Arab World1,Gulf Cooperation Council, GCC,Middle East,Middle East and North Africa, MENA
01-08-2025
Work Detail
Quotation are invited for High Pressure Hydraulic Hoses Supply & Replacement (Steam System, HSU1 & HRSGs DD Hydraulic Systems) at L1 Station during TSD & Unit Shut down. TECHNICAL AND GENERAL SPECIFICATION OF OUTSOURCING WORK L1 STATION,JEBEL ALI POWER STATION.TITLE: SCOPE OF WORK FOR HIGH PRESSURE HY DRAULIC HOSES SUPPLY &REPLACEMENT (STEAM SYSTEM, HSU1 & HRSGS DD HYDRAULIC SYSTEMS).DURATION: 2 DAY (DURING EACH UNIT SHUT DOWN AND TOTAL SHUT DOWN FROMJANUARY 2026 TO APRIL 2026)THE TENTATIVE SHUTDOWN DATES ARE AS BELOWL1 TSD:- 02.01.2026 TO 11.01.2026HRSG 72:- 0 8.01.2026 TO 24.01.2026HRSG 71:- 23.02.2026 TO 26.03.2026HRSG 73:- 10.04.2026 TO 29.04.2026A.#PRE BID QUALIFICATION1.#THE CONTRACTOR SHALL VISIT THE SITE AND BE FULLY FAMILIAR WITH THEWORK SCOPE, PLANT ACCESS, FACILITIES, COMPLEXITIES, SAFETY MEASURESETC., HOSES T YPE, END CONNECTIONS ETC BEFORE HE SUBMITS HIS BID.2.#THE CONTRACTOR SHALL HAVE PAST EXPERIENCE RELATED TO SIMILARACTIVITIES. RELEVA NT DOCUMENTS TO BE SUBMITTEDB.#SCOPE OF WORK:1.#CONTRACTOR REQUIRES TO SEND THEIR REPRESENTATIVE TO GET THE DETAILSFROM SITE FOR EAC H HYDRAULIC HOSE/END CONNECTIONS ETC AND MAKE THE HOSESREADY FOR REPLACEMENT DURING SHUTDOWNS.2.#MOBILIZE MEN/EQUIPMENT AFTER GETTIN G THE PO (3 TIMES - ONE TIMEDURING TOTAL SHUT DOWN AND TWO TIMES DURING UNIT SHUTDOWNS FROM JANUARY2026 TO APRIL 2026).3.#GET PTW (P ERMIT TO WORK) AND LC (LINE CLEARANCE) DOCUMENT FROM DEWA.4.#THE FOLLOWING DOCUMENTS TO BE SUBMITTED TO GET PTW,O#METHOD STATEMENTO# RISK ASSESSMENTO#TOOL BOX TALK REPORT.5.#CONTRACTOR TO HAVE THEIR OWN ARRANGEMENT IN EXTENDING THEELECTRICITY AND WATER UTILITY TO H IS PLACES OF WORK AS PER REQUIREMENTS.6.#AFTER RECEIVING THE CLEARANCE FROM DEWA, CHECK FOR ANY PRESSURE INTHE COMPLETE SYSTEM AND E NSURE THAT THE SYSTEM IS COMPLETELYDEPRESSURIZED PRIOR TO LOOSE THE HOSE END CONNECTION.7.#BEFORE START OF WORK ENSURE AREA IS CORRE CTLY SECURED AND SAFE TOWORK ON IN ALL RESPECTS, REPORT IF ANY ISSUE / OBSERVATION TO DEWAENGINEER.8.#SLOWLY LOOSE HOSE END CONNECTI ONS AND COMPLETELY DRAIN ALL THERESIDUAL OIL FROM HOSES IN A BASKET AND AFTER THAT KEEP THE OIL INDESIGNATED DRUMS IN SPILL PALLETS. MAKE SURE THAT NO OIL SHOULD LEAKDURING DRAINING.9.#REMOVE ALL THE OLD HOSES ONE BY ONE.10.#CLEAN THE END OF PIPES/VALVES/ CYLINDER S FROM WHERE THE OLD HOSESREMOVED.11.#CHECK THE THREAD/ END CONNECTIONS PROPERLY.12.#REPLACE THE HOSES/O RING/ SEAL WITH NEW ONE.13. #CHECK THE HOSE END CONNECTIONS/DIA/LENGTH/PRESSURE RATING ETC SHALLBE SAME OR HIGHER THAN THE EXISTING.14.#THE HOSES SHALL BE FROM USA/EUROPE/JAPAN OR KOREA ONLY.15.#THE HOSES SHALL BE FROM A WELL-KNOWN MANUFACTURER ONLY.16.#HOSES PRESSURE TEST CERTIFICATE SHALL BE PROVIDED WITH MARKING OFEACH HOSE.17.#HOSES/END CONNECTIONS MATERIAL TEST CERTIFICATE SHALL BE PROVIDED.18.#PARTY SHALL VERIFY THE SIZES AND PROVIDE THE SAME HOSE AS EXISTINGAT SITE.19.#HOSES DIA/LENGTH/RATING HAVE BEEN PROVIDED IN BELOW LIST FORESTIMATION PURPOSE ONLY. EXACT DIMENSIONS AND END CONNECTIONS SHALL BEVERIFIED AND SUPPLY/REPLACE AS EXISTING AT SITE.20.#REPLACE THE HOSES WITH NEW HOSE AS PER BELOW LIST & QTY.SR##DESCRIPTION #TOTAL QTY #1#HOSE AND COUPLING KIT (2SN3/8 L=1500 DKSO12-SY+SKS12-SY,# CCIREF:TBA FOR HVP GR7.MANULI TRACTOR, 2T ISO 1436-1 EN853 2SN10WP 330 BARSAE 100R 2 AT-1 , 3/8 4780 PSI 1500MM, ONE END 1/2 MALE NIPPLE OTHER END1/2NUT . KKS 74/75LBL11AA002,74/75 LAE11AA051,74/75LBF11AA005,74/75LCE11AA051,70 LCE12AA051,74/75 LBL13AA002,74/75 LBL13AA051,74/ 75 LAE13AA051,74/75LCE11AA052,71LBH12AA005#40#2 1.#MAKE SURE THE END CONNECTION SHALL NOT BE INTERCHANGE TO DIFFERENTPORTS AND HOSE S HALL BE FIXED AT THE SAME PORT FROM WHERE IT HAS BEENREMOVED.22.#HANDOVER THE OLD HOSES TO DEWA.23.#REPLACEMENT OF ALL THE SEALS AND O-RINGS WILL BE IN THE SCOPE OFCONTRACTOR.24.#ALL DEFECTS TO BE BROUGHT TO THE NOTICE OF DEWA. DEWA ENGINEERSHALL BE CONSULTED IN C ASE OF ANY INDICATION OF DAMAGE.25.#WARRANTY OF THE HOSES REQUIRED AT LEAST 2 YEARS.26. Qty: 40 SCOPE OF WORK FOR ATTACHED FOR HIGH PRESSURE HYDRAULIC HOSES SUPPLY &REPLACEMENT (STEAM SYSTEM, HSU1 & HRSGS DD HYDRAULIC SYSTEMS). Qty: 3 High pressure Hydraulic Hoses supply & replacement (Steam system, HSU1 & HRSGs DD Hydraulic systems) at L1 station during TSD & Unit shut down for any further details please contact Mr. Nadeem Anjum 048140587 nadeem.ahmad@dewa.gov.ae STANDARD TERMS & CONDITIONS 1) Prices should be DDP delivery duty paid at DEWA stores. 2) Quotation to be submitted only in local currency U.A.E Dirhams 3) DEWA Standard payment terms is 30 days credit from the date of acceptance of material 4) No DEWA staff or his or her relatives up to third degree should have ownership or partnership in your company, and your participation in DEWA tenders / RFQs should not constitute a Conflict or perceived Conflict of Interest. Supplier Registration: https://srm.dewa.gov.ae/irj/portal/anonymous/regis Tender Link : https://srm.dewa.gov.ae/sap/opu/odata/sap/ZSRM_RFX_REG_BID_SRV/AttachmentSet(2332501896)/$value
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.