The Capacity Of The Clique Is Thrown Away From The Ground With External Production Excavators With 1.0 (1-1.2) M3, Group Of Group: 3, Drilling Of The Ground By Moving To A Distance Of 10 M, Buldozers Power: 96 (130) Kw (A.G.), Group 3 Group, Hand-Drilling In Sloped Trenches In Sloped Trenches Up To 2 M, To Add To The Time Of Each Of The Next 10 M Shipment Of Ground: 01-01-031-3, Filling Of Pits And Trenches By Changing The Place To Distance From The Ground To 5 M, The Power Of Bulldozers: 96 (130) Kw (A.G.), To Add To The Change In The Change Of Every Next 5 M Of The Ground: 01-01-034-3, Treatment Of Ground With Pneumatic Beaters, Group Group: 1, 2, The Capacity Of The Chalker Was Drilled By Excavators With 0.65 (0.5-1) M3 By Loading The Grouped By Loading The Ground In The Cars, Group: 3, Mouse-Shopping Car Kamaz 66115, 2011 15T Transportation Distance - 5 Km. 1St-Grade Load, Fulfillment Of Work On The Ground In The Soil, Group Of Group: 2-3, Construction Of Six Bases: Gravel, Correction Of Concrete Prepared Layer. (Concrete B7.5), Establishment Of The Lentvaria: When The Iron Concrete Is Up To 1000 Mm (Concrete B25), A-3 Classroom Fixture, A-1 Class Fixture
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.