Task No. 1 Renovation Of The Boiler Room. Subject: The Subject Of The Contract Is The Renovation Of The Boiler Room In The Dps Building In Klisin, The Branch In Dzbańce. The Settlement Of The Subject Of The Contract Is Flat -Rate. The Contractor Draws Up Calculation Based On These Descriptions, Requirements, Bill Of Quantities. Scope Of Work:- Disassembly And Assembly Works Of The New Oil Burner, Water Heater, Pipelines,- Replacement Of A Three-Way Valve In A Heat Pump,- Replacement Of Steel Pipes,- Assembly Of Water Treatment Plants,- Assembly Of Refrigeration,- Collection Of Installation In The Mode Provided By Udts- Other Construction Works Resulting From The Predecessors, Descriptions And Other Works And Other Works And Other Works And Other Works And Other Works Construction Necessary To Complete The Task In The Scope Of The Contractor. The Contractor Should Include Other Costs Of Works That Are Necessary To Complete The Task, Including If The Office Of Technical Supervision Is Required. A Detailed Description Of The Subject Of The Contract Includes Swz, Documentation Constituting An Attachment To Swz, Number Of Works. The Landlord Allows The Possibility Of Conducting A Local Vision In Order To Read The Facts Of The Construction Site, Workplace, Delivery, Assembly. Local Vision Is Possible To Conduct After Prior Agreement With The Contracting Authority. The Contracting Authority Provides For The Possibility Of Taking A Local Vision From Pn-Pt (On Business Days) Between From 08.30 - 13.00. Before Arrival, You Should Agree With The Dps Employee In Klisin: Tel. 77 4857593. The Reporting One Informs All Contractors That The Estimated Value Of The Contract Is Net Pln 101 282.14, Gross 109 384.71 Pln. Information Regarding The Variant Offer Referred To In Art. 92 Of The Public Procurement Law: The Ordering Party Does Not Allow The Submission Of Variants. They Are Intended Only To Indicate The Minimum Expected Parameters And The Quality Standard Of Adopted Systems And Executive Elements As Well As Supply Of Devices. In Connection With The Above, The Employer Allows Solutions And/Or Equivalent With The Same Technical And Quality Parameters Or Better. The Contractor, Who Refers To Equivalent Solutions, Is Obliged To Show That He Offers Materials, Technologies, Devices, Deliveries, Services Or Construction Works Meet The Requirements Specified By The Contracting Authority By Submitting The Relevant Documents (A List Of Equivalent Solutions Along With Its Description Or Standards Confirming This Equivalence).
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.