Pedestal Jib Cranes - Combined Terminal Monthey: Project Container Portal Crane With Drehlafkatz. A New Container Terminal For Multimodal Envelope Is Being Built On The Workshop Of The Terminal Combiné Monthey Sa, South Of One Of The Largest Chemical Locations In Switzerland. A Multimodal Goods Handling (Train, Truck) Takes Place In The Container Terminal Terminal Combine De Monthey. In Addition To The Envelope Of Containers With Dangerous Goods/Hazardous Substances Or Water -Hazardous Fabrics, An Envelope And Storage Of Containers With Commodity And Empty Containers Also Take Place In The Container Terminal. With The Solid -Side Interpreters Of The Container Portal Cranes, A Usable Load Of Approx. 11.5 M Is Achieved. This Is Designed To Be Able To Operate The Two Railway Tracks. Within The Span Of The Container Portal Cranes Of 36.8 M, A Storage Area Container 6-Frozen, Flexible Trailer Parking Areas And 1 Truck Loading And 1 Truck Charging Track Are Arranged. With The Pendulum Support -Side Boom, A Usable Load Of 9.0 M Is Achieved. Another Storage Area For A 2-Row Container Is Provided In The Pendulum Support In The Pendulum Support. The Stacking Height Of The Containers Is 4 High Cube And Can Be Run Over With Another High Cube Container On The Crane. The New Crane Railway To Be Built Has A Length Of Approx. 250 M With A Crane -Overstretched Work Area Of Approx. 230 M In The Longitudinal Line. The Crane Railway Is To Be Built As Part Of The New Terminal Building Towards The Southeast To The Northwest With A Constant Longitudinal Gap Of 0.35%. The Base Plate Has A Slope Of 0.85%. Due To The Proximity To The Sbb Railway Line, It Must Be Ensured That The Assembly Work Does Not Intervene In The Protection Area Of The Railway Line.
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.