Secondary School Construction Work - Realschule Eggenfeldern Ba 5, Architectural Work. Construction Site Device Demolition Work - Demolition Walls, Levels And Tar Areas In The Outdoor Area - Remove Approx. 140M³ Upper Floor - Approx. 210M³ Excavation Excavation - Approx. 177M³ Outburst Of Fundamental Excavation - Approx. 175M³ Excavation Depth. Foundation - All Earthworks For Basic Pipes - Basic Lines Under The Floor Slab - Basic Lines Outside The Building - Refritional Removing Savings Of Concrete And Reinforced Concrete Work - Approx. 175M³ Lean Concrete Deeper Foundations - Approx. 77M³ Strip Foundations - Approx. 125M³ Floor Slab - Approx. 5M³ Retaining Wall Insulation And Sealing Work - Approx. 500M² Bituminous Welding Track - Approx. 156M² Bitum Thickness Coating - Approx. 156M² Perimeter Insulation Demolition/ Wall Work - Breakout. Doors, Floor Coverings, Suspended Ceilings - Demolition Of Drywall Walls, - Demolition Steel Supports - Demolition Of Existing Wind Traps - Making Breakthroughs And Core Holes - Close Door Openings, 2 Pieces - Make Door Openings, 2 Pieces - Make Window Openings, 4 Pcs. Steel Construction Work - Steel Carriers In Different Profile Types For Static Upgrading, Approx. 95M
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.