Construction Project Management Services-Project Control And Bim Management As Well As Total Entrepreneur/Total Acceptance Controlling-Chesco. The Project Includes The Turnkey Planning And Construction Of The Research Center In The Form Of Three Functional Units (Test Center-Tc, Approx. 7.062.00 M² Nuf 1-6; Fast-Make Electrification Research Center-F-Mercent, Approx. 7,263.00 M² Nuf 1-6; Research Center-Rc, Approx. 3,354.00 M² Nuf 1-6) Infrastructure Measures And Outdoor Facilities (Ia) On The Site Of The Technology And Innovation Park (Tip), The Former Cottbus Airport, Which Offers Space For An Approximately 52 Ha Construction. The Procurement Authority Comes From A Calculated Investment Volume As Follows: Kg 200: Net Eur 4,182,910.71; Kg 300: Net Eur 52,532,877,14; Kg 400: Net Eur 34,924,049.29; Kg 500: Net Eur 7.805,032.86; Kg 600: Net Eur 67,945,234.06; Kg 700: Net Eur 22,076,602.61. For The Project Control Services, All The Necessary Services From The Performance And In All Performance Areas Based On Aho Issue 9 2020 And The Project Control Performance Bim Are Included In Project Preparation, 2 Planning, 3 Execution, 4 Execution And 5 Project Completion. The Scope Of Claims Of The Individual Project Levels Is Described In The Task And Corresponds To The Versions In Accordance With Aho Issue 9, 2020. In Addition To The Basic Project Control For The Use Of Bim, All Necessary Bim Management Services Must Also Be Provided As Special Services Based On The Given Client Information Requirements And The Bim Application Cases. In Order To Ensure, In Particular For Monitoring And Enforcing The Quantitative, Qualitative, Scheduled And Cost Requirements, Goals Of The Client And Obligations In The Desired Total Or Total Acceptance Procedure, As Well As After The Contract Is Concluded For The Subsequent Planning And After Further Retention In The Following Execution, Test, Commissioning As Well As Acceptance And Warranty Phase Are Also In The Interest To Provide Partial Services Of The Hoai And, Based On Their Modified Models, Buildings And Interiors As Well As Technical Equipment And Outdoor Facilities In The Performance Phases 7-9. The Participation In The Preparation And Implementation Of The Tu/Tü Award Is Mandatory. Within The Performance Of The Technical Equipment, The Controlling Of The User -Specific System Technology, Which Can Be Provided In Particular By The Tu/Tü, Is Of Particular Importance. General Project Description: Establishment Of A Center For Researching, Manufacturing And Testing Components And Systems For Electrical, Hydrogen And Saf (Sustainable Aviation Fuel) Operated As Well As Hybridelectric Drives And Systems For The Traffic And Transport Area, In Particular Promoted The Air Traffic Sector With Means From The Strong And Federal Program (Strengthening The Transformation Dynamics And Departure In The Renovation And At The Coal -Fired Power Plant