Construction Of Foundation, Cable Trench, Oil Sump, Fp Wall, Equipment Foundation, Chainlink Fencing, Pipe Culvert And Misc. Civil Work At Various Live Substations Under Getco Am Division Mahuva Under Circle Office Amreli.; (A) DEMOLITION/DISMETALLING 1 Demolition including stacking of serviceable materials and disposal of unserviceable materials with all lead and lift for R.C.C. work. 30.00 CMT 1097.00 ₹ 32,910.00 2 Demolition including stacking of serviceable materials and disposal of unserviceable materials with all lead and lift for C.C. work. 20.00 CMT 632.00 ₹ 12,640.00 3 Demolition of Brick / Bella / Block work and Stone masonry including stacking of serviceable materials and disposal of unserviceable materials with all lead and lift. 20.00 CMT 571.00 ₹ 11,420.00 4 Scraping the distemper or plastic paint or other paint work from wall surface, ceiling etc., with sand papers including cleaning the scales & floor, scaffolding etc., complete as directed by E.I.C. 150.00 SMT 12.00 ₹ 1,800.00 5 Removing existing plaster work including scaffolding & throwing the stuff to any lead and lift etc. complete as directed by E.I.C. 200.00 SMT 20.00 ₹ 4,000.00 6 Removing wooden / steel frame door / window / ventilator / Rolling shutter with shutters from masonry or concrete work without damaging the same including stacking the same etc., complete as directed by E.I.C. 10 NO 195.00 ₹ 1,950.00 7 Removing the existing tiles, kotah stone from flooring / Wall and existing water proofing treatment including base concrete, throwing the stuff as & where directed up to any lead. Etc. complete as directed by E.I.C. 100.00 SMT 50.00 ₹ 5,000.00 8 Dismantling sanitary fittings like wash basin, Urinal, W.C. pan, Indian and European type flushing tank etc. including stacking the materials with all lead and lift. 11 NO 420.00 ₹ 4,620.00 9 Dismantling / Removing GI/CI pipes, G.S.W. pipes, AC/PVC rain water, GI/CI pipes with fittings clamps, excavation including stacking the materials with all lead and lift 151.00 RMT 78.00 ₹ 11,778.00 and crediting the same in GEB store etc. complete as directed by E.I.C. 10 Labour charges for removing the chainlink fencing panel with nuts & bolts from angle supports including stacking the same as directed by E.I.C. 26 NO 16.00 ₹ 416.00 11 Removing the existing fencing post P.S.C. or angle iron from concrete without damaging the post & stacking etc. complete including dressing the ground as directed by E.I.C. 27 NO 16.00 ₹ 432.00 12 Cutting out Cracks of Roofs, Walls, terrace and other places to V - Section, cleaning out, wetting, grouting with cement and sand slurry 1:3 (1-Cement, 3- Sand) including making good as directed by EIC. 50.00 RMT 69.00 ₹ 3,450.00 13 Cutting of Trees from its roots / branches only as directed by EIC. The item rate includes cutting of trees, disposal of waste outside premises of s/s up to any lead & lift, removing its roots, applying anti - weed treatment, filling the excavated pit & levelling etc. complete as directed by EIC. The item rate includes all material & labour charges to executed the work completely as directed by EIC. 30 NO 600.00 ₹ 18,000.00 (B) EXCAVATION 14 Excavation (Executed with Manual Labour) for foundation up to 1.50 m Depth including sorting out and stacking of useful materials & Refilling the sides of the trenches and disposing of the excavated stuff up to any lead - Loose or Soft soil. 168.00 CMT 210.00 ₹ 35,280.00 15 Excavation (Executed with Manual Labour) for foundation up to 1.50 m Depth including sorting out and stacking of useful materials & Refilling the sides of the trenches and disposing of the excavated stuff up to any lead - Dense or Hard soil. 180.00 CMT 270.00 ₹ 48,600.00 16 Excavation (Executed with Manual Labour) for foundation up to 1.50 m Depth including sorting out and stacking of useful materials & Refilling the sides of the trenches and disposing of the excavated stuff up to any lead - Hard Murrum. 66.00 CMT 461.00 ₹ 30,426.00 17 Excavation (Executed with Manual Labour) for foundation up to 1.50 m Depth including sorting out and stacking of useful materials & Refilling the sides of the trenches 58.00 CMT 540.00 ₹ 31,320.00 and disposing of the excavated stuff up to any lead - Soft Rock not required blasting. 18 Excavation (Executed with Manual Labour) for foundation up to 1.50 m Depth including sorting out and stacking of useful materials & Refilling the sides of the trenches and disposing of the excavated stuff up to any lead -Hard Rock. 37.00 CMT 1023.00 ₹ 37,851.00 19 Excavation (Executed with Manual Labour) for foundation from 1.50 m to 3.00 m Depth including sorting out and stacking of useful materials & Refilling the sides of the trenches and disposing of the excavated stuff up to any lead -Dense or Hard soil. 81.00 CMT 292.00 ₹ 23,652.00 20 Excavation (Executed with Manual Labour) for foundation from 1.50 m to 3.00 m Depth including sorting out and stacking of useful materials & Refilling the sides of the trenches and disposing of the excavated stuff up to any lead - Hard Murrum. 22.00 CMT 494.00 ₹ 10,868.00 21 Excavation (Executed with Manual Labour) for foundation from 1.50 m to 3.00 m Depth including sorting out and stacking of useful materials & Refilling the sides of the trenches and disposing of the excavated stuff up to any lead - Soft Rock not required blasting. 80.00 CMT 563.00 ₹ 45,040.00 22 Excavation (Executed with Manual Labour) for foundation from 1.50 m to 3.00 m Depth including sorting out and stacking of useful materials & Refilling the sides of the trenches and disposing of the excavated stuff up to any lead - Soft Rock not required blasting. 80.00 CMT 1063.00 ₹ 85,040.00 (C) CONSTRUCTION (1) CONCRETE WORK 23 Providing and laying cement concrete 1:4:8 (1 Cement : 4 Coarse and : 8 black crushed stone aggregate 40mm nominal size ) and curing complete- Foundation and plinth. 65.00 CMT 2754.00 ₹ 1,79,010.00 24 Providing form work of ply wood shuttering so as to give a smooth exposed finish including centering (adjustable tubular steel supports). Shuttering strutting and propping etc. for any height of propping and centering below supporting floor to ceiling , and removal of the same for reinforced concrete and plain concrete. for Footings, foundations and pedestal. 455.00 SMT 284.00 ₹ 1,29,220.00 .... more in document