Ventilation And Air-Conditioning Installation Work-Refurbishment And Expansion Karl-Braucmann-School: Ventilation Ba1. For Construction Phases 1, The Listed Ventilation Systems Are Planned For The Following: - Ventilation System 1: Administration Component A (Volume Current 1,730 M3/H) - Ventilation System 2: Toilet Building A (Volume Current 610 M3/H) - Ventilation System 3: Class Building A (Volume Flow 3,000 M3/H) - Ventilation System A (Kitchen/Cafeteria Building 1.900 M3/H) - Ventilation System 5: Sports Hall (Volume Current 2,000 M3/H) - Ventilation System 6: Covering (Volume Flow 1,680 M3/H) - Ventilation System 9: Forum Buildings B (Volume Current 1,820 M3/H) - Calcular Engineering - Split Climate System Technology Rooms
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.