & UL certified pressure transmitter 248 CE & UL certified Surge protector 3 phase at main switch. 249 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 250 Installation, commissioning & testing for one tubewell / OHT 251 CWR of Zone 1D 252 Pump :- SupplyofHorizontal pump set with pump fitted with gland packing, MS fabricated base frame for both Motor & Pump, CI coupling (Spacer type), Steel coupling gurad.MOC: casing - Cast Iron FG 260, impeller - ASTMA A 743 Gr. CF8M, Shaft - AISI 410 a) Discharge : 1800 lpm x 27 m. head Electric Motor : -Supply of 4 Pole, 415 Volt, 50 Hz, 1450 RPM B3 mounting as per IE3 Standerd TEFC Motor. The motor shall besuitable to drivetheabove pumps within its whole range andof required capacity.20 H.P.(head , discharge & HP are tantative may vary as per site condition) 253 Starter :-Supplyof SCADA Compacatable Motor soft starter suitable tooperateat0.415KV+10%3 phase, 50Hz. A.C.supply andtocontroltheabove motors. It shallcompriseofall protection devicesas per latest I.S.S. specifications. - 20 H.P. or above as per site condition - (3 Nos) L.T. Switchgear Panel Board :- Supply of 1 no. panelextensible typeswitchboard suitable for 0.415 KV3 phase 50 HZ. A.C. supply in cubical pattern, floor mountingcompletewith insulatedbus bars of suitable size forrequiredload. The switch board shall consist of the following :(a) 02no.Incoming Panelcomprisingofsuitable capacity ACB/MCCB indoor vertical isolation horizontally drawouttype withrelays as per ISS.Panelwill be comprisingof voltmeterwith selector switch, power factor meter,frequencymeter. KWH meter and ammetercomplete with selector switch, motor protection relay etc to operate 03 nos. of above required motor. (b) 6 Nos. outgoing panelsfor pumping plants. 3 Nos. Of Pump, 01 No. for Internal & External lighting, 01 no. for welding & other miscellanious work and 01 nos spare Each panelhavingsuitable capacity MCCB with ammeter and C.T.with selectorswitch,KWmeter, single phasingpreventer, capacitoretc for proper functioning for whole E&M Equipments installed in scope ofCWR. 254 Servo-Stablizer 60 KVA or above as per site condition 255 Power Cable :-Supply and laying of1100 V grade 3 core 16 mm2 from panel to starter and starter to motor XLPE armoured cables ofrequiredsizes with earthing material (3x30 mt) approx. 256 C.I. / M.S. Fitting of Delivery pipes and specials as per details given below: 150 mm size individual delivery and 250 mm size common delivery with jointing material, Tee, bends 257 Reflux Valve 150 mm 258 Sluice Valve 250 mm with actuator 259 Sluice Valve 150 mm with actuator 260 Dismantling Joint. 261 150 mm 262 250 mm 263 Nut Bolts and rubber packing etc. 264 Supply of MS Girder for pump base etc. 265 Supply of spare parts required for maintenance of all equipments. 266 Direct on line type electromagnetic type flow meter of size 250 mm in common delivery ofM.S.pipelinefor measuring dischargeofpumpswithsignal transmitter device. Digitalflowindicatorshallbe installedin pump house on instrument control panel. 267 Supply of SCADA CompacatableElectronic level indicator. 268 Supply of electronic pressure Indicating devices SCADA Compactable. 269 Tools & spanners : HT, LT megger, Tong tester, Crimping tool (manual and hydraullic) 270 E.O.T. crane of 3 Tones capacity with 6 meter lift alongwith traveling trolley and girder etc. 271 SCADA Compatable Chlorination System 272 Erection and commissioning of above items. 273 Testing : At works of pumps & other equipments 274 Trial run and operation of pumping plants for one months. 275 Painting of equipments with two coats. 276 CE/UL approved manufacturers Intelligent smart energy meter with memory real time clock and 1 serial port integrated with R.T.U. as per spec mentioned in technical bid documents. 277 Auto phase reversal unit -Auto phase reversal unit/ automatic transfer switch withinbuilt time delay & enclosure of SuitableAmpere rating (Confirming to I.E.C. - 60947-1 and I.E.C.- 60947-6-1)as specified in tender technical specification sheet 278 CE / UL approved manufacturer’s Radartype Level Transmitter for CWR as specified in tender technical specification sheet 279 CE / UL approved manufacturer’s Pressure Transmitterin each pumping delivery line as well main header line of Pump as per specifications specified in tender technical specification sheet. 280 Complete cabling for ZPS including all power and control cable of all equipments at ZPS and OHTs. 281 02 nos(1W+1S) monoblock /submersible single phase 50 hz 3hp pumpset capable of drain out waste water of dry well with starter and all fittings arrangemnent (pipe,tee bend etc) required for complete disposal of waste water as required 282 Security Surveillance IP Camera with Recorer 283 Trial Run of CWR through SCADA for 3 Month 284 Internal & External Electrification of CWR Zone 1D (Lighting of bulding and campus) 285 Supply,installation and fixing of 286 M.S tubler poles 9.5 m height 287 Twin tube light covered 288 450 mm dia exhaust fan 289 1200 mm ceiling fan 290 250 watt flood light 291 15 amp power plug point 292 5 Amp power plug point 293 Supply of tube light LED etc. 294 Wiring of plant in copper conductor 295 Supply &laying of 4x 16 sq mm Copper conductor cable 296 SCADA Automation Items for Tubewells 297 CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (3x1) 298 G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(3x1) 299 CE & UL certified 7 HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter.(3x1) 300 Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (3x1) 301 Trial run for 03 months period for each tubewell through SCADA(3x1) 302 Automation of CWR 303 CE & UL approved manufacturers RTU/PLC suitable to communicate with GSM based modem unit with CPU and power supply with analog and digital parameter and features as specified for each tubewell & CWR to store and transmit data on GSM backbone. RTU/PLC designed with logic to transfer data at multiple stations as specified in tender technical specification sheet including Control panel with IP 54 protection industrial grade for all equipments (Separate for control (24 V) and power equipments) with CE / UL approved manufacturer’s Surge protector for Control Panel and CE / UL approved manufacturer’s 7 HMItouchscreen suitable to communicate with PLC/RTU, for local display & control of process parameters as specified in tender technical specification sheet .(Suitable for 03 nos. CWR Motor.) 304 GSM/GPRS based wireless communicationmodem for RTU/PLC capable to transfer and gather data from remote sites to control stations, all accessories included with signal enhancer anteena made for pumping plant as specified in tender technical specification sheet. 305 CE/UL surge protector 3 phase at main switch. 306 CE/UL Certified 7 HMI Touchscreen suitable to commuticate with PLC / RTU for loac display and control of process parameter. (Suitable to display data of all 03 motors) 307 Control Panel with IP54 protection Indsutrial grade for all equipmets seprate for control (24 Volt) and power equipment. (Suitable for all 03 motors) 308 Installation, Testing & Commissioning 309 Trail Run of CWR Zone 1D 310 03 Month Trial Run of 03 nos Tw & CWR including staff & liquid chlorine. 311 Zone-1 E 312 Construction of Tubewell(300X200 size) TW No 2 (Rebore) & TW No 3 313 Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. 314 Transportation, Erection and Dismantling of Rig Machine (1x2) 315 Drilling by RC/DC Rig Machine 600 mm dia 316 0 to 65 mtr. deep (65x2) 317 65 to 100 mtr. deep 500 mm dia(35x2) 318 100 to 130 mtr. 500 mm dia(30x2) 319 Tubewell Assembly 320 M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect. 321 300 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.(60.5x2) 322 200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm.(60x2) 323 Supply of pea gravel (38.22x2) 324 Logging of bore hole by departmental / approved electric logger.(1x2) 325 Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. 326 Lowering of 300mm dia pipe from GL to 60m deep BGL. (60x2) 327 Lowering of 200mm dia pipe from 60 to 100m deep BGL. (40x2) 328 Lowering of 200mm dia pipe from 100 to 120m deep BGL.(20x2) 329 Development of Tubewell by compressor 330 Transportation, Installation and Dismantling of 250/350 PSI Compressor (1x2) 331 Development of Tubewell by Adequate Capacity Air compressor (40x2) 332 Development of Tubewell by O.P. Unit 333 Transportation, Installation and Dismantling of3 Cusec O.P. Unit & Yield Test. 334 Development of Tubewell by Adequate Capacity by O.P. Unit 335 Chemical and Bacterological test of water sample from depaprtmental/ approved lab. 336 Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. 337 Pumping Plant tw Equipment at Existing Tubewell Zone 1E,TW No 1 338 Servo-Stablizer 40 KVA or above as per site condition 339 Automatic chlorination system compactable to SCADA system 340 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or as per site condition 341 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) 342 Motor operated actuator for Existing Sluice Valve (size as per site condition) 343 CE & UL certified Inteligent Smart Energy Meter 344 CE & UL certified Electro magnatice flow Meter 150mm size or as per site condition 345 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 346 CE & UL certified pressure transmitter 347 CE & UL certified Surge protector 3 phase at main switch. 348 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 349 Installation, commissioning & testing for one tubewell / OHT 350 Pumping Plant at Zone 1E,TW No 2(Rebore) 351 SITC of Submersible pump set of 1200 lpm at 55 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).( head, discharge & HP are tantative may vary as per site condition) 352 25 H.P. or above as per site condition. 353 3 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 354 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 355 4 x 16 sq. mm Al. cable 356 Automatic chlorination system compactable to SCADA system 357 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or aboveor above as per site condition. 358 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) 359 Motor operated actuator with sluice valve 150mm Sluice Valve 360 CE & UL certified Inteligent Smart Energy Meter 361 CE & UL certified Electro magnatice flow Meter 150mm size 362 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 363 CE & UL certified pressure transmitter 364 CE & UL certified Surge protector 3 phase at main switch. 365 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 366 Installation, commissioning & testing for one tubewell / OHT 367 Pumping Plant at Zone 1E,TW No 3 368 SITC of Submersible pump set of 839 lpm at 55 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).( head, discharge & HP are tantative may vary as per site condition) 369 17.5 H.P. or above as per site condition. 370 3 Mtr. long heavy duty size 100mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 371 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 372 4 x 16 sq. mm Al. cable 373 Automatic chlorination system compactable to SCADA system 374 Soft starter with RS-485 port-400V Class minimum 15 Kw rating or above as per site condition. 375 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) or above as per site condition. 376 Motor operated actuator with sluice valve 100mm Sluice Valve 377 CE & UL certified Inteligent Smart Energy Meter 378 CE & UL certified Electro magnatice flow Meter 100mm size 379 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 380 CE & UL certified pressure transmitter 381 CE & UL certified Surge protector 3 phase at main switch. 382 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 383 Installation, commissioning & testing for one tubewell / OHT 384 SCADA Automation of Zone 1E TW No 1 (Existing), T.W. No 2 (Rebore) & T.W. No 3 385 CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x3) 386 G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(1x3) 387 CE & UL certified 7 HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter.(1x3) 388 Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x3) 389 Trial run for 03 months period for 03 nos of tubewell through SCADA(1x3) 390 Trial run of Zone 1E 391 03 Month Trial run of tubewells of Zone 1E with staff at tw 2(Rebore)&3 and liquid chlorine consumption on all 03 tubewells. 392 Zone-3 393 Construction of Tubewell of Zone 3 T.W. No 3 394 Drilling of borehole for Tubewell contruction by RC/DC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. 395 Transportation, Erection and Dismantling of Rig Machine 396 Drilling by RC/DC Rig Machine 500 mm dia 397 0 to 65 mtr. deep 398 65 to 100 mtr. deep 450 mm dia 399 100 to 130 mtr. 450 mm dia 400 Tubewell Assembly 401 M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support girder etc. As required & as per typed design complete in all respect. 402 200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 403 150 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 404 Supply of pea gravel 405 Logging of bore hole by departmental / approved electric logger. 406 Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. 407 Lowering of 200mm dia pipe from GL to 60m deep BGL. 408 Lowering of 150mm dia pipe from 60 to 100m deep BGL. 409 Lowering of 150mm dia pipe from 100 to 150m deep BGL. 410 Development of Tubewell by compressor 411 Transportation, Installation and Dismantling of 250 PSI Compressor 412 Development of Tubewell by Adequate Capacity Air compressor 413 Development of Tubewell by O.P. Unit 414 Transportation, Installation and Dismantling of1 Cusec O.P. Unit & Yield Test. 415 Development of Tubewell by Adequate Capacity by O.P. Unit 416 Chemical and Bacterological test of water sample from depaprtmental/ approved lab. 417 Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. 418 E/M equipmenton Existing Pumping Plant at Tubewell of Zone 3 TW No 1 & 2 419 Servo-Stablizer minimum 40 KVA or above or as per site condition. (1x2) 420 Automatic chlorination system compactable to SCADA system (1x2) 421 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition. 422 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.)or above as per site condition. (1x2) 423 Motor operated actuator for Existing Sluice Valve (1x2) 424 CE & UL certified Inteligent Smart Energy Meter (1x2) 425 CE & UL certified Electro magnatice flow Meter 150mm size (1x2) 426 CE & UL certified hydro static type sub soil water level transmitter for tubewell. (1x2) 427 CE & UL certified pressure transmitter(1x2) 428 CE & UL certified Surge protector 3 phase at main switch(1x2) 429 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT(1x2) 430 Installation, commissioning & testing for one tubewell / OHT (1x2) 431 Pumping Plant at Zone 3 TW No 3 432 SITC of Submersible pump set of 492 lpm,59 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).(Head, Discharge & HPare tantative may vary as per site condition ) 433 12.5 H.P. or above as per site condition 434 3 Mtr. long heavy duty size 100mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 435 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 436 4 x 16 sq. mm Al. cable 437 Automatic chlorination system compactable to SCADA system 438 Soft starter with RS-485 port-400V Class minimum 15 Kw rating or above 439 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) 440 Motor operated actuator with sluice valve 100mm Sluice Valve 441 CE & UL certified Inteligent Smart Energy Meter 442 CE & UL certified Electro magnatice flow Meter 100mm size 443 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 444 CE & UL certified pressure transmitter 445 CE & UL certified Surge protector 3 phase at main switch. 446 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 447 Installation, commissioning & testing for one tubewell / OHT 448 SCADA Automation Items 449 CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x3) 450 G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(1x3) 451 CE & UL certified 7 HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter. (1x3) 452 Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x3) 453 Trial run for 03 months period for 03 nos of tubewell through SCADA(1x3) 454 Trial run of Zone 3 TW No 1 & 2 (Existing) & TW No 3 455 03 Month Trial run of tubewells of Zone 3 with staff at tw 3 and liquid chlorine consumption on all 03 tubewells. 456 Zone-4 457 Construction of Tubewell of Zone 4 TW No 1 (Rebore) 458 Drilling of borehole for Tubewell contruction by RC Rig Machine including transportation, erection, dismantling of Rig and assoiated T & P complete in all respect including required all material, labour etc. 459 Transportation, Erection and Dismantling of Rig Machine 460 Drilling by RC/DC Rig Machine 500 mm dia 461 0 to 65 mtr. deep 462 65 to 100 mtr. deep 450 mm dia 463 100 to 130 mtr. 450 mm dia 464 Tubewell Assembly 465 M.S. tubewell assembly with all required parts like plain pipe, slotted pipe (as required upto 50% of plain pipes) rings, well cap, bail plug, clamp, reducer, central guide, support structer etc. As required & as per typed design complete in all respect. 466 200 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 467 150 mm. Dia MS ERW Housing/ casing pipe having wall thickness of 7.1mm. 468 Supply of pea gravel 469 Logging of bore hole by departmental / approved electric logger. 470 Lowering of Tube well assembly duly welded including welding electrode and shurounding of pea gravel complete in all respect. 471 Lowering of 200mm dia pipe from GL to 60m deep BGL. 472 Lowering of 150mm dia pipe from 60 to 100m deep BGL. 473 Lowering of 150mm dia pipe from 100 to 150m deep BGL. 474 Development of Tubewell by compressor 475 Transportation, Installation and Dismantling of 250 PSI Compressor 476 Development of Tubewell by Adequate Capacity Air compressor 477 Development of Tubewell by O.P. Unit 478 Transportation, Installation and Dismantling of1 Cusec O.P. Unit & Yield Test. 479 Development of Tubewell by Adequate Capacity by O.P. Unit 480 Chemical and Bacterological test of water sample from depaprtmental/ approved lab. 481 Baricading/ fencing of the site during the construction of T.W. to ensure that site is not exposed to risk of accident. 482 Pumping plant of Zone 4 TW No 1 (Rebore) 483 SITC of Submersible pump set of Discharge 600lpm ,59 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset,servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items). (Head, discharge & HP are tantative may vary as per site condition) 484 15 H.P. or above as per site condition. 485 3 Mtr. long heavy duty size 100mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 486 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 487 4 x 16 sq. mm Al. cable 488 Automatic chlorination system compactable to SCADA system 489 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition. 490 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) 491 Motor operated actuator with sluice valve 150mm Sluice Valve 492 CE & UL certified Inteligent Smart Energy Meter 493 CE & UL certified Electro magnatice flow Meter 150mm size 494 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 495 CE & UL certified pressure transmitter 496 CE & UL certified Surge protector 3 phase at main switch. 497 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 498 Installation, commissioning & testing for one tubewell / OHT 499 Pumping plant of Zone 4 TW No 2(Existing) 500 SITC of Submersible pump set of discharge 1100 lpm ,58 m head with 24m column pipe,NRV,CI D/F Bend 90 ,CI A/F Tee, D/F pipe (1.5 m long 2 nos and 1.0 m long 1 no) Earthing ,Painting ,Toolset, Servo Stablizer,wiring of pump house internal and external, Chain pulley block,and all Pumping plant accessories with nut bolts and rubber packing etc.(All other items for pumping plant item not included in SCADA Automation pumping plant items).( head, discharge & HP are tantative may vary as per site condition) 501 25 H.P. or above as per site condition. 502 3 Mtr. long heavy duty size 150mm diacolumn pipe same as above spare (for 18 mtr length ) (1 set = 02 nos) 503 Copper cable size 2x3cx6 sq mm. flat for 18 m extra column pipe. 504 4 x 16 sq. mm Al. cable 505 Automatic chlorination system compactable to SCADA system 506 Soft starter with RS-485 port-400V Class minimum 22 Kw rating or above as per site condition. 507 Auto Phase reversal unit with inbuilt time delay and enclosure (100 Amp.) 508 Motor operated actuator with sluice valve 150mm Sluice Valve 509 CE & UL certified Inteligent Smart Energy Meter 510 CE & UL certified Electro magnatice flow Meter 150mm size 511 CE & UL certified hydro static type sub soil water level transmitter for tubewell. 512 CE & UL certified pressure transmitter 513 CE & UL certified Surge protector 3 phase at main switch. 514 Complete cabling of tubewell including all power and control cables of all equipment at pump house and OHT 515 Installation, commissioning & testing for one tubewell / OHT 516 SCADA Automation Items 517 CE & UL Certified PLC/ RTU in IP 54 enclosure suitable to communicate with GSM based modem unit with CPU & Power supply with analog & digital parameter & features as specified, for each tubewell/ OHT & stand alone OHT to store and transmit data on GSM backbone, RTU/PLC designed with logic to transfer data at multiple stations (1x2) 518 G.S.M./G.P.R.S. based wireless communication with 4G modem for RTU/ PLC Capable to transfer and gather data from remote sites to control stations all accessories included with signal enhancer anteena made for pumping plant internet charges(1x2) 519 CE & UL certified 7 HMI touch screen suitable to communication with PLC/RTU local display and control of process parameter.(1x2) 520 Control panel with IP-54 protection industrial grade for all equipment separate for control (24V and power equipments) (1x2) 521 Trial run for 03 months period for 02 nos of tubewell through SCADA (1x2) 522 Trial run of Zone 4 T.W No 1 (Rebore) & T.W. No 2 (existing) 523 03 Month Trial run of tubewells of Zone 4 with staff at tw 1(Rebore) and liquid chlorine consumption on all 02 nos of tubewells. 524 OHT forZone-1C, 1D, 1E 3&4 525 Motor operated actuator for Existing sluice valve onExisting OHTof 300 mm size. of Zone 1C 526 Motor operated actuatorwith sluice valve on New OHTof 400 mm size. Of Zone 1D, 1E & Zone 3 527 Motor operated actuator for Existing sluice valve onExisting OHT of 250 mm size. of Zone 4 528 Flow Meter on OHT delivery line of size 300 mm dia for Existing OHT of Zone 1C 529 Flow Meter on OHT delivery line of size 400 mm dia for New OHT of Zone 1D, 1E & Zone 3 530 Flow Meter on OHT delivery line of size 250 mm dia for Existing OHT of Zone 4 531 Chlorine Analyzer rnge 0-5 ppm (electrolyte with membrane cap; Type- Amperometric. 532 CE/UL certified Radar type Level Transmitter for Over haead Tank for Eisting OHT of zone 1&2 and new OHT of Zone 3 533 MASTER CONTROL SYSTEM (MCS) 534 CE/UL & BIS Certifed industrial grade LED MONITOR with latest configuration 535 (i) 65 (upto 50 Tubewells). 536 Desktop/PC with i5/i7 processor for 537 CE/UL Certified 5KVA UPS with batteries . 538 Full development version of required TAGS SCADA Software with coustomization of sowftware for MCS as per requirement . 539 CE/UL Certified master control room PLC with redundant CPU & power supply at MCS in IP54 enclouser 540 CE/UL Certified Field gateway agent for transfering data from MCS to Central control room. 541 GSM based wireless/Broaband/Equipment communication system for PLC capable to transfer & received data & gather data from remote sites to control satation, All accessories included signal enhancer antenna along with running expences, till DLP. 542 CE/UL Certified Firewall for network protection. 543 SURGE PROTECTOR FOR ETHERNET communication protection. 544 CE/UL certified industrial grade Ethernet Switch. 545 Mobile App Facility system architecture (industries internet based & viewed through mobile apps for increased local & Remote Visibility). 546 Canon/HP or equivalent Laser Printer 1018 or equivement. 547 Security Sureillance IP camera with recorder (optional) 548 Installion, Commissioning & testing including required furniture, A/c etc. 549 Trial run of MCS for 03 months period
Contract Date : 07 Jan, 2025   |   Contract Value : 22.15 Crore
Disclaimer

We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Tender Detail
Website https://www.getco.co.in/tender/index.html?page=1
Quantity 0
MSME Exemption No
Tender Type Open Tender
Startup Exemption Click Here
Competitive Bidding NCB
Similar Tenders
TENDER INSIGHTS

858

Electric Tenders
Live
CLICK TO KNOW MAXIMUM WIN

Tell us about your Product / Services,

We will Find Tenders for you

🇮🇳 +91
TenderDetail
Loading tenders