TDR : 56985454
Gujarat Energy Transmission Corporation Limited

Tender Brief :

Bharuch, Gujarat

Tender For Tender for Work of Survey, Design, Supply, Installation, Testing, commissioning with Comprehensive Maintenance contract of 5 years for Solar Rooftop Projects on Control Room building at 66kV Karanj S/s,66kV Kharach-2 S/s, 66kV Patna S/s, 6

Published: 12 Aug 2026
Opening: Ref Document
Closing: 24 Aug 2026
Amount: 76.91 Lakhs
EMD: 76917
Tender Fee: 5900


Works Accounting Services Acoustical Work Advertising Agency Aerial Advertisement Agriculture service
6
Days Left
Tender Summary / Eligibility Criteria
Tender for Work of Survey, Design, Supply, Installation, Testing, commissioning with Comprehensive Maintenance contract of 5 years for Solar Rooftop Projects on Control Room building at 66kV Karanj S/s,66kV Kharach-2 S/s, 66kV Patna S/s, 66kV Vasravi S/s, 66Kv Simodara S/s, 66kV Gala Karjan S/s, 66kV Hariyal S/s, 66kV Kosamba-2 S/s, 66kV Mandvi S/s, 66kV Palod-II S/s, 66kV Tadkeshwar S/s, 66kV Vankal S/s, 66kV Velanja S/s, 66kV Zankhvav S/s Under KIM TR Division under Bharuch TR Circle
Documents Download All
8595e9a439c34163929a49740e41bee8
8595e9a439c34163929a49740e41bee8.html
E154Tenderbharuch
E154Tenderbharuch.pdf
No Boq
No Corrigendum
Probable Bidders

AI engine predicts probable bidders to help you bid strategically.

MSME Exception
Explore More →
Technical
Tender involves procurement of high capacity electrical equipment including diaphragm coupling of pump & motor with 90kW capacity at 2900 RPM. The project scope includes installation, testing, commissioning and operational handover.
Previous / Similar Result
BRR : 3210559 Survey, Design, Fabrication, Supply, Installation, Testing, Commissioning With Remote Monitoring System Of Solar Rooftop Projects With Cumulative Capacities Of 55 Kw ( 10Kw On-Grid & 45 Kw-Off-Grid ) At Various Government Buildings In Achalpur Taluka Of District Amravati Through District Planning Commission ( Dpc ) Fund With Comprehensive Maintenance Contract ( Cmc ) For5 Years.
Contract Date : 25 May, 2023   |   Contract Value : 58.76 Lakhs
BRR : 5239858 Tender For Permanent Cathodic Protection ( Pcp ) Works For Six City Cgd Project ( 18 Months Arc ) Of Gail ( India ) Limited; 1 Pcp System For Varanasi Ga, Bhubaneshwar Ga, Cuttack Ga, Patna Ga, Ranchi Ga & Jamshedpur Ga 2 Design, Detail Engineering, Manufacturing, Inspection / Fat ( Factory Acceptance Test ) , Supply, Packing, Insurance, Transportation To Site, Storage At Site ( Transportion Of Material From Storage To Site ) , Loading / Unoading, Instalation, Testing & Commissioning Of Impressed Current Based Permanent Cathodic Protection System To Protect The External Surfaces Of Long 3Lpe Coated Pipelines Against Corrosion Laid In Various Gas Of Gail, For Minimum Services Life Of 35 Years Using Using Mmo Coated Titanium Anodes With Backfill, Cppsm / Tr Units, AjbS, CjbS, All Interconnecting Cables, Reference Cells, Hook-Up Of Existing Pcp System If Any, Bonding Of Pipelines, Monitoring Systems Including Ac-Dc Interference Detection And Mitigation & All Other Equipments And Hardwares Required For Completeness Of Job As Specified In Specification, Scope Of Work, As Per Mecon’S Standard Specifications For Pcp System Mec / Ts / 05 / 62 / 016B, Scope Of Work, Design Basis & Data Sheets Enclosed, Land For Agb Shall Be Provided By Gail Or Agb Shall Be Installed In Gail Permised I.E. Cgs, Cng Station, Drs, Mrs Etc, Details Are Given Under Below- 3 Design, Detailed Engineering, Preparation Of Pcp Design Document & Bill Of Material, Fieldsurvey For Permanenet Cathodic Protection System, Measurement Of Soil Resistivity ( Layer Resistivity At Agb ) At Agb Location As Per Specification For Corrosion Survey Mec / Ts / 05 / 21 / 016C Inclduing Collection Of Additional Data With All Types Of Crossings Is In The Scope Of Bidder, Including Selection Of Plot / Location For Deepwell Anode Groundbed At Cp Station Locations Within Cng Stations, Considering Remoteness From The Target Pipeline Of Following Gas- 4 Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, 5 Design, Engineering, Supply Of Anode Ground Bed ( Agb ) , Deep-Well Bed Type ( 1X 10 Nos Or 2X5 Nos. Confuguration As Per The Soil Data ) For Following Gas, Consisting Of Minimum Ten ( 10 ) Numbers Of Mixed Metal Oxide Coated Titanium Tubular Anodes Of 25Mm Dia. / 1000Mm Long Size And 8A Rating With Tail Cable Of 1C X 10Mm2 Annealed Stranded Copper Conductor, Pvdf Insulated, Hmwpe Sheathed / Jacket ( Kynar Cable ) Shall Be Terminated At Ajb. Actual Numbers Of Anodes Shall Be Finalized After The Approval Of Design Calculation & Configuration Of Agb Submitted By The Bidder. Anode Ground Bed Resistance Should Be Maintained Less Than 1- Ohms. Minimum Depth Of Deep-Well Anode Bed Shall Be Min. 48M ( It May Increase As Per The Survey Data To Get Effective Remoteness From Pipeline ) . 6 Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, 7 Installation, Testing & Commissioning Of Anode Ground Bed ( Agb ) Of Deep-Well Bed Type ( 1X 10 Nos Or 2X5 Nos. Confuguration As Per The Soil Data ) For Follwoing Gas Having Individual Anodes Vertically In Bed, Consisting Of Minimum Ten ( 10 ) Numbers Of Mixed Metal Oxide Coated Titanium Tubular Anodes Of 25Mm Dia. / 1000Mm Long Size And 8A Rating With Tail Cable Of 1C X 10Mm2 Annealed Stranded Copper Conductor, Pvdf Insulated, Hmwpe Sheathed / Jacket ( Kynar Cable ) Shall Be Terminated At Ajb. Actual Numbers Of Anodes Shall Be Finalized After The Approval Of Design Calculation & Configuration Of Agb Submitted By The Bidder. Anode Ground Bed Resistance Should Be Maintained Less Than 1- Ohms. Minimum Depth Of Deep-Well Anode Bed Shall Be 48M ( As Per Drawing ) & It May Increase As Per The Survey Data To Get Effective Remoteness From Pipeline. 8 Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, 9 Supply Including Design, Manufacturing, Shop Testing, Inspection, Packing, Forwarding, Transportation Of Indoor Type 75V / 25A Output Rating Ac / Dc Operated Automatic Cp Transformer Rectifier Unit / Cppsm Unit Confirming To Standard Specification No. Mec / Ts / 05 / E9 / 082A & B, Data Sheet & Drawing. The Cp Units Shall Be Installed Inside The Control Room For Following Ga. All The Cp Units Shall Have Scada Monitoring Facility, Current Interruption Facility With Timer ( Gsm Connectivity & Gps Synchronized ) Etc As Per Specification Including Commissioning And Maintenance Spares As Required. 10 Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, 11 Installation, Civil / Structural Support, Earthing, Testing & Commissioning Of Outdoor Type 75V / 25A Output Rating Ac Operated Automatic Cp Transformer Rectifier Unit Confirming To Standard Specification No. Mec / Ts / 05 / E9 / 082A, Data Sheet & Drawing For Following Gas. The Tr Units Shall Be Installed Indoor, Bidder Scope Include Proper Installation Of Cp Units In The Room With All Fabrication Work. All The Tr Units Shall Have Scada Monitoring Facility, Current Interruption Facility With Timer ( Gps Synchronized ) Etc As Per Specification Including Commissioning And Maintenance Spares As Required. 12 Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, 13 Supply Of All The Cables ( Cu-Conductor, Xlpe Insulated, Pvc Sheathed, Armd / Unrmd ( 1Cx6 Mm2, 1Cx10 Mm2, 1Cx25 Mm2, 1Cx35 Mm2 As Required ) Of Pcp System, Including All Incoming Power Cable And Outgoing Cp Cables Of Cptr / Cppsm Units Including Making Of Under Ground Trenches, Testing, Commissioning Of All Interconnecting Cables Among Power Supply, Cp Unit, Battery Bank Etc Including Supply Of Tinned-Cu Lugs, Double Compression Type Cable Glands, Cable Marker, Cable Tags Etc As Required For Completion Of The Work At Selected Cp Station Locations, Break Up Of Cable Quantitis Shall Be Carried During Approval Of Engineering Document. 14 1C X 6 Mm2 - Armored For Potential Measurement, Ref Cell Etc 15 Multi-Core, Frls, 1.5 Sqmm, 12 Pair, Twisted Pair, Armoured, Signal Cables As Per Is / Bs For Ref Cell Etc From Cjb To Tr Unit. 16 1Cx 25 Mm2- Armored For Bonding / Grounding Etc. 17 1Cx 35 Mm2- Armored For Anode & Cathode Header Cable. 18 3C X 10Mm2- Armored For Tr / Cppsm Unit Incomer Cable. 19 Laying, Termination, Glanding, Ferruling, Testing And Commissioning Of All The Cables ( Cu-Conductor, Xlpe Insulated, Pvc Sheathed, Armd / Unrmd ( 1Cx6 Mm2, 1Cx10 Mm2, 1Cx25 Mm2, 1Cx35 Mm2 As Required ) Of Pcp System, Including All Incoming Power Cable And Outgoing Cp Cables Of Cptr / Cppsm Units Including Making Of Under Ground Trenches, Testing, Commissioning Of All Interconnecting Cables Among Power Supply, Cp Unit, Battery Bank Etc Including Installation Of Tinned-Cu Lugs, Double Compression Type Cable Glands, Cable Marker, Cable Tags Etc As Required For Completion Of The Work At Selected Cp Station Locations Of Gas.Break Up Of Cable Quantitis Shall Be Carried During Approval Of Engineering Document. 20 1C X 6 Mm2 - Armored For Potential Measurement, Ref Cell Etc 21 Multi-Core, Frls, 1.5 Sqmm, 12 Pair, Twisted Pair, Armoured, Signal Cables As Per Is / Bs For Ref Cell Etc From Cjb To Tr Unit. 22 1Cx 25 Mm2- Armored For Bonding / Grounding Etc. 23 1Cx 35 Mm2- Armored For Anode & Cathode Header Cable. 24 3C X 10Mm2- Armored For Tr / Cppsm Unit Incomer Cable. 25 All Cable To Pipe Connection By Thermit Welding / Pin Brazing ( For Charged Pipeline ) For 35, 25, 10 , 6 Sq.Mm Copper Cable Including Excavation And Exposing Piping, Recoating With Epoxy, Testing, Material Supply Etc. 26 Supply Of Junction Boxes For Gas As Per Design Of Pcp System For Anode Bed - 27 Anode Junction Boxes ( Ip-55, Weather Proof ) 28 Cathode Junction Boxes ( Ip-55, Weather Proof ) / Pcp Bond Junction Box Including Hookup / Bonding Of New Pipelines To Existing Pcp System At Cjb / Cppsm / Tlp As Required By Means Of Direct / Reistance / Diode-Resistance Bonding As Required As Per Detail Mentioned In Scope Of Work. 29 Cathode Junction Boxes / Pcp Bond Junction Box ( Ip-55, Flame Proof Ex-D & Weather Proof ) Including Hookup / Bonding Of New Pipelines To Existing Pcp System At Cjb / Cppsm / Tlp As Required By Means Of Direct / Reistance / Diode-Resistance Bonding As Required As Per Detail Mentioned In Scope Of Work. 30 Installation, Testing & Commissioning Of Junction Boxes Including All Labor And Civil Work For Gas As As Design - 31 Anode Junction Boxes ( Ip-55, Weather Proof ) 32 Cathode Junction Boxes ( Ip-55, Weather Proof ) / Pcp Bond Junction Box Including Hookup / Bonding Of New Pipelines To Existing Pcp System At Cjb / Cppsm / Tlp As Required By Means Of Direct / Reistance / Diode-Resistance Bonding As Required As Per Detail Mentioned In Scope Of Work. 33 Supply Of Recommended Spares For Cp Unit As Per Scope Of Work For Each Ga As Per Appendix-Ii In Scope Of Work. 34 Supply Of Recommended Spares For 2 Years Operation & Maintenance Of Cp System As Per Spare List Enclosed ( Appendix-Ii In Scope Of Work ) 35 Testing & Commissioning Of Complete Permanent Cathodic Protection System Of The Comptele Pipelines In Each Ga As Per Scope Of Work. 36 Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, ( Refer Scope Of Work For The Breakup Of The Quantities ) 37 Post Commissioning Surveys As Per The Approved Procedures 38 Post Commissioning Surveys-Cipl Survey Including Pcp Effectiveness Check By Measuring Psp At Coupon Locations 39 Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, ( Refer Scope Of Work For The Breakup Of The Quantities ) 40 Post Commissioning Surveys-Current Attenuation Test Survey ( Cat ) 41 Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, ( Refer Scope Of Work For The Breakup Of The Quantities ) 42 Post Commissioning Surveys-Dcvg Survey At The Complete Length Of The Pipeline For Mapping Coating Defects On The Pipeline. ( Holiday Mapping Shall Be Quantified With Known Size Of Coupon Prior To Start Of The Dcvg Survey, With Respect The %Ir / Re Observed While Detecting The Known Size Coupon Holiday. ) 43 Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, ( Refer Scope Of Work For The Breakup Of The Quantities ) 44 Post Commissioning Surveys-Ac & Dc Interference Detection & Mitigation Survey For Whole Pipleline By Back Up Agency / Bidder Includes Software Based Modeling / Simulation Of The Pipeline For The Ac Pick-Up Due To Long Term ( Induced ) & Short Term Interference ( Ground Fault, Lightning Etc ) And Ac Corrosion Study And Mitigations. Dc Interference Studies & Mitigations Measures Shall Also Be Carried Out As Per The Scope Of Work. The Details Of Pipelines Are Provided In Scope Of Work. Material Required For All Mitigation Masures Propsed By Bidder, Shall Be In The Scope Of The Bidder. 45 Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, ( Refer Scope Of Work For The Breakup Of The Quantities ) 46 Preparation And Submission Of As-Built Drawings / Documents Including Final Commissioning Report For Pcp System, Post Commissioning Survey, Interference Study Report As Per Approved Design For All Ga. 47 Polarisation Coupons ( 25 Mmx 25Mm ) With Magnetic Reed Switch & Ref Cell For As Per Approved Design- 48 Supply Of Polarisation Coupons ( 25 Mmx 25Mm ) With Magnetic Reed Switch & Permanent Ref Cell At Following Ga-Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, ( Refer Scope Of Work For The Breakup Of The Quantities ) 49 Installation, Testing & Commisisoning Of Polarisation Coupons ( 25 Mmx 25Mm ) With Magnetic Reed Switch At Following Ga-Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, ( Refer Scope Of Work For The Breakup Of The Quantities ) 50 Ac Corrosion Coupons For All Ga 51 Supply Of Ac Corrosion Coupons ( 1 Cm2 Exposed Area ) At Ht Line And Locations Prone To Interference Have One Side Exposed Area Of 10 Mm X 10 Mm With Ac Current Shunt, Shall Be Provided Along The Pipeline At Vulnerable Locations To Monitor The Ac Corrosion Activity On The Pipeline As Per Enclosed Standard Specification. Location Of Ac Corrosion Coupons ( 1 Cm2 Exposed Area ) Shall Be Decided During Detail Engineering In Consultation With Gail / Mecon. 52 Installation, Testing & Commissioning Of Ac Corrosion Coupons ( 1 Cm2 Exposed Area ) At Ht Line And Locations Prone To Interference Have One Side Exposed Area Of 10 Mm X 10 Mm With Ac Current Shunt, Shall Be Provided Along The Pipeline At Vulnerable Locations To Monitor The Ac Corrosion Activity On The Pipeline As Per Enclosed Standard Specification. Location Of Ac Corrosion Coupons ( 1 Cm2 Exposed Area ) Shall Be Decided During Detail Engineering In Consultation With Gail / Mecon. 53 Computerized Test Stations 54 Supply, Installation, Testting & Commisisoningof Ctsu Unit As Per Mecon Specification For The Following Ga-Varanasi, Bhubaneshwar, Cuttack, Patna, Ranchi, Jamshedpur, ( Refer Scope Of Work For The Breakup Of The Quantities ) 55 Supply, Recording & Demonstration Of Ctsu Reader / Laptop Working On Gsm As Per Specificaiton With All Softwares And Hardwares As Per Scope Of Work For Automatic Recording Of Dc Psp & Current, Ac Psp & Ac Corrosion Density. 56 Supply, Installation, Testting & Commisisoning Of Central Monitoring Server At Each Ga With Central Monitoring Facilities Of Ctsu & Tr Unit On Gsm As Per Specificaiton With All Softwares And Hardwares As Per Scope Of Work. 57 Comprehensive Maintenanceof Tr Unit / Cpppsm Units 58 Comprehensive Maintenanceof Tr Unit / Cpppsm Units Including Spare Replacement For Period Of Two Years As Per Scope Matrix In The Tender Document / Scope Of Work Annexure-E For All Ga. 59 Comprehensive Maintenanceof Tr Unit / Cpppsm Units 60 Supply Of Following Tcp Materials, If Required / Found Damaged / Missing During The Pcp System Work- 61 Solid State Type Polarisation Cells ( 3.7 Ka @ 30 Cycle ) For Ht Power Line Crossings ( 66Kv & Above ) . 62 New Test Stations Big Size- ( Weather Proof With Ip-55 ) Suitable For Polarisation Cells As Per Tender Drawings With Name Plate 63 New Test Stations Normal Size- ( Weather Proof With Ip-55 ) As Per Tender Drawings With Name Plate 64 Earthing Electrodes 65Mm Dia X 3Mtr Long & 4.5 Mm Thick Gi Pipe For Earthing Of Cathodically Unprotected Pipeline At Consumer Station / Drs Station / Metering Skid / Ht Line. 65 Gi Strip ( 25X3 ) Mm 66 Solid State Surge Diverters Rating 100 Ka ( 10 / 350 Us ) For Insulating Joints. ( Flame Proof Type ) 67 Installation, Testing & Commissioning Of Following Tcp Materials, If Required / Found Damaged / Missing / Not Working During The Pcp System Work- 68 Solid State Type Polarisation Cells ( 3.7 Ka @ 30 Cycle ) For Ht Power Line Crossings ( 66Kv & Above ) . 69 New Test Stations Big Size- ( Weather Proof With Ip-55 ) Suitable For Polarisation Cells As Per Tender Drawings With Name Plate. 70 New Test Stations Normal Size- ( Weather Proof With Ip-55 ) As Per Tender Drawings With Name Plate 71 Earthing Electrodes 65Mm Dia X 3Mtr Long & 4.5 Mm Thick Gi Pipe For Earthing Of Cathodically Unprotected Pipeline At Consumer Station / Drs Station / Metering Skid / Ht Line. 72 Gi Strip ( 25X3 ) Mm 73 Solid State Surge Diverters Rating 100 Ka ( 10 / 350 Us ) For Insulating Joints. ( Flame Proof Type ) 74 Total Amountexcluding Gst 75 Gst ( Cgst & Sgst / Utgst Or Igst ) @ 18% Of Net Total Amount Mentioned At Sl. No.184 Above. ( Enter Rate Of Applicable Gst )
Contract Date : 09 Apr, 2024   |   Contract Value : 7.97 Crore
BRR : 9528620 Tender For Provision Of Cgsd (Kochi) At Willingdon Island, Kochi; 1 SCHEDULE A Part - I (BUILDING & STRUCTURE WORKS)Details of prepriced schedule is given in tender documents. 2 SCHEDULE A PART-II ( SITE CLEARENCE/DEVELOPMENT & EARTH WORKS) Details of prepriced Schedule is given in tender documents. 3 SCHEDULE A PART-III (INTERNAL WATER SUPPLY) Details of prepriced Schedule is given in tender documents. 4 SCHEDULE A PART-IV (INTERNAL ELECTRIFICATION) Details of prepriced Schedule is given in tender documents. 5 SCHEDULE A PART-V (FIRE FIGHTING)Details of prepriced Schedule is given in tender documents. 6 SCHEDULE A PART-VI (ROAD/PATH/ HARD STANDING/CULVERT)Details of prepriced Schedule is given in tender documents. 7 SCHEDULE A PART-VII (EXTERNAL WATER SUPPLY) Details of prepriced Schedule is given in tender documents. 8 SCHEDULE A PART-VIII (EXTERNAL ELECTRIFICATION) Details of prepriced Schedule is given in tender documents. 9 SCHEDULE A PART-IX (SEWAGE DISPOSAL) Details of prepriced Schedule is given in tender documents. 10 SCHEDULE A PART-X (AREA DRAINAGE) Details of prepriced Schedule is given in tender documents. 11 SCHEDULE A PART-XI (COMPOUND WALL) Details of prepriced Schedule is given in tender documents. 12 SCHEDULE A PART-XII (ORGANIC WASTE CONVERTER AND SMART ENERGY METER) Details of prepriced Schedule is given in tender documents. 13 SCHEDULE A PART -XIII (MISCELLANIOUS ITEMS) Note:- This schedule is not pre-priced by MES and the rate shall be quoted by the bidder. 14 INTERNAL WATER SUPPLY S & F for 15 mm dia bore CP two way bib cock with CP wall flange (Make : Jaquar Model No. OPP15041PM / Eqvlt in Kohler/Grohe), cast copper alloy, screwed down high pressure with crutch screwed both ends for CPVC pipes or for union and fixed complete all as specified and directed by Engr-in-charge. 15 S & F for 15 mm dia bore CP bib cock with CP wall flange (Make : Jaquar Model No. OPP15037PM / Eqvlt in Kohler/Grohe), cast copper alloy, screwed down high pressure with crutch, screwed both ends for CPVC pipes or for union and fixed complete all as specified and directed by Engr-in-charge. 16 S & F for 20 mm bore concealed Stop cock reqular brass body with spindle extnwith Exposed Part Kit of Concealed Stop Cock with Fitting Sleeve, Operating Lever & Adjustable Wall Flange (Compatible with ALD-083CQT & ALD-089CQT)(Make : Jaquar Model No. ALD 089 CQT/ Eqvlt in Kohler/Grohe), cast copper alloy, screwed down high pressure with crutch , screwed both ends for CPVC pipes or for union and fixed complete all as specified and directed by Engr-in-charge. 17 S & F for 25 mm dia bore concealed Stop cock reqular brass body with spindle extn with Flush Cock & Wall Flange 25mm Ceramic Disc Cartridge) with Plain Knob (Make : Jaquar Model No. ALD 081/ Eqvlt in Kohler/Grohe), cast copper alloy, screwed down high pressure with crutch, screwed both ends for CPVC pipes or for union and fixed complete all as specified and directed by Engr-in-charge. 18 S & F 20mm bore CP angular stop cock with CP wall flange (Make : Jaquar Model No. CQT 23053 / Eqvlt in Kohler/Grohe), cast copper alloy, screwed down, high pressure with crutch, screwed both ends for iron pipe or for union and fixed 19 S & F for 100 mm overhead shower rose round shape single flow (ABS Body chrome plated with gray face plate (Make : Jaquar Model No. 1989 with SHA 479L300S / Eqvlt in Kohler/ ESS ESS) with Shower Arm ø20mm & 300mm Long Round Shape with 90˚ Bend for Wall Mounted Showers with Stainless Steel connected to pipe complete all as specified and directed by Engr-in-charge. 20 COOLING APPLIANCESDesign, Supply, Installation, Testing and Commissioning of Invertor Type Floor Mounted Packaged AC Units including indoor and outdoor unit complete of specified capacities, combination of energy efficient Inverter compressor plus fixed compressors, nominal capacity condensing unit with all standard fittings, safety devices, like HP/LP cutout, single phase preventor, overload relays, R-410A Gas, vibration isolation pads etc. Suitable to work till 50 Deg ambient, Blue Fin Condensor and Corrosion Resistant Body, Wide Voltage Range 360V - 440V, The quoted rate shall include Group controller also asrequired for controlling AC from a single point and timer option for load sharing of AC units complete all as specified and as directed by Engineer - in - charge, of following capacities.Note: Design report shall be submitted before execution of work at site by the contractor to GE for his scruitiny/comments and further submitted to AO for his approval.Make: Blue Star/Daikin/Haeir/Godrej/Voltas/Equivalent. 21 a) 22 TR Inverter Package AC Units 22 b) 16.5 TR Inverter Package AC Unit 23 BLANK 24 BLANK 25 BLANK 26 Supply, Installation and Testing of Refrigerant pipingwith necessary clamping (suction & Discharge) Hard/Soft drawn Copper tube of suitable sizes, with copper elbows, tees, Tubular Nitrile Insulations etc as required complete all as specified and as directed by Engineer - in - charge. 27 S & F Control Cabling B/W Indoor & Outdoor units 28 M & L Refrigerant Gas - R410A 29 Supply, Installation and Testing of Hard PVC drain piping. Drain piping with Tubular Nitrile Rubber Insulation: complete in all respects, well clamped till drain Points complete all as specified and as directed by Engineer - in - charge. For All Units 30 DUCTINGSupply, fabrication, installation, testing of GI rectangular ducts, complete with all fittings such as tee, bends, special off shoots, inspection doors, transformation pieces etc. as required as per IS 655 including suspension and supporting arrangement for plenum, duct etc. required complete all as specified and as directed by Engineer - in - charge. 31 a) Using 0.63 mm (24 Gauge) GI sheet 32 b) Using 0.80 mm (22 Gauge) GI sheet 33 c) Using 1.00 mm (20 Gauge) GI sheet 34 DUCT INSULATION & LININGSupply and Installation of Acoustic Insulation of ducts using 9MM Open Cell Nitrile Rubber, well adhesived, 150 - 180 Kg/cm2 complete all as specified and as directed by Engineer - in - charge. 35 Supply, installation & testing of Thermal Insulation of ducts using 9MM Closed Cell Nitrile Rubber, well adhesived, 40-60 Kg/cm2 complete all as specified and as directed by Engineer - in - charge. 36 S & F Canvas Connection 37 AIR DISTRIBUTION PRODUCTSSupply and Fixing of Powder Coated Aluminium Grills/ Diffusers (Supply/ Return) complete all as specified and as directed by Engineer - in - charge. 38 S & F Collar Dampers 39 Supply and Installation of Fire Dampers complete all as specified and as directed by Engineer - in - charge. 40 Supply, Installation, Testing and Commissioning of Heater Bank Plus Humidistat Arrangement complete all as specified and as directed by Engineer - in - charge. 41 Supply and fixing, testing and commissioning water coolerhaving stainless steel body with inbuild purifier HIMA 7 NHC, dispencing capacity 125 ltr/hr and storage tank capacity 40 ltr normal and 40 cold electric driven (single phase), 230 volt, AC power supply with all connecting accessories complete all as specified and directed. 42 Supply and fixrefrigerator, electric driven (single phase), 220 V,50 HZ, capacity 195 Litres, 3 Star rated direct cool inverter, single door all as specified and directed by the Engineer-in-Charge. 43 Supply and install, testing and commissioning of split type air conditioner 1.5 TR Capacity of invertertechnology 5 star rating with cordless remote control single phase 240 volts complete with all accessories such as indoor and outdoor units and refrigerent tubing of adequete length as required at site indoor mounting plate, duly powder coated fixing with anchor bolts at any height, drain pipe of suitable size brought to ground level from any height, initial filling of refrigerent gas including making round hole on existing wall for taking up refrigerent tubing, drain pipe, cables, etc and making good the disturbed surface by matching with existing adjoining surface complete all as specified and directed (Cooling appliances- qty 4, Air conditioning- qty 10) 44 Supply and fix Voltage stabilizer 3 KVA for automatic operation, single phase naturally air cooled indoor type, wall mounted & designed for input variation between 170 V to 280 V with output voltage stabilized at 230 V with accuracy of ± 2.5% 45 Supply and fix Voltage stabilizer 4 KVA for automatic operation, single phase naturally air cooled indoor type, wall mounted & designed for input variation between 170 V to 280 V with output voltage stabilized at 230 V with accuracy of ± 2.5% (Cooling appliances-qty4, Air conditioning- qty 10) 46 AIR CONDITIONINGSupply and install,Testing & commissioning of split type air conditioner 2 TR capacity of inverter technology 5 star ratingwith cordless remote control, single phase 240 volts complete with all accessories such asindoor and outdoor units and refrigerent tubing of adequete length as required at site, indoor mounting plate, duly powder coated fixing with anchor bolts at any height, drain pipe of suitable size brought to ground level from any height, initial filling of refrigerent gas including making round hole on existing wall for taking up refrigerent tubing, drain pipe, cables etc and making good the surace by matching with adjoining surface complete all as specified and directed. 47 Supply and fix Voltage stabilizer 5 KVA for automatic operation,single phase naturally air cooled indoor type, Wall mounted type & designed for input variation between 170 V to 280 V with output voltage stabilized at230 V with accuracy of ± 2.5% 48 INTERNAL ELECTRIFICATIONS & F LED Mirror light 1 x 5W LUMOS ECCO 1 feet Make: Luker or Equivalent 49 S & F modular MCB DBOx 3 Pin Socket with MCB SP 20 Amp, 240 V including plastic enclosure as per manufacturer instruction fixed on wall surface complete for Air conditioner all as specified and as directed. (Make:-Havells, Model-DHDMCSN0251016 or equivalent) 50 Supply and fix Air circulator of 600 mm sweep AC single Phase. 230V, 1440 RPM complete all as specified and as directed. (Make: Havells model, Turbo Force Wall or equivalent) 51 S & FVertical triple pole & neutral (VTPN), double door, 16-way metallic modular distribution board conforming to IEC 61439-3, suitable for flush / surface mounting with provision for FPMCCB as incomer and TPN/SP MCBs as outgoing, reversible metal door, 200 A copper busbar for each phase, fully insulated & shrouded neutral bar, earth bar, wiriest & cable ties for cable management, profited masking sheet, etc. having IK 09 & IP 43 protection complete all as specified and directed. 52 S & FVertical triple pole & neutral (VTPN), double door, 4-way metallic modular distribution board conforming to IEC 61439-3, suitable for flush / surface mounting with provision for FPMCCB as incomer and TPN/SP MCBs as outgoing, reversible metal door, 200 A copper busbar for each phase, fully insulated & shrouded neutral bar, earth bar, wiriest & cable ties for cable management, profited masking sheet, etc. having IK 09 & IP 43 protection complete all as specified and directed. 53 M & L for Flame ProofMCB Distribution board SPN 12 way, with case iron body, powder painted, with 100 Amps rated bus bar etc. including provision of one 32 Amps SPN MCB as incoming and 6 Amps SP MCB -10 Nos as outgoingcomplete all as specified and as directed. 54 M & L for Flame ProofMCB Distribution board SPN 8 way, with case iron body, powder painted, with 200 Amps rated bus bar etc. including provision of one 32 Amps SPN MCB as incoming and 6 Amps SP MCB- 6 Nos as outgoingcomplete all as specified and as directed. 55 Supply and fix Engage light with Green & Red LED complete all as specified and as directed 56 Supply and fix of CS mounted high intensity LED search light, long range, manually swivel in all direction, 250 W, minimum range 700 meters, Single, LED Efficiency> 140 lm/w, PF> 0.95, CCT 5500K - 6500K, Optical grade PMMA/PC lens/reflector efficiency>95%, multiple circuit to avoid complete run down, anti UV, narrow beam 5 degree, die cast LM6 body with air fins, powder coated, constant current, an average lux at 10 meter - 8000 lux with circle of approx 600 mm, working temp: -20 to +60 degree C, input Volt 100-300 VAC, 50 Hz, PF >0.95, IP-66, confirming to LM79/ LM80 and type tested as per IS: 10322/ IS: 13383, BIS approved and Govt lab tested for lux intensity. The search light is completed with manual revolving CS stand D20cm x H15cm (min.) with 3 nos. foundation holes for mounting of searchlight on watchtower structure, manual rotation of light on horizontally 360 degree with 45 degree tiltable with provision of both instant locking arrangement at desired position. Model No. CS-LRFLL-25PC25 of KALIN make or equivalent 57 Supply, install, testing and commisisong of outdoor floor/wall mounted thermoplastic polycarbonatefeeder pillar panel, Enystar EmptyEnclosures, IP-65, weatherproof, corrosion free, Halogen and Silicon Free, Frame retardant with Opaque Lid Size-[276 x 546 x 186]mm and Transparent Hinged Lid, completed all as specified and directed. 58 M & L for TV socket module metal flushed including flushed Box cover plate Box for 2 way module complete all as specified. 59 M & L for telephone jack with module metal flushed including flushed Box cover plate Box for 2 way module complete all as specified. 60 Supply and lay coaxial cable for TV Cabledrawn through conduit 61 S & F flame proof exhaust fan 300 mm sweep, single phase, 1440 RPM complete all as specified and as directed. 62 FIRE FIGHTINGSupply and fix Foot Valve conforming to IS 4038, 100 mmdia. 63 Supply and fix Foot Valve conforming to IS 4038, 150 mmdia. 64 Supply and fix Cast Iron Air Valves with single air Outlets, conforming to IS 14845 of size 100 mm dia bore and fixing up in Cast Iron Water supply mains of size 100 mm dia. 65 S & F sprinkler flexible drop pipe 1 mtr long. 66 S & F sprinkler rossette 25 mm dia. 67 Supply and installation, testing and commissioning of Analog Addressable type Active Loop Repeater (Loop power/external power) Fire terminal with inbuit turbo isolator, Backlit LCD Display 6x40 characters display, having Controls For Reset, Mute, Accept, Silence alarms and Self Test, with programmable free keys and Duly Approved byEN54/LPCB/VDS/FM Make: SIEMENS/NOTIFIER/BOSCH 68 M & L for Low smoke Zero helogen flame retardent fire alarm cable2 core, 1.5 mm² copper conductor confirming to BS7629-I, BS6387 & rated for 500 v grade having plaine sraded copper coductutor with priming insulation of glass mica fire resistance tape & secondery insulation of high performancesilicon rubber with electrostatic screen of aluminium fire barrier Type LT53 outer sheath confirming to BS 7655, red in colour drawn through & including concealed steel conduit including laying,fixing,connecting complete all as specified and directed. 69 Staircase signage down of make bajaj cat part no. 111499 model no. DSDWBB 3W double side display for staircase downwards (with 2 hours built in battery backup) complete all as specified and directed at site complete all as specified and directed. 70 S & F wall mounted LED emergency Exit signage luminaire Lit up using regular mains supply comes with a unique rechargeable Ni-Cd battery capable of emergency back up upto 05 hours(Cat No. 220211 Make Bajaj or equivalent to CG/Havells. 71 Supply, Installation, test and Commissioning CPRI APPROVED factoryfabricated, indoor type, LT panel board , made out of 2 mm thick CRCA Sheetsingle door withboth side opening including Neoprene Rubber Gasket, suitable for 440 Volt 3 Phase 4 Wire System, including Danger Plate, Earthing Strip Point and Ventilation Louvers at Rear Side, Bottom detachable Gland Plate complete with suitable size Zinc Chromium Plated Nuts, Bolts and Washers, etc. and embeddedwith 50X50X6mm Mild Steel Angle Iron Frame and 750 mm above the Normal Ground Level complete withinternal connection with suitable size of cable, cable lugs and cable glandsPCC Foundation in Cement Concrete 1:3:6 (20 mm Graded Stone Aggregate) and Testing after Installation includingcomplete all as specified and comprising of the following:- Make of MCCB/MCB -MDS/LEGRAND/L&T/HEGGER (Main Fire Fighting Panel)INCOMING(i) MCCB 4 Pole 400 amp 50 Hz, 415 V with rupturing capacity 35 KA with microprocessor based release - 01 No.(ii) Voltmeter Digital type 0-500 Volts range flush type with selector switch- 01 No.(iii) Aluminium Bus bar TPN - 600 amps- 1setOUTGOING(i) MCCB 3 Pole 200 amp 50 Hz, 415 V with rupturing capacity 35 KA with microprocessor based release- 02 No.(iii) MCB TPN 32 Amp - 03 Nos.(iv) 80 HP S/D soft STARTER- 02 Nos.(v) DOL STARTER 7.5 HP- 02 Nos.(vi) Motor Protection Relay32-88 amps- 2 nos. (vii) Motor Protection Relay2- 5.5 amps- 2 nos. (viii) On/Off/Trip Indication Lamps, 220 V AC- 6 nos.(ix) Start/Stop Push Button, 4 Nos. (x) Phase indicating lamps RYB for incoming and each outgoing connection.(xi) Digital type Ammeter 0- 150 amps with selector switch and CT coils of suitable capacity for incoming and each outgoing connection- 1 no. 72 M & L for coating and wrapping of under ground steel pipe buried in soil shall have protection against corrosion as per IS-10221.The coating and wrapping shall be carried out in systamatic manner to get uniform thickness of coating as per IS specification 73 Supply, Installation, test and Commissioning CPRI APPROVED factoryfabricated, Indoor type, LT panel board, made out of 2 mm thick CRCA Sheetsingle door withboth side opening including Neoprene Rubber Gasket, suitable for 440 Volt 3 Phase 4 Wire System, including Danger Plate, Earthing Strip Point and Ventilation Louvers at Rear Side, Bottom detachable Gland Plate complete with suitable size Zinc Chromium Plated Nuts, Bolts and Washers, etc. and embeddedwith 50X50X6mm Mild Steel Angle Iron Frame and 750 mm above the Normal Ground Level complete withinternal connection with suitable size of cable, cable lugs and cable glandsPCC Foundation in Cement Concrete 1:3:6 (20 mm Graded Stone Aggregate) and Testing after Installation includingcomplete all as specified and & directedby Engr-in-charge comprising of the following :– ( Booster terrace pump panel)INCOMING:-(a) INCOMING MCCB 40 A 25 KA, 4 POLE- 01 No.(b) Busbar TPN of size 100 apms - 1 setOUTGOINGS:-(a) MCB 3 POLE TPN 32 Amps,10 KA-2 Nos.(b)DOL Starter for 7.5 HP Pump set-1 Nos.(c) Ammeter Class-1, digital panel mounting type 96mmx96mm L & T cat no WDS301FCA00 including CT 50X5 Amps 3 nos & selector switch-4 nos(d) Voltmeter Class- 1, digital panel mounting type 96mmx96mm L&T CAT NO.WDS301FEV00 & selector switch - 1 no.(e) LED TYPE indicator lamp 1 set (set of three for R,Y,B)(f) Mini protecrionRelay 4-11 amp - 1 nos. 74 Fire Extinguisher mechanical Foam type trolly mouted of 9 Liters capacity. Ceasefire 9 litrs fire Extinguisher AFFF Foam type, External Cartridge type, Pressure Guage Gross weight 14.6 Kg, empty weight5.6 Kg, Can height 611 MM, Diameter 175 MM, Discharge time less than 60 Secs controllable discharge mechanism, Minimum 6 Mtrs, Applicable on Class A, B, can construction deep down & CO2 Mig welded Valve Construction: Forging & Machining, Internal coating of can: Epoxy powder coating, External coating of can: Epoxy poyster powder coating sheet metal thickness 2.0MM,1 year warranty. Make Cease Fire Or Equivalent. (pol store) 75 Supply, Installation,Testing & commissioning of Carbon Dioxide (Co2) type fire extinguisher of 4.5 Kg confirm to IS: 15683, with ISI marked/TAC approved fitted with required accessories including wall suspension brackets. 76 Supply, Installation,Testing & commissioning ofDRY CHEMICAL POWDER (ABC) stored pressure type fire extinguisher of 6 Kg confirm to IS: 15683, with ISI marked/TAC approved fitted with required accessories including wall suspension brackets. 77 Supply and fixing single unit flame type detectors (Triple IR infrared flame detectors) Addressable type Flame detectors with UV/IR detection capacity (add up cost of module to be a complete set, the type of module shall be relaying type module) complete all as specified and directed 78 Supply and fixing,Test and Drain valve 65/50mm, forged brass body, brass chrome plated ball, 304SS stem with Polycarbonate sight glass, indicator and handle made of steel complete all as specified and directed 79 SPECIAL EQUIPMENTS FOR STORESDesign, manufacture, Supply, installation, testing and commissioning of Automated Storage and Retrieval System with storage racks, pallets, stacking crane, computer hardware with compatible inventory software as a turnkey solution complete all as specified and directed. Automated Storage and Retrieval System shall consist of computer controlled & PLC stacker crane driven system for automatically placing & retrieving materials from defined storage locations. The crane shall be capable of lifiting, stacking and retriveing the pallet loads weight upto 1125 Kg (max) complete all as specified and directed by the Engineer-in-Charge. Technical data for design of heavy duty ASRS:-(a) Dimensions:-Height:10 Mtrs for racking system which shall be designed and constructed to store the required no. and size of pallets.(b)Storage capacity:-Pallet Size: 1300 (W) x 1200(D) x 1250 (H) in mmPallet Nos.: 480Pallet load capacity: 1125 KgTotal capacity: 540 Tons(c) Stacker Crane: Double mast automated stacker crane for handling Pallet, size 1300mm(W) x 1200mm (D) x 1250mm (H) and pay load (including Pallet self weight) of 1125 Kg max. The stacker crane shall be capable of picking up the pallet from in-feed conveyor or loading station and stacking it into empty slots of racking system. Similarly, it shall also be capable of retrieving the palltet from racking system and putting it on the same conveyor or unloading station. Stacker crane will be mounted on rails at the bottom to traverse the length of the storage system. Top rails mounted on the racking system shall also support it. PMDC motars should be used with required counter weight for better efficiency of verticle travel.General technical parameters of stacker crane:Technical parameters/Type- Double Mast(i) Operation mode (Networking)- On-line automatic / Single automatic (Ground/Boarding) /Manual operation (Boarding) / Maintenance (ii) Communication Means- Wireless 80 (iii) Power supply mode- 380 to 415 V, 50 Hz, three phase five wire (iv) Addressing mode- Horizontal and verticle operation: photo electrical sensor + bar code scanners(v) Positioning / Reduction accuracy (mm) level- lifting ± 3 - 5, Fork : ± 3(vi) Fork unit- 1 Double deep fork(vii) Load unit- MS Pallet (viii) Total Height- 10 Mtr(ix) The normal lifting speed (m/min) - 10 MPM(x) The normal running speed (m/min) - 65 MPM(xi) Rated load- 1125 Kg(xii) Receipt equipment fixed platform/conveyor/lifting /platform(electric/manual)- Conveyor(d) Pallets: to stack and retrieve the pallet weighing up to loaded pallet weight 1125 Kg at height up to the last loading level in the racking system. It should have retrieval mechanism to enable stacking & retrieval of pallet from either side of the rack and also to pick up the load directly from the loading station.Pallet Details:-(i) Dimensions - 1300mm(W) x 1200mm(D)(ii) Pallet height- 1250 mm(e) Racking system:- Two single aisle having two row racking system each with 05 verticle levels for storage of material. Racking for double deep type storage of 480 Pallet of size 1300mm(W) x 1200mm (D) x 1250mm (H). Loaded pallet weight: Pay load with pallet 1125 Kg max. System details:-Working aisle -01 Nos. (Double deep)Store rack -24 Nos./RowTotal rack in 1 aisle-24 (Left) + 24 (Right)= 48 Nos.No. of level- 5 Nos/RackTotal Pallet-48 x 5 x 2 = 480 Nos.Load capacity- 1125 Kg/LevelDouble mast stacker crane-01 No. 81 (f)Aisle Equipment:-This will consist of electrical as well mechanical aisle equipments and willl be designed as per the pallet requirement. The mechanical Aisle equipment of bottom rail shall consist of I Beam and will be provided with adjustable calmps for holding the rail in position to ensure proper alignment. Top rail shall be mounted on the racking. The electrical aisle equipment shall consist of power rail (fully enclosed bus bar having 7 pole system), which is mounted on the racking system below the first loading level.(g) Details of rack members:-The racking system shall consist of cold-rolled steel sections as per manufacturers design to accommodate and store pallets and connected systems.(h) Loading- unloading station/ Conveyor(i) Pallet Load 1125 Kg max.(ii) Bearing- SKF Equivalent make(iii) Motor- Seimens/Sew Euro Drive/Nord Sew/ Bonfiglioli or equivalent(iv) Gear Box- Bonfiglioli Make or equivalent(v) V.F.D.- Yashkawa make or equivalent(j) All steel surface shall be powder coated finish with 8 tank treatment process.(k) Maintenence: The annual maintenence of complete ASRS system during the defect liability period of two years shall be included in the rate quoted for the system and the AMC contract duly signed with the manufacturer of the ASR system shall be submitted at the time of handling over the system. The AMC shall include all spares and consumables etc required during the period of two years and nothing extra shall be paid on this accountNote- 1)Mechanical safety provision (i) End of aisle shock absorbers / bumpers for stacker crane.(ii) End of travel buffer for the lifting crane.(iii) Safety catches on lifting carriage.(iv) Anti-tilt mechanism for the stacker crane. An additional antifall device must be provided for the lifting carriage. In the event of electromagnetic break motor failure or malfunction, this device should automatically engage to safely hold the carriage and prevent any freefall, thereby avoid accidents due to emergency brake failure.(v) Continuous rail cleaning brush for floor rail.(vi) Adjustable rail clamp to ensure alignment. 82 (vii) Resilient rubber pads on adjustable clamps for vibration dampening.(viii) Profile check on lifting carriage to check all three dimensions (width, depth & height) of the pallet. Note - 2 Electrical safety provision (i) There shall be Emergency stop push button at all panels and stations.(ii) Optical light beam amd mechanical safety sensor to stop the operation in case of improper storage.(iii) Back up circuitry for proper system operation.(iv) An electromagnetic brake shall be used to avoid the slippage of the hoist.(v) Stopper shall be provided for the maintenance door.(vi) Load cells shall be provided for the over weight of tray.(vii) Automatic door shall be provided for operator safety while machine in operating condition.Note - 3 Physical safety provision (i) The ASR system shall comprise of safety fences having grid size of max. 40 x 40mm & wire dia should be of min. 3 mm. Height of the fencing should be minimum 2.0 meter.(ii) One No. of electromagnetic aisle access door shall be provided. It should cover the complete length of the system on one side.(iii) A manual locking system to restrict the movement of unauthorised personnel shall be provided.NOTE: 1) Design report shall be submitted before execution of Work at site by the contractor toGE for his scrutiny / comments and futher submitted to AO for obtaining approval. Item No. 13.070 below shall be compatible with this item/ system and both should be integrated. Changes in make of different components of ASR system and minor changes in different parameters are permitted with approval of Accepting Officer as per recommendation of ASR system manufacturerprovidedthe end objective of the system is complied.2) The ASR system is to be installed in Bulk store house complex. Necessary civil works for installation of the ASRS required in the building is included in the scope of this item. Neccessary arrangements for integration of system with flooring and overhead trussess of the building shall be done at appropriate stage and shall be included in the rates quoted3) The PLC program backup for the ASRS and Advanced Inventory Management System shall be provided in an editable format. The WMS program shall be provided along with its source code to enable the user to perform maintenance, modifications and future upgrades as part of the project acceptanceMake of ASR system:Armstrong Ltd/ Godrej Koerber/ Kardex India storage solutions Pvt Ltd/ Daifuku India Pvt Ltd/ Addverb technologies Ltd/ Craftsman Automation Ltd/ Tech-mark 83 Supply, installation, testing and commissioning of Advanced Inventory Management System with compatibile computer hardware and integrated inventory and weight management system with PLC based software complete all as specified and directed by the Engineer-in-Charge. Technical specification of the system(i) System Height(Min) : 6400 (±100) mm(ii) System Width(Min) : 3150 (±100) mm(iii) System Depth(Min) : 2300 (±100) mm(iv) System Base(Min) : 7.24 Sq.Mtr(v) Tray Int. Size(Min): 300 (H) x 2450(W) x 500 (D) in mm(vi) Tray dead weight(Min) - 57 Kg (Approx.)(vii) Per tray weight capacity - 300 Kg(Min)Technical specification of the system:-(viii) Tray Quantity : 32 Nos.(ix) Usable net load - 9.6 ton(Min)(x) Storage surface area per system - 39.2 sq mtr(Min)(xi) Door - Automatic, (xii)Power supply - 440V, 50/60 Hz, 3 Phase(xiii) Motor 3 Phase 1440 RPM - Seimens make or equivalent(xiv) Chain - Diamond makeor equivalent, (xv)Bearing - SKF/NTN make or equivalent(xvi) External cladding - Epoxy powder coatedSafety Features:1. Photo curtain at access port, 2. Motor Protection relays, 3. Limit switch at door, 4. Single phase preventer,5. Switch mode power supply, 6. 15 Min battery backup for PLC, 7. Noise less than 60db, 8. Emergency stop various safety alertsNote: 1) The system and software provided under this item shall be of same make as for item 13.066 to 13.069 or a compatible system and software as recommended by the chosen manufacturer of ASR system. This system shall be integrated with ASR system.2) Comprehensive maintenance of the system during two years of defect liability period shall be a part of this item and rates shall be quoted accordingly. Comprehensive maintenance shall include all spares including software update. The ASR and advanced management system shall be operated by single warehouse management system.3) The PLC program backup for the ASRS and Advanced Inventory Management System shall be provided in an editable format. The WMS program shall be provided along with its source code to enable the user to perform maintenance, modifications and future upgrades as part of the project acceptance 84 Supply, installation and testing of Car Traffic Boom Barrier 6 mtr suitable to working on power supply 230 Volt, 50 Hz, 24V DC electric motor, adjustable with CAMS, operating ambient temperature from -20 to +55 Degree Celsius, uses cycle 2000/Day, air cooling, type of beam is rectangular with skirt, effective torque 280-290 Nm open/close time 2 to 4 Sec complete all as specified and as directed by Engineer-in- charge.Make: FAAC/Parkilo/Skidata/BFT 85 EXTERNAL WATER SUPPLYSupply and fix Foot valve conforming to IS, 100 mm dia complete all as specified and directed. 86 Supply and fix Cast iron air release valve with 100 mm bore and two outlets as per IS:14845 complete all as specified and directed. 87 Supply, installing, testing and commissioning of electrically driven horizontal Centrifugal Pump set 9.0 LPS at 50 Meter Head as per specification, motor TEFC type, 2880 rpm, 415 V, 50 Hz, 3 phase, class F insulation, IP 55 protection, starting on suitable Star Delta starter. The pump shall be horizontal, end suction, top discharge. The pump shall have cast iron casing, cast iron/bronze impeller (as per manufacturer), carbon steel shaft with common base frame (fabricated mild steel channel frame or cast iron type) placed on RCC (1:2:4) including foundation, bolts, nuts etc. complete with antivibrator pad as required capable of discharging not less than 550 LPM at 45 mtr head inclusive of suitable rated three phase starter as recommended by the manufacturer, PVC insulated copper cable connection from starter to the motor terminals all as specified and directed by the Engineer-in-charge.(01 No. Working + 01 No Stand By)Make:- Kirloskar Brothers/Crompton or equivalent. 88 Supply, install, test and commissioning of LT Panel, indoor type, powder coated, 2.0 mm thick CRCA Sheet, CPRI approved having, IP 43, MS angle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply, bus bar chamber with Horizontal copper bus bar for 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natural flow of air. The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 2.0 mm thick CRCA Sheet duly compartmentalised for each control gear with louvers and air vent gasket for natural flow of air and suitable provision to accommodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables. Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, track resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. andcomprising as under: LT Panel for Pump House. The LT Panel comprising of the following:- 89 Incoming:-MCCB, thermal magnetic release, 4 pole, 415 Volts, 100 Amps, breaking capacity 36 KA- 01 No. Ics =100% IcuMetering Unit:- (a) R Y B Indications (LED Type)- 01 sets(b) Digital Multi function meter - 01 No.(c) CTs - 100/5A, CL-1, 15 VA - 01 set(d) Horizontal Aluminium busbar for 3 phase, 440 volts, 50Hz, 4 wire system of rating 350 Amps for phase and 350 amp for the neutral barOutgoing:-(a) MCB, TPN 40 Amp, 415 Volt, C Curve - 03 Nos.(b) Star Delta starter 12.5 HP, 3 Phase, 415 Volt- 02 Nos.(c) Digital ammeter - 2nos.(d) Single Phase Preventer - 2 nos. 90 M & L Valve chamber of internal size 0.90m X 0.90m X 0.90m (internal dimensions) including excavation of earth work in any type of soil, 150mm thick PCC in 1:4:8 type D2 foundation, brick work in CM 1:6, 15 mm thick rendering in CM 1:4 to internal surfaces and external surfaces upto 150mm depth below GL, PCC 1:3:6 type C1 as in coping, cover with two Nos. of hinges and one No. handle made out of MS round bar 10mm dia with necessary locking arrangement including painting to the steel surfaces with two coats of synthetic enamel paint over a coat of red oxide primer complete all as shown on drg and as specified. Note:- The quoted rate shall include all earthwork and connected items. 91 M & L Earthing complete with Galvanized steel earth plate electrode of size 600mmX600mm, 6.00 mm thick buried directly in ground vertically to a depth not less than 2.25 metres below the normal ground level with top edge of the plate not less than 1.5m below normal GL and connected to galvanized iron strip of size 32 x 6 mm size by means of bolts, nuts, check nuts and washers of galvanized iron steel all as shown in Electrical Plate No. 3 connecting to earthing test point, including necessary earth work in any type of soil, PCC earth chamber made in PCC 1:3:6 type C1 (using 20mm graded aggregate), common salt, charcoal, CI funnel, earth pit cover in RCC 1:2:4 type B1 (using 20mm graded aggregates), with 8mm CTD bars @ 100mm c/c in both ways, including necessary form work complete including necessary test on completion all as specified and as directed. 92 EXTERNAL ELECTRIFICATIONM & L for HT/LT MS cable route indicator, engraved the description on the disc not less than 6 dia welded with 40x6xmm MS strip of approx length 90 cm duly painted on the steel parts as per colour code and provision of PCC 1:4:8 type D-2 using 40 mm grade stone aggregate of not less than 0.05 cum in each at base under the ground including necessary earth work and formwork complete all as specified and directed.Note: HT route indicator shall be painted as under:-(i) For HT 11 KV cables - “BROWN”(ii) For LT cables - “BLUE” 93 Supply and fix compact air insulated bus bar trunking system with copper busbar 1600 Amps, 50 KA breaking capacity, IP54 protection, bus duct 1600 A, 415 Volt, capacity sandwich type, Set RYBN complete with accessories such as flange ends, vertical bends, supporting brackets etc from transformer to LT panel board complete all as specified and directed. 94 Supply, install, testing and commissioning of Distribution transformer step-down Level 2 (Previously EE Level 3 before Amendment No 4 to IS 1180), 11KV / 0.433KV, Three Phase complying withIS: 1180/IEC-76(Part-1) 2014 with latest amendments, indoortype double copper wound suitable for 50 Hz system of capacity 800 KVA, oil immersed naturally cooled delta connected on HT side and Star connected on LT side, Vector Group Dyn11, provided with OFF load tap changer to vary secondary voltage from -7.5% to + 7.5 % in step of 2.5 %.Losses should be confined to the limits specified as follows: maximum allowable losses atfull load (100 %) & Half Load (50 %) shall not be exceeded 5838 watts & 2147 Wattsrespectively as per GRlHA RATING, Percentage Impedance: 4.5%. Losses and Impedance are subjected to tolerance as specified in IS 1180. The transformers should be supplied with first filling of oil confirming to IS 335. The transformer should have both side cable end box with neutral brought out complete all as directed by Engineer - in -Charge, and installation of transformer shall be carried out as per IS-10028and comprising with the following standard fittings/Technical specifications:-(a) Lifting lug for transformer and tank.(b) Earthing terminal rating and diagram plate.(c) Air release device.(d) Oil filling inlet pipe with plug.(e) Drain outlet pipe with brass gate valve.(f) Conservator tank with oil level indicator(g) Silica jel breather(j) First fill of oil upto level including conservator tank with fresh new oil conforming to IS335.(k) Type of connection Delta/Star(l) Type of cooling: Oil and Natural Air.(m) Vector group: DYN 11.(n) Temperature rise over an ambient of 50 °C maximum.(o) Cable end box on both side for HT/LT cables of suitable size.(p) Provision of thermometer with pocket.(q) Provision of oil and winding temperature gauge. 95 Supply, install, test and commissioning of LT Panel, Indoor type, powder coated, 2.00 mm thick CRCA Sheet, CPRI approved having, IP 43, MSangle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply,bus bar chamber with Horizontal copper bus bar for 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natural flow of air.The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 1.6 mm thick CRCA Sheet duly compartmentalised for each control gear with louvers and air vent gasket for natural flow of air and suitable provision to accommodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables. Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, track resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. andcomprising as under: The LT Panel comprising of the following:- Main LT PanelHorizontal copper busbar for 3 phase, 440 volts, 50 Hz, 4 wire system of rating 1600 Amps for phases and 1600 Amps for Neutral. 96 Incoming:-Incomer:-ACB 4 Pole, 415 V, 50 KA with Thermal Magnetic Release (Manual Draw out type) of capacity 1250 AmpMetering Unit:- (a) R Y B Indications (LED Type)- 1 sets(b) Digital Multi function meter - 01 No.(c) CTs - 1600/5A, CL-1,15 VA - 1 setOutgoing:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 630 Amps, Ics =100% Icu, breaking capacity 35 KA, Ics =100% Icu- 02 No. (For DG AMF Panel & Spare)(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 400 Amps, Ics =100% Icu breaking capacity 36 KA- 02 No. (for APFC Panel & FPB 2 Near bulk Store) (c) MCCB, thermal magnetic release, 4 pole, 415 Volts, 320/315 Amps, Ics =100% Icu breaking capacity 36 KA- 01 No. (for FPB 1 Near Adm Block) (d) MCCB, thermal magnetic release, 4 pole, 415 Volts, 200 Amps, Ics =100% Icu breaking capacity 36 KA- 01 No. (for Existing Load)(e) MCCB, thermal magnetic release, 4 pole, 415 Volts,125 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for FPB 3 Near Auction Disposal Store)(f) MCCB, thermal magnetic release, 4 pole, 415 Volts, 32 Amps, Ics =100% Icu breaking capacity 25 KA- 03 No. (for MT Complex, Watch tower no 2, Guard room)(g) Digital Ammeter with suitable CT for each outgoing 97 Supply, install, test and commissioning of LT Panel, outdoor type, powder coated, 3.00 mm thick CRCA sheet, CPRI approved having, IP 54, MS angle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply,bus bar chamber with Horizontal aluminium bus bar 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natural flow of air. The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 2 mm thick CRCA sheet duly compartmentalised for each control gear with louvers and air vent gasket for natural flow of air and suitable provision to accommodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables. Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, crack resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. Feeder Panel No.1 (Near Admn bldg) 98 Horizontal Aluminium busbar for 3 phase, 440 volts, 50Hz, 4 wire system of rating 600 Amps for phases and 600 Amps for Neutral.Incoming:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 400 Amps, breaking capacity 36 KA - 01 No. Ics =100% IcuMetering Unit:- (a) R Y B Indications (LED Type) - 1 sets(b) Digital Multi function meter - 01 No.(c) CTs - 600/5A, CL-1,15 VA - 1 setOutgoing:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 200 Amps, Ics =100% Icu breaking capacity 36 KA- 02 No. (for 2nd floor & spare)(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 160 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for 1st floor)(c) MCCB, thermal magnetic release, 4 pole, 415 Volts, 63 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for G floor)( d) Digital Ammeter with suitable CT for each outgoing 99 Supply, install, test and commissioning of LT Panel, outdoor type, powder coated, 3.00 mm thick CRCA sheet, CPRI approved having, IP 54, MSangle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply,bus bar chamber with Horizontal aluminium bus bar 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natural flow of air.The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 2 mm thick CRCA sheet duly compartmentalised for each control gear with louvers and air vent gasket for natural flow of air and suitable provision to accommodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables.Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, crack resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. Feeder Panel No.2 (Near Bulk Store) Horizontal Aluminium busbar for 3 phase,440 volts, 50Hz, 4 wire system of rating 600 Amps for phases and 600 Amps for Neutral. 100 Incoming:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 400 Amps, breaking capacity 36 KA - 01 No. Ics =100% IcuMetering Unit:- (a) R Y B Indications (LED Type)- 1 sets(b) Digital Multi function meter - 01 No.(c) CTs - 600/5A, CL-1,15 VA - 1 setOutgoing:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 200 Amps, Ics =100% Icu breaking capacity 36 KA- 02 No. (for Equipment Load & spare)(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 125 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for Bulk Store)(c) MCCB, thermal magnetic release, 4 pole, 415 Volts, 32 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for Watch Tower No. 1)( d) Digital Ammeter with suitable CT for each outgoing 101 Supply, install, test and commissioning of LT Panel, outdoor type, powder coated, 3.00 mm thick CRCA sheet, CPRI approved having, IP 54, MSangle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply,bus bar chamber with Horizontal aluminium bus bar 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natural flow of air. The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 2 mm thick CRCA sheet, duly compartmentalised for each control gear with louvers and air vent gasket for natural flow of air and suitable provision to accommodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables.Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, crack resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. Feeder Panel No.3 (Near Auction Disposal Store) 102 Horizontal Aluminium busbar for 3 phase, 440 volts, 50Hz, 4 wire system of rating 200 Amps for phases and 200 Amps for Neutral.Incoming:-(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 125 Amps, breaking capacity 25 KA- 01 No. Ics =100% IcuMetering Unit:- (a) R Y B Indications (LED Type) - 1 sets(b) Digital Multi function meter - 01 No.(c) CTs - 200/5A, CL-1,15 VA - 01 setOutgoing:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 100 Amps, Ics =100% Icu breaking capacity 25 KA- 02 No. (for Store Dispatch Complex & Spare)(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 32 Amps, Ics =100% Icu breaking capacity 25 KA- 03 No. (for Pol store, Auction disposal store, Covered Hard Standing)(c) Digital Ammeter with suitable CT for each outgoing 103 Supply and fixing poly carbonate street light junction boxes IP 66/67 Weather proof suitable for outdoor installation having minimumsize255 x 355 x 122 including suitableCable connecting Terminals, Cable lugs, including provn of one No. MCB SP 6 Amps for operating the street light fittings, Suitable Cable Glands as per site requirement, all as directed by the Engineer-in-Charge. 104 S & F Street light bracket made out of GI tubing 32/40 mm dia, light grade of length1.2 mtr long bend to shape suitable for security light fitting with necessary MS clamp-02 Nos with one coat of anti corrosive primer and two coats of aluminium paint including nut, bolt, washers and 3 core FRLSinsulated sheathed, multistranded copper conductor of size 1.5 sqmm for phase and neutral and 1.5 sq mm for earthing drawn throughthe poles for connection from junction box to light fitting complete etc all as specified.Note: Phase should be Red/Yellow/Blue, neutral should be black and earthing wire should be green in colour. Two runs of cable for phase and neutral and one run of cable for earth will be measured and paid as one unit length. 105 Supply and fixing of LED flood light, 200W, watt 230 V, AC outdoor type with thermal management in multiple optics and equipped with IP66 protection, with impact and corrosion resistant complete with driver and lamp and made up of pressure die cast aluminium housing with toughened glass and high power LEDs and secondary lenses with IP protection incl system efficiency >110/120LPW 10KV SPD included Energy saving, environmental friendly and general purpose lighting complete all as specified and directed Engineer-in-Charge. Make : Make : Crompton/Philips/Wipro/Bajaj 106 Supply and fix High Mast Panel outdoor type, suitable to take load up to 6 KW, Conforms to IS/IEC 60947-4-1, Provided with Protection Degree IP 54, Extended wide band (150 Vac - 300 Vac) coil, FRLS (Fire retardant low smoke) Internal wiring, In-built Short-Circuit Protection, Class H Insulation, 3 Phase 415 Volts AC with the following accessories:Phase : 3 Phase, 415 VoltsMax Load Capacity : 6 KWTimer type: AstronomicalContactor Rating : 32 A TPMCB Rating : 63 A TPNMake : Crompton/ Philips/Wipro 107 Supply and laying DWC (Double wall Corrugated) duct pipe outer dia 63 mm and inner dia 50 mmconforming IS 16205 (Part 24 ) for protection ofelectric cable complete all as specified and directed. ( for 10 sqmm St light cable & 16 Sqmm cable) 108 AVIATION OBSTRUCTION LIGHTSupply and fix aviation obstruction light integral aviation light comprising of aluminium housing with polycarbonate enclosure, 240 volt with timer switch and one No.10 A, MCB, SPN 230 V with fixed enclosure complete all as specified and directed by Engineer-in-charge.Make:- Bajaj cat No BGAV 302 LED or equivalent in Philips/Crompton/Surya 109 INCINERATORSupply, fixing and testing and commissioning of Solid waste Electric Incinerator, single chamber type having a combustion chamber supported with electric coil for generating sufficient heat to burn 100Kg/hr solid waste, retains and re-burns the exhaust gases for minimum of 2 seconds at 850°C, Stainless steel stack for longevity, fitted with a Velocity Cowl as standard, Chamber designed for maximum air flow and circulation which in turn improves efficiency and total burn time, easy to open and close loading door, designed to increase operator safety, steel cladding to reduce risk of infection and increase longevity of system with working temperature not less 450 degree Celsius mounted on foundation as recommended by OEM including electrical control panel with suitable size MCCB, relays & contactor recommended by OEM complete all as complete all as specified and directed.Note:(a) The electrical works including electrical LT panel, internal wiring of the LT panel, suitable size copper wires from panel to Solid waste Electric Incinerator as recommended by OEM to operate the Solid waste Electric Incinerator of capacity 100 Kg/Hr to make Solid waste Electric Incinerator operational is deemed to be included in the rate quoted. (b) All Electrical works shall be carried out as per relevant BIS/lS equivalent standard norms only and also in accordance with the latest edition of the Indian Electricity Act / rules formed there under and as amended from time to time.(c) Any other works (mechanical, electrical & Civil) connected to installation, testing & functional requirement of Solid waste Electric Incinerator of capacity 100 Kg/Hr all as mentioned above and which is not mentioned or included in this Schedule but required at site necessary shall be carried out by the contractor and quoted rate shall deemed to included for the same.(d) Foundation/Plinth/Base: shall be provided as per manufactures recommendations, however minimum 0.5m space should be available all around the Solid waste Electric Incinerator and height of plinth shall not be less than 0.5 MMake: Precitech thermal Pvt. Ltd., Rram Buisiness corp, Alfa therm Ltd., Thermax Ltd, Kanti Industries, Fortec 110 Supply & fixing MCCB, thermal magnetic release, 4 pole, 415 Volts, 200 Amps, breaking capacity 36 KA- 01 No.Ics =100% Icu with Sheet metal enclosures fixed properly at directed location and connecting/testing complete all as directed. 111 ELECTRIC SIRENSupply and fixing Sirens Electronic type Horizontal Double Mounting Three Phase 400/440V, 2800 RPM 50 C/s Flame Proof, audible range 3.5 Km, 2 HP, continuous normal operation for at least 50 minutes with on/off system complete all as specified and directed. 112 Supply and fix advance Sirens controller Electronic type suitable to operate on 3 phase, 415 volt AC 50 Hzcomplete all as specified and directed. 113 Supply & fixing MCCB, thermal magnetic release, 4 pole, 415 Volts, 63 Amps, breaking capacity 25 KA- 01 No.Ics =100% Icu with Sheet metal enclosures fixed properly at directed location and connecting/testing complete all as directed. 114 SOLAR POWER PLANTDesign, supply, installation testing and commissioning of roof top solar photovoltaic power plant (ON-GRID) on roof top of existing bldg of capacity 150 KWp, power evacuation at 415 Volt 3 phase system all as per guidelines/norms issued by MNRE & Indian Metrological Deptt approved Solar Radiation Data viz Direct Normal Irradiance, Global Horizontal radiance etc complete comprising with the following Solar Photo Voltaic Plant.(a) Design, supply, installation, testing and commissioning of Solar PV Modules capable of generating 150 KWp (AC) electricity at 415 Volt 3 phase system. These Solar PV Modules of 540 watt PERC with a modular efficiency of 17-19.84% as per IEC and MNRE standard or as per approved design parameters with Poly/Multi Crystalline Silicon Solar cells of minimum wattage of 540 watt with minimum 144 cells & efficiency not less than 17 -19.84%, conforming to IEC 61215, IEC 61730, IEC 61701. Solar PV Module should be of approved Indian Brand only and Qualify under the Domestic Content requirement (DCR) norms of NVVN/SECI and testing requirement fixed by MNRE. The PV modules shall be warranted for a period of minimum 25 years, Solar PV modules used in system shall be warranted for their output peak watt capacity, which should not be less than 90% at the end of Ten years and 80% at the end of Twenty Five years. Each Solar PV Module must use RF identification tag. The following information must be mentioned in the RFID used in each module:Name of manufacture of PV module, Name of manufacturer of Solar cell, Month & year of manufacturer (for solar cell and module), Country of origin (lt is mandatory to use cells and modules manufactured in India). I-V curve of the module, Wattage, LM, V-M, & FF for the module, Unique Serial No & Model No of the module, Date & year of IEC PV qualification certificate, Name of the test lab issued IEC certificate. The PV modules used in the solar power projects must qualify to the latest edition of the following International Electro technical Commission (IEC) P module qualification test or equivalent BIS Standards. The PV module must be tested and approved by one of the IEC authorized test centres. 115 (b) Material and labour for Module Mounting structure (MMS) fabricated from hot dip galvansied iron section of suitable size with specified tilt angle according to site requirement & optimum angle to achieve maximum benefit of solar energy and suitable to withstand 180 Kmph wind speed all as per approved design parameters as per MNRE standards and to match with the existing site conditions. Necessary roof treatment to avoid any seepage in future shall be done by the Contractor and the amount included in the rate quoted. The roof tiles shall be dismantled and refixed back in original position. Structure shall be built with brick masonry basement of adequate size as per direction at site including all necessary civil work required for the foundation.(c) Supply, laying & Testing of DC cable minimum size 4/6sq mm multi stranded copper conductor, conforming to relevant IS, weather proof UV resistant with operating temperature up to 120 degrees, minimum rated voltage 1100 volt for inter connection of SPV Modules to array junction box including suitable size of cable lugs, male & female MC4 connectors & joints etc.(d) Supply, installation test and commissioning of protection devices MCCB 400 A, isolator and three phase 4 wire LT energy meter, array junction boxes having rating 150 KWp with over voltage protection and surge protection.(e) Supply, installation, test and commissioning of Grid tie Solar Power conditioning unit / inverter of minimum capacity 150 KWp(DC to AC 415 V in Three phase system) all as per approved design parameters & capable of generating output voltage 415 V AC at rated load condition with efficiency not less than 98 %, conforming to IEC 600682-2 NDE standards with power reduction, LVRT with protections for anti-islanding, Ground fault monitoring, Grid Monitoring, AC & DC Over voltage and under voltage protection, AC & DC short circuit lover current protection and DC reverse polarity protection, graphic display etc. all as specified and as directed.(f) Material and labour for Earthing for Lightning protection for SPV modules etc as per IE rule, MNRE guide line & BIS all as per approved plan complete with galvanised earth plate electrode 600x600x6 mm thick buried directly in ground vertically (earth pit not less than 2.25 mtr deep below normal ground level) with top edge of plate not less than 1.5 mtr below normal ground level connected to and including Gl strip 32x6mm size protected with Gl medium grade pipe 40mm dia for earth electrode up to test point by means of GI nuts, bolts, check nuts and washers including earth work excavation, PCC (1:3:6) type Cl pit and RCC cover ( 1:2:4) type Bl and funnel, with necessary charcoal, salt etc complete. 116 (g) Supply and fixing aluminium strip of size 25 x 3mm thick for roof / down conductor fixed on insulators/ saddles of suitable size for SPV modules lightning protection upto interconnection between Roof top LA to Ground Earthing system. (h) AC Cable: Supply and laying of 150 Sqmm LT XLPE insulated, screened PVC bedded, sheathed with multi-stranded aluminium conductor armoured with galvanised steel wire 1100 volts grade heavy duty conforming to IS 150 Sqmm x 3.5Core as per site requirement.Note (i) :-(a) Before quoting the bid, Contractor or his authorised Engineer/consultant must visit the proposed site to study the site condition.(b) Before commencement of work, contractor shall submit drawings & lay out plan with scale including required qty to Accepting Officer for approval.Note(ii):-(a) The mechanical structures, electrical works and overall workmanship of the Grid solar power plant must be warrented for a minimum of 5 years.(b) All Mechanical, Electrical works shall be carried out as per relevant BIS/lS equivalent standard norms only and also in accordance with the latest edition of the Indian Electricity Act / rules formed thereunder and as amended from time to time.(c) Any other works (mechanical, electrical & Civil) connected to installation, testing & functional requirement of solar photovoltaic power plant of capacity 150 KWp (AC) all as mentioned above and which is not mentioned or included in this Schedule A but required at site necessary shall be carried out by the contractor and quoted rate shall deemed to included for the same(d) Contractor shall provide adequate Spares/items required for minimum period of 1 year maintenance including DC & AC items under scope of work.Note (iii) : Design report shall be submitted before execution of Work at site by the contractor toGE for his scrutiny / comments and futher submitted to AO for obtaining approval. 117 DG SETSupplying, installing, testing and commissioning, factory assembled silentDiesel Engine driven generator set, fully wired alternator AC to give an out put of 400 KVA continuously rating at a power factor 0.8 lagging, 3 phase 4 wire, 415 volts 50 Hzsupply, 1500 RPM, directly coupled with diesel engine liquid cooled mounted on common base frame complete with floor mounting fuel tank (service tank) of adequate capacity with fuel line & accessories, PCC foundation work as per manufacturers instructions, vibration damper pads, control panel & other accessories etc and comprising of following.(a) Diesel Engine: Liquid cooled turbo charged with after cooler to deliver suitable BHP at 1500 RPM under NTP conditions of BS 5514 and conforming to IS 10001/ 10002, DIN 6271 & ISO 3046 with an overload capacity of 10% for one hour in any 12 hours continuous operation with the following accessories: Diesel engine of rated speed at full load electric start developing with system with radiator and including electronic governor control of class A1, engine control panel, lub oil pump, water pump, fuel tank, exhaust pipe with silencer and suitable for electric start with batteries ofadequate capacity and suitable for alternator of specified capacity complete with fly wheel direct/flexible coupling and coupling guard complete.(b) Radiator with blower fan or heat exchanger with guard.(c) Pipe coupling for engine cooling system piping.(d ) Corrosion inhibitor coolant(e) Paper element filters(i) Fuel filter(ii) Lube oil filter(iii) By pass(f) Fly wheel housing and fly wheel to suit alternator.(g) Engine bearing mechanism in fly wheel housing.(h) Shut off coil with safeties for LLOP/HWT/over speed.(i) Dry type air cleaners and vacuum indicators.(j) Residential silencers.(k) Stainless steel exhaust flexible bellows. 118 (l) Battery charging alternator.(m) Exhaust piping made out of STIC C class, MS pipe inclusive of all accessories and hardware, necessary supports scaffolding as per manufacturers recommendations to sustain back pressure with rain cap.(n) Mineral wool insulation 2 inch thick suitable for 400 degree Celsius temperature cladded with aluminium sheet of30 gauge for the entire length of exhaust pipe.(o) First fill of oil, coolant and diesel during commissioning and 12 hours testing.(p) Interconnecting copper cabling of adequate capacity batteries control.(q ) Fuel pipe class STIC 1 /1.5 /2 dia - 01 lot(r) Self starter 24 volts DC.(s) Electric operated electronic governor.(t) Fuel injection pump.(u) Electronic instrument panel, complete with all accessories as per manufacturers specifications displaying the following:-(i) 12vx2 nos -24V Battery. (ii) Water temperature.(iii) lubricating oil pressure.(iv) Engine speed -1500Rpm(v) Engine hours(vi) Frequency.(vii) Voltage.(v) Safety control (Trip and indication).(i) High water temperature(ii) Low lube oil temperature(iii) Overspeed stop 119 (w) Base frame: Sturdy, fabricated welded construction, channel iron base frame (duly painted) for mounting engine and alternator as per manufacturers design alonwith AVM pads.(x) Battery:-24 volts(2x12v Battery) DC, 180AH, maintenance free battery conforming to IS:14257 with leads & terminals (Make- Excide/Amron).(y) Fuel tank:12 hrs. full load diesel storage capacity fuel tank with mounting brackets factory made of 5mm thick HR/MS sheet with level indicator fuel inlet, fuel outlet, air vent, drain plug, inlet arrangement for diesel filling for exterior canopy (without opening its panel) etc complete all as specified and directed.(z) Isolator panel with 630 amp MCCB(aa) Auto logic panel for automatic stat(ab) Alternator: Alternator suitable rated for 400 KVA, 0.8 pf , 415 volts, 3 phase, 4 wire, 50 Hz at 1500 RPM, self excited and self regulated with AVR brushless, screen protected, drip proof, insulation class-H, IP -23, voltage regulationgrade - VG 3 self ventilated and conforming to BS: 5000 / IS: 4722 suitable for engine as mentioned here-in before, conformig to IS: 13364(part-1)Make: KOEL GREEN / stampford/crompten/kirloskar/Greaves(ac) Acoustic Enclosure:- M & L for acoustic enclosure for the above 400 KVA DG set to reduce noise level to 75 dB measured at 1.0 meter distance for audible frequencies as per guide of Central Pollution Control Board andmanufacturers specification and comprising of following from authorised GOEMs of Gen Set manufacturers specified :-(i) Sound insulation : 100mm thick Rock wool (Density 64 Kg/Cum).(ii) Outer body : 1.6mm thick CRCA(iii) Door : 1.6mm thick CRCA(iv) Base frame : ISMC 300(v) Inside illumination : 1 No.- 1 x 18 watt LED fitting of make Phillips/ Bajaj/ Crompton.(ad) AMF Control panel:- Factory fabricated cubicle type, free standing, floor mounted, indoor type, IP-43, AMF control panel, provided with removable rear panels & hinged front panel for easy accessibility, fabricated out of not less than 2.0mm thick CRCA sheet including two coats of powder coated paint over a coat of red oxide primer etc and comprising of following: 120 (ae) AMF control circuit with 4 pole MCCB 630 Amps - 2 nos, with ultimate breaking capacity Icu-50 KA at 415 volts and microprocessor release conforming to IEC 60947 Part-I with breaking capacity Ics=Icu at 415 volts , thermal overload setting 70% to 100%, short circuit setting 5 to 10 times-02 Nos. for main supply & DG set supply with HRC back up fuse complete with all DC control relays/ Line voltage monitor (LVM) as per OEM specifications incorporating motorised stored energy operating Engine start, stop, three attempt starting facility and failure to start etc.(af) Digital load manager : Three phase 4 wire indicating V,I,PF, KVA, KW, F of Enercon make with serial communication port model No. EM6400 with class 1.0 accuracy meter or equivalent make suitable rating of CT per phase- one No.(i) Indication lamp R, Y, B with 3 Nos. of 2A HRC fuses-10 sets.(ii) Bottom gland plate for incoming and outgoing cables.(iii) Circuit diagram plate.Note:- DG set should be as per CPCB- 4 latest norm wef 01 July 2023 of National Clean Air programme (NACP) Act 1981.The contractor shall procure the item within the period given by CPBC in case of revision in CBPC norms. Nothing extra will be paid on account of delay from the part of contractor. DG set shall have an exhaust with stack height of minimum 2m from the top of generator with a cowl. Smoke released from the exhaust of the DG sets indicating that emission parameters are within permissible limits, as prescribed by CPCB, demonstrating compliance with emission limits prescribed by CPCB 2016. 121 Supply, install, test and commissioning of LT Panel, Indoor type, powder coated, 2.00 mm thick CRCA Sheet, CPRI approved having, IP 43, MS angle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply, bus bar chamber with Horizontal aluminium bus bar 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natuaral flow of air. The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 1.6 mm thick CRCA Sheat duly compartmentalised for each control gear with louvers and air vent gasket for natuaral flow of air and suiatable provision to accomodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables.Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, track resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. Feeder Panel No.1 (DG Panel ) 122 Incoming:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 630 Amps, breaking capacity 36 KA - 01 No. Ics =100% IcuMetering Unit:- (a) R Y B Indications (LED Type) - 1 sets(b) Digital Multi function meter - 01 No.(c) CTs - 800/5A, CL-1,15 VA - 1 set(d) Horizontal aluminium bus bar for 3 phase 440 V, 50 Hz, 4 wire system of rating 800 Amps for phases and 800 Amps for neutralOutgoing:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 400 Amps, Ics =100% Icu breaking capacity 36 KA- 03 No. (for Package AC Bulk Store, pump house and fire pump & spare)(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 160 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for Pump House & Fire Pump)(c) MCCB, thermal magnetic release, 4 pole, 415 Volts, 80 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for Incianator)(d) MCCB, thermal magnetic release, 4 pole, 415 Volts, 32 Amps, Ics =100% Icu breaking capacity 25 KA- 07 No. (for Terrace pump 1, Terrace pump 2, Power House, High mast 1, High mast 2, Street Light)(e) Digital Ammeter with suitable CT for each outgoing(f) Astro Time switch for 3 phase 20A- 1 No(g) 3 Phase Power contactor 20 amps, with 230 coil 123 SEWAGE DISPOSALM & L for laying of DWCPE sewage pipes line 200 mmdia borepipe sftiffnessclass SN 8 includingsealing of joints fittings etc complete with collers complte all as spcified and directed 124 M & L for laying of DWCPE sewage pipes line 150 mmdia borepipe sftiffnessclass SN 8 includingsealing of joints fittings etc complete with collers complte all as spcified and directed 125 COMPOUND WALLS & F Concertina Coil of 600/700 mm outer dia made out of 2.60 mm dia spring steel wire dipped in corrosion preventive fluid (rusilo 901) of castrol make each coil having min 50 turns (circles) covering 6 m and an average weight not less than 8.57 Kg (plus or minus 5 %) incl handle and spike at both ends of coil erected in position on top of mild steel angle by fixing with 1.70 mm GI wire for securing, coil with fish hook bars, incl necessary welding to MS Sections etc all as specified and directed. 126 GREEN BUILDING NORMS(GRIHA CONCEPT)Supply and Install Organic Waste Converter fully automatic having capacity 50Kg/day, having internal tank made of high quality stainless steel while external panels are powder coated for enhanced product life with necessary electric control panel, cabling necessary civil works for installing machine etc with following requirements:-Type of machine: Fulley automatic in-vessel composterComposting method: 24 Hrs. Micro-organisms-based compostingmachine Type of microganism used: Heat resistant thermophilic bacteria Final Output: Dry organic Soil conditioner/Soil supplementsCycle time: 24Hrs Volume reduction in 24Hrs: 80-85% Internal tank: Stainless steel type Main agitator Shaft: Stainless steel type Input voltage: 415VSpecial features: VFD as standard across all models, Touchscreen standards Daily waste processing: 150Kgs Rated capacity: 7KWPower consumption (KWH par cycle): 13-15Length: 1650, Width: 850,Height: 1455 127 Supply, installation, testing and commissioning Three phase energy meter with the following specifications: Microprocessor based three phase, smart electricity meter, equipped with a bi-directional cellular (NB-IoT) communication that allows it to interact with the head end system (HES) for data collection and configuration with adequate security including electronic static pre paid cum postpaid energy meter rating 415 Volts, 50 Hz of range 10-100 Amps, complying to IS16444:2015 (reaffrimed 2020) and conforming to IS 3779 with LED display and parameters like Voltage, Current, Frequency, Power, Power factor, KWH/KVA, default in built dual source, inbuilt long range (LORAWAN) Communication suitable for outdoor LoRa data accumulator and also compatible for Prepaid and Postpaid online energy monitoring billing system with disconnection /reconnection through remote software / data export to ERP complete with 5 Years warranty.Note:(a) The Energy Meter to be capable of running in both prepaid and postpaid mode.(b) The meters to carry 5 year warranty. (for entire system) 128 Supplying, Fixing, Commissioning and testing of configuration of cloud Hosted multi user web based software with following modules:(i) Head End System (HES): to acquire meter data automatically from DCU sand monitor parameters acquired from meters.(ii) Meter Data Management ModuleThe meter data management module would be responsible for collecting the data from the data concentrator and make the data available to the billing system. The system would support offline meter(a) 30 min instantaneous data from all the meters for seven parameters Cumulative Energy. Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency(b) Monthly billing survey data for cumulative energy and max demand(iii) Billing Module: The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data/billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid and prepaid functionality as required.(iv) Occupation and Vacation Module: The system would support occupation/vacation based on the unit catagories. The system would support automatic data capture on occupation and vacation events.(v) Website: There would be a dedicated website forAGE/GE and BSO team to view all the data and information alongwith customer portal for use of customer. The designated users in MES would have the admin access to the application. The MES Staff would also have the access to the key information on mobile App (AndroiandiOS based) for admin use complete all as specified and directed.(vi) Customer Module: The system would include a customer portal for the resident/occupants to login and view their own energy /billing data and recharge facility. There shall be consumer App (Android and iOS based) also to log in and view their own energy/billing data and recharge facility.(vii) Communication Module :The system would provide communication of energy data and bills via print, email and sms methods. 129 (viii) Meter Master Data: The system would support meter data repository. The system would support meter replacement process.(ix) Excel Export: the system would support export of metering and billing data in excel and pdf format.(x) Energy Accounting module: The system would include features of energy accounting, the system would to able to account for total energy block wise, facility wise and would also allow calculations of the unaccounted energy in case total energy meter is also available.(xi) Prepayment/Recharging Facility:The system should periodically monitor the energy consumption of prepaid consumers and decrease the available credit based on the consumption. The system should allow online/digital recharging through consumer App (Androidand iOSbased) and Web portal. The configuration and necessary arrangement for payment gateway and E-MRO facility shall be deemed to be included in the quoted rate. The system should sendconnect/disconnect command on the basis of available credit.Low credit alarm: The system will give an alarm over the consumer App and SMS to the registered mobile number in case the credit in the meter goes down be low apredefined limit.Emergency credit: The meter will work even when the credit falls down to zero to prevent disconnection. This limit shall be configurable. The system should support happy hours inorder to prevent disconnection in non working hours and on holidays. The Happy hours should be configurable complete all as specified and directed. 130 Supply, Installation, Testing and Commissioning of DCUs/Gateways and the arrangement of Sim cards or Internet to enable reliable medium for two-way communication between Smart Meter & HES. The data acquisition (Push/Pull) frequency shall be, configurable. It shall push events such as tamper, power off etc. to HES immediately on occurrence/receipt from meters. It shall have provision for the cellular, WiFi and Ethernet communication for the backhaul to HES. It shall be capable to handle data of minimum 1000 Nos. of any type of smart meter (1ph/3ph).It shall be able to communicate with the nearest meters at a distance of at least 500 m, depending on topographical features. Communication of the nearest meters with other meters shall be established through appropriate mesh formation. RF Mesh shall support self-forming and self-healing features. The equipment shall be weather proof and dust proof (minimum rating: IP54 for indoor and IP65 for outdoor installation). It shall have rechargeable battery with backup for 1(one) hour for normal meter reading, to push tamper event, carry out on demand reading, etc complete all as specified and directed. 131 Hosting GPRS (4G) charges for Gateway for five years from the date of completion F Including 2 years waranty and 2 years Maintinance after warranty) Make:-Airtel/Jio/Vodafone 132 Supply and installation of digital Water flow meter 50mm suitable for domestic and commercial applications complete all as specified and directed. 133 Supply and installation of digital Water flow meter 40mm suitable for domestic and commercial applications complete all as specified and directed. 134 ARBORICULTUREM & L for excavation of pits size 30cm x 30cm x 30cm in loose soil and filling the pit with mixture of river sand and approved top soil in the proportion of 1:3 mixed with 30% of cow dung powder, 100gms of bone meal and 100gm of neem cake powder 135 All as per item No 13.121 above but pit size 60cm x 60cm x 60cm 136 Supplying and planting red palm or royal palm healthy sapling having 45cm height and shall have a minimum height of 65cm after 6 months 137 Supplying and planting coconut tree healthy sapling having 75cm height and shall have a minimum 95cm after 6 months. 138 Supplying and planting flower plants(Champa/ hybrid hibiscus/ Hybrid west Indian Jasmine/ Hybrid Plumeria white plant/ Panama yellow plant/ Oleander) healthy sapling having 10cm minimum height and shall have a minimum 25cm to 30cm height after 6 months. 139 Supplying and planting phylanthus healthy sapling having 15cm to 30cm height and shall have a minimum 45cm height after 6 months. 140 Supplying and planting bougainvillea colour flower plants healthy sapling having 15cm to 30cm height and shall have a minimum 45cm height after 6 months. 141 Supplying and planting song of India flower plants healthy sapling having 15cm to 30cm height and shall have a minimum 45cm height after 6 months. 142 Supplying and planting dracaena flower plants healthy sapling having 15cm to 30 cm height and shall have a minimum 60cm height after 6 months. 143 Supply and planting mexican grass including providing manure as directed. 144 PILE FOUNDATIONBoring 450 mm dia piles to any depthin any type of soil/ strata by anyapproved method, complete all as shown on drawings and as specified anddirected.Note:- The quoted rate shall include for mobilization and demobilisation of piling equipment, making approaches to site or point of pile boring if necessary. Nothing extra shall be paid on this account. 145 Boring for bored cast in situ pile 600 mm dia to any depth through any type of soil / strata, using DMC method (Direct Mud Circulation)and getting out & disposal of spoil to any distance outside of MD land , complete all as specified and as directedby the EngineerIn Charge 146 M & L Reinforced cement concrete of grade M-35 design mix (RMC) as per IS-456using 20 mm graded stone aggregate in cast in situ DMC bored pile of any length / any sectionscomplete all as specified and as shown on drg 147 M & L Reinforced cement concrete of grade M-35 design mix (RMC) as per IS-456using 20 mm graded stone aggregate in pile caps / grade beams complete all as specified and as shown on drg 148 Providing TMT bars (CRS/HCRM/CRM) in reinforcement 10 mm dia and over for bored cast in situ piles of any length and any dia all as shown on drgs including cut to length, bend to required shape, cranking/hooking ends if necessary and binding with and including 0.9mm dia MS wire (annealed) or welding so as to secure the bar firmly in position/ required shape complete all as specified and shown on drgs (Fe-500D). 149 Providing TMT bars (CRS/HCRM/CRM) in reinforcement 10 mm dia and over for pile caps and grade beams, cut to length, bent to shape required, hooking ends and binding with and including 0.9mm dia MS wire (annealed) or welding so as to secure the bar firmly in position/ required shape complete all as specified and shown on drgs (Fe-500D). 150 All as per item No 13.136 here-in-before but5mm dia and over upto and including 10mm dia as in helicals for piles and stirrups for grade beams complete all as specified and directed. 151 M & L for providing PCC (1:4:8) type D-2 using 40 mm graded stone aggregate for concrete layer below pile caps foundation complete all as specified and directed. 152 Formwork to sides of pile caps/ grade beams and similar work, rough finished surface of concrete flat all as specified and as directed. 153 M & L for carrying out non destructive integrity test all as per IS 2911 (Part 4) 2013 for 600 mm dia cast in situ piles including mobilising and removing the testing equipments from site after testing is completed all as specified and directed. 154 M & L for carrying out non destructive integrity test all as per IS 2911 (Part 4) 2013 for 450 mm dia cast in situ piles including mobilising and removing the testing equipments from site after testing is completed all as specified and directed. 155 M & L for carrying out Initial Load test (vertical load test) cast in situ piles of 600 mm dia as per IS 2911 (Part 4) 2013 including mobilising and removing the testing equipments from site after testing is completed all as specified and directed.(Note :- Providing and installing test piles shall measured and paid separately) 156 M & L for carrying out Initial (lateral load test) cast in situ piles of 600 mm dia as per IS 2911 (Part 4) 2013including mobilising and removing the testing equipments from site after testing is completed all as specified and directed.(Note :- Providing and installing test piles shall measured and paid separately) 157 M & L for carrying out Initial load test (pull outtest as per design load) of cast in situ piles of 600 mm dia as per IS 2911 (Part 4) 2013including mobilising and removing the testing equipments from site after testing is completed all as specified and directed.(Note :- Providing and installing test piles shall measured and paid separately) 158 M & L for carrying out Routine load Test (Vertical load)all as per IS 2911 (Part 4) 2013 for 600 mm dia cast in situ piles including mobilising and removing the testing equipments from site after testing is completed 159 Testing of piles Initial load test (verticle load test) for 450mm dia cast in situ bored piles all as per IS including removing the testing equipments from the site after testing is completed all asspecified and as directed 160 M & L for carrying out Initial Load test (lateral load test) cast in situ piles of 450 mm dia as per IS 2911 (Part 4) 2013 including mobilising and removing the testing equipments from site after testing is completed all as specified and directed.(Note:- Providing and installing test piles shall measured and paid separately) 161 M & L for carrying out Initial load test (pull outtest as per design load)of cast in situ piles of 450 mm dia as per IS 2911 (Part 4) 2013including mobilising and removing the testing equipments from site after testing is completed all as specified and directed.(Note :- Providing and installing test piles shall measured and paid separately) 162 M & L for carrying out Routine load Test (Vertical load)all as per IS 2911 (Part 4) 2013 for 450 mm dia cast in situ piles including mobilising and removing the testing equipments from site after testing is completed
Contract Date : 11 Feb, 2026   |   Contract Value : 59.27 Crore
BRR : 7636241 Tender For Provision Of Cgsd (Kochi) At Willingdon Island, Kochi; 1 SCHEDULE A Part - I (BUILDING & STRUCTURE WORKS)Details of prepriced schedule is given in tender documents. 2 SCHEDULE A PART-II ( SITE CLEARENCE/DEVELOPMENT & EARTH WORKS) Details of prepriced Schedule is given in tender documents. 3 SCHEDULE A PART-III (INTERNAL WATER SUPPLY) Details of prepriced Schedule is given in tender documents. 4 SCHEDULE A PART-IV (INTERNAL ELECTRIFICATION) Details of prepriced Schedule is given in tender documents. 5 SCHEDULE A PART-V (FIRE FIGHTING)Details of prepriced Schedule is given in tender documents. 6 SCHEDULE A PART-VI (ROAD/PATH/ HARD STANDING/CULVERT)Details of prepriced Schedule is given in tender documents. 7 SCHEDULE A PART-VII (EXTERNAL WATER SUPPLY) Details of prepriced Schedule is given in tender documents. 8 SCHEDULE A PART-VIII (EXTERNAL ELECTRIFICATION) Details of prepriced Schedule is given in tender documents. 9 SCHEDULE A PART-IX (SEWAGE DISPOSAL) Details of prepriced Schedule is given in tender documents. 10 SCHEDULE A PART-X (AREA DRAINAGE) Details of prepriced Schedule is given in tender documents. 11 SCHEDULE A PART-XI (COMPOUND WALL) Details of prepriced Schedule is given in tender documents. 12 SCHEDULE A PART-XII (ORGANIC WASTE CONVERTER AND SMART ENERGY METER) Details of prepriced Schedule is given in tender documents. 13 SCHEDULE A PART -XIII (MISCELLANIOUS ITEMS) Note:- This schedule is not pre-priced by MES and the pre-priced rate indicated as Rs 0.00 under Col. E signifies this fact only. 14 INTERNAL WATER SUPPLY S & F for 15 mm dia bore CP two way bib cock with CP wall flange (Make : Jaquar Model No. OPP15041PM / Eqvlt in Kohler/Grohe), cast copper alloy, screwed down high pressure with crutch screwed both ends for CPVC pipes or for union and fixed complete all as specified and directed by Engr-in-charge. 15 S & F for 15 mm dia bore CP bib cock with CP wall flange (Make : Jaquar Model No. OPP15037PM / Eqvlt in Kohler/Grohe), cast copper alloy, screwed down high pressure with crutch, screwed both ends for CPVC pipes or for union and fixed complete all as specified and directed by Engr-in-charge. 16 S & F for 20 mm bore concealed Stop cock reqular brass body with spindle extnwith Exposed Part Kit of Concealed Stop Cock with Fitting Sleeve, Operating Lever & Adjustable Wall Flange (Compatible with ALD-083CQT & ALD-089CQT)(Make : Jaquar Model No. ALD 089 CQT/ Eqvlt in Kohler/Grohe), cast copper alloy, screwed down high pressure with crutch , screwed both ends for CPVC pipes or for union and fixed complete all as specified and directed by Engr-in-charge. 17 S & F for 25 mm dia bore concealed Stop cock reqular brass body with spindle extn with Flush Cock & Wall Flange 25mm Ceramic Disc Cartridge) with Plain Knob (Make : Jaquar Model No. ALD 081/ Eqvlt in Kohler/Grohe), cast copper alloy, screwed down high pressure with crutch, screwed both ends for CPVC pipes or for union and fixed complete all as specified and directed by Engr-in-charge. 18 S & F 20mm bore CP angular stop cock with CP wall flange (Make : Jaquar Model No. CQT 23053 / Eqvlt in Kohler/Grohe), cast copper alloy, screwed down, high pressure with crutch, screwed both ends for iron pipe or for union and fixed 19 S & F for 100 mm overhead shower rose round shape single flow (ABS Body chrome plated with gray face plate (Make : Jaquar Model No. 1989 with SHA 479L300S / Eqvlt in Kohler/ ESS ESS) with Shower Arm ø20mm & 300mm Long Round Shape with 90˚ Bend for Wall Mounted Showers with Stainless Steel connected to pipe complete all as specified and directed by Engr-in-charge. 20 COOLING APPLIANCESDesign, Supply, Installation, Testing and Commissioning of Invertor Type Floor Mounted Packaged AC Units of specified capacities, combination of energy efficient Inverter compressor plus fixed compressors, nominal capacity condensing unit with all standard fittings, safety devices, like HP/LP cutout, single phase preventor, overload relays, R-410A Gas, vibration isolation pads etc. Suitable to work till 50 Deg ambient, Blue Fin Condensor and Corrosion Resistant Body, Wide Voltage Range 360V - 440V, The quoted rate shall include Group controller also asrequired for controlling AC from a single point and timer option for load sharing of AC units complete all as specified and as directed by Engineer - in - charge, of following capacities.Note: Design report shall be submitted before execution of work at site by the contractor to GE for his scruitiny/comments and further submitted to AO for his approval.Make: Blue Star/Daikin/Haeir/Godrej/Voltas/Equivalent. (HIGH SIDE (MACHINES))(Outdoor unit) 21 a) 22 TR Inverter Package AC Units 22 b) 16.5 TR Inverter Package AC Unit 23 Design, Supply, Installation, Testing and Commissioning of Normal Type Floor Mounted Packaged AC Units of specified capacities, nominal capacity condensing unit with all standard fittings, safety devices, like HP/LP cutout, single phase preventor, overload relays, R-410A Gas, vibration isolation pads etc. Suitable to work till 50 Deg ambient, Blue Fin Condensor and Corrosion Resistant Body, Wide Voltage Range 360V - 440V, The quoted rate shall include support works for outdoor units with necessary catwalk for service access complete all as specified and as directed by Engineer - in - charge, of following capacitiesNote: Design report shall be submitted before execution of work at site by the contractor to GE for his scruitiny/comments and further submitted to AO for his approval.Make: Blue Star/Daikin/Haeir/Godrej/Voltas/Equivalent. LOW SIDE (MACHINES))(Indoor unit) 24 a) 22 TR Inverter Package AC Units 25 b) 16.5 TR Inverter Package AC Unit 26 Supply, Installation and Testing of Refrigerant pipingwith necessary clamping (suction & Discharge) Hard/Soft drawn Copper tube of suitable sizes, with copper elbows, tees, Tubular Nitrile Insulations etc as required complete all as specified and as directed by Engineer - in - charge. 27 S & F Control Cabling B/W Indoor & Outdoor units 28 M & L Refrigerant Gas - R410A 29 Supply, Installation and Testing of Hard PVC drain piping. Drain piping with Tubular Nitrile Rubber Insulation: complete in all respects, well clamped till drain Points complete all as specified and as directed by Engineer - in - charge. For All Units 30 DUCTINGSupply, fabrication, installation, testing of GI rectangular ducts, complete with all fittings such as tee, bends, special off shoots, inspection doors, transformation pieces etc. as required as per IS 655 including suspension and supporting arrangement for plenum, duct etc. required complete all as specified and as directed by Engineer - in - charge. 31 a) Using 0.63 mm (24 Gauge) GI sheet 32 b) Using 0.80 mm (22 Gauge) GI sheet 33 c) Using 1.00 mm (20 Gauge) GI sheet 34 DUCT INSULATION & LININGSupply and Installation of Acoustic Insulation of ducts using 9MM Open Cell Nitrile Rubber, well adhesived, 150 - 180 Kg/cm2 complete all as specified and as directed by Engineer - in - charge. 35 Supply, installation & testing of Thermal Insulation of ducts using 9MM Closed Cell Nitrile Rubber, well adhesived, 40-60 Kg/cm2 complete all as specified and as directed by Engineer - in - charge. 36 S & F Canvas Connection 37 AIR DISTRIBUTION PRODUCTSSupply and Fixing of Powder Coated Aluminium Grills/ Diffusers (Supply/ Return) complete all as specified and as directed by Engineer - in - charge. 38 S & F Collar Dampers 39 Supply and Installation of Fire Dampers complete all as specified and as directed by Engineer - in - charge. 40 Supply, Installation, Testing and Commissioning of Heater Bank Plus Humidistat Arrangement complete all as specified and as directed by Engineer - in - charge. 41 Supply and fixing, testing and commissioning water coolerhaving stainless steel body with inbuild purifier HIMA 7 NHC, dispencing capacity 125 ltr/hr and storage tank capacity 40 ltr normal and 40 cold electric driven (single phase), 230 volt, AC power supply with all connecting accessories complete all as specified and directed. 42 Supply and fixrefrigerator, electric driven (single phase), 220 V,50 HZ, capacity 195 Litres, 3 Star rated direct cool inverter, single door all as specified and directed by the Engineer-in-Charge. 43 Supply and install, testing and commissioning of split type air conditioner 1.5 TR Capacity of invertertechnology 5 star rating with cordless remote control single phase 240 volts complete with all accessories such as indoor and outdoor units and refrigerent tubing of adequete length as required at site indoor mounting plate, duly powder coated fixing with anchor bolts at any height, drain pipe of suitable size brought to ground level from any height, initial filling of refrigerent gas including making round hole on existing wall for taking up refrigerent tubing, drain pipe, cables, etc and making good the disturbed surface by matching with existing adjoining surface complete all as specified and directed (Cooling appliances- qty 4, Air conditioning- qty 10) 44 Supply and fix Voltage stabilizer 3 KVA for automatic operation, single phase naturally air cooled indoor type, wall mounted & designed for input variation between 170 V to 280 V with output voltage stabilized at 230 V with accuracy of ± 2.5% 45 Supply and fix Voltage stabilizer 4 KVA for automatic operation, single phase naturally air cooled indoor type, wall mounted & designed for input variation between 170 V to 280 V with output voltage stabilized at 230 V with accuracy of ± 2.5% (Cooling appliances-qty4, Air conditioning- qty 10) 46 AIR CONDITIONINGSupply and install,Testing & commissioning of split type air conditioner 2 TR capacity of inverter technology 5 star ratingwith cordless remote control, single phase 240 volts complete with all accessories such asindoor and outdoor units and refrigerent tubing of adequete length as required at site, indoor mounting plate, duly powder coated fixing with anchor bolts at any height, drain pipe of suitable size brought to ground level from any height, initial filling of refrigerent gas including making round hole on existing wall for taking up refrigerent tubing, drain pipe, cables etc and making good the surace by matching with adjoining surface complete all as specified and directed. 47 Supply and fix Voltage stabilizer 5 KVA for automatic operation,single phase naturally air cooled indoor type, Wall mounted type & designed for input variation between 170 V to 280 V with output voltage stabilized at230 V with accuracy of ± 2.5% 48 INTERNAL ELECTRIFICATIONS & F LED Mirror light 1 x 5W LUMOS ECCO 1 feet Make: Luker or Equivalent 49 S & F modular MCB DBOx 3 Pin Socket with MCB SP 20 Amp, 240 V including plastic enclosure as per manufacturer instruction fixed on wall surface complete for Air conditioner all as specified and as directed. (Make:-Havells, Model-DHDMCSN0251016 or equivalent) 50 Supply and fix Air circulator of 600 mm sweep AC single Phase. 230V, 1440 RPM complete all as specified and as directed. (Make: Havells model, Turbo Force Wall or equivalent) 51 S & FVertical triple pole & neutral (VTPN), double door, 16-way metallic modular distribution board conforming to IEC 61439-3, suitable for flush / surface mounting with provision for FPMCCB as incomer and TPN/SP MCBs as outgoing, reversible metal door, 200 A copper busbar for each phase, fully insulated & shrouded neutral bar, earth bar, wiriest & cable ties for cable management, profited masking sheet, etc. having IK 09 & IP 43 protection complete all as specified and directed. 52 S & FVertical triple pole & neutral (VTPN), double door, 4-way metallic modular distribution board conforming to IEC 61439-3, suitable for flush / surface mounting with provision for FPMCCB as incomer and TPN/SP MCBs as outgoing, reversible metal door, 200 A copper busbar for each phase, fully insulated & shrouded neutral bar, earth bar, wiriest & cable ties for cable management, profited masking sheet, etc. having IK 09 & IP 43 protection complete all as specified and directed. 53 M & L for Flame ProofMCB Distribution board SPN 12 way, with case iron body, powder painted, with 200 Amps rated bus bar etc. including provision of one 32 Amps SPN MCB as incoming and 6 Amps SP MCB -10 Nos as outgoingcomplete all as specified and as directed. 54 M & L for Flame ProofMCB Distribution board SPN 8 way, with case iron body, powder painted, with 200 Amps rated bus bar etc. including provision of one 32 Amps SPN MCB as incoming and 6 Amps SP MCB- 6 Nos as outgoingcomplete all as specified and as directed. 55 Supply and fix Engage light with Green & Red LED complete all as specified and as directed 56 Supply and fix of CS mounted high intensity LED search light, long range, manually swivel in all direction, 250 W, minimum range 700 meters, Single, LED Efficiency> 140 lm/w, PF> 0.95, CCT 5500K - 6500K, Optical grade PMMA/PC lens/reflector efficiency>95%, multiple circuit to avoid complete run down, anti UV, narrow beam 5 degree, die cast LM6 body with air fins, powder coated, constant current, an average lux at 10 meter - 8000 lux with circle of approx 600 mm, working temp: -20 to +60 degree C, input Volt 100-300 VAC, 50 Hz, PF >0.95, IP-66, confirming to LM79/ LM80 and type tested as per IS: 10322/ IS: 13383, BIS approved and Govt lab tested for lux intensity. The search light is completed with manual revolving CS stand D20cm x H15cm (min.) with 3 nos. foundation holes for mounting of searchlight on watchtower structure, manual rotation of light on horizontally 360 degree with 45 degree tiltable with provision of both instant locking arrangement at desired position. Model No. CS-LRFLL-25PC25 of KALIN make or equivalent 57 Supply, install, testing and commisisong of outdoor floor/wall mounted thermoplastic polycarbonatefeeder pillar panel, Enystar EmptyEnclosures, IP-65, weatherproof, corrosion free, Halogen and Silicon Free, Frame retardant with Opaque Lid Size-[276 x 546 x 186]mm and Transparent Hinged Lid, completed all as specified and directed. 58 M & L for TV socket module metal flushed including flushed Box cover plate Box for 2 way module complete all as specified. 59 M & L for telephone jack with module metal flushed including flushed Box cover plate Box for 2 way module complete all as specified. 60 Supply and lay coaxial cable for TV Cabledrawn through conduit 61 S & F flame proof exhaust fan 300 mm sweep, single phase, 1440 RPM complete all as specified and as directed. 62 FIRE FIGHTINGSupply and fix Foot Valve conforming to IS 4038, 100 mmdia. 63 Supply and fix Foot Valve conforming to IS 4038, 150 mmdia. 64 Supply and fix Cast Iron Air Valves with single air Outlets, conforming to IS 14845 of size 100 mm dia bore and fixing up in Cast Iron Water supply mains of size 100 mm dia. 65 S & F sprinkler flexible drop pipe 1 mtr long. 66 S & F sprinkler rossette 25 mm dia. 67 Supply and installation, testing and commissioning of Analog Addressable type Active Loop Repeater (Loop power/external power) Fire terminal with inbuit turbo isolator, Backlit LCD Display 6x40 characters display, having Controls For Reset, Mute, Accept, Silence alarms and Self Test, with programmable free keys and Duly Approved byEN54/LPCB/VDS/FM Make: SIEMENS/NOTIFIER/BOSCH 68 M & L for Low smoke Zero helogen flame retardent fire alarm cable2 core, 1.5 mm² copper conductor confirming to BS7629-I, BS6387 & rated for 500 v grade having plaine sraded copper coductutor with priming insulation of glass mica fire resistance tape & secondery insulation of high performancesilicon rubber with electrostatic screen of aluminium fire barrier Type LT53 outer sheath confirming to BS 7655, red in colour drawn through & including concealed steel conduit including laying,fixing,connecting complete all as specified and directed. 69 Staircase signage down of make bajaj cat part no. 111499 model no. DSDWBB 3W double side display for staircase downwards (with 2 hours built in battery backup) complete all as specified and directed at site complete all as specified and directed. 70 S & F wall mounted LED emergency Exit signage luminaire Lit up using regular mains supply comes with a unique rechargeable Ni-Cd battery capable of emergency back up upto 05 hours(Cat No. 220211 Make Bajaj or equivalent to CG/Havells. 71 Supply, Installation, test and Commissioning CPRI APPROVED factoryfabricated, indoor type, LT panel board , made out of 2 mm thick CRCA Sheetsingle door withboth side opening including Neoprene Rubber Gasket, suitable for 440 Volt 3 Phase 4 Wire System, including Danger Plate, Earthing Strip Point and Ventilation Louvers at Rear Side, Bottom detachable Gland Plate complete with suitable size Zinc Chromium Plated Nuts, Bolts and Washers, etc. and embeddedwith 50X50X6mm Mild Steel Angle Iron Frame and 750 mm above the Normal Ground Level complete withinternal connection with suitable size of cable, cable lugs and cable glandsPCC Foundation in Cement Concrete 1:3:6 (20 mm Graded Stone Aggregate) and Testing after Installation includingcomplete all as specified and comprising of the following:- Make of MCCB/MCB -MDS/LEGRAND/L&T/HEGGER (Main Fire Fighting Panel)INCOMING(i) MCCB 4 Pole 160 amp 50 Hz, 415 V with reputing capacity 35 KA with microprocessor based release - 01 No.(ii) Voltmeter Digital type 0-500 Volts range flush type with selector switch- 01 No(iii) Aluminium Bus bar TPN - 200 amps- 1setOUTGOING(i) MCCB 3 Pole 125 amp 50 Hz, 415 V with reputing capacity 35 KA with microprocessor based release- 01 No.(iii) MCB TPN 32 Amp -02 Nos(iv) 80 HP S/D STARTER- 01 Nos(v) DOL STARTER 7.5 HP- 01 Nos(vi) Motor Protection Relay32-88 amps- 1 no. (vii) Motor Protection Relay2-5.5 amps- 1 no. (viii) On/Off/Trip Indication Lamps, 220 V AC- 6 nos.(ix) Start/Stop Push Button, 2 No. (x) Phase indicating lamps RYB for incoming and each outgoing connection.(xi) Digital type Ammeter 0- 150 amps with selector switch and CT coils of suitable capacity for incoming and each outgoing connection- 1 no. 72 M & L for coating and wrapping of under ground steel pipe buried in soil shall have protection against corrosion as per IS-10221.The coating and wrapping shall be carried out in systamatic manner to get uniform thickness of coating as per IS specification 73 Supply, Installation, test and Commissioning CPRI APPROVED factoryfabricated, Indoor type, LT panel board, made out of 2 mm thick CRCA Sheetsingle door withboth side opening including Neoprene Rubber Gasket, suitable for 440 Volt 3 Phase 4 Wire System, including Danger Plate, Earthing Strip Point and Ventilation Louvers at Rear Side, Bottom detachable Gland Plate complete with suitable size Zinc Chromium Plated Nuts, Bolts and Washers, etc. and embeddedwith 50X50X6mm Mild Steel Angle Iron Frame and 750 mm above the Normal Ground Level complete withinternal connection with suitable size of cable, cable lugs and cable glandsPCC Foundation in Cement Concrete 1:3:6 (20 mm Graded Stone Aggregate) and Testing after Installation includingcomplete all as specified and & directedby Engr-in-charge comprising of the following :– ( Booster terrace pump panel)INCOMING:-(a) INCOMING MCCB 40 A 25 KA, 4 POLE- 01 No.(b) Busbar TPN of size 100 apms - 1 setOUTGOINGS:-(a) MCB 3 POLE TPN 32 Amps,10 KA-2 Nos.(b)DOL Starter for 7.5 HP Pump set-1 Nos.(c) Ammeter Class-1, digital panel mounting type 96mmx96mm L & T cat no WDS301FCA00 including CT 50X5 Amps 3 nos & selector switch-4 nos(d) Voltmeter Class- 1, digital panel mounting type 96mmx96mm L&T CAT NO.WDS301FEV00 & selector switch - 1 no.(e) LED TYPE indicator lamp 1 set (set of three for R,Y,B)(f) Mini protecrionRelay 4-11 amp - 1 nos. 74 Fire Extinguisher mechanical Foam type trolly mouted of 9 Liters capacity. Ceasefire 9 litrs fire Extinguisher AFFF Foam type, External Cartridge type, Pressure Guage Gross weight 14.6 Kg, empty weight5.6 Kg, Can height 611 MM, Diameter 175 MM, Discharge time less than 60 Secs controllable discharge mechanism, Minimum 6 Mtrs, Applicable on Class A, B, can construction deep down & CO2 Mig welded Valve Construction: Forging & Machining, Internal coating of can: Epoxy powder coating, External coating of can: Epoxy poyster powder coating sheet metal thickness 2.0MM,1 year warranty. Make Cease Fire Or Equivalent. (pol store) 75 Supply, Installation,Testing & commissioning of Carbon Dioxide (Co2) type fire extinguisher of 4.5 Kg confirm to IS: 15683, with ISI marked/TAC approved fitted with required accessories including wall suspension brackets. 76 Supply, Installation,Testing & commissioning ofDRY CHEMICAL POWDER (ABC) stored pressure type fire extinguisher of 9 Kg confirm to IS: 15683, with ISI marked/TAC approved fitted with required accessories including wall suspension brackets. 77 Supply, Installation,Testing & commissioning of Water Mist High pressure stored pressure type fire extinguisher of 9 Kg confirm to IS: 15683, with ISI marked/TAC approved fitted with required accessories including wall suspension brackets. 78 Supply and installation at approved location approved make Fire sand bucket of 24 gauge galvanized steel sheet, each set shall have 4 buckets with stand & Showel etc, complete. 79 SPECIAL EQUIPMENTS FOR STORESDesign, manufacture, Supply, installation, testing and commissioning of Automated Storage and Retrieval System with storage racks, pallets, stacking crane, computer hardware with compatible inventory software as a turnkey solution complete all as specified and directed. Automated Storage and Retrieval System shall consist of computer controlled & PLC stacker crane driven system for automatically placing & retrieving materials from defined storage locations. The crane shall be capable of lifiting, stacking and retriveing the pallet loads weight upto 1125 Kg (max) complete all as specified and directed by the Engineer-in-Charge. Technical data for design of heavy duty ASRS:-(a) Dimensions:-Height:10 Mtrs for racking system which shall be designed and constructed to store the required no. and size of pallets.(b)Storage capacity:-Pallet Size: 1300 (W) x 1200(D) x 1250 (H) in mmPallet Nos.: 480Pallet load capacity: 1125 KgTotal capacity: 540 Tons(c) Stacker Crane: Single mast automated stacker crane for handling Pallet, size 1300mm(W) x 1200mm (D) x 1250mm (H) and pay load (including Pallet self weight) of 1125 Kg max. The stacker crane shall be capable of picking up the pallet from in-feed conveyor or loading station and stacking it into empty slots of racking system. Similarly, it shall also be capable of retrieving the palltet from racking system and putting it on the same conveyor or unloading station. Stacker crane will be mounted on single rail at the bottom to traverse the length of the storage system. A single top rail mounted on the racking system shall also support it.General technical parameters of stacker crane:Technical parameters/Type- Single Mast(i) Operation mode (Networking)- On-line automatic / Single automatic (Ground/Boarding) /Manual operation (Boarding) / Maintenance (ii) Communication Means- Wireless 80 (iii) Power supply mode- 380 to 415 V, 50 Hz, three phase five wire (iv) Addressing mode- Horizontal and verticle operation: photo electrical sensor + bar code scanners(v) Positioning / Reduction accuracy (mm) level- lifting ± 3 - 5, Fork : ± 3(vi) Fork unit- 1 Double deep fork(vii) Load unit- MS Pallet (viii) Total Height- 10 Mtr(ix) The normal lifting speed (m/min) - 10 MPM(x) The normal running speed (m/min) - 65 MPM(xi) Rated load- 1125 Kg(xii) Receipt equipment fixed platform/conveyor/lifting /platform(electric/manual)- Conveyor(d) Pallets: to stack and retrieve the pallet weighing up to loaded pallet weight 1125 Kg at height up to the last loading level in the racking system. It should have retrieval mechanism to enable stacking & retrieval of pallet from either side of the rack and also to pick up the load directly from the loading station.Pallet Details:-(i) Dimensions - 1300mm(W) x 1200mm(D)(ii) Pallet height- 1250 mm(e) Racking system :- Two aisle having two row racking system each with 05 verticle levels for storage of material. Racking for double deep type storage of 480 Pallet of size 1300mm(W) x 1200mm (D) x 1250mm (H). Loaded pallet weight: Pay load with pallet 1125 Kg max. System details:-Working aisle -01 Nos. (Double deep)Store rack -24 Nos./RowTotal rack in 1 aisle-24 (Left) + 24 (Right)= 48 Nos.No. of level- 5 Nos/RackTotal Pallet-48 x 5 x 2 = 480 Nos.Load capacity- 1125 Kg/LevelSingle mast stacker crane-01 No. 81 (f)Aisle Equipment:-This will consist of electrical as well mechanical aisle equipments and willl be designed as per the pallet requirement. The mechanical Aisle equipment of bottom rail shall consist of I Beam and will be provided with adjustable calmps for holding the rail in position to ensure proper alignment. Top rail shall be mounted on the racking. The electrical aisle equipment shall consist of power rail (fully enclosed bus bar having 7 pole system), which is mounted on the racking system below the first loading level.(g) Details of rack members:-The racking system shall consist of cold-rolled steel sections as per manufacturers design to accommodate and store pallets and connected systems.(h) Loading- unloading station/ Conveyor(i) Pallet Load 1125 Kg max.(ii) Bearing- SKF Equivalent make(iii) Motor- Seimens/Sew Euro Drive/Nord Sew/ Bonfiglioli or equivalent(iv) Gear Box- Bonfiglioli Make or equivalent(v) V.F.D.- Yashkawa make or equivalent(j) All steel surface shall be powder coated finish with 8 tank treatment process.(k) Maintenence: The annual maintenence of complete ASRS system duyring the defect liability period of two years shall be included in the rate quoted for the system and the AMC contract duly signed with the manufacturer of the ASRS system shall be submitted at the time of handling over the system. The AMC shall include all spares and consumables etc required during the period of two years and nothing extra shall be paid on this accountNote- 1Mechanical safety provision (i) End of aisle shock absorbers / bumpers for stacker crane.(ii) End of travel buffer for the lifting crane.(iii) Safety catches on lifting carriage.(iv) Anti-tilt mechanism for the stacker crane.(v) Continuous rail cleaning brush for floor rail.(vi) Adjustable rail clamp to ensure alignment. 82 (vii) Resilient rubber pads on adjustable clamps for vibration dampening.(viii) Profile check on lifting carriage to check all three dimensions (width, depth & height) of the pallet. Note - 2 Electrical safety provision (i) There shall be Emergency stop push button at all panels and stations.(ii) Optical light beam amd mechanical safety sensor to stop the operation in case of improper storage or obstruction in the operator window either internal or external reasons like operator hand or material placed at edge of the tray.(iii) Back up circuitry for proper system operation.(iv) An electromagnetic brake shall be used to avoid the slippage of the hoist.(v) Stopper shall be provided for the maintenance door.(vi) Load cells shall be provided for the over weight of tray.(vii) Automatic door shall be provided for operator safety while machine in operating condition.Note - 3 Physical safety provision (i) The ASRS system shall comprise of safety fences having grid size of max. 40 x 40mm & wire dia should be of min. 3 mm. Height of the fencing should be minimum 2.0 meter.(ii) One No. of electromagnetic aisle access door shall be provided. It should cover the complete length of the system on one side.(iii) A manual locking system to restrict the movement of unauthorised personnel shall be provided.NOTE: Design report shall be submitted before execution of Work at site by the contractor toGE for his scrutiny / comments and futher submitted to AO for obtaining approval. Item No. 13.070 below shall be compatible with this item/ system and both should be integratedMake of ASR system:Armstrong Ltd/ Godrej Koerber/ Kardex India storage solutions Pvt Ltd/ Daifuku India Pvt Ltd/ Addverb technologies Ltd/ Craftsman Automation Ltd/ Tech-mark 83 Supply, installation, testing and commissioning of Advance Inventory Management System with computer hardware with compatible inventory software complete all as specified and directed by the Engineer-in-Charge. Technical specification of the system(i) System Height : 6400 (±100) mm(ii) System Width : 3150 (±100) mm(iii) System Depth : 2300 (±100) mm(iv) System Base : 7.24 Sq.Mtr(v) Tray Int. Size: 300 (H) x 2450(W) x 500 (D) in mm(vi) Tray dead weight - 57 Kg (Approx.)(vii) Per tray weight capacity - 300 KgTechnical specification of the system:-(viii) Tray Quantity : 32 Nos.(ix) Usable net load - 9.6 ton(x) Storage surface area per system - 39.2 sq mtr(xi) Door - Automatic(xii) Power consumption - 3.7 KW(xiii) Power supply - 440V, 50/60 Hz, 3 Phase(xiv) Motor 3 Phase 1440 RPM - Seimens make or equivalent(xv) Chain - Diamond makeor equivalent(xvi) Bearing - SKF/NTN make or equivalent(xvii) External cladding - Epoxy powder coatedSafety Features:1. Photo curtain at access port, 2. Motor Protection relays, 3. Limit switch at door, 4. Single phase preventer,5. Switch mode power supply, 6. 15 Min battery backup for PLC, 7. Noise less than 60db, 8. Emergency stop various safety alertsNote: The system and software provided under this item shall be of same make as for item 13.069 or a compatible system and software as recommended by the chosen manufacturer of ASR system. This system shall be integrated with ASR system. 84 Supply, installation and testing of Car Traffic Boom Barrier 6 mtr suitable to working on power supply 230 Volt, 50 Hz, 24V DC electric motor, adjustable with CAMS, operating ambient temperature from -20 to +55 Degree Celsius, uses cycle 2000/Day, air cooling, type of beam is rectangular with skirt, effective torque 280-290 Nm open/close time 2 to 4 Sec complete all as specified and as directed by Engineer-in- charge.Make: FAAC/Parkilo/Skidata/BFT 85 EXTERNAL WATER SUPPLYSupply and fix Foot valve conforming to IS,100 mm dia complete all as specified and directed. 86 Supply and fix Cast iron air release valve with 100 mm bore and two outlets as per IS:14845 complete all as specified and directed. 87 Supply, installing, testing and commissioning of electrically driven horizontal Centrifugal Pump set 9.0 LPS at 50 Meter Head as per specification, motor TEFC type, 2880 rpm, 415 V, 50 Hz, 3 phase, class F insulation, IP 55 protection, starting on suitable Star Delta starter. The pump shall be horizontal, end suction, top discharge. The pump shall have cast iron casing, cast iron/bronze impeller (as per manufacturer), carbon steel shaft with common base frame (fabricated mild steel channel frame or cast iron type) placed on RCC (1:2:4) including foundation, bolts, nuts etc. complete with antivibrator pad as required capable of discharging not less than 550 LPM at 45 mtr head inclusive of suitable rated three phase starter as recommended by the manufacturer, PVC insulated copper cable connection from starter to the motor terminals all as specified and directed by the Engineer-in-charge.(01 No. Working + 01 No Stand By)Make:- Kirloskar Brothers/Crompton or equivalent. 88 Supply, install, test and commissioning of LT Panel, indoor type, powder coated, 2.0 mm thick CRCA Sheet, CPRI approved having, IP 43, MS angle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply, bus bar chamber with Horizontal copper bus bar for 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natural flow of air. The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 2.0 mm thick CRCA Sheet duly compartmentalised for each control gear with louvers and air vent gasket for natural flow of air and suitable provision to accommodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables. Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, track resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. andcomprising as under: LT Panel for Pump House. The LT Panel comprising of the following:- 89 Incoming:-MCCB, thermal magnetic release, 4 pole, 415 Volts, 100 Amps, breaking capacity 36 KA- 01 No. Ics =100% IcuMetering Unit:- (a) R Y B Indications (LED Type)- 01 sets(b) Digital Multi function meter - 01 No.(c) CTs - 100/5A, CL-1, 15 VA - 01 set(d) Horizontal Aluminium busbar for 3 phase, 440 volts, 50Hz, 4 wire system of rating 350 Amps for phase and 350 amp for the neutral barOutgoing:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 63 Amps, breaking capacity 16 KA- 02 No. Ics =100% Icu -2 nos.(b) MCB, TPN 40 Amp, 415 Volt, C Curve - 02 Nos.(c) Star Delta starter 12.5 HP, 3 Phase, 415 Volt- 02 Nos.(d ) Digital ammeter - 2nos.(e) Single Phase Preventer - 2 nos. 90 M & L Valve chamber of internal size 0.90m X 0.90m X 0.90m (internal dimensions) including excavation of earth work in any type of soil, 150mm thick PCC in 1:4:8 type D2 foundation, brick work in CM 1:6, 15 mm thick rendering in CM 1:4 to internal surfaces and external surfaces upto 150mm depth below GL, PCC 1:3:6 type C1 as in coping, cover with two Nos. of hinges and one No. handle made out of MS round bar 10mm dia with necessary locking arrangement including painting to the steel surfaces with two coats of synthetic enamel paint over a coat of red oxide primer complete all as shown on drg and as specified. Note:- The quoted rate shall include all earthwork and connected items. 91 M & L Earthing complete with Galvanized steel earth plate electrode of size 600mmX600mm, 6.00 mm thick buried directly in ground vertically to a depth not less than 2.25 metres below the normal ground level with top edge of the plate not less than 1.5m below normal GL and connected to galvanized iron strip of size 32 x 6 mm size by means of bolts, nuts, check nuts and washers of galvanized iron steel all as shown in Electrical Plate No. 3 connecting to earthing test point, including necessary earth work in any type of soil, PCC earth chamber made in PCC 1:3:6 type C1 (using 20mm graded aggregate), common salt, charcoal, CI funnel, earth pit cover in RCC 1:2:4 type B1 (using 20mm graded aggregates), with 8mm CTD bars @ 100mm c/c in both ways, including necessary form work complete including necessary test on completion all as specified and as directed. 92 EXTERNAL ELECTRIFICATIONM & L for HT/LT MS cable route indicator, engraved the description on the disc not less than 6 dia welded with 40x6xmm MS strip of approx length 90 cm duly painted on the steel parts as per colour code and provision of PCC 1:4:8 type D-2 using 40 mm grade stone aggregate of not less than 0.05 cum in each at base under the ground including necessary earth work and formwork complete all as specified and directed.Note: HT route indicator shall be painted as under:-(i) For HT 11 KV cables - “BROWN”(ii) For LT cables - “BLUE” 93 Supply and fix compact air insulated bus bar trunking system with copper busbar 1600 Amps, 50 KA breaking capacity, IP54 protection, bus duct 1600 A, 415 Volt, capacity sandwich type, Set RYBN complete with accessories such as flange ends, vertical bends, supporting brackets etc from transformer to LT panel board complete all as specified and directed. 94 Supply, install, testing and commissioning of Distribution transformer step-down Level 2 (Previously EE Level 3 before Amendment No 4 to IS 1180), 11KV0.433KV, Three Phase complying withIS: 1180/IEC-76(Part-1) 2014 with latest amendments, indoortype double copper wound suitable for 50 Hz system of capacity 800 KVA, oil immersed naturally cooled delta connected on HT side and Star connected on LT side, Vector Group Dyn11, provided with OFF load tap changer to vary secondary voltage from -7.5% to + 7.5 % in step of 2.5 %.Losses should be confined to the limits specified as follows: maximum allowable losses atfull load (100 %) & Half Load (50 %) shall not be exceeded 5838 watts & 2147 Wattsrespectively as per GRlHA RATING, Percentage Impedance: 4.5%. Losses and Impedance are subjected to tolerance as specified in IS 1180. The transformers should be supplied with first filling of oil confirming to IS 335. The transformer should have both side cable end box with neutral brought out complete all as directed by Engineer - in -Charge, and installation of transformer shall be carried out as per IS-10028and comprising with the following standard fittings/Technical specifications:-(a) Lifting lug for transformer and tank.(b) Earthing terminal rating and diagram plate.(c) Air release device.(d) Oil filling inlet pipe with plug.(e) Drain outlet pipe with brass gate valve.(f) Conservator tank with oil level indicator(g) Silica jel breather(j) First fill of oil upto level including conservator tank with fresh new oil conforming to IS335.(k) Type of connection Delta/Star(l) Type of cooling: Oil and Natural Air.(m) Vector group: DYN 11.(n) Temperature rise over an ambient of 50 °C maximum.(o) Cable end box on both side for HT/LT cables of suitable size.(p) Provision of thermometer with pocket.(q) Provision of oil and winding temperature gauge. 95 Supply, install, test and commissioning of LT Panel, Indoor type, powder coated, 2.00 mm thick CRCA Sheet, CPRI approved having, IP 43, MSangle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply,bus bar chamber with Horizontal copper bus bar for 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natural flow of air.The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 1.6 mm thick CRCA Sheet duly compartmentalised for each control gear with louvers and air vent gasket for natural flow of air and suitable provision to accommodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables. Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, track resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. andcomprising as under: The LT Panel comprising of the following:- Main LT PanelHorizontal copper busbar for 3 phase, 440 volts, 50 Hz, 4 wire system of rating 1600 Amps for phases and 1600 Amps for Neutral. 96 Incoming:-Incomer:-ACB 4 Pole, 415 V, 50 KA with Thermal Magnetic Release (Manual Draw out type) of capacity 1250 AmpMetering Unit:- (a) R Y B Indications (LED Type)- 1 sets(b) Digital Multi function meter - 01 No.(c) CTs - 1600/5A, CL-1,15 VA - 1 setOutgoing:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 630 Amps, Ics =100% Icu, breaking capacity 35 KA, Ics =100% Icu- 02 No. (For DG AMF Panel & Spare)(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 400 Amps, Ics =100% Icu breaking capacity 36 KA- 02 No. (for APFC Panel & FPB 2 Near bulk Store) (c) MCCB, thermal magnetic release, 4 pole, 415 Volts, 320/315 Amps, Ics =100% Icu breaking capacity 36 KA- 01 No. (for FPB 1 Near Adm Block) (d) MCCB, thermal magnetic release, 4 pole, 415 Volts, 200 Amps, Ics =100% Icu breaking capacity 36 KA- 01 No. (for Existing Load)(e) MCCB, thermal magnetic release, 4 pole, 415 Volts,125 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for FPB 3 Near Auction Disposal Store)(f) MCCB, thermal magnetic release, 4 pole, 415 Volts, 32 Amps, Ics =100% Icu breaking capacity 25 KA- 03 No. (for MT Complex, Watch tower no 2, Guard room)(g) Digital Ammeter with suitable CT for each outgoing 97 Supply, install, test and commissioning of LT Panel, outdoor type, powder coated, 3.00 mm thick CRCA sheet, CPRI approved having, IP 54, MS angle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply,bus bar chamber with Horizontal aluminium bus bar 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natural flow of air. The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 2 mm thick CRCA sheet duly compartmentalised for each control gear with louvers and air vent gasket for natural flow of air and suitable provision to accommodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables. Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, crack resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. Feeder Panel No.1 (Near Admn bldg) 98 Horizontal Aluminium busbar for 3 phase, 440 volts, 50Hz, 4 wire system of rating 600 Amps for phases and 600 Amps for Neutral.Incoming:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 400 Amps, breaking capacity 36 KA - 01 No. Ics =100% IcuMetering Unit:- (a) R Y B Indications (LED Type) - 1 sets(b) Digital Multi function meter - 01 No.(c) CTs - 600/5A, CL-1,15 VA - 1 setOutgoing:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 200 Amps, Ics =100% Icu breaking capacity 36 KA- 02 No. (for 2nd floor & spare)(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 160 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for 1st floor)(c) MCCB, thermal magnetic release, 4 pole, 415 Volts, 63 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for G floor)( d) Digital Ammeter with suitable CT for each outgoing 99 Supply, install, test and commissioning of LT Panel, outdoor type, powder coated, 3.00 mm thick CRCA sheet, CPRI approved having, IP 54, MSangle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply,bus bar chamber with Horizontal aluminium bus bar 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natural flow of air.The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 2 mm thick CRCA sheet duly compartmentalised for each control gear with louvers and air vent gasket for natural flow of air and suitable provision to accommodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables.Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, crack resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. Feeder Panel No.2 (Near Bulk Store) Horizontal Aluminium busbar for 3 phase,440 volts, 50Hz, 4 wire system of rating 600 Amps for phases and 600 Amps for Neutral. 100 Incoming:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 400 Amps, breaking capacity 36 KA - 01 No. Ics =100% IcuMetering Unit:- (a) R Y B Indications (LED Type)- 1 sets(b) Digital Multi function meter - 01 No.(c) CTs - 600/5A, CL-1,15 VA - 1 setOutgoing:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 200 Amps, Ics =100% Icu breaking capacity 36 KA- 02 No. (for Equipment Load & spare)(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 125 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for Bulk Store)(c) MCCB, thermal magnetic release, 4 pole, 415 Volts, 32 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for Watch Tower No. 1)( d) Digital Ammeter with suitable CT for each outgoing 101 Supply, install, test and commissioning of LT Panel, outdoor type, powder coated, 3.00 mm thick CRCA sheet, CPRI approved having, IP 54, MSangle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply,bus bar chamber with Horizontal aluminium bus bar 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natural flow of air. The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 2 mm thick CRCA sheet, duly compartmentalised for each control gear with louvers and air vent gasket for natural flow of air and suitable provision to accommodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables.Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, crack resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. Feeder Panel No.3 (Near Auction Disposal Store) 102 Horizontal Aluminium busbar for 3 phase, 440 volts, 50Hz, 4 wire system of rating 200 Amps for phases and 200 Amps for Neutral.Incoming:-(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 125 Amps, breaking capacity 25 KA- 01 No. Ics =100% IcuMetering Unit:- (a) R Y B Indications (LED Type) - 1 sets(b) Digital Multi function meter - 01 No.(c) CTs - 200/5A, CL-1,15 VA - 01 setOutgoing:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 100 Amps, Ics =100% Icu breaking capacity 25 KA- 02 No. (for Store Dispatch Complex & Spare)(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 32 Amps, Ics =100% Icu breaking capacity 25 KA- 03 No. (for Pol store, Auction disposal store, Covered Hard Standing)(c) Digital Ammeter with suitable CT for each outgoing 103 Supply and fixing poly carbonate street light junction boxes IP 66/67 Weather proof suitable for outdoor installation having minimumsize255 x 355 x 122 including suitableCable connecting Terminals, Cable lugs, including provn of one No. MCB SP 6 Amps for operating the street light fittings, Suitable Cable Glands as per site requirement, all as directed by the Engineer-in-Charge. 104 S & F Street light bracket made out of GI tubing 32/40 mm dia, light grade of length1.2 mtr long bend to shape suitable for security light fitting with necessary MS clamp-02 Nos with one coat of anti corrosive primer and two coats of aluminium paint including nut, bolt, washers and 3 core FRLSinsulated sheathed, multistranded copper conductor of size 1.5 sqmm for phase and neutral and 1.5 sq mm for earthing drawn throughthe poles for connection from junction box to light fitting complete etc all as specified.Note: Phase should be Red/Yellow/Blue, neutral should be black and earthing wire should be green in colour. Two runs of cable for phase and neutral and one run of cable for earth will be measured and paid as one unit length. 105 Supply and fixing of LED flood light, 200W, watt 230 V, AC outdoor type with thermal management in multiple optics and equipped with IP66 protection, with impact and corrosion resistant complete with driver and lamp and made up of pressure die cast aluminium housing with toughened glass and high power LEDs and secondary lenses with IP protection incl system efficiency >110/120LPW 10KV SPD included Energy saving, environmental friendly and general purpose lighting complete all as specified and directed Engineer-in-Charge. Make : Make : Crompton/Philips/Wipro 106 Supply and fix High Mast Panel outdoor type, suitable to take load up to 6 KW, Conforms to IS/IEC 60947-4-1, Provided with Protection Degree IP 54, Extended wide band (150 Vac - 300 Vac) coil, FRLS (Fire retardant low smoke) Internal wiring, In-built Short-Circuit Protection, Class H Insulation, 3 Phase 415 Volts AC with the following accessories:Phase : 3 Phase, 415 VoltsMax Load Capacity : 6 KWTimer type: AstronomicalContactor Rating : 32 A TPMCB Rating : 63 A TPNMake : Crompton/ Philips/Wipro 107 Supply and laying DWC (Double wall Corrugated) duct pipe outer dia 63 mm and inner dia 50 mmconforming IS 16205 (Part 24 ) for protection ofelectric cable complete all as specified and directed. ( for 10 sqmm St light cable & 16 Sqmm cable) 108 AVIATION OBSTRUCTION LIGHTSupply and fix aviation obstruction light integral aviation light comprising of aluminium housing with polycarbonate enclosure, 240 volt with timer switch and one No.10 A, MCB, SPN 230 V with fixed enclosure complete all as specified and directed by Engineer-in-charge.Make:- Bajaj cat No BGAV 302 LED or equivalent in Philips/Crompton/Surya 109 INCINERATORSupply, fixing and testing of Solid waste Electric Incinerator, single chamber type having a combustion chamber supported with electric coil for generating sufficient heat to burn 100Kg/hr solid waste, retains and re-burns the exhaust gases for minimum of 2 seconds at 850°C, Stainless steel stack for longevity, fitted with a Velocity Cowl as standard, Chamber designed for maximum air flow and circulation which in turn improves efficiency and total burn time, easy to open and close loading door, designed to increase operator safety, steel cladding to reduce risk of infection and increase longevity of system with working temperature not less 450 degree Celsius mounted on foundation as recommended by OEM including electrical control panel with suitable size MCCB, relays & contactor recommended by OEM complete all as complete all as specified and directed.Note:(a) The electrical works including electrical LT panel, internal wiring of the LT panel, suitable size copper wires from panel to Solid waste Electric Incinerator as recommended by OEM to operate the Solid waste Electric Incinerator of capacity 100 Kg/Hr to make Solid waste Electric Incinerator operational is deemed to be included in the rate quoted. (b) All Electrical works shall be carried out as per relevant BIS/lS equivalent standard norms only and also in accordance with the latest edition of the Indian Electricity Act / rules formed there under and as amended from time to time.(c) Any other works (mechanical, electrical & Civil) connected to installation, testing & functional requirement of Solid waste Electric Incinerator of capacity 100 Kg/Hr all as mentioned above and which is not mentioned or included in this Schedule but required at site necessary shall be carried out by the contractor and quoted rate shall deemed to included for the same.(d) Foundation/Plinth/Base: shall be provided as per manufactures recommendations, however minimum 0.5m space should be available all around the Solid waste Electric Incinerator and height of plinth shall not be less than 0.5 M 110 Supply & fixing MCCB, thermal magnetic release, 4 pole, 415 Volts, 200 Amps, breaking capacity 36 KA- 01 No.Ics =100% Icu with Sheet metal enclosures fixed properly at directed location and connecting/testing complete all as directed. 111 ELECTRIC SIRENSupply and fixing Sirens Electronic type Horizontal Double Mounting Three Phase 400/440V, 2800 RPM 50 C/s Flame Proof, audible range 3.5 Km, 2 HP, continuous normal operation for at least 50 minutes with on/off system complete all as specified and directed. 112 Supply and fix advance Sirens controller Electronic type suitable to operate on 3 phase, 415 volt AC 50 Hzcomplete all as specified and directed. 113 Supply & fixing MCCB, thermal magnetic release, 4 pole, 415 Volts, 63 Amps, breaking capacity 25 KA- 01 No.Ics =100% Icu with Sheet metal enclosures fixed properly at directed location and connecting/testing complete all as directed. 114 SOLAR POWER PLANTDesign, supply, installation testing and commissioning of roof top solar photovoltaic power plant (ON-GRID) on roof top of existing bldg of capacity 150 KWp, power evacuation at 415 Volt 3 phase system all as per guidelines/norms issued by MNRE & Indian Metrological Deptt approved Solar Radiation Data viz Direct Normal Irradiance, Global Horizontal radiance etc complete comprising with the following Solar Photo Voltaic Plant.(a) Design, supply, installation, testing and commissioning of Solar PV Modules capable of generating 150 KWp (AC) electricity at 415 Volt 3 phase system. These Solar PV Modules of 540 watt PERC with a modular efficiency of 17-19.84% as per IEC and MNRE standard or as per approved design parameters with Poly/Multi Crystalline Silicon Solar cells of minimum wattage of 540 watt with minimum 144 cells & efficiency not less than 17 -19.84%, conforming to IEC 61215, IEC 61730, IEC 61701. Solar PV Module should be of approved Indian Brand only and Qualify under the Domestic Content requirement (DCR) norms of NVVN/SECI and testing requirement fixed by MNRE. The PV modules shall be warranted for a period of minimum 25 years, Solar PV modules used in system shall be warranted for their output peak watt capacity, which should not be less than 90% at the end of Ten years and 80% at the end of Twenty Five years. Each Solar PV Module must use RF identification tag. The following information must be mentioned in the RFID used in each module:Name of manufacture of PV module, Name of manufacturer of Solar cell, Month & year of manufacturer (for solar cell and module), Country of origin (lt is mandatory to use cells and modules manufactured in India). I-V curve of the module, Wattage, LM, V-M, & FF for the module, Unique Serial No & Model No of the module, Date & year of IEC PV qualification certificate, Name of the test lab issued IEC certificate. The PV modules used in the solar power projects must qualify to the latest edition of the following International Electro technical Commission (IEC) P module qualification test or equivalent BIS Standards. The PV module must be tested and approved by one of the IEC authorized test centres. 115 (b) Material and labour for Module Mounting structure (MMS) fabricated from hot dip galvansied iron section of suitable size with specified tilt angle according to site requirement & optimum angle to achieve maximum benefit of solar energy and suitable to withstand 180 Kmph wind speed all as per approved design parameters as per MNRE standards and to match with the existing site conditions. Necessary roof treatment to avoid any seepage in future shall be done by the Contractor and the amount included in the rate quoted. The roof tiles shall be dismantled and refixed back in original position. Structure shall be built with brick masonry basement of adequate size as per direction at site including all necessary civil work required for the foundation.(c) Supply, laying & Testing of DC cable minimum size 4/6sq mm multi stranded copper conductor, conforming to relevant IS, weather proof UV resistant with operating temperature up to 120 degrees, minimum rated voltage 1100 volt for inter connection of SPV Modules to array junction box including suitable size of cable lugs, male & female MC4 connectors & joints etc.(d) Supply, installation test and commissioning of protection devices MCCB 400 A, isolator and three phase 4 wire LT energy meter, array junction boxes having rating 150 KWp with over voltage protection and surge protection.(e) Supply, installation, test and commissioning of Grid tie Solar Power conditioning unit / inverter of minimum capacity 150 KWp(DC to AC 415 V in Three phase system) all as per approved design parameters & capable of generating output voltage 415 V AC at rated load condition with efficiency not less than 98 %, conforming to IEC 600682-2 NDE standards with power reduction, LVRT with protections for anti-islanding, Ground fault monitoring, Grid Monitoring, AC & DC Over voltage and under voltage protection, AC & DC short circuit lover current protection and DC reverse polarity protection, graphic display etc. all as specified and as directed.(f) Material and labour for Earthing for Lightning protection for SPV modules etc as per IE rule, MNRE guide line & BIS all as per approved plan complete with galvanised earth plate electrode 600x600x6 mm thick buried directly in ground vertically (earth pit not less than 2.25 mtr deep below normal ground level) with top edge of plate not less than 1.5 mtr below normal ground level connected to and including Gl strip 32x6mm size protected with Gl medium grade pipe 40mm dia for earth electrode up to test point by means of GI nuts, bolts, check nuts and washers including earth work excavation, PCC (1:3:6) type Cl pit and RCC cover ( 1:2:4) type Bl and funnel, with necessary charcoal, salt etc complete. 116 (g) Supply and fixing aluminium strip of size 25 x 3mm thick for roof / down conductor fixed on insulators/ saddles of suitable size for SPV modules lightning protection upto interconnection between Roof top LA to Ground Earthing system. (h) AC Cable: Supply and laying of 150 Sqmm LT XLPE insulated, screened PVC bedded, sheathed with multi-stranded aluminium conductor armoured with galvanised steel wire 1100 volts grade heavy duty conforming to IS 150 Sqmm x 3.5Core as per site requirement.Note (i) :-(a) Before quoting the bid, Contractor or his authorised Engineer/consultant must visit the proposed site to study the site condition.(b) Before commencement of work, contractor shall submit drawings & lay out plan with scale including required qty to Accepting Officer for approval.Note(ii):-(a) The mechanical structures, electrical works and overall workmanship of the Grid solar power plant must be warrented for a minimum of 5 years.(b) All Mechanical, Electrical works shall be carried out as per relevant BIS/lS equivalent standard norms only and also in accordance with the latest edition of the Indian Electricity Act / rules formed thereunder and as amended from time to time.(c) Any other works (mechanical, electrical & Civil) connected to installation, testing & functional requirement of solar photovoltaic power plant of capacity 150 KWp (AC) all as mentioned above and which is not mentioned or included in this Schedule A but required at site necessary shall be carried out by the contractor and quoted rate shall deemed to included for the same(d) Contractor shall provide adequate Spares/items required for minimum period of 1 year maintenance including DC & AC items under scope of work.Note (iii) : Design report shall be submitted before execution of Work at site by the contractor toGE for his scrutiny / comments and futher submitted to AO for obtaining approval. 117 DG SETSupplying, installing, testing and commissioning, factory assembled silentDiesel Engine driven generator set, fully wired alternator AC to give an out put of 400 KVA continuously rating at a power factor 0.8 lagging, 3 phase 4 wire, 415 volts 50 Hzsupply, 1500 RPM, directly coupled with diesel engine liquid cooled mounted on common base frame complete with floor mounting fuel tank (service tank) of adequate capacity with fuel line & accessories, PCC foundation work as per manufacturers instructions, vibration damper pads, control panel & other accessories etc and comprising of following.(a)Diesel Engine: Liquid cooled turbo charged with after cooler to deliver suitable BHP at 1500 RPM under NTP conditions of BS 5514 and conforming to IS 10001/ 10002, DIN 6271 & ISO 3046 with an overload capacity of 10% for one hour in any 12 hours continuous operation with the following accessories:. Diesel engine of rated speed at full load electric start developingwithsystem with radiator and including electronic governor control of class A1, engine control panel, lub oil pump, water pump, fuel tank, exhaust pipe with silencer and suitable for electric start with batteries ofadequate capacity and suitable for alternator of specified capacity complete with fly wheel direct/flexible coupling and coupling guard complete.(a) Radiator with blower fan or heat exchanger with guard.(b) Pipe coupling for engine cooling system piping.(c ) Corrosion inhibitor coolant(d) Paper element filters(i) Fuel filter(ii) Lube oil filter(iii) By pass(e) Fly wheel housing and fly wheel to suit alternator.(f) Engine bearing mechanism in fly wheel housing.(g) Shut off coil with safeties for LLOP/HWT/over speed.(h) Dry type air cleaners and vacuum indicators.(j) Residential silencers.(k) Stainless steel exhaust flexible bellows. 118 (l) Motor driven priming pump.(m) Battery charging alternator.(n) Exhaust piping made out of STIC C class, MS pipe inclusive of all accessories and hardware, necessary supports scaffolding as per manufacturers recommendations to sustain back pressure with rain cap.(o) Mineral wool insulation 2 inch thick suitable for 400 degree Celsius temperature cladded with aluminium sheet o30 gauge for the entire length of exhaust pipe.(p) First fill of oil, coolant and diesel during commissioning and 12 hours testing.(q) Interconnecting copper cabling of adequate capacity batteries control.(r ) Fuel pipe class STIC 1 /1.5 /2 dia - 01 lot(s) Self starter 12 volts DC.(t) Electric operated electronic governor.(u) Fuel injection pump.(v) No of cylinders - 12 No VEE(w) Electronic instrument panel, complete with all accessories as per manufacturers specifications displaying the following:-(i) 12vx2 nos -24V Battery. (ii) Water temperature.(iii) lubricating oil pressure.(iv) Engine speed -1500Rpm(v) Engine hours(vi) Frequency.(vii) Voltage.(w) Safety control (Trip and indication).(i) High water temperature(ii) Low lube oil temperature(iii) Overspeed stop 119 (x) Base frame: Sturdy, fabricated welded construction, channel iron base frame (duly painted) for mounting engine and alternator as per manufacturers design alonwith AVM pads.(y) Battery:-24 volts(2x12v Battery) DC, 180AH, maintenance free battery conforming to IS:14257 with leads & terminals (Make- Excide/Amron).(z) Fuel tank:12 hrs. full load diesel storage capacity fuel tank with mounting brackets factory made of 5mm thick HR/MS sheet with level indicator fuel inlet, fuel outlet, air vent, drain plug, in let arrangement for diesel filling fro exterior canopy (without opening its panel) etc complete all as specified and directed.(aa) Isolator panel with 250 amp MCCB(ab) Auto logic panel for automatic stat(b) Alternator: Alternator suitable rated for 400 KVA, 0.8 pf , 415 volts, 3 phase, 4 wire, 50 Hz at 1500 RPM, self excited and self regulated with AVR brushless, screen protected, drip proof , insulation class-H, IP -23, voltage regulationgrade - VG 3 self ventilated and conforming to BS: 5000 / IS: 4722 suitable for engine as mentioned here-in before, conformig to IS: 13364(part-1)Make: KOEL GREEN / stampford/crompten/kirloskar/Greaves(c) Acoustic Enclosure:- M & L for acoustic enclosure for the above 400 KVA DG set to reduce noise level to 75 dB measured at 1.0 meter distance for audible frequencies as per guide of Central Pollution Control Board andmanufacturers specification and comprising of following from authorised GOEMs of Gen Set manufacturers specified :-(i) Sound insulation : 100mm thick Rock wool (Density 64 Kg/Cum).(ii) Outer body : 1.6mm thick CRCA(iii) Door : 1.6mm thick CRCA(iv) Base frame : ISMC 300(v) Inside illumination : 1 No.- 1 x 18 watt LED fitting of make Phillips/ Bajaj/ Crompton.(d) AMF Control panel:- Factory fabricated cubicle type, free standing, floor mounted, indoor type, IP-43, AMF control panel, provided with removable rear panels & hinged front panel for easy accessibility, fabricated out of not less than 2.0mm thick CRCA sheet including two coats of powder coated paint over a coat of red oxide primer etc and comprising of following: 120 (e) AMF control circuit with 4 pole MCCB 630 Amps - 2 nos, with ultimate breaking capacity Icu-50 KA at 415 volts and microprocessor release conforming to IEC 60947 Part-I with breaking capacity Ics=Icu at 415 volts , thermal overload setting 70% to 100%, short circuit setting 5 to 10 times-02 Nos. for main supply & DG set supply with HRC back up fuse complete with all DC control relays/ Line voltage monitor (LVM) as per OEM specifications incorporating motorised stored energy operating Engine start, stop, three attempt starting facility and failure to start etc.(f) Digital load manager : Three phase 4 wire indicating V,I,PF, KVA, KW, F of Enercon make with serial communication port model No.EM6400 with class 1.0 accuracy meter or equivalent make suitable rating of CT per phase- one No.(iii) Indication lamp R, Y, B with 3 Nos. of 2A HRC fuses-10 sets.(iv) Bottom gland plate for incoming and outgoing cables.(v) Circuit diagram plate.Note :- DG set should be as per CPCB -4 latest norm wef 01 July 2023 of National Clean Air programme (NACP) Act 1981. 121 Supply, install, test and commissioning of LT Panel, Indoor type, powder coated, 2.00 mm thick CRCA Sheet, CPRI approved having, IP 43, MSangle iron section of 50X50X6 mm frame, suitable for 3 Phase 415 volts 50 Hz, AC supply,bus bar chamber with Horizontal aluminium bus bar 3 phase and neutral 4 wire system duly insulated with heat shrinkable type sleeves as per colour code, supported on epoxy insulators, factory fabricated, roof canopy, with front and back openable double door system lockable/openable by keys from both sides, louvers & air vent gasket for natuaral flow of air.The bottom of the outer shell contains a detachable plate having provision for entry of armoured cable of adequate size with glands. The inner shell be made out of 1.6 mm thick CRCA Sheat duly compartmentalised for each control gear with louvers and air vent gasket for natuaral flow of air and suiatable provision to accomodate incomer/outgoing MCCBs/MCBs and metering devices and suitable busbar chamber for passing and connecting UG cables.Providing bus bar for phases and neutral and shall be insulated with colour coded heat shrinkable sleeve and shall be mounted on suitable size F class insulators made on non hygroscopic, non combustile, track resistant, high strength FRP/SMC/DMC material at an interval of not more than 300 mm through out the length of the TPN bus bar all as specified and directed by the Engr-in-Charge. Feeder Panel No.1 (DG Panel ) 122 Incoming:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 630 Amps, breaking capacity 36 KA - 01 No. Ics =100% IcuMetering Unit:- (a) R Y B Indications (LED Type) - 1 sets(b) Digital Multi function meter - 01 No.(c) CTs - 800/5A, CL-1,15 VA - 1 setOutgoing:-(a) MCCB, thermal magnetic release, 4 pole, 415 Volts, 400 Amps, Ics =100% Icu breaking capacity 36 KA- 02 No. (for Package AC Bulk Store & spare)(b) MCCB, thermal magnetic release, 4 pole, 415 Volts, 160 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for Pump House & Fire Pump)(c) MCCB, thermal magnetic release, 4 pole, 415 Volts, 80 Amps, Ics =100% Icu breaking capacity 25 KA- 01 No. (for Incianator)(d) MCCB, thermal magnetic release, 4 pole, 415 Volts, 32 Amps, Ics =100% Icu breaking capacity 25 KA- 07 No. (for Terrace pump 1, Terrace pump 2, Power House, High mast 1, High mast 2, Street Light)(e) Digital Ammeter with suitable CT for each outgoing(f) Astro Time switch for 3 phase 20A- 1 No(g) 3 Phase Power contactor 20 amps, with 230 coil 123 SEWAGE DISPOSALM & L for laying of DWCPE sewage pipes line 200 mmdia borepipe sftiffnessclass SN 8 includingsealing of joints fittings etc complete with collers complte all as spcified and directed 124 M & L for laying of DWCPE sewage pipes line 150 mmdia borepipe sftiffnessclass SN 8 includingsealing of joints fittings etc complete with collers complte all as spcified and directed 125 COMPOUND WALLS & F Concertina Coil of 600/700 mm outer dia made out of 2.60 mm dia spring steel wire dipped in corrosion preventive fluid (rusilo 901) of castrol make each coil having min 50 turns (circles) covering 6 m and an average weight not less than 8.57 Kg (plus or minus 5 %) incl handle and spike at both ends of coil erected in position on top of mild steel angle by fixing with 1.70 mm GI wire for securing, coil with fish hook bars, incl necessary welding to MS Sections etc all as specified and directed. 126 GREEN BUILDING NORMS(GRIHA CONCEPT)Supply and Install Organic Waste Converter fully automatic having capacity 50Kg/day, having internal tank made of high quality stainless steel while external panels are powder coated for enhanced product life with necessary electric control panel, cabling necessary civil works for installing machine etc with following requirements:-Type of machine: Fulley automatic in-vessel composterComposting method: 24 Hrs. Micro-organisms-based compostingmachine Type of microganism used: Heat resistant thermophilic bacteria Final Output: Dry organic Soil conditioner/Soil supplementsCycle time: 24Hrs Volume reduction in 24Hrs: 80-85% Internal tank: Stainless steel type Main agitator Shaft: Stainless steel type Input voltage: 415VSpecial features: VFD as standard across all models, Touchscreen standards Daily waste processing: 150Kgs Rated capacity: 7KWPower consumption (KWH par cycle): 13-15Length: 1650, Width: 850,Height: 1455 127 Supply, installation, testing and commissioning Three phase energy meter with the following specifications: Microprocessor based three phase, smart electricity meter, equipped with a bi-directional cellular (NB-IoT) communication that allows it to interact with the head end system (HES) for data collection and configuration with adequate security including electronic static pre paid cum postpaid energy meter rating 415 Volts, 50 Hz of range 10-100 Amps, complying to IS16444:2015 (reaffrimed 2020) and conforming to IS 3779 with LED display and parameters like Voltage, Current, Frequency, Power, Power factor, KWH/KVA, default in built dual source, inbuilt long range (LORAWAN) Communication suitable for outdoor LoRa data accumulator and also compatible for Prepaid and Postpaid online energy monitoring billing system with disconnection /reconnection through remote software / data export to ERP complete with 5 Years warranty.Note:(a) The contractor would be responsible for removing the existing meter, noting down the reading and depositing it with the MES AGE E/M store complete all as specified & directed.(b) The Energy Meter to be capable of running in both prepaid and postpaid mode.(c) The meters to carry 5 year warranty. (for entire system) 128 Supplying, Fixing, Commissioning and testing of configuration of cloud Hosted multi user web based software with following modules:(i) Head End System (HES): to acquire meter data automatically from DCU sand monitor parameters acquired from meters.(ii) Meter Data Management ModuleThe meter data management module would be responsible for collecting the data from the data concentrator and make the data available to the billing system. The system would support offline meter(a) 30 min instantaneous data from all the meters for seven parameters Cumulative Energy. Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency(b) Monthly billing survey data for cumulative energy and max demand(iii) Billing Module: The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data/billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid and prepaid functionality as required.(iv) Occupation and Vacation Module: The system would support occupation/vacation based on the unit catagories. The system would support automatic data capture on occupation and vacation events.(v) Website: There would be a dedicated website forAGE/GE and BSO team to view all the data and information alongwith customer portal for use of customer. The designated users in MES would have the admin access to the application. The MES Staff would also have the access to the key information on mobile App (AndroiandiOS based) for admin use complete all as specified and directed.(vi) Customer Module: The system would include a customer portal for the resident/occupants to login and view their own energy /billing data and recharge facility. There shall be consumer App (Android and iOS based) also to log in and view their own energy/billing data and recharge facility.(vii) Communication Module :The system would provide communication of energy data and bills via print, email and sms methods. 129 (viii) Meter Master Data: The system would support meter data repository. The system would support meter replacement process.(ix) Excel Export: the system would support export of metering and billing data in excel and pdf format.(x) Energy Accounting module: The system would include features of energy accounting, the system would to able to account for total energy block wise, facility wise and would also allow calculations of the unaccounted energy in case total energy meter is also available.(xi) Prepayment/Recharging Facility:The system should periodically monitor the energy consumption of prepaid consumers and decrease the available credit based on the consumption. The system should allow online/digital recharging through consumer App (Androidand iOSbased) and Web portal. The configuration and necessary arrangement for payment gateway and E-MRO facility shall be deemed to be included in the quoted rate. The system should sendconnect/disconnect command on the basis of available credit.Low credit alarm: The system will give an alarm over the consumer App and SMS to the registered mobile number in case the credit in the meter goes down be low apredefined limit.Emergency credit: The meter will work even when the credit falls down to zero to prevent disconnection. This limit shall be configurable. The system should support happy hours inorder to prevent disconnection in non working hours and on holidays. The Happy hours should be configurable complete all as specified and directed. 130 Supply, Installation, Testing and Commissioning of DCUs/Gateways and the arrangement of Sim cards or Internet to enable reliable medium for two-way communication between Smart Meter & HES. The data acquisition (Push/Pull) frequency shall be, configurable. It shall push events such as tamper, power off etc. to HES immediately on occurrence/receipt from meters. It shall have provision for the cellular, WiFi and Ethernet communication for the backhaul to HES. It shall be capable to handle data of minimum 1000 Nos. of any type of smart meter (1ph/3ph).It shall be able to communicate with the nearest meters at a distance of at least 500 m, depending on topographical features. Communication of the nearest meters with other meters shall be established through appropriate mesh formation. RF Mesh shall support self-forming and self-healing features. The equipment shall be weather proof and dust proof (minimum rating: IP54 for indoor and IP65 for outdoor installation). It shall have rechargeable battery with backup for 1(one) hour for normal meter reading, to push tamper event, carry out on demand reading, etc complete all as specified and directed. 131 Hosting GPRS (4G) charges for Gateway for five years from the date of completion F Including 2 years waranty and 2 years Maintinance after warranty) Make:-Airtel/Jio/Vodafone 132 Supply and installation of digital Water flow meter 50mm suitable for domestic and commercial applications complete all as specified and directed. 133 Supply and installation of digital Water flow meter 40mm suitable for domestic and commercial applications complete all as specified and directed. 134 ARBORICULTUREM & L for excavation of pits size 30cm x 30cm x 30cm in loose soil and filling the pit with mixture of river sand and approved top soil in the proportion of 1:3 mixed with 30% of cow dung powder, 100gms of bone meal and 100gm of neem cake powder 135 All as per item No 13.121 above but pit size 60cm x 60cm x 60cm 136 Supplying and planting red palm or royal palm healthy sapling having 45cm height and shall have a minimum height of 65cm after 6 months 137 Supplying and planting coconut tree healthy sapling having 75cm height and shall have a minimum 95cm after 6 months. 138 Supplying and planting flower plants(Champa/ hybrid hibiscus/ Hybrid west Indian Jasmine/ Hybrid Plumeria white plant/ Panama yellow plant/ Oleander) healthy sapling having 10cm minimum height and shall have a minimum 25cm to 30cm height after 6 months. 139 Supplying and planting phylanthus healthy sapling having 15cm to 30cm height and shall have a minimum 45cm height after 6 months. 140 Supplying and planting bougainvillea colour flower plants healthy sapling having 15cm to 30cm height and shall have a minimum 45cm height after 6 months. 141 Supplying and planting song of India flower plants healthy sapling having 15cm to 30cm height and shall have a minimum 45cm height after 6 months. 142 Supplying and planting dracaena flower plants healthy sapling having 15cm to 30 cm height and shall have a minimum 60cm height after 6 months. 143 Supply and planting mexican grass including providing manure as directed. 144 PILE FOUNDATIONBoring 450 mm dia piles to any depthin any type of soil/ strata by anyapproved method, complete all as shown on drawings and as specified anddirected.Note:- The quoted rate shall include for mobilization and demobilisation of piling equipment, making approaches to site or point of pile boring if necessary. Nothing extra shall be paid on this account. 145 Boring for bored cast in situ pile 600 mm dia to any depth through any type of soil / strata, using DMC method (Direct Mud Circulation)and getting out & disposal of spoil to any distance outside of MD land , complete all as specified and as directedby the EngineerIn Charge 146 M & L Reinforced cement concrete of grade M-35 design mix (RMC) as per IS-456using 20 mm graded stone aggregate in cast in situ DMC bored pile of any length / any sectionscomplete all as specified and as shown on drg 147 M & L Reinforced cement concrete of grade M-35 design mix (RMC) as per IS-456using 20 mm graded stone aggregate in pile caps / grade beams complete all as specified and as shown on drg 148 Providing TMT bars (CRS/HCRM/CRM) in reinforcement 10 mm dia and over for bored cast in situ piles of any length and any dia all as shown on drgs including cut to length, bend to required shape, cranking/hooking ends if necessary and binding with and including 0.9mm dia MS wire (annealed) or welding so as to secure the bar firmly in position/ required shape complete all as specified and shown on drgs (Fe-500D). 149 Providing TMT bars (CRS/HCRM/CRM) in reinforcement 10 mm dia and over for pile caps and grade beams, cut to length, bent to shape required, hooking ends and binding with and including 0.9mm dia MS wire (annealed) or welding so as to secure the bar firmly in position/ required shape complete all as specified and shown on drgs (Fe-500D). 150 All as per item No 13.136 here-in-before but5mm dia and over upto and including 10mm dia as in helicals for piles and stirrups for grade beams complete all as specified and directed. 151 M & L for providing PCC (1:4:8) type D-2 using 40 mm graded stone aggregate for concrete layer below pile caps foundation complete all as specified and directed. 152 Formwork to sides of pile caps/ grade beams and similar work, rough finished surface of concrete flat all as specified and as directed. 153 M & L for carrying out non destructive integrity test all as per IS 2911 (Part 4) 2013 for 600 mm dia cast in situ piles including mobilising and removing the testing equipments from site after testing is completed all as specified and directed. 154 M & L for carrying out Initial Load test (vertical load test) cast in situ piles of 600 mm dia as per IS 2911 (Part 4) 2013 including mobilising and removing the testing equipments from site after testing is completed all as specified and directed.(Note :- Providing and installing test piles shall measured and paid separately) 155 M & L for carrying out Initial (lateral load test) cast in situ piles of 600 mm dia as per IS 2911 (Part 4) 2013including mobilising and removing the testing equipments from site after testing is completed all as specified and directed.(Note :- Providing and installing test piles shall measured and paid separately) 156 M & L for carrying out Initial load test ( pull outtest) of cast in situ piles of 600 mm dia as per IS 2911 (Part 4) 2013including mobilising and removing the testing equipments from site after testing is completed all as specified and directed.(Note :- Providing and installing test piles shall measured and paid separately) 157 M & L for carrying out Routine load Test (Vertical load)all as per IS 2911 (Part 4) 2013 for 600 mm dia cast in situ piles including mobilising and removing the testing equipments from site after testing is completed 158 Testing of piles (Initial load test) for 450mm dia cast in situ bored piles all as per IS including removing the testing equipments from the site after testing is completed all asspecified and as directed
Contract Date : 23 Jul, 2025   |   Contract Value : 57.42 Crore
BRR : 9545191 Tender For Provision Of Solar Power Plant At Sevoke Mil Station Under Ge Sevoke Road.; 2 Design, procurement, erection, installation, testing and commisioning including connecting to local utility grid; Grid connected solar photovoltaic plant 0.8 MW output peak capacity with net billing arrangement including Solar Photovoltaic Modules,DC Cabling, Module Mounting Structures (suitable for ground mountingwith and including Soil Investigation as per OEM recommendation, RCC foundation framed structure and other connected civil work duly vetted by IIT / NIT), Array Combining Boxes, ACDB, DCDB, Lightining Protection of SPV modules and other accessories, String Inverter as Power Conditioning Unit, Weather Station and Data Monitoring system (SCADA) all as per detailed specifications given in tender documents, latest MNRE/SECI/NISE/IREDA guidelines and directions, meeting the Make in India (DCR), consisting of all requisite accessories (BOS-Balance of system) and including the following main components (NOTE : The work shall be executed directly by OEM only through contractor.) Item Continued as 1.01 to 1.45 3 (A) Photo Voltaic Module: Mono-crystalline Silicon Bifacial Solar Photovoltaic Modules of minimum 550 Wp(module power and number of modules to be selected according to available area), having cell efficiency more than 20% under standard conditions, form fill factor more than 0.76, plant performance ratio > 75%, made of high transmitivity glass front surface and it shall give high encapsulation gain (transmittance above 90% and bending less than 0.3%). The modules shall have the following features :(a) The electrical parameters of SPV modules under standard test condition of irradiance 1000W/sqm, AM 1.5 Spectrum and temp 25 degree Celsius shall be as under : (i) Max Peak Power Pmax : 550 Wp or more (ii) Voltage at Max Power : > 40 V (iii) Current at Pmax :> 10A 4 (iv) Short Circuit Current :> 12A (v) Open Circuit Voltage :> 47 V (vi) Module Efficiency : > 20%(b) Rated output of the modules shall have positive tolerance of 3-5% and no negative tolerance is allowed.(c) It shall perform satisfactorily in RH 85% with temperature up to +85 degree C and should withstand wind of 200 kmph on the surface of panel.(d) PV modules shall be warranted for their output peak watt capacity, and it shall not fall of its initialvalue below 90% in first 10 year end and 80% after the end of 25 years.(e) Each module shall have RFID tag encapsulated with solar cell bearing following details (i) Name of Manufacturer of SPV Module (ii) Name of Manufacturer of Solar Cell 5 (iii) Month and year of Manufacturing (separately for cell and module) (iv) Country of Origin (both cell and module) (v) Peak wattage, Im, Vm and fill factor of the module (vi) Date of year of obtaining IEC PV module qualification certificate including the test lab issuing IEC certificate. (vii) Unique serial no of model no of module (viii) IV curve of module(ix) Other relevant information on traceability of solar cells & modules(f) The temperature coefficient of power for the module shall not be more than 0.50% per degree Celsius.(g) The module must have bypass diode of suitable capacity.(h) PV module must confirm to latest edition of IEC 61215/ IS 14286. In addition the modules must confirm to IEC 61730 Part I and II for construction and testing & safety qualifications and confirming to IEC 62804 PID.(j) It shall also be in conformity to latest minimum technical specification issued by MNRE/IREDA/SECI/NISE/ALMM from time to time. Modules should be of MNRE/IREDA/SECI/NISE/ALMM approved companies and as per latest IEC/IS standards. 6 (k) RFID reader is to be provided by contractor(l) Both PV cells and SPV modules shall be made in India (DCR).(m) Each structure should have angle of inclination as per the site conditions to generate maximum power. However, to accommodate more capacity the angle inclination may be reduced to 10 - 13 Degree until the plant meets the specified performance ratio requirements.(n) Fire Points with Fire extinguisher liquefied CO2 gas of capacity 10 kg and adequate qty confirming to relevant IS or ISI mark complete as recommended by manufacturer deemed to be included in the unit rate quoted.(o) Danger Board and Rubber mat as recommended by manufacturer deemed to be included in the unit rate quoted.(p) S&F Pressure Booster pump electrically operated with minimum 3 HP 02 Nos (Running+ standby) three Phase AC Supply motor and having head not less than 20 mtr, including PCC foundation civil wokrs and necessary cable required for connection in drawn in PVC conduit heavy duty/ DWC/Electrode pipe from existing nearest point to the motor starter panel including motor starter suitable capacity,PP-R IS-15801 (Polypropylene random co-polymer) pipe 3-layer 63 mm/50 mm/32 mm/25 mm inner dia (outer green coloured UV stablilized, middle black coloured UV stabilized and innermost layer white coloured with anti-microbial property) fusion welded grade PN-10 SDR-11 ( Pressure nominal 10KGS/cm2 ) having thermal stability for hot & cold water supply including all types of plain and brass threaded PPR fittings of any size such as elbow, tees, FTA and MTA etc laid in trenches with necessary exavation, removing and returning filling work and including all accessories from the new PVC tank cap 10000 Ltrs install at proposed site for cleaning of entire solar power plant system.(q) SPV Panel is to be fixed in such a way that lower portion of the Panel remains atleast above 1.5 mtr of finished reflecting surface and cost deemed to be included in the quoted rates. 7 (B) Junction Boxes: Junction boxes of suitable Nos (as per design)/OEM recommendations inputs and suitably rated out put having separate DCfuses for both (+)&(-) on input and isolator on output terminal for each string.Each junction box must have as pare input terminal.The junction boxes shall be dust and vermin proof and water proof made of FRP/ Thermo Plast with IP 65 protection in compliance with IEC 62208 and shall be UV resistant, fire retardant. It shall have surge protection and maintenance free earthing as per relevant standard. The junction box shall have suitable arrangement of the following: (a) The strings are required to be connected to the copper bus bar through individual fuses. (b) Provide arrangement for disconnection (DC dis-connection switch) for each SJB/ SCB. (c) To provide a test point for each sub group for quick fault location and to provide group array isolation. (d) Each array box shall be of relevant IEC standard. (e) Each array junction box shall have suitable bypass & reverse blocking diodes for minimum DC blocking voltage of 1000V with suitable arrangement of its connection. Reverse blocking and bypass diodes shall work for extreme temperatures and shall have efficiency of 99.98% confirmed by appropriate IEC standard. 8 (C) DC Cables: Suitable size of XLPE insulated tinned Copper cable (min 10 sqmm) of solar grade, 1100 Volts and UV resistant for outdoor installations confirming to IEC : 60227/15694 & 60502/ IS : 1554 (Pt I&II)) and shall be as under : (a) All cables and connectors must be as per IS/IEC standards and shall be able to withstand harsh environmental conditions including high temperature, UV radiations, rain, dirt, burial and attack by moss and microbes for 25 years and voltage as per latest IEC/IS. (b) All the cables / wires shall be provided with UV resistant printed ferrules for DC wires. (c) The size of the cable shall be such that average voltage drop at full power from PV module to inverter shall be less than 1.5%. (d) Cable batch No., Drum No, IS code and size and make shall be mentioned on every one meter or as per OEM practice. (e) The wiring of the module interconnection shall be in UPVC/HDPE pipe of suitable size. (f) The cost of interconnecting DC Copper cable, MS cable trays, MS cable trays suitable to accommodate Solar grade cables from SPV module to inverter are included in the item. 9 (g) Boring of holes under road, pavement, hard standing by trenchless technology (HDD) GI protection pipe up to 100 mm bore (dia), maximum 2.5 metre below of apron areain ant type of soilcomplete.Note : (i) All the precaution to be taken by the contractor before drilling the bore. The contractor has to take plan of existing cables any type and pipe line in existing area before drilling the bore. (ii) Any damage to existing cables any type and pipe line in the way of drilling the bore will be repaired and make good by the contractor within 24 hours. No extra cost will be paid in this account. (iii) Contractor has to get the survey of route, length and depth for boring before quoting the rate. (iv) Connected items like HDPE/PPR/DWCPE pipes, exavation, removing, return filing, channel, any type of metal work is not measured and paid separately under relevant items.(D) Module Mounting Structure (MMS) (Suitable for ground mounting on any type of soil condition) :Design, procure, fixing, support structure made of hot dipped galvanised steel with min 85 micron thickness including necessary PCC / RCC foundation and associated work (cutting, grounding, PCC filling, disposing waste material,etc., complete) and fixing mounting arrangement suitable for SPV modules so as it can with stand wind speed of 170 km per hour & minimum yield strength off 250 MPa. The mounting structure is to be installed on ground. Mounting structures to be so designed that maximum load is directly on ground. It shall also observe minimum space without sacrificing the out put of SPV panels & adequate spacing between the arrays shall be available for easy cleaning and maintenance. Nuts, bolts, protected from the atmosphere and weather mounting structure shall have to be adequately of Stainless Steel of grade SS316. 10 NOTES :- (a) Two numbers of anti theft fasteners of Stainless Steel on two diagonally opposite corners of each module shall be provided. (b) Module mounting structure shall be fitted to provide maximum generation. (c) MMS design shall be supported with Staddpro Report vetted by Third Party (Gov Institute) and submitted for the approval of the Accepting Officer. (d) The height of approved design MMS for solar power plant shall be as per latest MNRE/IREDA/SECI/ NISE guidelines. (e)Minimum grade of RCC M-25, design mix (using 20mm graded crushed stone aggregate includingTMT bar as per design, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete and other connected works as per design and OEM recommendation. Civil work shall be designed through approved consultant of MES as per latest MNRE/IREDA/SECI/ NISE guidelines and vetted by IIT / NIT.(E) Lightning Protection forentire Solar Power Plant (i.e PV Array, Inverter etc) : Design, procure and fix lighting arrestor system confirming toIS/ IEC-62305(Part1-4)on the ground. The air terminal shall be fixed at the top of MS pole with base so as to beat least two meter above the pole to be protected. Its height above 9 mtr level shall be depend upon the level of protection and protection radii required. 11 NOTES :-(i) The cost of all equipments, MS Pole, Copper strip upto earth test point,LA, etc., shall be deemed to be included in this item. (ii) The cost of sufficient earthing for lightning protection is also included in this item to be provided by Engr-in-charge. and no extra payment will be made to the contractor on this account (iii) The complete system shall include chemical earthing (as per OEM recommendations) and earth strip/cable etc for earth of SPV module, array, inverter,DC & AC boxes and for LA etc as per latest IS/MNRE/IREDA/NISE/SECI/ALMM specifications and guidelines.No separate cost of the same is included in the schedule and amount will be paid to the contractor on this account. In case of any dispute, decision of Engr in charge will be final, conclusive and binding to contractor. (The earthing shall be of copper earth plate and having specification as per SSR Item Sr 19474). Earth resistance shall not be more than 3 Ohms. (iv)Separate LA arrangement & the design document of the same shall also be submitted. (v) The protection against induced high voltage shall be provided by the use of metal oxide varistors and suitable earthing such that induced transient find and alternate route to earth. (vI) SPV Power Plant shall be provided with lightening and over voltage protection. (vii) Internal surge protection shall consist of three MOV type surge-arrestors connected from +ve abd +ve terminals to earth (via Y arrangement) 12 (F)Power Conditioning Unit: Procure, fixing, testing and commissioning of minimum 4 (Four) unitswith overall not less than 800 KW output on 11 KV AC supply, Solar-power inverter suitable for without DC power of Solar PV module/ array with AC output further feeding to grid confirming to IEC:61683 for efficiency, IEC:62109-1 or equivalent for safety and IEC:62093 for reliability. The input DC & output AC technical specification of Inverter are as under :Input (DC) (a) Max Absolute DC input Voltage : 1000 V (b) Start-up DC input voltage : 200 - 500 V (Default 420V) (c) Operating input DC voltage range : 200 - 1000 V (d) No of independent MPPT : One (e) MPPT input DC voltage range at Pacr : 180 - 1000 V DC (f) Max input DC Current : As per design. (g) AC grid connection type : 3Phase (4W + PE) (h) AC output power : As per design. (j) Max AC output Apperant power : As per design. (k) Max AC output Current : As per design. (l) Max AC fault current : As per design. 13 (m) Nominal Output Voltage : 800 Volts AC 3phase or as per the design of Solar Stepup Transformer (n) Output voltage range :± 10% (o) Output Frequency : 50 Hz ± 3Hz (p) Power factor : > 0.99 (q) Harmonic Distortion Current : < 3% (r) Efficiency : > 98% (s) Standby operation consumption : < 1.5 W(t) Operating temperature upto 85 degree centigrade (u) The Copper based inverter shall have minimum IP-67 protection, ground fault monitoring, reverse polarity protection, anti-islanding, DC reverse polarity, AC and DC short circuit current and over current, AC and DC over voltage and over temperature. 14 (v) The inverter shall adjust voltage and frequency levels to suit the grid. (w) The inverter shall be self commulated with Pulse Width Modulation (PWM) technology and shall be capable of synchronise maximum with in one min. (x) Maximum Power Point Tracker (MPPT) confirming to IEC 62093 shall be integrated in the inverter to maximise the energy drawn from the PV array (y) Monolithic design of inverter is not permitted. (z) Shall have anti-Islanding features. (aa) The inverter shall have suitble nos of protected inputs (asper design) and outgoing shall be protected by ACB/MCCB. (ab) The inverter should have MODBUS, PROFIBUS, ETHERNET common ports. (ac)The inverte rshall include appropriate self protection and self diagnostic features to protect itself and the PV array fromthedamageintheeventof invertercomponent failureor fromparametersbeyondtheinverterssafeoperatingduetointernaland/orexternalcauses. Invertershallhaveprotectionarrangementagainst ground leakage faults, over voltage, (SPD) & over current. Inverter shall have arrangement for adjustment for adjusting DC input current and shall trip against sustainable fault down stream and shall not restart till fault is rectified. (ad) The inverter should have provisions of Galvanic isolation, anti-islanding protection (IEEE 1547/UL 1741) equivalent IS and lightening. (ae) PCU must have the feature to work in tandem with other similar PCUs and be able to be successively switched ON and OFF automatically based on solar radiation variations during the day. (af) Minimum Warranty of Inverter- 12(Twelve) Years and defect liability period deemed to amended accordingly for the said item. 15 (G)ACDB : Outdoor type powder coated weather proof,vermin proof made out of CRCA sheet front open able door, lockingarrangement, including suitable working space in DCDB busbar chamber, cable box chamber including Copper busbar of designed capacity /bus raisers suitable capacities with PVC sleeves/tape RYB colour for phases identification, including all bus raiser shall be extend upto cable box chamber fixed on fibre insulation for RYB & neutral to all out going cable, confirming to IP-65 and fixed on wall / floor with control wiring with comprising cable gland brass, copper lugs etc. and comprising the following as per design :- (i) MCCB 4Pmicroprocessor based for outgoing (ii) MCCB 4Pmicroprocessor based for incoming (iii) AC type 2 Surge Protection Device (iv) Spreader Terminals as per requirement (v) Multifunction meter (vi) CT of suitable ratio(vii) Copper busbar chamber (ix) The earthing shall be of copper earth plate and having specification as per SSR Item Sr 19474).Earth resistance shall not be more than 3 Ohms. 16 (H) DCDB:- Outdoor type powder coated, weather proof, dust proof,vermin proof made out in CRCA sheet front open able door, looking arrangement, including suitable working space in DCDB busbar chamber,cable box chamber including copper bus raisers with PVC sleeves/ tape RYB coloursfor phase identification, including all bus raiser shall be extend upto cable box chamber, confirming to IP-65 and fixed on wall /floor with contral wiring with comprising cable gland brass, copper lugs etc. (i) MCCB as per requirement (ii) Fuse as per requirement (iii) Copper busbar chamber. (I) Weather Monitoring System Pyranometer : The pyranometer (ISO 9060 classification ) alongwith necessary assessories for measuring incidental solar radiation at horizontal and inclined plane of array. Specifications of the pyranometer shall be as follows :- (i) Spectral response : 031 to 2.8 micron,(ii) Time response (95%). Max 15 second 17 (iii)Nonlinearity + 0.5% (iv) Temperature response : - 2%(v) Tilt error <+/- 0.5% (vi)Zero offset themal radiation +7W/Sqm (vii) Zero offset temperature change + 2 W/Sqm(viii) Operating temperature range - O °C to 80°C(ix) Non stabillity Maximum - 0.8%,(x) Resolution minimum +/-1 W/Sqm (xi)Output Analog 4.50mA (xii) Digital RS 485(xiii) The earthing shall be of copper earth plate and having specification as per SSR Item Sr 19474).Earth resistance shall not be more than 3 Ohms. 18 (J)Balance of System(BOS) Items/ Components:TheBOSitems/componentsof theSPVpowerplants/systems deployed under this project shall conform to the latest edition with certificate of IEC or equivalent BIS Standards/MNRE specifications/ as specified in Para 1.01 of Minimal Technical Requirements/ Standards for SPV System/Plants to be deployed during this financial year under the programmes of MNRE available on MNRE website as on last date of quoting of tender. Notes:(i) The contractor must visit the site before quoting the rates for this item to assess the site condition so as to decide up on location and layout of SPV, placement of inverter, length of DC cables, lightning arresters, etc., complete. (ii) The contractor shall submit complete scheme including electrical diagram of the work, schematic diagram, SPV module layout, placement of LAs, Civil work, etc., complete as per IREDA/ SECI/NISE/MNRE/ALMM latest guidelines as applicable, Relevant IEC/IS norms to the GE for approval with in one month of date of commencement of the work. (iii) The rate quoted is deemed to be inclusive of the all protection system including surge, lightning arresters and necessary earthing all as specified and directed. 19 (K) Remote monitoring system (SCADA) for solar power plant complete with all electronic andelectricial partswith andincluding all necessary software and hardware etc to make fully functional connected to LED monitor (55 inches) with complete plant parameters as required and operate the system from remote and Other Accessories includingandThe system will be controlled from the main control room where all the data from different parts of the plant shallbe received, analyzed and action taken either manually or on auto as per the system design by OEM . The SCADA shallhave remote monitoring capability comprising with the following Items and with and including all connectedaccessories as per OEM recommendation complete:(a) Main SCADA control wall mounting panel complete with fixing arragnment like nut bolt, washers suitable size and connected items. (b) LED Moniter (55. inches) with mouse, key board, CPU (Minimum 1 TB storage alongwith 12 GB RAM, i7 processor), key pad and single phaseUPS 10 KVA with 12 Volt battery, 14400 Ah battery bank with rack and required battery backup should not be less than 4 Hrs inside control room.(c)“SCADA System shall be audited for Cyber Security by CERT certified firms at the time of commissioning. Subsequent cyber security audit shall be carried out after every 03 years and cost of audit and rectification shall be born by the contractor” 20 The Contractor shall provide following defined user access levels, unless otherwise instructed by the Engineer-in-Charge: -• Normal viewing only (default level) The default level shallpermit users to view al displays except those specifically assigned to a higher level of access.• Dally Access The daily access level shall allow viewing (ie default an printing at trend displays.• Operator Level (Remote Control) The operator level shall permit authorised users to access lower levels a and to carry out the following actions:- Perform control actions Acknowledge alarmsEnter or modify manually-entered data for inclusion in thereports.• Monthly and Yearly Data Archiving The level shall permit authorised users to access lower levels and shall provide the facility to download specific data to long ten data storage for archive purposes(d)The SCADA software shall be of a proven design and reliable, and conforming to industrial standards and shall: -• Support multiple makes of RTU/ Microprocessor controller/ transmitters and models and provide required software features needed to easily adapt a device whichshall not be supported as standard to the SCADA system. 21 • RTU/ PLC/ Microprocessor base controllers and transmitters shall have an expandable architecture and scalability to provide future capacity increases in SCADA system as well as meet present needs of the administration, provide multi-level security and password mechanisms to prevent use of the system by unauthorised persons. The access privilege of authorised users shall be defined separately and permission shall be provided to the users only to access areas concerning them, provide an on-line operatingenvironment.• Adding a new RTUI Microprocessor based Controller to the SCADA system or changing configuration of the existing RTUs/ Microprocessor based controller shall not result in stopping or hinder working order of SCADA system.• The Contractor shall specify maximum number of data which shall be achieved by the system without any performance loss. The Contractor shall conduct necessary tests to prove maximum number of data points achieved. The Contractor shall also be responsible to create additional data points necessary for conducting such tests. Any AutoCAD graphics shall be able to be converted to process diagrams and shall be re-loaded and operated after completion of all works and during tests.(e)The Contractor shall hand over to MES the SCADA and application software (as CDs or DVDs) necessary for re-loading software to the system in case of failures The CDs or DVDs shall be provided after making the necessary tests. The operating system ofrouters and work stations shall be of an architecture that provides a multi-tasking operating environment, and SCADA software shall also be multi-tasking. Therefore multiple tasks such as receiving measurement results from devices, displaying these results on computer screen. storing on a computer disk, sensing alarm conditions that may occur based on measurement results, and displaying them to users, generating reports from collected data, and printing them cut, transferring issued commands to Microprocessor controllers/ RTUs/ PLC, that SCADA software is supposed to execute shall be handled simultaneously without one task waiting for another. 22 To configureSCADA software or to change the system configuration, definitions shall be either defined directly by using a keyboard or another interactive tool or mechanisms that allow importing of configuration definitions from a text file created with a text editor. The database configuration shall be provided by means of an interactive program that contains menus or similar approaches and shall be easy to use The database configuration definition program, when required, shall be capable of extracting definitions related to the configuration from information created in text format to use as definitions for configuration The following shall be possible online without interruption or hindering of usual operations: -•Adding an RTU to the SCADA system.•Deleting an RTU from the SCADA system•Changing configuration information related to an existing RTU definition.•Modifying definitions in database containing information about measurement and control points.•Creating screen pictures which offer operators to monitor and control the SCADA system.•Similar configuration changes. 23 (f)SCADA software shall be upgradeable to new versions with an automatic mechanism to be provided by the Contractor. The old version of software shall be overwritten by new version without resulting in a change in any of the definitions created in previous version, nor disturbing the operational logic defined in previous version. Al! text being available on the screen shall be in English language The database shall be configured on-line when the SCADA system shall be in operation. The changes on existing definitions or new definitions related to database shall be made when the data collection n and control functions are being performed. The SCADA Software shall be operated using the database that shall be resident in the memory(g)Data Exchange The control system shall provide a method of real-time data exchange with different application programs like Geo Information System (GIS). relational database, third party spreadsheet packages, report generation and graphical simulation packages.(h) Historical Data Management An historical data management (HDM) system shall be provided for archive, storage and retrieval of operational data comprising field input data, manually-entered data and calculated points Archived historical data shall minimally include averages, minima and maxima for each analogue value compiled over hourly. daily and monthly time periods, with a minimum capacity of 1o00 points. The HDM system shall be capable of selectively increasing the rate of data capture based on events, such as process variable status, discrete inputs, or operator command. Minimum and-maximum data shall include the time and date of occurrence. Gaps in collected data caused by faulty instruments or control system equipment shall not be included in average). minimum and maximum compilations. 24 (j) Report GenerationThe system shall be provided with a report generator utility which shall enable authorised users to create, delete or modify report definitions The report definitions shall allow for retrieval of data from on-line database and farm historical data files and for formatting data for output to printer. The format of each report shall be definable by user to include the definition of static or background data, placement of data base values, number of significant digits of a value, date and time of report and calculated values(k)Graphic Display GenerationThe system shall be provided with an interactive on-screen graphic generation utility which shall allow an authorised user to create new graphic displays and modify or delete existing displays at any work station including those associated with the LCP/ outstations. The generation utility shall include an interactive linkage process allowing user to link symbolic, numeric and bar graph representations and data entry locations to dynamic data base variables. The graphic display system shall be capable of making full use of the VDU resolution in the composition and display of graphic information. Graphic symbols shall be definable by the user for display of static and dynamic data. The user shall be able to as5emble a library of symbols which shall be retrievable into any graphic display. Text and symbols shall be able to be enlarged, shrunk, moved, mirrored or related with reference to a given display. The system shall be able to represent dynamic analogue data on a graphic display as a variable-length, sizeable bar graph, as well as numeric text. 25 (l)DisplaysGeneral all displays, excepting those containing data derived from historical files, shall be completely displayed within two seconds of the operators request. Dynamic data shall be continuously updated while being displayed. All screen displays shall provide following displays which shall be fixed in their locations to normal operations:• Alarm banner window at bottom of the screen display showing last three highestpriority unaccepted alarms. Where the system allows contents of banner to be limited (eg by user name or group) then the selection criteria applied shall be displayed with the banner.• Main display area for user selected displays e.g. mimics, alarm lists, etc.• System dialogue banner window at bottom of the screen shall display relevant system information such as error message and user prompts 26 •A day, date and time indicator shall be able to show local time an alarm bannerarea shall be included on all displays which provide information regarding most resentalarm events. The system shall allow operator to obtain details of most recent alarm event from any operational screen display through direct operation using a maximum oftwo keystrokes or selections. The system shall allow the operator to obtain a print of any display, including graphics through use of a standard system command. Screen displays shall appear identical incorporated form Dynamic data contained on a display shall not change during screen print Such that a snapshot of conditions is portrayed. Each display shall include time of day in hoursminutes and seconds and date in day, month and year format.•A facility shall be provided which allows paging to related displays through the use of ‘page forward or backward keys, or through the use of pick points(m) Suitable size of HT & LT XLPE insulated screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 11000 Volts and 1100 Volts grade with stranded aluminium / copper conductor of size as per OEM recommendation and approved design ISI markedincluding cable glands, lugs, jointing kit etc. to suit the cable size and to be laid in trenches, fixed along pole, under floors, through GI pipe laid under floors/roads, through concealed GI pipe along wall etc.with all fixing & connecting accessories and necessary earthwork, civil work deemed to be included in quoted rates of the above items.(n)Generic Displays.The system shall produce various generic displays automatically 27 Metering arrangements: (A)Suitable bi-directional metering arrangements with recording facility shall be provided as per the norms of WBSEDCL. The metering arrangements must have feature to measure and record, (i)Parameters of KW, KWh, KVAR, voltage, current, PF and any other metering required to determine efficiency and efficacy of the system. (B) LT 3 Phase 4 Wire Electronic Tri vector Meter with CT ratioshould be as per capacity of SPV plant. (i) Standard: IS 13779:1999 / CBIP 88 (ii) Accuracy: Class 0.5 (ii) The metering arrangement shall have inbuilt Solar PV Plant synchronisation features. (iii) Reference Voltage - 3x240 V (iv) Basic Current (Ib)- 5 A (v) Maximum continuous current (Imax) - 10 A (vi) Rated Frequency (variation) - 50Hz (±5%) 28 (vii) Power consumption:- Voltage circuit: Less than 1.5 W and 10 VA per Phase at reference voltage, reference temperature and reference frequency Current circuit: Less than 1 VA per phase at basic current, reference frequency and reference temperature (viii) Display type: 8 digit 7 segment backlit LCD display, not less than10 mm character height (ix) Display in the event of Power Failure: Internal battery back-up for LCD display (x)Communication port: Galvanically isolated Optical Communication port for data transfer through either CMRI or remote device or both is providedwith RS 485 for DLMS protocol (C) CT/PT operatedenergy meter with following features (i) True four quadrant metering (iii) Time and day metering with maximum demand registration and automatic billing (iv) LCD display with announciators for various critical events (v) Scroll lock feature for continuous display of a desired parameter on display (vi) High resolution energy display mode for dial test (vii) DLMS protocol for meter reading, with option to remote reading port. 29 (viii) Advanced event detection features for voltage, current and magnetic influence (ix) Meter reading in absence of mains, using internal battery. (x)Power Manager Device Nano type with 4 inverter support with energy monitoring, zero export control, Load Management having RS-485 communication port, ethernet including RS 485 cable core size 0.5-1.5 Sqmm to establish communication between inverters, SCADA and sensor as per OEM recommendation with and including all connectedaccessoriesdeemed to be included quoted rates.(xi) Digital WIND SPEED SENSOR withminimum 3 cup Anemometer range 0 to 70 Mtr/ Sec distance constant 2.5 Mtrs output TTL Pulses output proportional to wind speed and diameter of cup 50mm with brass housing and stainless stell shaft(xii) WIND DIRECTIONSENSOR with wind vane and sensing vain coupledto linear endlsess potentio meter IP 67, range 0-357degrees, operating temperature -40 to +60 degrees celsiuswith brass housing and stainless stell shaft and aluminium vane complete 30 (xiii) AIR TEMPERATURE SENSOR withRTD sensing element PT100 mounted inside a weather shield duly coated with weather proof reflective white paint , range -40 degree to +60 degree celsius with nylon body housingwith weather shield and brass stem to mount the sensor, includingpower requirment 5 Volt DC complete. (xiv) MODULE TEMPERATURE SENSOR Model PT 1000 measuring range -40 Degreeto + 80 Degree Celcius with suitable ouput as required and directed on site and mounting on RTD encapsulated in suitable housing including connecting cables as required complete.(xv)Tipping Bucket Rain Gauge with Magnet and Red Switch type Sensing, rim diameter 203 mm and collecting are 335 MM SQ, Rain gauge shell made up of FRP bucket and mounting made up of stainless steel SS316 and unlimted capacity,including connecting cables as required complete.(xvi)SOLAR Radition Sensor ARN 8101 with 72 element thermo pile sensor and spectral range 0.3 to 3 Micro Mtrs and sensitivity 20 Micro Volt/ W/M², range 0 to 1500W/SQM & output 0 to 25 milli Volt and operating temp -10 to 70 Degree Celsiusincluding connecting cables as required complete with all fixing arrangment and necessary civil work complete with including all connectedaccessories as per OEM recommendation/Designcomplete: 31 (L)Step up solar transformer (800 volt/11 KV)” - Design,procure,erection, installation, testing and commisioning including connecting to local utility grid :Oil filled Type 3 phase, 50 Hz, ONAN cooling type, vector group of appropriatetype, number of load voltage Ratio: number of Phases / Freq.: 3 Phase / 50 Hz., Sealed type Copper wound Transformer with Off Load Tap Changing Arrangement on HV side in steps of 2.5% , +5% to -10% having cable end boxes on HV side suitable for 3 Crore X 300 Sq. mm. XLPE cable of 11 kV grade on HT side and LV side complete with all accessories like buchholz relay, Oil temperature indication, winding temperature indication and alarm etc preferbly DMCR Protection Relay i/c first filling of filtered dehydrated K Class natural Ester Oil bioTransol (as per IS 16659) and confirming to IS 1180 and losses shall be as energyefficiency Level 3 only & 100% load phase, with an impedence of 6.25% i/c as per specification below complete in all respects as required at site. Design ambient to be considered as 50 Deg C.All the balance parameter like temp rise, Basic insulation level, flux density etc shall be strictly in accordance with IS 1180 Part - 1 only including necessary earth work, PCC plinth foundation etc.Heat Run Test is the mandotary test for each Transformer.Standard: The equipment shall conform to the latest edition of applicable standards as follows. In case of conflict between applicable standards and this specification, this specification shall govern.• IS 2026 Standard for Oil filled Transformer• IS:3639 for Fittings and Accessories• IS:2099 for Bushings > 1000 V• IS:7421 for Bushings < 1000 V• IS:1271 for Electrical Insulation classified by Thermal stability• IEC 62770 Natural Ester Oil• CBIP Guidelines 32 (xvii) CORE : Transformer shall be double wound, core type with low loss, non-ageing, high permeability PRIMEGRADE, CRGO with M4 Grade or Better, perfectly insulated and clamped to minimize noise and vibrations. Followings should be Mandatory for any manufacturer: -(a) Transformer shall be of BOLTLESS core design.(b) Core shall be purchased Directly from Manufacturer or from their accreditedMarketingorganization of Repute & not through any agent. Bidder has to submit manufacturer’s name during bidding having sufficient credential & Core has to be purchased from the approved manufacturer.(c) Stage inspection of the core shall be done at manufacturer’s premises & inspection call shall be given with following Documents: (i) Invoice of the supplier (ii) Mill’s test certificate (iii) Packing list (iv) Bill of landing & Bill of Entry certificate by customs(d) Transformer manufacturer should have in-house core cutting facilities for proper control & monitoring of quality & to avoid mixing of Prime core with Second grade /defective core materials. Transformer Manufacturer should have in-house slitting Machine so that core is cut to width & stacked with minimum air gap thus ensuring Burr level less than 10Microns.(e) Core shall be procured from one of these reputed Manufacturers : Posco / Nippon/ Novex/ Ak Steels.(f) The insulation structure for the core to bolts and core to clamp plates shall be such as to withstand a voltage of 2000V for one minute. 33 (xviii)Tank:Tank should be of corrugated wall construction type. The exterior of tank and other steel surfaces exposed to the weather shall be thoroughly cleaned and have a priming coat of zinc chromate applied. The second coat shall be of an oil and weather-resistant nature, preferably of distinct colour from the prime and finish coats. The final coat shall be of a flossy, oil and weather resisting non-fading paint of specified shade. The interior of the tank shall be cleaned by shot blasting and painting with two coats of heat resistant and oil insoluble paint.Winding:(a) Winding shall be made with 99.9% pure electrolytic grade copper, insulated with thermally upgraded paper (Insulation Class A / Conductor Turn Insulation-Class E).The HV & LV winding should be able withstand thermal and mechanical stress in the event of short circuit.(b)Winding shall be carried in dust free area(c) The completed core and coil assembly shall be dried in vacuum and shall be immediately impregnated with oil after the drying process to ensure elimination of air and moisture within the insulation.Oil type: TransformerTransformer oil shall be as per IS-335:1993. It shall be natural/synthetic ester oil. The material safety Data Sheets (MSDS) for the Transformer oil shall be submitted by the bidder along with the offer Temperature Indicator:One set of winding temperature indicators with necessary current transformer, heating coil and a detector element and one set of oil temperature indicator with maximum reading pointer shall be mounted locally so as to be readable at a standing height from ground level. Each of the above indicators shall be provided with necessary contacts for alarm and trip: (a) Oil Insulation class : K class. It should also exhibit safety against fire hazards 34 (b) Cooling : ONAN(c) Vector Group: to be decided during design.(d) Percentage Impedance (Z%) 6.25 %.(e) Transformer Losses:as per IS 1180 - Level 1(2021)(f) Taps on HV for HV variation : +5 to -10 % in steps of 2.5% each (g) Termination (HV): Cable End box for11 KV cableof suitable size(h) Termination (LV): Cable connection(j) The transformer shall be supplied with following fittings:(k) Lifting lugs and Jack lifting pad support(l) Earthing terminals - to be decided during design. 35 (M)Earthing :The complete system shall include chemical earthing of required quantity for step-up Transformer (as per OEM recommendations) and earth strip/cable etc for earth of SPV module, array, inverter,DC & AC boxes and for LA etc as per latest IS/MNRE/IREDA/NISE/SECI/ALMM specifications and guidelines.No separate cost of the same is included in the schedule and amount will be paid to the contractor on this account in case of any dispute decision of Engr in charge will be final and binding to contractor. (The earthing shall be of copper earth plate and having specification as per SSR Item Sr 19474).Earth resistance shall not be more than 3 Ohms. 36 IMPORTANT NOTE FOR SOLAR POWER PLANT CONTRACT (COST DEEMED TO BE INCLUDED IN QUOTED RATES :-(1) The item specification and details given are for guidance purposes only and are likely to vary with modified / higher specification than that specified in the BoQ based on detailed site survey, solar potential assessment, design approval etc keeping the quantity of Solar inverter (PCU) and Solar Transformer same as in the BoQ. The items as per the finalized and approved design and specification, including make, shall be provided by the contractor without any extra cost to the department. All makes should be as per the latest MNRE approved list of makes and models.2.Cost of preparation of DPR design vetting from NISE/MNRE approved Institute and net billing arrangement (as per WBSEDCL) is deemed to be included in the quoted rate.3.The contractor shall submit complete design of Solar power plant, Schemetic/line drawings, detailed mounting structure array layout drawings alongwith SBC report based on the soil investigation as per OEM recommendation, Single line diagram with and including project reportand connected document shall be submitted by OEM through contractor prior to commencement of the work for approval of Accepting officer and subject to the drawing and designduly vetted by IIT/NIT (for mounting structure only) and vetted by NISE/ SECIfor entire scheme of Solar Power GenerationProject including evacuation and Net Metering arrangement complete before recommendation by GE for approval of the accepting Officer. 37 (i) The scope of works involves engineering, procurement & construction (EPC) of entire Solar Power Plant of capacity 0.8 MWp.4. The entire work shall be executed directly by OEMonly through contractor and contractor has to submit the MoU with OEM (agreement period for 25 years of entire Solar Power Plant Project) prior to commencement of work and same shall be approved byGE. 5. Boring of holes under road, pavement, hard standing by trenchless technology (HDD) GI protection pipe up to 100 mm bore (dia), maximum 2.5 metre below of apron areain any type of soilcomplete.Note : (i) All the precaution to be taken by the contractor before drilling the bore. The contractor has to take plan of existing cables any type and pipe line in existing area before drilling the bore. (ii) Any damage to existing cables any type and pipe line in the way of drilling the bore have to berepaired and made good by the contractor within 24 hours. No extra cost will be paid in this account. (iii) Contractor has to get the survey of route, length and depth for boring before quoting the rate. (iv) Connected items like HDPE/PPR/DWCPE pipes for entire Solar Power Plant Project, exavation, removing, return filing, channel, any type of metal work is deemed to be included in the quoted rate. 38 6.Cost of comprehensive maintenance as per OEM recommendation alongwith cost of spare parts required during 5 years of defect liabilty period after completion of Ph-I is deemed to be included in the quoted rate.7. Bidders attention is drawn to pre-bid conferance with department and also visit the site prior to bidding and other factor required as per OEM recommendation deemed to be included in quoted rates.8. The contractor has to carryout Pre-commissioning test of solar power plant including stepup transformer by CEI/SEI. The necessary tools and plants required for inspection of the plant shall be arranged by the contractor.and costsare inclusive in quoted rates.9. Contractor needs to know the irradiance of the location at the project before quoting. The contractor will design DCR (Make in India) for entire Solar Power Plant according to irradiance of the project location and efficiency of the components to produce the desired peak value as mentioned in the schedule i.e. 800 KW output on 11 KV AC supply and inject to the proposed RMU 11 KV. 10. During the execution of work any type of damage by elephant or monkey manance, contractor is fully responsible for protection of all solar power plant equipments including connected items i.e. PV Module, Inverter etc. No claim will be sought from the department. 39 11. All SCADA related activities viz. cables till SMBS and inverter and the requisite software and hardwarefor control room shall be included in the quoted rate.12. Vegetation Growth should be controlled by use of Deweeding Chemicals deemed to be included in Quoted Rates.13. Adequate Water Storage Facility of capacity 10000 Ltrs PVC Tank 5 Layer (with guarantee of 10 years after physical completion of work) on PCC Platform including suitable foundation for cleaning of PV Modules and suitable water drainage facilitiesfor both (Rain Water and Cleaning Water) from proposed site to existing drainage chamber is deemed to be included in the quoted rate.14. Solar Transformer fed from the Inverter should not be having odd harmonics (certificate needs to be required before physical completion of work).15.The Shutdown duration of Inverter should be monitored and recorded and analyzed. 40 16. The SPV Power Plant will be capable of generating 800 kW AC Output atleast once in a year and the AC Output of the plant will be not less than 90% of initial output by the end of 10 yearsand not less than 80% of the initial output by the end of 25 years.17. The Contractor shall operate and maintain Fire Protection System and safety equipments for the entire Solar Power Plant for 10 Years and cost of the spare is deemed to be included in the quoted rates.18.The firefighting system for the proposed power plant for fire protection shall be consisting of:a) Portable fire extinguishers in the control room for fire caused by electrical short circuitsb) Sand buckets in the control roomc) The installation of Fire Extinguishers should conform to TAC regulations and BIS standards. The fire extinguishers shall be provided for control room housing, PV array installation.19.Solar Components shall not be connected to LAN, WAN, or any Internal Data/OPS nw. 41 20.Sys with Bluetooth, GSM, Wi-Fi, or any Telemetry features should be avoided, unless explicitly cleared monitored.21. Finalization Of Feasibility Report, Design, Engineering, Transportation, Storage, Insurance, Civil Works, Erection, Testing & Commissioning etc., ensuring net-billing as per state net billing policy, quality control of grid connected.22.The Comprehensive Maintenance of SPV Plant would include wear, tear, overhauling, machine breakdown, insurance and replacement of defective modules, Inverters/PCU, spares, consumables & other partsas pe OEM reocmmendation and specification for 5 (Five) years under DLP of Phase-I..23.The Contractor shall arrange technical vetting of the plant during execution by the Cyber/INT officer and training by Unit Technical Pers till defect liability stage of Phase-I. 42 24.a) An energy meter (for net-billing) shall be installed between the solar Grid-tied inverter and the building distribution board to measure gross solar AC energy production (the Solar Generation Meter). The Solar Generation Meter shall be of the same accuracy class as the DISCOM service connection meter or as specified by local regulatory requirements. Separate for two different buildings.b) The bidder must take approval/NOC from the Concerned DISCOM for the connectivity, technical feasibility, and synchronization of SPV plant (if required).c) Contractor shall be provided system software (Cloud) for data hosting of Solar Power Plant with the Government approved agency and also audited by CERT-In (Computer Emergency respose team-India) is deemed to be included in the quoted rates. 25.a) Two sets of Engineering, electrical drawings, and Installation and O&M manuals are to be supplied. Bidders shall provide complete technical datasheets for each equipment giving details of the specifications along with make/makes in their bid along with the basic design of the power plant and power evacuation, synchronization, along with protection equipment is deemed to be included in the quoted rates. 43 b) All test and calibration certificates, wherever applicable.26. The bidder shall take entire responsibility for the electrical safety of the installation(s) and personnel, including connectivity with the grid and follow all the safety rules & regulations applicable as per local guidelines and regulations, etc. Insurance of the installers (of the vendor) working abroad is mandatory.27. (a) The bidder shall take entire responsibility for the electrical safety of the installation(s) and personnel, including connectivity with the grid and follow all the safety rules & regulations applicable as per local guidelines and regulations, etc. Insurance of the installers (of the vendor) working abroad is mandatory.(b) The contractor will carry out fortnightly, monthly, quarterly and annual maintenance as per Proforma of Appendix here-in-after respectively. In case the contractor fails to carry out the above maintenance following penalty per Solar will be imposed. 44 (i) Not carrying out maintenance fortnightly- Rs 2500.00(ii) Not carrying out maintenance Monthly- Rs 5000.00(iii) Not carrying out maintenance quarterly- Rs 7000.00(iv) Not carrying out maintenance annually - Rs 10000.00(c) The Contractor shall be responsible for ensuring production of 800 kW AC output of electricity at the injection point of RMU atleast once in a year from the SPV plant. In case the output is less than 800 kW AC unit, it will be deemed as under-designed plant. The contractor will be responsible for making good the shortfall by repair / replacement of the SPV Plant free of cost. Delay in this regard will attract monetary penalty to be amounted for the period wef very next day of the completion of Phase-I to the date of completion of rectification / replacement by multiplying the maximum value of units less generated than 800 kW AC for every day with the prevailing rate of electricity tariff of WBSEDCL Rate of electricity in West Bengal is Rs 6.52 per unit as in Sep 2025.(d) Maintenance and supervision shall be done by trained men for the safe operation of Solar’s contractor shall carry out fortnightly servicing including adjustment lubrication, repair of replacement fo parts if necessary. In addition to fortnightly servicing contractor’s senior mechanic of foreman shall carryout the inspection as per maintenance schedule and make necessary entries in the proforma attached here-in-after duly signed by Contractor & Engg-in-Charge as applicable kept in the switch room for this purpose. It will be the responsibility of the contractor to see that the maintenance schedule book is maintained properly by their senior mechanic or foreman. They shall promptly attend and call back & shall not be kept pending for more than 4 hours unless it has the prior approval of the Garrison Engineer. 45 (e) For any repairs/ replacement of Solar the contractor shall always be aware of time factor following are the fixed time (including Sunday/Holiday) for repair/replacement of parts/components/ accessories which shall be adhered to :- (i) Minor repair/ replacement- 4 hours (ii) Major repair/ replacement - 1day(f) The decision of the GE regarding Minor/Major repair shall be final conclusive and binding. In case of failure on the part of the contractor to keep the solar’s in running condition within the stipulated period mentioned in above the contractor is to pay penalty charges as mentioned below subject maximum of 10% of the total contract value and after that measurement will not be considered for the same defective Solar till it is in satisfactory working condition :-(i)Upto 12 hours @ 2000/-(ii) Above 12 Hours and up to 24 hours @ 5000/-.28. RFID Tag scanner of reputed make shall be provided by the contractor is deemed to be included in the quoted rates.29. Existing Room at 33 KV Switch Yard shall be used for SCADA/ Solar equipment/Control Room. 46 30. Surface preparation and laying of light yellow/white coloured interlocking tiles of appropriate thickness under the whole area of PV module array to make a reflecting surface for bifacial Solar PV module alongwith periodical water sprinkling arrangement for cooling of interlocking tiles is deemed to be included in the quoted rates. 31.The complete system shall include chemical earthing (as per OEM recommendations) and earth strip/cable etc for earth of SPV module, array, inverter,DC & AC boxes /LA etc as per latest IS/MNRE/IREDA/NISE/SECI/ALMM specifications and guidelines is deemed to be included in the quoted rates. Earth resistance shall not be more than 3 Ohms .32. The mounting steel structure shall be as per IS 2061-1992 and galvanizing as per IS 4759 and should withstand WIND Load as per relevant IS Code/NBC.33.Soil Stabliztion testing certificate needs to be required before completion of physical completion of work (Phase-I) so that the performance of the PV Plant is not affected in Highly Soiled areas for minimum 25 years. 47 34. M&O (Phase-II) should be finalize at the planning stage itself. The important point are as under:- (a) The thermal imaging of pv panel should be taken once a year for checking its health including hot spots.(b) The cleaning cycle of panel should be fixed as per the ratio of short circuit current falling below 0.9. The cleaning provision shoul be made available before evacuating the power.(c) The shutdown duration of inverter should be monitored and recorded and analyzed 48 Supplying, Installation, Testing & Commissioning including design, manufacture and testing at works of indoor type , IP 4X ,floor mounted metal clad, 11 KV VCB panel board totally enclosed & fully interlocked, Horizontal drawout, Horizontal isolation type breaker as per IEC-62271-100/200, as amended up to date and additional specifications, having capacities as mentioned below, single break, trip free mechanism, motor charged and manually/electrically closing breaker suitable for use on 11 KV,3 Phase, 50Hz A.C. supply with STC 25 KA for 3 Sec.Internal Arc for AFLR 25kA at rated voltage for 0.1s at individual compartments i.e. Busbar, VCB and cable compartment.complete with self contained, fully interlocked, rack in and rack out mechanism, air insulated and encapsulated copper bus bars of 800 Amps capacity, breaker featured with mechanical ON/OFF indicator with hand trip device, spring release coil, shunt trip coil and auxiliary switch of 8 NO + 8 NC andequipped with following switch gears and accessories.The panel shall be complete with following switchgear and accessories. The structure of the switchgear must be fabricated using steel sheets coatedwith Alu-Zinc (Aluminium Zinc alloy)/PRINTED CRCA All major sub-components (switchgear, relays, meter & vacuum interrupters) shall be of same make. VCB and vacuum interrupters shall be designed for 100 short circuit operations at full short circuit of 25KA. Breaker shall be roll on floor type/ CASSET TYPE. Separate earthing truck shall be required for each bus earthing & cable earthing. Earthing truck shall be so designed that it is impossible to earth a live. It shall be provided with capacitive voltage divider and complete with audio visual annunciation, one for each panel. Item Continued as 2.01 to 2.04 49 INCOMINGS & Outgoing VCBs :Type : Air insulated VCB, autoreclosing, system voltage :- 11kV + 5%, 50 Hz+ 5%, 3 phase, rated voltage : 12kV, rated current : 800A in 40 ° C ambient, Short time rating for 3 sec : 26.3 kA, Short Circuit Making Current : 65 kA, insulation level (PF rms/ impulse peak) : 35 kA/75kA, System Ground : Solidly Earthed,Duty Cycle : 0 - 0.3 sec - CO - 3 min - CO, Break/ Make time :- Not more than 5 Cycle, Range for Auxiliary voltage for Closing / Tripping / Spring Charging : 85-110%/ 70-110%/85-110%. of rated voltage. The VCB must withstand 10000 mechanical, & 100 at rated short circuit current. The breakers should have auxiliary contact 6 No+ 6 NC, in minimum. The used Breakers will comply with IEC 62271/ IS 13118. Qty. - 3 Nos (1 no Incomer & 1 outgoings)Busbar: Rated Current : 800A @ 40°C ambient, Material : Silver Plated /Tined , High conductivity elecrolytic Copper Bus Bar sleeve :Heat Shrinkable PVC Sleeve with joints having full voltage soft PVC shroude Short time rating for 1sec :26.3kA -1 setCurrent Transformer:Voltage class: As specified in Circuit breaker ; Type: cast resin type, Dual core, Dual Ratio , Barden :10VA; Class insulation : Class E or better . Protection core: 5P10, Metering : 1.0 , Short time rating for 1 sec :26.3kA Ratio :300-150/1-1, 7 setsBus Potential Transformer: Rated Voltage : Primary - 11000 / ✓3 , Sec -110✓3; Type : Cast resin , draw out type, 3- phase , 3-limb complete with HV fuses . Barden : 100VA per phase ; Class of insulation : Class F or Better , Accuracy Class: 1.0;Rated Voltage factor : 1.2 continuous, 1.5 for 30 Secs. PT shouldbe drawnout type and serivce continuously shall be indepandent of Breaker trolly position...1set 50 Relay for Control & Protection: Numerical Type IDMT Relay (50/51, 50N/5IN) with two elements for overcurrent and earth fault having settings 50% to 200% for overcurrent and 20% to 80% for earth fault in equal steps with time and current settings and high set instantaneous unit. Additionally, condition monitoring CB wear, condition monitoring CT supervision, disturbance recorder, undervoltage & over voltage protection, trip circuit supervisioncan be measured through the relay. The device shall support webserver/web HMI through which we can monitor and control the relays over a ethernet Lan network. Licenses for theprogramming software shall be provided free of cost.The numerical relay shall have large mimic-based LCD screen display . .The relay shall have 8 Digital inputs and 8 Digital Outputs and one additional watchdog ouput.The device has to aloe controlling of min. six objects (circuit breakers, disconnectors and grounding switches). Controlling has to be done by “select-execute” or “direct control” principle. Controlling has to be possible by: through local HMI, remote communication, via digital input or via function key. Events has to be readable to SCADA systems, front panel or by setting software.The sample rate of the recording has to settable to 32samples/cycle.The devices shall provide storage up to events 2000 based on the resolution.The device shall support following communication protocols: Native IEC 61850 ed1 & ed2, Modbus TCP. The IEC 61850 communication has to support peer to peer communication (GOOSE) if requiredThe IEC 61850 interface must be able to configure through setting software. Also the same setting software has to be able to generate ICD filesThe device shall have KEMA IEC61850 edition 2 certificates - 3 sets. High Speed Master Trip relay VAX31- 3 Set, Ttrip circuit supervision relay-VAJH13-3 set6 Window Annunciation Facia . with ACCEPT, RESET & TEST Push Button - 3 set . Auxillary relay for Transmission faults (VAA33)- - 3 Set 51 Metering: Meters: 1-NosUL&CE Multifunction Digital meter displaying Voltage, Amps, kWh, kW, P.F., Active, reactive, apparent energy , disturbance direction detection, Individual harmonic up to the 63rd harmonic. at least 256 samples/cyclewith ethernet Port with inbuilt webserver and complying to IEC 61557-12, IEC 62053-22 certified by third party laboratory.Temperature Monitoring Sensor for the Three Phases of Incomer VCB Panel :Supply, installation, testing & commissioning ofthermal monitoring system to be provided to detect abnormal temperatures due to faulty connections and to prevent equipment B19damage. The switchgear shall have wireless temperature measurement sensors at all critical points:(a) 3 nos. foreach phase at incoming side cable joints The wireless temperature sensors installed on conductors shall be :(i) Installed with direct contact to hot point, to achieve accuracy of +/- 2°C(ii) Self-power (no auxiliary supply, no battery)(a) communicate wirelessly(c) Operate from -25°C to 125 °CThe system shall allow 2 configurable thresholds (pre-alarm and alarm). This system shall have integrated algorithms enabling to anticipate as early as possible an abnormal temperature, before damage occur (strong predictive capacity) and generate alarm through SCADA/monitoring software. Thermal sensor shall beself powered by the network current. Temperature data is sent via Zigbee wireless communication to provide high performance and accurate thermal monitoring. The sensor is secured to the connection point and is in direct contact with the measured point. Smartphones or tablets (with a Zigbee communication dongle) can be used with our Thermal Connect mobile application to scan data locally and can replace the need of periodic infrared scanning. Thermal sensors should comply to following standards:1 EN/IEC 61010,2010 2. UL 61010-12, 20123. ETSI EN 300238, 2012 V1.0.1 4. IEEE 802.15.4, 2013 52 Power Pack shall be with 220Volt AC Input & 24 volt DC continuous output suitable for closing /tripping indication of HT panel boards with 2nos 12Volt 100AH maintenance free batteries, chatging unit for trip system complete with suitable capacity dogital MFM connections with 2.5sq mm FRLS inaulated copper conductor cable etc as required.-4 set.The 11 KV HT Switchboard of 1 panel,shall bewith all accessories, interconnections,internal wiring, labels, space heaters etc. complete as required.3 panels shall be mechanically interlocked in such a way that only one operates at a time and multifunctional digital meters shall be interconnected and programmed in such a way that total consumption will come in one meter summating both of them.Note: 1. Quotated rates shall be inclusive of construction of foundation for the installation of VCB as per OEM drawing.2. The equipment shall be tested by SEI post sucessful installtion and report shall be submitted to this office. 53 Design, Manufacturing, Supply, Installation, Testing and Commissioning of 3 way 12 kV rated Ring Main Unit ofwith Fault Level 21KA 3 sec internal ARC 1 sec for tank and cable box , consisiting of 630A12 kV rated , 2 nos motorized type VCB as incomers & 1 load break switch as outgoings with metering modules along with necessary Earth Switches,battery and battery charger for shunt trip arrangement andMotor and other auxiliary circuit operation, HT CopperBus bar with current density not more than 1.6A/sq. mm as per detailed description as follows: RMU Construction: The switchgear and busbar shall all be contained in a stainless steel enclosure filled with SF6 at 0.3 bar (300 hPa) relative pressure to ensure the insulation and breaking functions. Sealed for life, the enclosure shall meet the sealed pressure system criterion in accordance with the IEC 62271-1 standard (§ 3.6.5.4): a volume for which no further gas processing is required during its entire expected life”. In addition, manufacturer shall confirm that maximum leakage rate is lower than 0,1 % / year. It shall provide full insulation, making the switchgear insensitive to the environment (temporary flooding, high humidity...), IP67 degrees of protection in accordance with recommendation IEC 60529 § 14.2.7. No SF6 gas handling required at site. Thus assembled, the active parts of the switchgear shall be maintenance-free and the switchboard shall be low-maintenance. The switchgear operating mechanism shall have an IP2X protection and cable chamber shall be IP55, Over all IP protection shall be IP55 . The tank shall be made of at least 2mm unpainted stainless steel. Item Continued as 3.01 to 3.05 54 VCB is the preferred dielectric medium for MV RMUs. Oil filled switchgear will not be considered. RMU shall be in accordance with IEC 60376.Any accidental overpressure inside the sealed chamber will be limited by the opening of a pressure limiting device in the lower part of the enclosure. Gas will be released to the rear or the bottom of the switchboard away from the operator and internal arc tested for both cable and tank for 21KA 1sec AFLR with test conducted with minimum 3 functions TankNumber of mechanical operations of Circuit breaker 2000 O/C , Number of electrical operations at full loop current for LBS: 100 O/C , Number of electrical operations at full loop current for CB: 2000 O/C,. Manufacturer shall provide type test report to prove compliance with IEC 62271-200 Annex A, Internal arc classification class AFL with 21kA 1s for the enclosure. Make of the RMU, vaccum intrtupter , relay & meter shall be of same OEM. All the test certificate shall be in the name of the OEM only . If there is any name change / acquisition by other OEM happened for the RMU then test cerificates shall contain the new OEM name only.HT System : 3 phase -3 wire , HT Fault level21 kA, Power System earthing - solindly earthed at up stream source, HT Copper Bus with Short Time Curent rating 21 kA for 1 Sec ( 3Sec), Continuous current rating at least 630 A. tank and cable chamberof RMU must be IAC rated for 21 kA for 1 Sec AFLR. Design ambient to be considered as 40 Deg C.HT Circuit Breaker :(i) There shall be 1nos.load break switches as incomings and 2 nos 12 kV rated VCBas outgoing ( total 3 nos.) . The circuit breakers shall be fixed type. All of the switchgear shall be capable of withstanding this current without any damage being caused, in accordance with the recommendations IEC 62271-1 and IEC 62271-200.Loss of service continuity class: LSC2(ii) The Circuit Breaker must be rated for 12 kV ( nominal Voltage), 28 kV/75 kVp ,3 Phase, 50 Hz, Short Circuit Fault Level of 21 kA for 3 sec. 55 (iii) No. Of Close Coils - 01 no. operable at 24 V DC (85% - 110%)/ Spring Assited Closing, No. of Trip Coils - 01 nos. ,operabale at 24 V DC ( 70% - 110%) for shunt trip.(iv) Provision for supervision of the shunt Trip Circuits for the Trip Coils to be provided. (v)Switchgear classification: PM class(vi) Loss of service continuity class: LSC2(vii) Duty Cycle : O – 3min – CO – 3min – CO, Vacuum Circuit breaker shall be of M1, E2, C1 duty and capable for minimum 50 short circuit breaking operation at full short circuit level.(viii) STC rating 21 kA for 3 Sec (for Vacuum Interrupter).(ix)Vacuum Interruptor must be hermetically sealed and must comply IEC 60056 ( along with latest amendments). Vaccum interrupter shall be of same make as RMU(x)Circuit Breaker to be equipped with Suitable tripping arrangement with push button, Mechanical counter to assess the total number of operations of the breaker, Mechanical ON / OFF indicator, Auxiliary switches, Auxiliary Contacts( at least 2 NO + 2 NC of Class 2 category), Emergency trip push button.(xi) The Operating mechanism shall be spring charged motor operated/ spring assisted as per OEM type tested design type with Spring Charge Universal motor operable on 24 V DC / 230 V AC.(xii)Suitable monitoring of Bircuit Breaker status ( ON, OFF, Trip, CB Spring charged if applicable), Trip Circuit Healthy / Unhealthy, DC healthy/unhealthyto be provided using (xiii) Voltage Presence Indicator shall be provided against each HT circuit ( against each VCB) on line side for knowing the presence of line enerzisation status.(xiv)Number of Mechanical operations at full rated current for breaker: 2000 O/C 56 HT CT /PT : Load Break Switch - 11 KV, 630A, 21KA for 3sec Motorized Load break switch; with built in line side manual earth switch. Earthing should be completed within 2 operations only(i.e 1. Main switch - OFF, 2. Earth switch - ON). LBS shall have 3 positions, open or disconnected, closed and earthed, and will be constructed in such a way that interlocking prevents unauthorized operations. For earth switch, manual opening and closing will be driven by a fast-acting /snap action mechanism, independent of operator action. LBS and earth switch shall have a min of 1000 (M1) mechanical operations ,and 5 nos closing operations at rated SC current. LBS should have 100 electrical operations at rated current. LBS & Earth Switch should have separate apertures for operation.i) One set of 03 nos. ( for 3 phases) dual core Cast Resin CTs for Eachincomer VCBcomplying with IEC:60185 & IS 2705 ( along with latest amendments) , Core -1 - 400-200/1 A , 2.5 VA, Cl 0.5 for metering ; Core-2 - 400-200/1 A, 2.5 VA , 5P10 for Protection.ii) 01 no. of 03 phase Dual Core PT forHT bus ( 11 kV)with protection HRC fuseCore 1- 11kV /√3 / 110V/√3, Cl 0.5s, 50VACore 2- 11kV /√3 / 110V/3, Cl 3P, 50VA(iii) Multifunction Meter:2 Nos. 3 phaseDigital Multifunction Meter6400NGwith Voltage, Amps, kWh, kW, P.F., Active, reactive, apparent energy , disturbance direction detection, Individual harmonic up to the 63rd harmonic. at least 256 samples/cyclewith ethernet Port with inbuilt webserver and complying to IEC 61557-12, IEC 62053-22 certified by third party laboratory.for each VCB panel ( 96 mm x 96 mm) , Flush mounted, Class 1 conforming to IEC 62053-22 ( along with latest amendments). 57 Protection Relay: (i) 2 Nos. of Numerical Type Self-powered IDMT Relay(50/51, 50N/5IN) with two elements for overcurrent and earth fault having settings 50% to 200% for overcurrent and 20% to 80% for earth fault in equal steps with time and current settings and high set instantaneous unit. Relay should communicate on Modbus RS-485.(ii) Each VCB must have separate Anti Pumping Relay / Antipumping feature through motorization circuit.Fault Passageindicator: The FPI shall facilitate quick detection of faulty section of line. The fault indication may be on the basis of monitoring fault current flow through the device. The FPI should be self-powered and should have internal lithium battery for external indication and setting of FPI in the absence of current.The FPIs shall include: Fault detection - Phase to phase and Phase to earth faults.One potential- free output contacts for hardwiring to RTUs. On this basis, the SCADA/DMS will be able to monitor phase / earth fault condition.Local fault indications - LCD display on FPI front panel along with LED indication on front panel of RMU enclosure.Multiple reset option : End of time delay (Adjustable from 2 to 16 Hrs)Remote reset (Via potential free input contact of FPI)Manual reset (Reset button on front panel of FPI)Automatic reset on current restoration.The characteristics of the FPIs shall include: Phase fault thresholds configurable from at least 100 to 800 A,Earth fault thresholds configurable from at least 20 to 200 AMultiple number of steps for adjusting phase and earth fault thresholds. Fault current duration range configurable from at least 40 ms to 100 ms in 20 ms steps and further 100 ms to 300 ms in 50 ms steps. Variations with respect to these characteristics may be acceptable as long as they prove applicable and provide the same or better flexibility. 58 EARTHING : The cables shall be earthed by an earthing switch with short-circuit making capacity, in compliance with IEC 62271-102 standard. The earthing switch can only be operated when the switch is open. The switch and earthing switch operating mechanism shall have a mechanical endurance of at least 1000 operations. Integrated line side Earth switches shall be provided in each HT Circuit. ( against each VCB)RMU Bushing & Cable Termination: It is preferable to have all bushings accessible from the front of the RMU. Bushings along the sides or the rear of the RMU are not acceptable.For each cable compartment, the bushing shall be at the same height in order to facilitate a possible reversal of the cables. The bushing should be conveniently located for working with cables specified and allow for the termination of these cables: - 630 A M16 bolted connectors for switch-disconnectors and vacuum circuit breakers functions.The profiles of the cable connection bushings shall be in compliance with IEC-60137 standard. Cable clamps:A cable clamp arrangement must be provided for all network cables terminated on the RMU.Provision for Cable Entry: There shall be suitable provsion for Cable entry from bottom through 3 mm thick CRCA steel thick detachable gland plate along with provision for termination of 2 runs of 3 c X 300 Sq mm 11 kV (E ) , XLPE insulated Aluminium Cables (for HT side) and at LT side runs of cables matching with outgoing MCCB current rating.Note: (i) Quotated rates shall be inclusive of foundation for the installation of VCB as per OEM drawing.(ii) The equipment shall be tested by SEIaftersuccessful installtion and report shall be submitted to this office and cost deemed to inclusive in qoated rates 59 M&L for water proof, 3 core PVC insulated and PVC sheathed, copper conductor cable of size 1.5 sqmm, 1100 Volts grade including PVC conduits properly fixed on steel poles using GI wire for electrical connection of street light fittings, complete all as specified and directed. 60 Supply and fixing junction box having protection dust proof, acid resistant, shock proof, fire retardent self extinguisher for outside installation with knockout entry for cable of size 10 - 25 sqmm andminimum size 295x195x95 mm with terminals, with and includingbrackets for street light pole mounting andone 6A MCB SP complete all as specified and directed. 61 M&L for Advanceencapsulated compound based Chemical earthing CPRI tesed maintenance free , pipein -pipe technology upgraded(Zinc & Alloy coated). , Zinc & Alloy coated (80 -100) microns with pure zinc (99.9%) & Alloy coating (200-250) microns. Earthing system conforming IS 3034. The outer and inner pipe should be 76.2 mm and 41.9 mm dia respectively of3 mtrs long zinc coated with additional special alloy coating 300 mm on top side for additional protection of the terminal . The annular space between the pipes to be filled up with Compactfill (CF) (Crystalline Conductive) mixture which should bemachine pressed in the pipes not disintegrate or collapse when outer pipe corrodes . The inner pipe should be extended with terminals for connectivity.The job includes digging the pitsin any type of hard densesoilof min size 1000 X 1000 X 3050 mm depth taking out excavated soil, lowering/ placing thethe pipe in pipe earth electrode in pit in center ,filling of pure conductolite back filling compound (BFC Conductolite) having excellent moisture retaining capacity in 300 mm around the electrode(minimum 4 bags of 25 KG per pit per unit) or more qty of backfillcompoundas required to fill around the the elctrode in 300 mmin circumfrance of electrode . Contractor has to fill the remaining portion of pit withlow resistivity soil (agriculture soil) free from stones etcs, to be bring from out side defence landas the soil resistivity ofStn is very high and mixed with min 3 Bags of 50 Kg each of Bantonide clay. The BFC should be eco friendly it should not contain envernmently hazardous material/metal having ROHS certification from NABL accredited lab.The earth pit should be provided with a FRP earth pit cover for protection and safe guard of terminals. The material of earth electrodeshould have good electrical conductivity & anti corrosion property in wide range of soil conditions. The job also include M & L for in PCC(1:3:6) typeC-1 around the FRP cover for support and foundation and colouring the PCC work withdesired colour.completeall as specified and directed. Item Continued as 6.01 62 Note : (i) Design of earth electrode should be of pipein-pipetechnology .(ii) Contractor have to submit literature of earth electrode and get the make approved of GE before procurement.(iii) The earth electrode shall be CPRI tested to withstand short current test for 60kA rms for 1.0 second and 150kA for peak current.(iv) Contarctor has to fill pure back fill compound conductolite all around the earth electrodein 300 mm bore up to full depth of bore.(v) Contractor shall refill the pit with low resistivity soil (agriculature soil ) free fron stone etc and mixed with 06 bags of Bentonite of 25 Kg each to achive the low resistance values. (vi) copper strip will be laid below 60 cm from ground level and connected to test point through plinth protection. This Earthing System used for VCB and RMU only. For Solar Power Plant Earthing System is already deemed to be included in quoted rates.(vii) Necessary cost of repair to plinth protection and connected plate and earth continuity conductor by providing 2 x brass nuts bolts and brazing of joints,bringing argiculture soil from out side defence land and cost of 6 x Bags of bentonidedeemed to be included in the item rate.(viii) Contractor has to clear the side and disposed off the excavated soil from pit on completion of work. 63 SAFETY EQUIPMENTSSupply and fixing Rubber hand gloves suitable for 11 KVas per OEM recommendationcomplete all as specified and directed. 64 S&F for glass framed Shock treatment chart both in Hindi & Englishand connected accessoriescomplete all as specified and directed. 65 S&F for dry powder chemical type 4.5 kg fire extinguiser with clamps and connectedaccessories ISI Marked complete all as specified and directed. 66 S&F for single line diagram, schematic diagrams etc. of A1 size on suitable Aluminium sheet including lamination etc. as required as per OEM recommendationcomplete all as specified and directed. 67 Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in soft/loose soil complete all as specified and directed. 68 Excavation in trenches, not exceeding 1.5 mtr wide and not exceeding 1.5 mtr in depth for foundation, manholes, laying of UG cables/pipes etc. not exceeding 10 Sq.m on plan and getting out in soft/loose or any type of soil complete all as specified and directed. 69 Removing excavated material (soils) to a distance not exceeding 50m and depositing where directed at a level not exceeding 1.5 m above the starting point complete all as specified and directed. 70 Returning filling in, soft/looseor any type of soil including spreading leveling watering and ramming complete all as specified and directed. 71 Excavation in post holes (or similar holes) in soft/loose soil each n.exc 0.50 cum, getting out,returning, filling in and ramming earth or broken rubble mixed with earth around, in layers not exceeding 25 cm, watering, and removing surplus soil to a distance n.exc 50 m and making good surface all as specified & as directed. 72 M&L for RCC M-20, design mix (using 20mm graded crushed stone aggregate), including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and directed. 73 M&L for steel tubular swaged poles complete with cast iron base plate, finial taper plugs, bolts, nuts & screws as specified type 410 SP-31, 9.0 meter longinclusive of two coats of aluminium paint over one primer coat of red oxide zinc chrome primer including preparation of surfaces complete all as specified and directed.NOTE : (a) The poles shall confirm to IS - 2713 & each component pipe shall be ISI Marked & confirm to IS - 1161. (b) Necessary earthwork, PCC etc. shall be measured & paid separately under relevant items of work. 74 S & F LED Street lights nominal power 90 Watt, LED of Make Osram; Bridgelux ; Philips; Nicha; Cree; Samsung, LED wattage of minimum 3 watt each and Maximum 5 watt each, operational voltage of 170 volts to 270 volts, frequency of 50 Hz, lumen efficacy of minimum 120 lumens per watt, built-in integrated electronic LED driver, output open /short circuit protection, phase to phase protection, over voltage protection, surge voltage protection upto 4 KVs, protection grade IP 66, CRI greater than 80%, CW available CCT of 5700K, power factor of minimum 0.95, pressure die-cast aluminium alloy housing with polyester powder coated metallic silver finish after phosphochromate treatment, life span of minimum 50000 working hourswith IK10 and L70 on including fixing at any height and including wiring using three core PVC insulated, PVC sheathed, flexible stranded copper conductor FR-LSH cables suitable for outdoor use, 1.5 sqmm as per IS 694: 2010 complete all as specified and as directed.(i) If connection.cable from pole Juction box to street light and street light bracket up to 2 mtrs be included and measured in unit rate item, Beyond 2 mtrs of length to be paid seperately under respective items.(ii)At location where street lights/flood light are connected through overhead conductor, connection cable from light fitting to overhead conductor is deemed to be incl in the item rate. (iii) All LED street light/flood lights shall be properly connected with earth dolly provided with fittings and steel poles earth bolt.(iv)All LED lights have replacement warranty of 5 years from the date of completion of the contract accordingly condition 46 of GCC (IAFW-2249) shall be amended to extent mention above. Contractor has to submittwarranty certificate from manufacturer . Payment of light fitting will be released after receipt of 3 year replacement warranty certificate from manufacturer.(v) The LED lights will replaced bythe contractor free of cost in the case of manufacturing defects and Failure due to electrical impact if not connected properly with earth. Hence it is contractor responsibility to connect the light fitting earth wire and shall be grounded properly.(vi) The contractor shall submit the surge protection certificate and Type test certificate LM 79, LM 80 for luminaries from LED manufactutre. 75 M&L for Cement concrete (1:4:8) type D2, (Using 40mm graded crushed stone aggregate) as in foundations of poles and stay, filling and mass concrete complete all as specified and directed. 76 M&L for plain cement concrete (1:3:6), type-C2 (40mm graded crushed stone aggregate) as in foundation, filling and mass-concrete, coping etc for pole foundationwith and including necessary formwork complete all as specified and directed. 77 M&L PCC (1:2:4) type B2 (using 40 mm graded crushed stone aggregate) as in foundations, filling and mass concrete and copingwith and including necessary formwork complete all as specified and directed. 78 Material & labour for earthing complete with copper earth plate electrode 600 mm x 600 mm x 3.15 mm thick burried directly in ground (Earth pit not less than 4 mtr deep below ground level) with top edge of the plate not less than 3.25 mtrbelow ground level connected to copper strip 20 x 3.15 mm as earth lead by brass nut bolts washer including brazing the copper strip with copper plate as shown in electrical plate No 3 connected to earth test point including necessary excavation for earth pitin hard dense soil, rocky / disintergate rock, filling charcoal and salt around the plate in layers , filling the pit with low resistivity agriculture soil free from stones, to be bring from out side defence land and mixed with Bentonite , (4 bags of 25 Kg each ), construction ofinspection pit ( earth pit chamber) of brick work of size 600 x 600 x 600 mmwith PCC copping of 1 :1.5: 3, 12.5 mm aggregate A1 with MS sheet 2.8 mm plate cover on frame ofangle iron of size 40 x 40 x 5 mm with , wire mess, funnel, test point, 40 mm dia GI protection pipelightgrade and20 mm GI peforated pipefor wateringetc complete and testing on completion. The electrode and lead shall be of copper all as specified and directed by Engr-in-charge (Copper strip upto 7.5 RM will be included in the item rate and copper strip beyond 7.5 RM will be measured seperately Item Continued as 22.01 79 NOTE :-(i) Contractor shall uselow reisistivity fresh agriculture soil , mixed with 4 x Bags of bentoniteclay of 25 Kg each for refillingthe pit to achive the desired resistance.(ii) copper strip will be laid below 60 cm from ground level and connected to test point through plinth protection(iii) Necessary cost of repair to plinth protection as per existing specification and connected plate and earth continuity conductor by providing 2 x brass nuts bolts and brazing of joints,bringing argiculture soil from out side defence land and cost of 3 x Bags of bentonitedeemed to be included in the item rate.(iv) Contractor has to clear the side and disposed off the excavated soil from pit on completion of work.(v) Contractor has to submit test report of earthing after completing the earthing.(vi) Bentonite clay should be Conf to IS 6186: 1986.(vii) The cost ofCopper strip of size 20X3.15 mm from top of earth plate upto 7.5 meter above ground level is deemed to be included in the unit rate of above item.and copper strip beyond 7.5 RM will be measured seperately.(viii). All the joints in copper strip and connection with Earth Plate to be welded through brazing and in addition by proving brass nut bolt and washer are deemed to be included in the unit rate. (ix) Cost of brazing / welding and nut bolts are deemed to be included in the unit rate. (x) Cost includes removal of excavated soil upto a distance of 100 mtrs. 80 Supply and fixing copper strip of size 20 x 3.15mm as earth continuity conductor or main earthing lead fixed on V typeporcelain insulator, 4 BM, heavy duty ( ceramic bus bar supportinsulator off whitecolour ofsuitable for mounting strip of 20 mm wide x 3.15 min thick) saddle to wall, buried in ground or drawn in conduit/pipe or fixed to poles or any other indicated situation for loop earthing etc. as required 20 x 3.15 mm copper strip brazingto each joints and connected with by providingbrassnut boltsand washer including test point all as specified and directed by Engr in Charge. Note : Insulators shall be provided on every 50 cm. (Minimum 2 x insulators to be provided in every 1 x metre of strip and rate of the same deemed to included in quoated rates) 81 M&L sand cushioning (dry) in trenches for protection of UG cables (below, above and around the cable laid in trenches) of 230mm spreding thickness and consolidated (punned) upto 180mm thickness, complete all as specified and directed. 82 Supplying and laying un-reinforced precast concrete cable cover, class HV, type 1 with peak, size 300mm x 180mm x 40mm complete all as specified and as directed. 83 M&L for GI pipe 100 mm bore, light grade with all fittings and fixtures (ISI Marked), laid in trenches, under road or fixing on wall/ pole /crossing drain /nallah etc. of bore complete all as specified and directed. 84 Supply, laying, jointing & testing XLPE insulated screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 10 sq mm 4 core ISI marked as per IS 7098(Part-I): 1988 including cable glands, lugs etc. to suit the cable size and to be laid in trenches, fixed along pole, under floors, through GI pipe laid under floors/roads, through concealed GI pipe along wall etc.with all fixing & connecting accessories complete all as specified and directed. 85 Supply, laying, jointing & testing XLPE insulated screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 16 sq mm 4 core ISI marked as per IS 7098(Part-I): 1988 including cable glands, lugs etc. to suit the cable size and to be laid in trenches, fixed along pole, under floors, through GI pipe laid under floors/roads, through concealed GI pipe along wall etc.with all fixing & connecting accessories complete all as specified and directed. 86 Supply, laying, jointing & testing XLPE insulated screened, PVC bedded, galvanized steel strip or wire armoured, electric power cables (heavy duty) 1100 Volts grade with stranded aluminium conductor of size 25 sq mm 4 core ISI marked as per IS 7098(Part-I): 1988 including cable glands, lugs etc. to suit the cable size and to be laid in trenches, fixed along pole, under floors, through GI pipe laid under floors/roads, through concealed GI pipe along wall etc.with all fixing & connecting accessories complete all as specified and directed. 87 Supply, laying & testing PP-R IS-15801 (Polypropylene random co-polymer) pipe 3-layer 63 mm dia (outer green coloured UV stablilized, middle black coloured UV stabilized and innermost layer white coloured with anti-microbial property) fusion welded grade PN-10 SDR-11 ( Pressure nominal 10KGS/cm2 ) having thermal stability for hot & cold water supply including all types of plain and brss threaded PPR fittings of any size such as elbow, tees, FTA and MTA etc laid in trenches complete all as specified and as directed.Note:The contractor shall submit 15 Years warranty certificate against leakageand defect liabilty period deemed to amended acordingly. 88 Supply, laying & testing PP-R IS-15801 (Polypropylene random co-polymer) pipe 3-layer 32 mm dia (outer green coloured UV stablilized, middle black coloured UV stabilized and innermost layer white coloured with anti-microbial property) fusion welded grade PN-10 SDR-11 ( Pressure nominal 10KGS/cm2 ) having thermal stability for hot & cold water supply including all types of plain and brss threaded PPR fittings of any size such as elbow, tees, FTA and MTA etc laid in trenches complete all as specified and as directed.Note:The contractor shall submit 15 Years warranty certificate against leakageand defect liabilty period deemed to amended acordingly. 89 S&F for 63mm (OD) PP-R Gate valves (brass insert)and connected acessories complete all as specified and as directed. 90 S&F for 32mm (OD) PP-R Gate valves (brass insert) nd connected acessories complete all as specified and as directed. 91 M&L for hard core of gauge not exceeding 63mm with broken stone or boulders, deposited, spread and levelled in layers not exceeding 15cm thick, watered and rammed to a true surface complete all as specified and directed. 92 Providing and laying 60 mm thick factory made cement concrete interlocking paver block of M35 grade conforming to IS 15658-2006 made by block making machine with strong vibratory compaction, of approved size, design & shape, cast in rubber mould, glossy finish of approved colour, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge. 93 S&F for RCC pipes of 600 mm dia, NP-2 laid and jointed complete with collars complete all as specified and directed. 94 S&F for 250mm bore Flue pipes of mild steel sheet, black, in suitable lengths as approved by GE and fixed to walls complete all as specified and directed. 95 M&L for Brickwork with fly ash bricks (modular bricks ), straight or curved on plan exc 6m mean radius, built in cement mortar(1:6) complete all as specified and directed. 96 Material and labour for plastering 15 mm thick (in two coats of 10 mm and 5 mm thick) on fair faces of brick work or concrete surfaces (on vertical surfaces) in cement mortar 1:4 with integral water proofing compound finished even and fair complete all as specified and as directed. Note: - Water proofing compound will be deemed to included in qoated rates. 97 M&L for applying three coats of white wash on newly plastered wall surfaces including preparation of surface complete all as specified and directed. 98 S & F hot rolled low tensile structural steel of grade E165 as per IS 15911: 2010 as in hand rails, half round or other steel section or core for wooden hand-rail straight portion, drilled and countersunk for balusters running bars, for doors, balusters, nosing to steps including embedding in concrete and screwing etc. Wind ties for roof including securing bolts; posts and struts in fencing including cutting tops to shape as directed, drilling holes, notching for wire, etc.; flat iron fillets (for securing wire mesh etc.) including all necessary drilling, bolting or riveting, etc., and similar works complete all as specified and as directed. 99 S & F hot rolled medium and high tensile structural steel of grade E165 as per IS 15911: 2010 as in framed work such as grills, grating, etc., with ends of bars of shouldered and/or riveted, or forged into spikes, framed guard bars; barred iron doors; ladders; framed balusters; walk ways; railings; framework water tanks and similar work complete all as specified and directed by Engineer-in-charge. 100 S&F flat iron fillets (for securing wire mesh etc.) including all necessary drilling, bolting or riveting, etc., and similar work conforming to Fe-290 Gde E-165 complete all as specified and directed. 101 S&F MS screw bolt (machine made) with hexagonal or square heads at one end and screwed the other or screwed both ends, each screwed end to be fitted with washers and one hexagonal or square nut, exc. 5 cm and n. exc 10 cm long, diameter of neck 5 to 10 mm complete all as specified and directed. 102 Supply and fixinggalvanized steel chain link fence fabric of mesh size as approved , made out of 4 mm nominal dia of mesh wireconforming to IS 2712-2003 and having zinc coating of type heavy as laid down in IS-4826 including line wires/ binding complete all as specified and as directed(A Board of Officers under the orders of GE shall be convened to ascertain the weight per square metre of galvanized steel wire chain link fencing brought at site by the contractor against each lot of materials). 103 S&F 10mm round bars Fe-410-W (Gde-250) quality-A or Fe-290-(Gde-E-165) as in stiffner to hold the chain link fencing fixed with angle iron post inclucinding necessary welding and fixing arrangement at ends complete all as specified and directed . 104 S&F Galvanised, 2 strand, steel barbed wire 2.24mm dia barbed with 2mm dia barbs at 75mm spacings and straining and fixing to any type of standard rails straining bolts, including, securing or tying at crossings with and provision of galvanised mild steel wire, staples or steelpins, etc. complete all as specified and directed . 105 Material and Labour for applying two coats of synthetic enamel paint over a coat of red oxide zinc chrome primer on new steel and iron surface exceeding 10 cm in width or girth including preparation of surfaces complete all as specified and directed. 106 Material and Labour for applying two coats of synthetic enamel paint over a coat of red oxide zinc chrome primer on new steel and iron surface not exceeding 10 cm in width or girth including preparation of surfaces complete all as specified and directed. 107 Materials and Labour for reinforced cement concrete M-20design mixin columns; pillars; piers; posts; struts etc,complete all as specified and directed. 108 S&F for Mild steel TMT bars 10mm dia and over, conforming to Fe 500 D, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and as directed. 109 S & F for mild steel TMT bars 6 to 8 mm dia, conforming to Fe 500 D cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, stirup,hooking ends and binding with and including mild steel wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed. 110 M&L for construction of valve chamber with MS sheet cover 3mm thick with angle iron) frame of size 50 x 50 x 6mm and locking arrangements including painting one coat of primer followed by two coats of black sysnthetic paint including excvation and earth work in any type of soil,PCC (1:4:8) type D2 in foundation ,PCC benching 1:2;4 type B-1 ,PCC (1:5:8) block masonry 20 cm thick in cement mortor (1:6),10 mm thick plastering in CM 1:4 ,PCC bed in (1:3:6) and coping 50mm hick in cement concrete 1:2:4 type B1 using 20mm stone aggregate including necessary formwork,paintin one coat of red oxide and two coats of bituminious black paint on all steel surfaces as specified and as directed of sizes 800mm x 800mm x800mm (internnal dimensions) complete all as specified and as directed. 111 Sch A Part-II (Phase-II) 112 Providing Services for Manning and Operation of Solar Power Plant 0.8 MWp near 33 KV receiving stationat Sevoke Mil Station for FIRST YEAR after completion of Ph-I of the subject work with oneskilledcategory Electricianhaving certificate of Surya Mitra from NISE) for twoshifts of 8 hour, one helper (semi-skilled category) in two shift of 8 hrs eachcontinuous operation (including Sunday/Holiday) to maintain sub station in/out side Panels, Invertor, DC junction box, VCB as specified, including daily and weekly check up including cleaning of PV modules complete with suitable cleaning cloths etc , upkeeping the installation operational and in health condition, having own conveyance and communication system like mobile etc. complete, for Solar Power Plant with all minor consumable and expendable items and labour and tools for smooth and efficient operation complete all as specified and directed by Engineer-in-Charge. Make of spare parts / equipments of the Solar Power Plant :- Same as installed in the preceding phase of the work.Repair or replacement ofdefective components or spare parts will be carried out free of cost under DLP and comprehensive Maintenance as per OEM recommendation up to DLP period included in BOQ item No. 1.00. The Contractor may submit his claim for every months on pro-rata basis subject to condition 64 of IAFW-2249 (General Conditions of Contracts)The bidders shall ensure that the quoted amount for O&M is not less than minimum fair wages i.e. quoted amount is not less than the prepriced amount i.e. Rs 17,92,949.00. If quoted amount is less than the prepriced amount, same will be amended to pre-priced amount.Amount so adjusted will be deducted from quoted amount against Sch A Part-I i.e. Item No. 1.00 of BOQ. Quoted Amount of tender as a whole will remain unchanged due to this adjustment. Item Continued as 56.02 to 56.06 113 NOTES :- In addition to and Manning, Operation and Maintenance of Solar Power Plant, the following works will also be carried out by deputing addl manpower where required, to the entire satisfaction of Engr-in-Charge.(a) Minor repairs and preventive maintenance required to ensure serviceability and efficiency of complete MRS complex including supply of HT 11 KV fuse wire of proper sizeand minor spares such as nut, bolts, spring, lock nut of VCB/OCB as per sample, broom, duster, grass cutting tools, phawara, pick axes for cleaning/grass cutting of complete at Sub Stn Complex. 114 (b) Record of activities such as voltage / current / PF / Energy consumed / temp of transformers, break downs, day to day maintenance of Solar PV Plant etc.(c) The contractor shall ensure that all safety precautions are strictly exercised by the staff employed by him.Adherance to IE rules and statutory rules in vogue must be ensured.The contractor shall be fully responsible for any mishap that occurs due to any fault of the employee or due to non adherance of safety norms.(d) Record of activities such as attendance register, duty roster, pay distribution register of the whole staff employed by the contractor.(e) The electrician staff employed by the contractor shall be ITI holder with four years experience. 115 (g) Security lights within the complex will be operate by the tenderer. (h) The under mentioned tool kitwill be provided at site with person on duty :-(i) Electrician tool kit such as screw driver set, tester, test lamp, cutting plier, insulation tape, fuse wire of required size. (ii) Tongue tester(iii) HT megger(iv) First aid box (v) Shock treatment chart duly framed(vi) 33 and 11 KV Hand gloves(vii) 33 KV discharge rod withcopper chain(viii)) Helmet -02 nos(ix) Suitable Footwear - 02 nos(x) Cotton protective clothing with long sleeves duly embossed with GE Sevoke as directed. The tenderersquoted rates shall be deemed to be include the cost of all above provisions and nothing extra will be paid on any account. 116 (xi) The Bidders shall abide by the latest Labour rules and minimum wages Act. Wagespaid by the bidders to the persons employed shall not be less than the minimum wages fixed by the state/central government from time to time whichever is higher. (xii) The Bidders is responsible for insurance, EPF, ESI, Bonus, Labour welfare cess et., as applicable and shall be paid to the workmen as per existing Labour rules/ Acts/ regulations and rate quoted shall be deemed to be included for the same.(xiii) Dress Code : The bidders shall provide the workmen with Dark Blue Colour uniform {formal pant & T-shirt} with labels showing/ printed i.e. Name of the firm and designation on front and on the back of the T-shirt along with protective clothing, Industrial safety shoes, protective gears like helmet, safety belt etc..(xiv) Supervision and attending of all incoming & outgoing Solar Power Plant equipment metering equipments & monitoring to loads & other parameters of incomming & outgoing feeders & maintaining log sheet and attendance sheet. 117 INSURANCE: The Bidders shall also insure the workmen employed on the job.The Bidders shall be responsible for all Accidents/Injuries happening to the workmen. Any accident causing minor/fatal injury, partial disability due to any untoward incident or non-adherence to safety and IE regulations or fault in maintaining of internal electric supply system or on account of any mishandling/ wrong operation/ lack of knowledge of safety precautions or on account of any circumstances beyond his/ their control, the bidders shall be solely responsible for settling all claims of compensation to the deceased, falling which department will have a right to recover any sum indicated/ claimed by Labour commissioner/court authorities. No claim whatsoever will be entertained in this regard. No compensation is payable by the department on this account. Bidders shall provide first aid boxes to meet any emergency situations. 118 All as perBOQ serial item No 56.01 to 56.06 as mentioned here-in-before but for SECOND YEAR after completion of Ph-I of the subject work .NOTE :- (a) The bidders shall ensure that the quoted amount for O&M is not less than minimum fair wages i.e. quoted amount is not less than the prepriced amount i.e. Rs 18,75,076.00. If quoted amount is less than the prepriced amount, same will be amended to pre-priced amount.Amount so adjusted will be deducted from quoted amount against Sch A Part-I i.e. Item No. 1.00 of BOQ. Quoted Amount of tender as a whole will remain unchanged due to this adjustment. 119 All as perBOQ serial item No 56.01 to 56.06 as mentioned here-in-before but for THIRD YEAR after completion of Ph-I of the subject work .NOTE :- (a) The bidders shall ensure that the quoted amount for O&M is not less than minimum fair wages i.e. quoted amount is not less than the prepriced amount i.e. Rs 19,61,175.00. If quoted amount is less than the prepriced amount, same will be amended to pre-priced amount.Amount so adjusted will be deducted from quoted amount against Sch A Part-I i.e. Item No. 1.00 of BOQ. Quoted Amount of tender as a whole will remain unchanged due to this adjustment. 120 All as perBOQ serial item No 56.01 to 56.06 as mentioned here-in-before but for FOURTH YEAR after completion of Ph-I of the subject work .NOTE :- (a) The bidders shall ensure that the quoted amount for O&M is not less than minimum fair wages i.e. quoted amount is not less than the prepriced amount i.e. Rs 20,51,671.00. If quoted amount is less than the prepriced amount, same will be amended to pre-priced amount.Amount so adjusted will be deducted from quoted amount against Sch A Part-I i.e. Item No. 1.00 of BOQ. Quoted Amount of tender as a whole will remain unchanged due to this adjustment. 121 All as perBOQ serial item No 56.01 to 56.06 as mentioned here-in-before but for FIFTHYEAR after completion of Ph-I of the subject work .NOTE :- (a) The bidders shall ensure that the quoted amount for O&M is not less than minimum fair wages i.e. quoted amount is not less than the prepriced amount i.e. Rs 21,46,848.00. If quoted amount is less than the prepriced amount, same will be amended to pre-priced amount.Amount so adjusted will be deducted from quoted amount against Sch A Part-I i.e. Item No. 1.00 of BOQ. Quoted Amount of tender as a whole will remain unchanged due to this adjustment. 122 All as per BOQ serial item No 56.01 to 56.06 as mentioned here in before but for SIXTH YEAR after completion of Ph-I of the subject work .NOTE :- (a) The bidders shall ensure that the quoted amount for O&M is not less than minimum fair wages i.e. quoted amount is not less than the prepriced amount i.e. Rs 22,46,564.00. If quoted amount is less than the prepriced amount, same will be amended to pre-priced amount.Amount so adjusted will be deducted from quoted amount against Sch A Part-I i.e. Item No. 1.00 of BOQ. Quoted Amount of tender as a whole will remain unchanged due to this adjustment. 123 All as per BOQ serial item No 56.01 to 56.06 as mentioned here in before but for Seventh YEAR after completion of Ph-I.NOTE :- (a) The bidders shall ensure that the quoted amount for O&M is not less than minimum fair wages i.e. quoted amount is not less than the prepriced amount i.e. Rs 23,51,386.00. If quoted amount is less than the prepriced amount, same will be amended to pre-priced amount.Amount so adjusted will be deducted from quoted amount against Sch A Part-I i.e. Item No. 1.00 of BOQ. Quoted Amount of tender as a whole will remain unchanged due to this adjustment. 124 All as per BOQ serial item No 56.01 to 56.06 as mentioned here in before but forEight YEAR after completion of Ph-I.NOTE :-(a) The bidders shall ensure that the quoted amount for O&M is not less than minimum fair wages i.e. quoted amount is not less than the prepriced amount i.e. Rs 24,61,315.00. If quoted amount is less than the prepriced amount, same will be amended to pre-priced amount.Amount so adjusted will be deducted from quoted amount against Sch A Part-I i.e. Item No. 1.00 of BOQ. Quoted Amount of tender as a whole will remain unchanged due to this adjustment. 125 All as per BOQ serial item No 56.01 to 56.06 as mentioned here in before but for Ninth YEAR after completion of Ph-I.NOTE :-(a)The bidders shall ensure that the quoted amount for O&M is not less than minimum fair wages i.e. quoted amount is not less than the prepriced amount i.e. Rs 25,76,917.00. If quoted amount is less than the prepriced amount, same will be amended to pre-priced amount.Amount so adjusted will be deducted from quoted amount against Sch A Part-I i.e. Item No. 1.00 of BOQ. Quoted Amount of tender as a whole will remain unchanged due to this adjustment. 126 All as per BOQ serial item No 56.01 to 56.06 as mentioned here in before but for TENTH YEAR after completion of Ph-I.NOTE :-(a) The bidders shall ensure that the quoted amount for O&M is not less than minimum fair wages i.e. quoted amount is not less than the prepriced amount i.e. Rs 27,03,441.00. If quoted amount is less than the prepriced amount, same will be amended to pre-priced amount.Amount so adjusted will be deducted from quoted amount against Sch A Part-I i.e. Item No. 1.00 of BOQ. Quoted Amount of tender as a whole will remain unchanged due to this adjustment. 127 Comprehenisve maintenance of Solar Power Plant 0.8 MWpfor FIRST YEAR after expiry of DLP of Ph-I of the subject work with including periodical Check up andmaintenance as per OEM recommendation& connected accessories through Authorised Original Equipment Manufacturers Service Centre Engineersor through OEM Certified Agencies as approved by GE, complete all as specified and as directed. NOTE :-(a) Service engineer will carry scheduled preventative maintenance checks on SPV as per the standard check list of the OEM (b) Service engineer shall carry out checks on Solar Plant, as per the manufacturer’s check list and as directed by Engr-in Charge and would correct / recommend / suggest improvement in operation and performance. (c) Service Engineer during the visit will report on the performance or any other abnormality and inform parts requirement, shall also submit the report on work done and recommendations as well as spare parts offers to the concerned authority for arrangement.(d)Cost of equipment and spare parts which is not covered in warranty and DLP shall be measured in PC Sum andcost of item priced upto ₹500.00 shall be deemed to be included in the comprehenisve maintenance quoted cost. Repairs of minor components any other major components are also in the scope and cost of labour for minor / major components is deemed to be included in the quoted rate for this item.(e) Cost of gaskets, metal/rubber washer, CI washer special cement and small nuts/bolts and screws required for repair shall be deemed to be included in the unit rated quoted by the contractor. 128 Comprehenisve maintenance of Solar Power Plant 0.8 MWpfor SECOND YEAR after DLPof Ph-I of the subject work with including periodical Check up andmaintenance as per OEM recommendation& connected accessories through Authorised Original Equipment Manufacturers Service Centre Engineersor through OEM Certified Agencies as approved by GE, complete all as specified and as directed. NOTE :-(a) Service engineer will carry scheduled preventative maintenance checks on SPV as per the standard check list of the OEM (b) Service engineer shall carry out checks on Solar Plant, as per the manufacturer’s check list and as directed by Engr-in Charge and would correct / recommend / suggest improvement in operation and performance. (c) Service Engineer during the visit will report on the performance or any other abnormality and inform parts requirement, shall also submit the report on work done and recommendations as well as spare parts offers to the concerned authority for arrangement.(d)Cost of equipment and spare parts which is not covered in warranty and DLP shall be measured in PC Sum and cost up to Rs. 500.00 shall be deemed to be included in the comprehenisve maintenance quoted costrepairs of minor components any other major components are also in the scope of Annual Maintenance Contract.(e) Cost of gaskets, metal/rubber washer, CI washer special cement and small nuts/bolts and screws required for repair shall be deemed to be included in the unit rated quoted by the contractor. 129 Comprehenisve maintenance ofSolar Power Plant 0.8 MWpfor THIRD YEAR after DLPof Ph-I of the subject work with including periodical Check up andmaintenance as per OEM recommendation& connected accessories through Authorised Original Equipment Manufacturers Service Centre Engineersor through OEM Certified Agencies as approved by GE, complete all as specified and as directed. NOTE :-(a) Service engineer will carry scheduled preventative maintenance checks on SPV as per the standard check list of the OEM (b) Service engineer shall carry out checks on Solar Plant, as per the manufacturer’s check list and as directed by Engr-in Charge and would correct / recommend / suggest improvement in operation and performance. (c) Service Engineer during the visit will report on the performance or any other abnormality and inform parts requirement, shall also submit the report on work done and recommendations as well as spare parts offers to the concerned authority for arrangement.(d)Cost of equipment and spare parts which is not covered in warranty and DLP shall be measured in PC Sum and cost up to Rs. 500.00 shall be deemed to be included in the comprehenisve maintenance quoted cost repairs of minor components any other major components are also in the scope of Annual Maintenance Contract.(e) Cost of gaskets, metal/rubber washer, CI washer special cement and small nuts/bolts and screws required for repair shall be deemed to be included in the unit rated quoted by the contractor. 130 Comprehenisve maintenance ofSolar Power Plant 0.8 MWpfor FORTH YEAR after DLP of Ph-I of the subject work with including periodical Check up andmaintenance as per OEM recommendation& connected accessories through Authorised Original Equipment Manufacturers Service Centre Engineersor through OEM Certified Agencies as approved by GE, complete all as specified and as directed. NOTE :-(a) Service engineer will carry scheduled preventative maintenance checks on SPV as per the standard check list of the OEM (b) Service engineer shall carry out checks on Solar Plant, as per the manufacturer’s check list and as directed by Engr-in Charge and would correct / recommend / suggest improvement in operation and performance. (c) Service Engineer during the visit will report on the performance or any other abnormality and inform parts requirement, shall also submit the report on work done and recommendations as well as spare parts offers to the concerned authority for arrangement.(d)Cost of equipment and spare parts which is not covered in warranty and DLP shall be measured in PC Sum and cost up to Rs. 500.00 shall be deemed to be included in the comprehenisve maintenance quoted cost repairs of minor components any other major components are also in the scope of Annual Maintenance Contract.(e) Cost of gaskets, metal/rubber washer, CI washer special cement and small nuts/bolts and screws required for repair shall be deemed to be included in the unit rated quoted by the contractor. 131 Comprehenisve maintenance of Solar Power Plant 0.8 MWpfor FIFTH YEAR after DLPof Ph-I of the subject work with including periodical Check up andmaintenance as per OEM recommendation& connected accessories through Authorised Original Equipment Manufacturers Service Centre Engineersor through OEM Certified Agencies as approved by GE, complete all as specified and as directed. NOTE :-(a) Service engineer will carry scheduled preventative maintenance checks on SPV as per the standard check list of the OEM. (b) Service engineer shall carry out checks on Solar Plant, as per the manufacturer’s check list and as directed by Engr-in Charge and would correct / recommend / suggest improvement in operation and performance. (c) Service Engineer during the visit will report on the performance or any other abnormality and inform parts requirement, shall also submit the report on work done and recommendations as well as spare parts offers to the concerned authority for arrangement.(d) Cost of equipment and spare parts which is not covered in warranty and DLP shall be measured in PC Sum and cost up to Rs. 500.00 shall be deemed to be included in the comprehenisve maintenance quoted cost repairs of minor components any other major components are also in the scope of Annual Maintenance Contract.(e) Cost of gaskets, metal/rubber washer, CI washer special cement and small nuts/bolts and screws required for repair shall be deemed to be included in the unit rated quoted by the contractor. 132 Prime Cost Sum. The prime cost to be used as directed by the Accepting Officer vide Condition 1 (v) and 5 of IAFW-2249 (General Condition of Contracts) forming part of the tender documents.(a) Provide a prime cost of Rs.3,00,000.00 forsupply only of spare parts required for comprehensive maintenance after expiry of DLP of Phase-I, through a BOO convened by the CWE. The spares shall procured directly from the OEMs or their aurhorised distributor/dealer as approved by GE.(b) Bidders/Contractors quoted amount shall be inclusive of his overhead and profit and including all taxes and insert amount to cover all. The Bidders/Contractors is to quote lump sum amount under Column 6 covering all the aspects mentioned here in before, representing (%) percentage under Column 9, Above/Below (+ or - denomination) the Prime Cost Sum inserted by MES under Column 5. However, the quoted amount under Column 6 shall not exceed 15% (Fifteen Percentage) of Prime Cost Sum inserted by MES under Column 5. In case, the Bidders/Contractors quoted amount is in excess of 15% of the estimated amount, the same shall be restricted to 15% (Fifteen Percentage) and the amount quoted shall be corrected accordingly to work out the contract sum. Item Continued as 70.01 133 NOTE:-Prime Cost Sum shall be governed in terms of condition 1 (v) and 5 of IAFW-2249 (General Condition of Contract) and to be regularized through Deviation Order. The following procedure shall be adopted to execute the Prime Cost Sum :-(a) Step –I Service Engineer of OEM along with site executive shall visit every month for Preventive and corrective maintenance on all the Solar Power Plant as specified in BOQ herein before, and undertake routine comprehensive maintenance and identify the list of damage / defective spare parts in Solar Power Plant. Service Engineer have to submit report to concerned Engr-in Charge and BOO before undertaking replacement/ repairs, except in case of emergency.(b) Step –II Subsequently BOO will verify the same and submit the finding to the CWE after assembly of board in terms of CA Provision for concurrence.(c) Step –III After concurrence of BOO, the Engr-in-Charge will direct the contractor and the service provider to replace the unserviceable spare parts.(d) Step –IV Serviceability certificate of Solar Power Plant duly signed by the Service Engineer, BOO findings, GST enabled purchase voucher for the replaced spare parts alongwith draft DO details shall be submitted to the GE for placing of DO’s. The advance on account shall be accompanied alongwith the said DO’s for payment.
Contract Date : 17 Mar, 2026   |   Contract Value : 6.86 Crore
Disclaimer

We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.

Tender Detail
Website https://tender.nprocure.com/
Quantity
MSME Exemption No
Tender Type Open Tender
Startup Exemption Click Here
Competitive Bidding NCB
Similar Tenders
TENDER INSIGHTS

858

Electric Tenders
Live
CLICK TO KNOW MAXIMUM WIN

Tell us about your Product / Services,

We will Find Tenders for you

🇮🇳 +91
TenderDetail
Loading tenders