The Subject Of The Order Is The Construction Of A Municipal Nursery With Installations, Land Development And Equipment In Jamielnik. As Part Of The Intention, The Following Works Will Be Carried Out, Which Include In Particular: 1) Preparatory Works, 2) Earthworks, 3) Performing Foundations And Foundation Walls, 4) Making A Foundation For Floors, 5) Execution Of Ground Structure -External Load -Bearing Cutting Along With Warming And Loneing With Clinker Brick And Internal Load -Bearing Walls, 6) Cores, 7) Above -Ground Structure - Lin -Offs, Lintels, Wreaths, 8) Roof Structure, 9) Roof Covering, Flashings, Gags, 10) Window And Door Joinery, 11) Window And Door Joinery12) Partition Walls, 13) Making Floors And Floors, 14) Internal Wall Plasters, 15) Walls, 16) Suspended Ceilings And Roof Insulation With A Wooden Structure, 17) Outer-Coat Elements, 18) Facade, 19) Pavements And A Band, 20) Pedestrian And Road Route, Parking Lots, 21) Dumpster Shelter, 22) Pavement And Accompanying Devices, 23) Green-Extinguishing Areas, 24) Land Use (Benches, Baskets), 26) Playground, 27) Execution Of A Water Supply Connection, 28) Execution Of The Water Supply System, 29) Execution Of Sanitary Sewage System, 30) Execution Of A Sanitary Sewage Connection, 31) Rainwater Installation, 32) Ventilation Installation, 33) Purchase And Installation Of Heat Pump, 34). Electrical, 35) Installation Of Electrical Switchgears, 36) Installation Of Plug Sockets, 37) Execution Of Lightning Protection, 38) Execution Of Electrical Measurements, 39) Implementation Of Floor Heating Installations, 40) Equipment And Telecommunications Cables41) Devices For Data Transmission42) Local Computer Network, 43) Construction Works In The Construction Of Communication Lines, 44) Works In The Scope Of Electrical Installations, 45) Installation Of A Computer Wiring, 46) Installing Telecommunications Devices, 47) Construction Works In The Field Of Construction Of Communication Lines, 48) Purchase, Delivery And Assembly Of A Nursery Equipment, A Detailed Scope Of The Subject Of The Contract Is Determined By Design Documentation And The Performance Of Works.