1. Construction Industry: 1.1. Demolition Works: • Disassembly Of The Existing Scene Along With Its Facilities, • Disassembly Of Tiles On The Floor In The Vestibule And Toilet; • Dismantling Of The Existing Wooden Floor In The Main Hall Together With Filling With Trails (About Cm); • Disassembly Of Existing (3 Pcs) Doors To The Toilet And Vestibule In The Building; • Opening; 1.2. Walls Nagus: • Making Horizontal Insulation Of The Walls By The Prinz Method; • Making A Partition Wall Of The Room Facilities With Door Openings; 1.3. Construction Elements: • Installation Of Lintels (2 Pcs); 1.4. Wall And Ceiling Cladding: • Restoration Of The Ceiling With Gkf Above The Stage; 1.5. Window And Door Joinery: • Assembly Of New External Pvc Doors For Two -Leaf Entrance To The Vestibule; • Installation Of New Interior Pvc/Aluminum Doors For Toilet With Milk Glass And Ventilation Holes; • Installation Of New Internal Pvc/Aluminum Doors To The Room In The Place Of Demolished Stage With Ventilation Holes; Pvc/Aluminum From A Large Hall To The Vestibule, • Replacement Of Two Pvc Internal Window Sills (White Length 2X 1.5M) 1.6. Floors: • Leaving The Ground With A Sand Layer Up To 10 Cm; • Concrete Sleepers (Thin - Up To 10 Cm); • Insulation From Polyethylene Foil And Polystyrene. 10 Cm In The Large Hall Eps 100 And Pom. Vestibule And Toilet Gr. 5 Cm; • Concrete Floor Gr. 10 Cm, • Making A Ramp At The Stairs From The Kitchen To The Room With The Location Of The Tiles For The Exit Of A Waiter Wheelchair. 1.7. Plasters And Cladding: • Supplementing Plasters, Putty, • Location Of Ceramic Tiles In The Toilet • Location Of Vinyl Panels In The Main Room And The Resulting Facilities; 1.8. Painting: • Painting Walls And Ceiling In The Main Hall, Toilet And Vestibule; 1.9. Locksmith • Disassembly And Re -Assembly Of The Vaginal; 1.10. Hardening: • Leveling The Area Around The Building • Making The Trough For The Band And The Platform At The Main Entrance, Include The Cost Of Transport At A Distance Of 1 Km In M. Gołuszyce); • Aggregate Sleepers; • 15 Cm Concrete Foundation; • Edging (Investor Material); • Execution Of Ankle Pavements (Band And Platform) Investor Material; 2. Electrical Industry: 2.1. Execution Of The Electrical Installation In The Room Of The Room Facilities; 2.2. Execution Of Electrical Measurements; 2.3. Connection Of Air Conditioners To The Dashboard - An Even Power Distribution Into Phases3. Sanitary Industry: 3.1. Disassembly Of Sanitary Facilities In The Toilet; 3.2. Making Approaches To The Toilet And Sink; 3.3. Installation Of The Sink And Compact In The Toilet; Goods For People With Dispositions3.4. Transforming Approaches Under The Radiators In The Main Hall. The Concise Description Of The Subject Of The Contract (Annex 7 To Swz) Is Set Out In The Swz Attached To This Swz - Documentation And Description Of The Subject Of The Contract, Offer Cost Estimate/Predominant Of Works, Technical Specification And Acceptance Of Construction Works (In The
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.