The Subject Of The Order Is The Replacement Of Existing Water Meters Installed In Individual Recipients In The City And Commune Of Chodecz For Radio Water Meters, Delivered By The Employer. The Scope Of The Task Includes Disassembly Of Existing And Assembly Of 1770 New Radio Water Meters. Water Meters Subject To Replacement Are Located In Buildings And Water Meter Wells. For Some Water Meters, It Will Be Necessary To Replace Another Fittings Accompanying, E.G. Reduction, Necessary For The Installation Of A Water Meter. Accompanying Fittings: Assembly, Connecting, Reduction Must Be Supplied And Installed By The Contractor. The Costs Of Accompanying Fittings Should Be Included In The Costs Of The Contract. It Is Recommended That The Contractor Conduct Local Visions Before Conducting Assembly Works. Installation Of Water Meters Will Be Implemented At Individual Recipients In Places In The City And Commune Of Chodecz According To The List Of Addresses Provided By The Contracting Authority At The Latest On The Day Of Signing The Contract. The Landlord Reserves The Right To Change Addresses From The List Of Addresses In A Situation Where There Is A Need Or Necessity While Maintaining A Total Amount Of Water Meters For Assembly In The Number Of 1770 Pieces. The Obligation To Provide Access To Replace (E.G., Transferring Furniture Or Other Equipment, Stored Fuel, Etc. Hindering Access). Entrying The Installation And Short -Term Turbulence Of Water And Determine Whether Such Interference Will Not Cause Damage To A Device With A Water Recipient. The Converter Will Dismantle The Old Water Meter And Mount A New Water Meter In Such A Way That The Water Recipient Can Read The Water Meter From The Count. When Replacing The Water Meter) In Duplicate, Which Is Annex 4 To Swz. The Contractor Transfers To The Ordering Party On The Day Of The Final Acceptance, The Dismantled Meter With The Recommendation Of The Water Meter Replacement, On Which The Last Reading Of The Removed Water Meter Appears. Elements Of Connecting And Assembly Fittings And Elements Damaged During Disassembly. Installation Of The Water Meter. All Other Preparatory Works Necessary To Perform The Water Meter Are On The Side Of The Contractor. The Contractor Alone And At His Own Expense Repairs Small Damage And Leaks Within The Valves Cutting Off The Tributary Valves Directly Before And Behind The Water Meter, E.G. Tightening Of Snaps, Replacement Of Seals Or Seals And Replacement Of Elements Damaged During Disassembly. The Contractor Is Responsible For All Leaks Resulting From The Replacement Of The Water Meter And For The Effects Of Flooding The Rooms Formed After The Water Meter Replacement. In The Event That After Replacing The Water Meter There Are Disruptions In The Water Supply System Of The Water Recipient (Announcement, Turbulence, Water Atrophy) The Contractor Should Lead It To A State Of Use. Due To The Nature Of The Subject Of The Contract (I.E. Service), It Is Abandoned From Taking Int
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.