GTR 99808285

Tenders Are Invited For Solar Installation - Assembly Of A Photovoltaic Installation For: A) Continuing Education Center No. 5 At Ul. Mińska 1/5 In The Praga-Południe District In Warsaw; B) Vocational Training Center No. 1 At Ul. Berka Joselewicz 4 In The Praga-Południe District In Warsaw; C) District Education Finance Office At Ul. Grochowska 262 In The Praga-Południe District In Warsaw.

ICB — International Competitive Bid Closed central europe
Tender Information
GTR Reference
99808285
Tendering Authority
Subscribe to view
Tender No
492084-2025
Financer Name
Self-Funded
Work Title
Tenders Are Invited For Solar Installation - Assembly Of A Photovoltaic Installation For: A) Continuing Education Center No. 5 At Ul. Mińska 1/5 In The Praga-Południe District In Warsaw; B) Vocational Training Center No. 1 At Ul. Berka Joselewicz 4 In The Praga-Południe District In Warsaw; C) District Education Finance Office At Ul. Grochowska 262 In The Praga-Południe District In Warsaw.
Bid Type
ICB — International Competitive Bid
Country
Subscribe to view
Geographical Region
central europe
Political Region
European Union
Last Date of Bid Submission
25-08-2025 Closed
Work Detail
Solar Installation - Assembly Of A Photovoltaic Installation For: A) Continuing Education Center No. 5 At Ul. Mińska 1/5 In The Praga-Południe District In Warsaw; B) Vocational Training Center No. 1 At Ul. Berka Joselewicz 4 In The Praga-Południe District In Warsaw; C) District Education Finance Office At Ul. Grochowska 262 In The Praga-Południe District In Warsaw.. 1. The Subject Of The Order Is The Task: Installation Of A Photovoltaic Installation In Buildings Of The Continuing Education Center And Vocational Training Center And Installation Of A Photovoltaic Installation In The Building Of The District Education Finance Bureau At 262 Grochowska Street • Installation Of A Photovoltaic Installation At The Center For Continuing Education No. 5 At Ul. Mińska 1/5 In The Praga-Południe District In Warsaw; • Installation Of A Photovoltaic Installation At The Vocational Training Center No. 1 At Ul. Berka Joselewicz 4 In The Praga-Południe District In Warsaw; • Installation Of A Photovoltaic Installation In The District Education Finance Office At Ul. Grochowska 262 In The Praga-Południe District In Warsaw. 2. Requirements For Project Documentation And Implementation: • Architectural Inventory To The Extent Necessary For The Proper Implementation Of The Project, • Conducting An Inventory Of Existing Building Electricity Devices, • Technical Opinion Regarding The Need To Replace The Main Current Switch, • Photovoltaic Installation With Dc Power In The Range Of 49 - 50 Kwp On The Roof Of The Census Building No. 5 At Ul. Mińska 1/5, • Solar Installation With Dc Power In The Range Of 27 - 28 Kwp On The Roof Of The Building Of The Vocational Training Center No. 1 At Ul. Berka Joselewicza 4, • Photovoltaic Installation With Dc Power In The Range Of 40 - 41 Kwp On The Roof Of The District Building Of The Education Finance Bureau At Ul. Grochowska 262, • Plan For Distributing Photovoltaic Panels On The Roof Surface Of The Building, • Description Of The Recommended Method Of Installation Of Panels, • Mounting Structure And Strength Calculations For The Designed Installation, • The Photovoltaic Installation Will Be Connected To The Electrical Installation Of The Building, • Complete Simulation Of Installations Based On Popular Simulation Programs, • Generators Will Be Connected To The Inverter/Inverters Three -Phase, Which Will Convert A 400 V Dc, • Execution Or Adjustment Of The Buildings Lightning System, Taking Into Account The Installed Elements Of The Solar Installation, • Expansion Or Reconstruction Of Nn Main Switchgears In The Scope Of Connecting Pv Installations And The System Blocking System, • Supplying The Lan Network From Inverters To The Place Agreed With The Users Representative. In The Absence Of A Fiber Optic Connection Or The Inability To Send Data From Inverters To The Internet Network, The Contractor Will Mount A Router With A Sim Card. Determining Internet Access Should Be Made At The Design Stage, Which Must Be Confirmed By A Relevant Note With A Representative Of The User And The Ordering Party, • Lan Devices Covered By The Nis2 Directive For The Information Security Management System Must Meet Its Requirements, • If Necessary, Obtaining Connection Conditions, From E.On Polska S.A. For Photovoltaic Installation Of Facilities, • Agreeing On Documentation To The Necessary Extent At Stoen Operator Sp. Z O. O., • Agreeing On The Documentation In The Necessary
Key Value
Tender Value
Ref. Document
Tender Documents
Global Tender Document
c091222a-9d28-4620-80a7-09bfff8fd035.html
Attachments
Additional Details Available on Click
  • Tendering Authority
  • Publication Document (Tender Document / Tender Notice)
Disclaimer

We take all possible care for accurate & authentic tender information. However, users are requested to refer to the original Tender Notice / Tender Document published by the Tender Issuing Agency before taking any decision regarding this tender.

Tell us about your Product / Services,

We will Find Tenders for you

TenderDetail
Loading tenders