1) The Subject Of The Order Is The Construction Of A Water Pumping Stations Together With The Necessary Accompanying Infrastructure In Chojne, Journal Of Laws, No. 1048/36 And 311, Chojne Region, In The Sieradz Commune. The Scope Of The Order Includes In Particular: - Construction Of A Water Pumping Plant With A Pump Kit With Armament, - Construction Of Two Steel Above -Ground Water Retention Reservoirs, - Construction Of A Foundation For Power Generators, - Strengthening The Area By Making Internal Roads And Bands Around The Building And Water Tanks With A Pavement Of Concrete Cobblestones Together With The Exit To The Object. Poviat,- Fence Of The Object In The Panel Fence System On The Prefabricated Concrete Foundation With The Entrance Gate And The Gate From The Fence Panels In The Steel Frame,- Necessary Accompanying Infrastructure In The Form Of: Water Pipelines From Pehd Pipes, Sewage Pipelines From Pvc Pipes, Tight Tanks For Sanitary Sewage And Sanitary Sewage Tanks Technological, Outlet Of The Pipeline To The Roadside Ditch For Transfer And Trigger From Tanks, Power Cables In The Form Of An Internal Line Of Supplying Water Pumping Storage As Well As Control And Signaling Cables For Elements Of Water Pumping Storage. The Technology Hall Is 24.00M2, Within The Facility A Separate Room Of The Pump Hall With A Usable Area Of 15.82M2, A Toilet Room With An Area Of 3.08M2, A Chloride Room With Complete Equipment With A Usable Area Of 3.08M2.- Hydrophore Set With A Capacity Of 36.0 M³/H And Lifting Height 45.0M.- Two Retention Tanks With Capacity With Capacity V = 150M³ Each With A Steel Structure At A Total Height Of 10.5M And A Diameter Of 4.5M With Insulation Of A 10 Cm Thick Mineral Wool Protected With A Coat Of Powder -Painted Trapezoidal Sheet The Proceedings Undertakes To Grant A Minimum Of 36 -Month Warranty Period From The Date Of Failure Final Acceptance For The Construction Works Performed, With Mounted Devices In Accordance With Warranty Cards, With The Proviso That The Date Of The Deadline From Warranty Cards Will Not Start Earlier Than 60 Days Before The End Of The Final Acceptance. Warranty Period Equal To The Warranty Period. The Warranty Period Is A Criterion For Evaluation Of Offers6) A) The Contracting Authority Requires Employment Under An Employment Contract, Within The Meaning Of The Provisions Of The Act Of 26 June 1974, Labor Code (I.E., Journal Of Laws Of 2025, Item 277, As Amended) By The Contractor Or Subcontractor Of Persons Performing The Activities Indicated Below During The Order:- Service Of Devices, Machines And Equipment Pressure Raising Stations, Installation Works, Roads And Internal Squares As Well As Exit, Fence Of The Area (This Obligation Does Not Apply To The Construction / Works Manager),- Activities Related To The Performance Of Cleaning Works.B) Detailed Requirements For The Implementation And Enforcement Of The Employment Requirement Under The Employment Contract Were Specified In The Contract Templa
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.