According To The Residual Pollution Survey Conducted In May 2025 And June, The Soil Is Heavily Polluted On The Pikki 9 Property And Pollution Exceeds Both Life And Industrial Land. The Pollution Spreads Primarily In The Soil, Humus Layers And The Sandy Sandwiches, And Its Maximum Thickness Reaches Up To 5.3 Meters. The Geometric Volume Of The Pollution Site Was Modeled By Approximately 6,450 M³ Or About 10,320 Tons, Some Of Which Extend Beyond The Boundaries Of The Plot. The Study Used An Accurate 3D Model That Was Designed With Autocad Civi 3D Software Based On Geodetic Basic Data. The Analysis Revealed That In Several Points The Content Of Petroleum Products And Pah Compounds Exceeded Significantly Permitted Limits. Given The Extent Of Pollution, The Hydrogeological Conditions And The Environmental Safety, The Study Concluded That The Only Technically And Time-Consuming Solution Is The Exterior Cleaning Of The Exterminating Method-Ie The Excavation, Transport And Handling Of The Polluted Soil At The Landfill.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.