The Subject Of The Public Contract Is The Construction Of A New Suspension Footbridge For Pedestrians In The Total Length Of The Load -Bearing Structure 59.90 M And The Total Width Of The Footbridge 2.40 M, With A Walkable Width Is 1.00 M. The Ropes Are Led Through The Saddles Of Low Pylons And Anchored To The Existing Abutment On The Left Bank And To The New Concrete Block On The Right Bank. Wooden Frames Will Be Hung On The Steel Ropes. The Walkable Area Consists Of Wooden Planks. The Footbridge Railing Is Designed Wooden With A Horizontal Fill. The Project Also Includes The Renovation Of The Hiking Trail Consisting In The Treatment Of The Forest Road On The Right Bank, Where A Reinforced Concrete Support Wall With Stone Cladding Will Be Established. On The Left Bank Of The River Will Be Modified Wooden Railing Along The Trail, Replaced Wooden Surveying Bridges Of Local Watercourse And Built A New Rest Space. Sitting At The Rock Consists Of A Table And Two Oak Wood Benches For About 4 People. These Modifications Are Not Designed In The Construction Documentation.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.