This Competition Relates To The Appointment Of An Integrated Design Team For Ucc Outdoor Sports Facilities Phase 1. The Design Team Will Be Procured Via An Integrated Design Team Approach, With The Civil And Structural Engineer Acting As The Integrated Design Team Lead. The Principal Service Providers Required To Form Part Of The Integrated Team Are • Civil And Structural Engineering Services (Cse) • Architectural Services (As). • Mechanical And Electrical Engineering Services (Mep). • Project Supervisor Design Process (Psdp). The First Phase To Be Delivered Under The Developed Master Plan Is To Include The Following Works. • Mardyke Sports Grounds Facility O The Resurfacing Of The Existing Synthetic Hockey Pitch Such That It Will Be Converted Into A Recreational Sporting Facility, That Can Be Sub-Divided By Netting. O New Changing Rooms Adjacent The Gaa Pitch (Circa 300M2) O New Boat Storage Area (90M2) O Upgrading Of The Existing Floodlight Lamp Heads To Led. • Proposed Ucc Sports Park O 2 Synthetic Soccer Pitches, Complete With Floodlighting And Perimeter Fence, O 1 Synthetic Gaa Pitch, Complete With Floodlighting, Ball Stop Netting And Perimeter Fence, O 2 New Water Based Synthetic Hockey Pitches, Complete With Floodlighting And Perimeter Fence, O Standalone Equipment (90M2) And Maintenance Stores Area (90M2), O New Modular Changing Rooms (Circa 6-8 Dressing Rooms, Circa 400M2) O All Associated Site Infrastructure, Including Roads, Paths, Parking, Drainage Utilities, Biodiversity Spaces Etc. • The Curraheen Sports Grounds (The Farm). O Installation Of New Led Floodlights To Three Pitches, O Upgrading Of The Existing Floodlight Lamp Heads To Led To Three Pitches; And O New Modular Changing Rooms (Circa 6-8 Dressing Rooms, Circa 400M2)
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.