Architectural, Construction, Engineering And Inspection Services - Tnw_Hls_Stadt Rain_Neubau Feuerwehrhaus. The City Of Rain Intends The Construction Of A New Fire Station With 12 Trips Including Washing Hall, A Cold Hall And An Exercise Tower. The Size Of The Fire Service Equipment House Results From The Requirements From The Fire Department Requirements Plan. Due To The Building Class, Timber Construction Is Out Of The Question. A Possible Expansion Of 1-2 Trips Should Be Taken Into Account In The Design Planning, However, Detailed Planning For This Is Not The Content Of The Order. The Measure Is To Be Funded According To The Fire Brigade Allowance Guideline Fwzr. The Available Plot Of Land No. 1334/2 Is Located East Of Rain On Neuburger Str. / Schlehenstraße. The Property Has A Size Of 10,000 M². The Property Was Selected After The Recommendation Of The Location Analysis From September 2023. This Has Not Yet Been Conclusively Clarified With Regard To The Access Situation. The Owner Of The Neighboring Property Hall No. In 1334, A Walking Law Was Granted (See Appendix 4). This Would Have To Be Taken Into Account When Planning. An Alarm Access Is Created On Neuburger Strasse, Which Is To Be Provided With A Gate That Only Opens With Alarm. There Is Still No Decision For The Approval Of The Road Construction Office In The Access To The Neighboring Building. In Addition, Two Trips With One Goal Are Planned In Schlehenstraße - An Exit For The Emergency Vehicles And An Exit For The Secure Operating Driveway. For The Land No. In 1334/2, A Development Plan Is Drawn Up After The Design Planning, This Must Be Taken Into Account When Planning In Time After Completing The Lph. 2 If The Development Plan Is Created And Decided, So That A Temporal Turning Point Will Take Place Here. The Temporal Turning Point Here Is Currently Not Estimated. The Completion Of The Building Is Planned For The End Of 2028. The Size Of Total Costs (Kg 200-700) Of Almost Eur 12 Million Is Gross. Structural Plants The Fire Station Gets 12 Trips. These Are To Be Created According To Din, 11 Of Which Must Be Equipped With A Suction System And A Assembly Trove Must Be Planned. During The Exit With The Washing Hall, A Room For The High -Pressure Cleaner And For Cleaning Agents Must Be Provided. The Attached Space Program Can Be Found In The Overview Of The Structural Systems (See Appendix 2). With Regard To The Cold Hall And The Exercise Tower, The Implementation Is Still Dependent On The Total Costs Of The Project. The Lph. 1-2 Must Be Provided Over All Objects. However, After Completing The Lph. 2 It Emphasizes That The Costs For The Overall Project Are Too High, The Client Reserves The Right To Put The Cold Hall And The Exercise Storm Back For The Time Being And Only To Continue The Implementation Of The Fire Station Itself. If This Is The Case, The Lph. 3 Then Several Construction Phases Formed, Which Are Then Also Remunerated Separately. The Tube Washing System: A Gossiping System Has Already Been Made By De
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.